You are on page 1of 1

SCHEDULE OF BEAMS & GIRDERS f 'c = 41 MPa (6,000 psi)

12mm Ø & SMALLER REBARS fy = 276 MPa (40,000 psi.)


SCHEDULE OF BEAMS & GIRDERS f 'c = 41 MPa (6,000 psi)
12mm Ø & SMALLER REBARS fy = 276 MPa (40,000 psi.)
16mm Ø & LARGER REBARS fy = 414 MPa (60,000 psi.) 16mm Ø & LARGER REBARS fy = 414 MPa (60,000 psi.)
STIRRUPS "AA" (10MMØ) STIRRUPS "A" (10MMØ) STIRRUPS "B" (10MMØ) STIRRUPS "C" (10MMØ) STIRRUPS "D" (12MMØ) STIRRUPS "E" (2-12MMØ)
REINFORCEMENTS
1 @ 50 mm 2 @ 50 mm 4 @ 50 mm 2 @ 50 mm 2 @ 50 mm 2 @ 50 mm DIMENSION NO. OF PIECES SPACING
BEAM GRID LENGTH MAIN REBAR WEB
2 @ 100 mm 3 @ 100 mm 5 @ 100 mm 10 @ 100 mm 10 @ 100 mm
BXD LEFT SUPPORT MIDSPAN RIGHT SUPPORT OF REMARKS
8 @ 100 mm MARK LINE (M) Ø (MM) BAR
(MM X MM) TOP BOTTOM TOP BOTTOM TOP BOTTOM STIRRUPS
2 @ 150 mm 4 @ 150 mm 6 @ 150 mm 8 @ 150 mm 10 @ 150 mm 10 @ 150 mm BAR BAR BAR BAR BAR BAR
REST @ 250mm O.C REST @ 250mm O.C REST @ 250mm O.C REST @ 250mm O.C REST @ 250mm O.C REST @ 250mm O.C
2RMB - 8A - 3.20 300 X 500 20 4 2 2 3 2 2 B CURVED

REINFORCEMENTS
DIMENSION NO. OF PIECES SPACING 2RMB - 9A - 4.60 250 X 500 16 2 2 2 5 2 2 B CURVED
BEAM GRID LENGTH MAIN REBAR WEB
BXD LEFT SUPPORT MIDSPAN RIGHT SUPPORT OF REMARKS
MARK LINE (M) Ø (MM) BAR 2RMB - 10A 3- 5.50 300 X 500 20 2 2 2 4 5 2 C CURVED
(MM X MM) TOP BOTTOM TOP BOTTOM TOP BOTTOM STIRRUPS
BAR BAR BAR BAR BAR BAR - 5.70 300 X 500 20 5 2 2 4 2 2 C CURVED

RAMP BEAMS (GROUND TO SECOND) 2RMB - 11A - 6.30 300 X 600 20 2 2 2 5 2 2 2 Ø 10 C

RMB - 1A -A 1.60 200 X 500 16 4 2 4 2 4 2 A 2RMB - 12A 1' - 2 10.60 300 X 800 25 2 2 2 8 2 2 2 Ø 10 C

RMB - 2A 1 - 1' 4.00 250 X 500 16 2 2 2 5 2 2 B 2RMB - 13A 1-2 13.20 400 X 800 25 2 4 2 10 2 4 2 Ø 10 C

RMB - 3A -A 3.70 250 X 500 16 2 2 2 5 2 2 B 2RMB - 14A B-A 9.20 400 X 800 25 2 3 2 9 2 3 2 Ø 10 C

RMB - 4A - 6.00 200 X 500 16 2 2 2 5 2 2 B 2RMB - 15A -A 7.50 400 X 600 20 2 2 2 6 2 2 2 Ø 10 C

RMB - 5A - 1.70 200 X 500 16 2 2 2 2 3 2 B 2RMB - 16A 1-2 12.00 400 X 800 25 6 3 2 12 8 4 2 Ø 10 D
-B 3.20 200 X 500 16 3 2 2 2 3 2 B 2-3 12.00 400 X 800 25 8 4 2 4 9 4 2 Ø 10 D
B- 2.20 200 X 500 16 3 2 2 5 2 2 B 3-4 11.86 400 X 800 25 9 4 2 14 6 4 2 Ø 10 D

