You are on page 1of 1

25 MM DIA @300 (BENT UP)

10 MM DIA @ 150 (DIST. BARS) 12 MM DIA @ 250 (STRAIGHT)

500 4000 500

16 MM DIA @250 M - 25 A 20

500
(HAUNCH)
16 MM DIA @ 200 25 MM DIA @ 150

150
(BENT UP ALTERNATIVE BAR )

150

20 MM DIA @ 125 16 MM DIA @ 200

5000
25 MM DIA @ 150
(BENT UP ALTERNATIVE BAR ) 150

150

500
100
12 MM DIA @ 250
10 MM DIA @

100
150 (DIST. BARS)
(STRAIGHT BARS)
25 MM DIA @ 300
M -15 A 40
(BENT UP)
5200
REINFORCEMENT DETAIL OF RCC BARREL
L/4 L/4 DIMENSION DETAILS OF RCC BARREL
45°

NOTES:- DETAILS OF BENT UP(L-CLEAR SPAN)


1. ALL THE DIMENTION I ARE IN MILLIMETERS AND THE SAME MAY BE ROUNDED OFF TO ITS NEAREST VALUE FOR CONSTRUCTION EASINESS
2. FOUNDATION CONCRETE IN ALL COMPONENT OF STRUCTURE WILL BE NORMAL M-15 WITH 40 MM GRADED B.T. METAL
3. THE REINFORCEMENT SHALL BE DEFORMED BAR GRADE Fe 500 CONFORMING TO IS 1786-1979.
3.1 ALL MAIN REINFORCEMENT WILL BE PLACED WITH CLEAR COVER OF 50 MM UNLESS OTHERWISE SPECIFIED.
3.2 OVER LAP IN THE MAIN REINFORCEMENT WILL BE OF LENGTH 40 X (DIA OF LARGER BAR)
4. THE REINFORCEMENT STEEL USED SHALL BE HIGH YIELD STRENGTH DEFORMED BARS CONFIRMING TO IS 1786-1966 & IS 1139 -1966
5. THE REINFORCEMENT SHALL BE BENT & FIXED IN ACCORDANCE TO THE PROCEDURE SPECIFIED IN 786-1979 & 2502-1963
6. FOR THE LAP LENGTH, BOND LENGTH, SPACING OF REINFORCEMENT, WELDING ETC. REFERENCE TO BE MADE TO BE RELEVANT CLAUSE OF OF IS 456-2000
7. THE DESIGN CALCULATION ARE BASED ON THE ASSUMPTION THAT THE ANGLE OF INTERNAL FRICTION OF THE FILL IS 30° AND DENSITY 1.8 TON /M³
8. IF FULL LENGTH BARS ARE NOT AVAILABLE JOINTS HAVE TO BE OVERLAPPED AS PER IRC CLAUSE NO. 304.6 OF IRC - 21 OVERLAPPING OF BAR SHALL BE SUTABLE STAGGERED.
9. SUPPORT CHAIRS OF SUTABLE DIAMETER BARS SHALL BE PROVIDED TO SUPPORT REINFORCEMENT
10. CONCRETING OF THE R.C.C SLAB OR TROUGH IN A BAY SHALL BE DONE IN THE DIRECTION IN WHICH IT SPANS.
11. CONCTRUCTION JOINT IN BARREL SHALL BE PROVIDED AT 50 M C/C.
12. VERTICAL WALLS OF TROUGH FOR THE BOX SHALL BE CAST IN ONE POUR AS FOR AS POSSIBLE.OTHERWISE WATER TIGHT CONSTRUCTION JOINTS SHALL BE PROVIDED.
13. THE SHUTTERING OF BOTTAM SLAB AND WALLS SHALL NOT BE REMOVED BEFORE 21 DAYS FROM CASTING OF THE VERTICAL WALLS.
12.1 FLOOD DAMAGES DURING CONSTRUCTION CASE SHOULD BE TAKEN AS PER PROCEDURE LAID DOWN IN IS 9913-2009.

You might also like