You are on page 1of 1

200

100mm THICK SEPARATION


WALL

Y8-01-150 T/B
200mm THICK RC SHEAR WALL
T10@150mm

100ø RTR PIPE WORK


CHAMBER 1 CHAMBER 2 CHAMBER 3
100

2,600
2,200
2,600

500
700

INLET OUTLET
100

100
600
700 Y8-01-150 B/T
200

3900
100 100
200 1,100 1,100 1,100 200 OIL SEPARATOR GROUND SLAB
3900 SECTION
OIL SEPARATOR
SECTION (1) SCALE: 1:18
IRON COVER
ON MANHOLE(500*500mm)

150mm THICK RC COVER SLAB


150

T12@150mm

200
Variable

100mm THICK SEPARATION


WALL

OUTLET

Variable
INLET
T10--02-150(Hor)
100ø RTR PIPE WORK
900

800

200mm THICK RC SHEAR WALL T10--02-150 (NF)


T10@150mm
500

BENCHING FINISHED
300

T10--02-150 (FF)
WITH 10mm THICK

900
300
EPOXY MORTAR 150mm THICK REINFORCEMENT Y8-150 T
50 200

CONCRETE BASE SLAB


T8@150mm
T10--02-150(Starters) Y8-150 B
100 100 50mm THICK CONCRETE
200 1,100 1,100 1,100 200 BLINDING
50mm concrete

350
3900
blinding
200

50
OIL SEPARATOR 600 L
SECTION (2) OIL SEPARATOR GROUND SLAB
REINFORCEMENT
SCALE: 1:18

SCALE: 1:18

DESIGN CONSULTANTS: STRUCTURAL & MECHANICAL PROJECT NAME: DRAWING DESCRIPTION PROJECT ADRESS:
ENGINNER: DETAILS

Drawings prepared by Architects and Engineers from: DISTRICT: KICUKIRO DRG NO:
PROPOSED PETROL STATION SP LTD.
SECTOR: KANOMBE CLIENT:
SP REMERA II DRAWN BY: Eng. ENOCK Tuyishime
KFC Cell: KABEZA
OIL SEPARATOR SECTION CHK'D BY: Arch. Apiane NDORIMANA

SCALE:
DATE: 5/24/2018
GSPublisherVersion 0.0.100.100