You are on page 1of 1

A B C D

SCHEDULE OF TIE BEAM


BEAM BEAM STIRRUPS
2.54 2.66 3.00 2.15 AT LEFT SUPPORT AT MIDSPAN AT RIGHT SUPPORT
DESIGNATION SIZE DIAM.ø SPACING (mm)
200 200 200
2 - 16MMø 2 - 16MMø 2 - 16MMø
200MM 1 @ 50MM, 6 @ 100MM,
FTB - 1 10MMø

300

300

300
X 300MM 4 @ 150MM, REST @ 200MM O.C.
RB-1 RB-1 2 - 16MMø 2 - 16MMø 2 - 16MMø
5
RB-1

RB-1

RB-1

3.20
RB-1 RB-1
4 400 SECTION
150 100 150

2.00
SEE COLUMN DETAILS SEE COLUMN DETAILS

RB-1 RB-1
3 NAT. GROUND LINE

500
BACK FILL

700
3.80
RB-1

RB-1

RB-1
100mm THK. GRAVEL BASE

100 250

100
GRAVEL BASE GRAVEL BASE
GRAVEL BASE
RB-1
2
RB-1

RB-1

RB-1

1.70
SECTION
1
RB-1 RB-1
PLAN

300
3.15

REINFORCEMENT BARS:

W
SP @ 300MM - 10 mm. ø width
3 - 12 mm. ø length
ROOF BEAM FRAMING PLAN INTERIOR WALL FOOTING DETAIL
L L
PLAN
WALL FOOTING DETAIL TYPICAL FOOTING TIE-BEAM DETAIL
300

300
#16
300

300

COLUMN SECTION DETAIL TYPICAL BEAM DETAIL


SCHEDULE OF COLUMNS

SHEET NO.
MATA, CHRISTIAN JAY M UNIVERSITY OF MINDANAO PROPOSED 2-STOREY RESIDENTIAL BLDG.

ENGR. REY ALBERT CABOTAJE LOCATION: MATINA DAVAO CITY SOFTWARE APPLICATION FOR CE S-2