SCHEDULE OF BEAMS
WIDTH DEPTH MIDSPAN SUPPORT
SECTION mm mm TOP BOT TOP BOT STIRRUPS
B-1 200 400 2 4 4 2 10 Ø 1 @ 0.05, 10 @ 0.10 O.C REST @ 0.20 O.C
B-2 200 400 2 3 3 2 10 Ø 1 @ 0.05, 10 @ 0.10 O.C REST @ 0.20 O.C
WF 400 200 RB - 3 - 10 Ø LONG BARS 10 Ø TIES @ 0.25 O.C 10 Ø 1 @ 0.05, 10 @ 0.10 O.C REST @ 0.20 O.C
SCHEDULE OF COLUMNS
FOUNDATION
3RD - 4TH 4TH - DECK
TO 3RD FLOOR
COLUMN SIZE, mm 300 x 500 300 x 400 300 x 400
4 - 20 ØRSB
VERTICAL BARS 8 - 16 ØRSB 8 - 16 ØRSB
2 - 16 ØRSB
10 Ø 1 @ 0.05, 10 @ 10 Ø 1 @ 0.05, 10 @ 10 Ø 1 @ 0.05, 10 @
TIES 0.10 O.C REST @ 0.10 O.C REST @ 0.10 O.C REST @
0.20 O.C 0.20 O.C 0.20 O.C
2 - 20 Ø 8 - 16 Ø 8 - 16 Ø
500
400
500
SECTION DETAILS 2 - 16 Ø
2 - 20 Ø
300 300 300
2 - 16mm Ø
400
2 - 16mm Ø
2 - 16mm Ø
200
FTB - 1