3350 3350

175 3000 175 175 3000 175

10mmØ@100mm c/c 10mmØ@100mm c/c 32mmØ MS SLEEVE


(VERTICAL BAR) P (HORIZONTAL BAR) FOR INLET PIPE
P 600

175

175

150
MANHOLE
600

150
10mmØ@100mm c/c 2 NOS.-10mmØ BAR

300

0
(VERTICAL BAR) (EXTRA BAR)

60
300

600
600
10mmØ@100mm c/c

600
(HORIZONTAL BAR)

10mmØ @150mmc/c
10mmØ @150mmc/c

600
(BOTTOM BAR)
MANHOLE 60
0

(TOP BAR)
600 150 600
10mmØ@100mm c/c 150 2 NOS.-10mmØ BAR
(VERTICAL BAR) CEMENT PLASTER (1:3) WITH (EXTRA BAR)

60
NEAT CEMENT PUNNING

0
AFTER TWO COAT OF

0
60
WATER PROOFING COAT
3100
2750

10mmØ@100mm c/c

3100
2750
(HORIZONTAL BAR)
300

10mmØ @150mmc/c
(TOP BAR)

10mmØ @150mmc/c
(BOTTOM BAR)
300
175

175
PLAN 32mmØ MS SLEEVE
COVER SLAB PLAN
P FOR DELIVERY PIPE P
(RESERVOIR WATER TANK) (RESERVOIR WATER TANK)
(CAPACITY = Max.12000 LITER) SCALE = 1:25
SCALE = 1:30 (CONCRETE GRADE =M20)
(CONCRETE GRADE =M20)
32mmØ MS SLEEVE 10mmØ@150mm c/c
FOR INLET PIPE 150 600 MANHOLE (BOTHWAYS) TOP AND BOTTOM LAYER

150
GROUND LEVEL
300

GROUND LEVEL
300

FREE BOARD (WATER LEVEL)

2750
CEMENT PLASTER (1:3) WITH 32mmØ MS SLEEVE
1975

10mmØ@100mm c/c NEAT CEMENT PUNNING AFTER FOR DELIVERY PIPE


(VERTICAL BAR) TWO COAT OF WATER PROOFING COAT
10mmØ@100mm c/c
1675
2000

10mmØ@100mm c/c (VERTICAL BAR)


1375
1700
600

600

(HORIZONTAL BAR)
10mmØ@100mm c/c
(HORIZONTAL BAR)
10mmØ@100mm c/c
300 (EXTRA BAR) 300
10mmØ@100mm c/c
10mmØ@100mm c/c (BOTH WAYS)
300

300

(HORIZONTAL BAR) (TOP BARS)


175
200 75

10mmØ@100mm c/c
CEMENT PLASTER (1:3) WITH NEAT CEMENT PUNNING
(BOTH WAYS)
AFTER TWO COAT OF WATER PROOFING COAT
(BOTTOM BARS)
175mm THICK R.C.C. SLAB
75mm Thk. P.C.C.(1:3:6)
SECTION AT P-P 200 mm THICK BOULDER SOLING
(RESERVOIR WATER TANK) COMPACTED EARTH
SCALE = 1:30
(CONCRETE GRADE =M20)