6-D16mm DETAIL PEDESTAL

∅8mm-150mm
1 : 25

IWF 350x175x7x11 mm
4∅25 mm x 900 mm
ANCHOR BOLT

Base plate 20 mm thk 4-D16mm


2-D10mm
CONCRETE K225 c/w
W'MESH M8 (2 LAYER) ∅8mm-150mm
floor ± 0.00
m.t.a - 0.125

Lantai kerja 1:3:5

Balok Sloof 200


400mm

6-D16mm

∅8mm-150mm

∅12mm-150mm

Lantai kerja 1:3:5

SECTION 1 - 1
PONDASI SETAPAK
1 : 25

4-D16mm
2-D10mm Sloof 200
400mm
∅8mm-150mm

DETAIL SLOOF 1 1
D16-150mm

1 : 25

Sloof 200
400mm

D16-150mm

DETAIL - 1
1 1 PONDASI SETAPAK
parit selasar

1 : 25
lantai
selasar

Key Plan DETAIL - 1

PROJECT TITLE & LOCATION DATE 09/11/2016 NO DATE REVISION

BSS PMKS
PT SRI ANDAL LESTARI
DESA TJ LAUT KEC SUAK TAPEH
DRAWN
DESIGN
EKO S
EKO S
CHECK FETRIAN / KEVIN S

GROUP KAB BANYUASIN


SUMATRA SELATAN

DRAWING TITLE
APPROVE
DWG SCALE
WILSON SUTANTIO
AS SHOWN/TERTERA
DEPT TEKNIK DWN NO dwg/pmks pt sal/composting/11/16
- CIVIL ENGINEERING - COMPOSTING BUILDING SHEET NO 02-A/14
HEAD OFFICE
PALEMBANG PAPER SIZE A3

You might also like