RMB - 6A - 2.30 200 X 500 16 2 2 2 2 2 2 B 2RMB - 17A 2- 5.50 400 X 600 28 4 2 2 2 7 2 2 Ø 10 C


- 5.50 400 X 800 28 7 4 14 4 14 4 2 Ø 10 D RCWB
RMB - 7A - 5.20 300 X 500 20 2 2 2 5 4 2 C CURVED - 2.00 400 X 800 28 14 4 14 4 7 4 2 Ø 10 E CANT'R

RMB - 8A -2 3.30 300 X 500 25 2 2 4 2 4 2 C CURVED 2RMB - 18A C-A 10.50 300 X 800 25 8 4 2 12 6 4 2 Ø 10 D
2- 11.20 300 X 800 25 4 2 2 4 8 2 2 Ø 10 C
-4 12.50 300 X 800 25 8 2 2 6 2 2 2 Ø 10 C 2RMB - 19A B-A 6.50 400 X 800 25 12 4 2 8 8 4 2 Ø 10 E

RMB - 9A B-A 6.50 300 X 500 20 2 2 2 4 2 2 B 2RMB - 20A B-A 6.50 400 X 800 25 12 4 2 8 8 4 2 Ø 10 E

RMB - 10A 1' - 2 10.60 300 X 800 25 2 2 2 8 2 2 2 Ø 10 C RAMP BEAMS (3RD FLOOR TO 4TH FLOOR)

RMB - 11A 1-2 13.20 350 X 800 25 2 4 2 12 2 4 2 Ø 10 D 3RMB - 1A = RMB-1A

RMB - 12A 1-2 12.00 350 X 800 25 2 4 2 12 2 4 2 Ø 10 D 3RMB - 2A = RMB-2A

RMB - 13A 1-2 12.00 400 X 800 25 6 3 2 10 9 4 2 Ø 10 D 3RMB - 3A = RMB-3A


2-3 12.00 400 X 800 25 9 4 2 4 6 3 2 Ø 10 D
3-4 11.86 400 X 800 25 6 3 2 4 6 3 2 Ø 10 D 3RMB - 4A = 2RMB-4A
4- 2.20 400 X 600 25 4 2 4 2 2 2 2 Ø 10 B CANT'R
3RMB - 5A = 2RMB-5A
RMB - 14A 2- 5.50 400 X 600 25 8 4 2 2 6 2 2 Ø 10 C
- 5.50 400 X 600 25 6 2 2 2 6 2 2 Ø 10 C RCWB 3RMB - 6A = 2RMB-6A
-4 13.20 400 X 800 25 6 2 2 5 4 2 2 Ø 10 C
4- 2.20 400 X 600 25 4 2 4 2 2 2 2 Ø 10 B CANT'R 3RMB - 7A = RMB-7A

RMB - 15A 1-2 13.20 400 X 800 25 8 4 2 8 2 2 2 Ø 10 D 3RMB - 8A = 2RMB-8A

RMB - 16A C-A 10.46 400 X 800 28 8 4 2 12 6 4 2 Ø 10 E 3RMB - 9A = 2RMB-9A

RMB - 17A B-A 6.50 400 X 800 25 12 4 2 7 8 4 2 Ø 10 E 3RMB - 10A - 6.00 300 X 500 20 2 2 2 5 2 2 B

RMB - 18A B-A 6.50 400 X 800 25 12 4 2 10 8 4 2 Ø 10 E 3RMB - 11A 3- 7.30 300 X 600 20 2 2 2 5 5 2 C CURVED
- 4.50 300 X 500 20 5 2 2 3 2 2 C CURVED
RMB - 19A C-A 10.70 400 X 800 25 8 4 2 10 6 3 2 Ø 10 C
3RMB - 11A 3- 7.30 300 X 600 20 2 2 2 5 5 2 C CURVED
RAMP BEAMS (2ND FLOOR TO 3RD FLOOR) - 4.50 300 X 500 20 5 2 2 3 2 2 C CURVED

2RMB - 1A = RMB-1A 3RMB - 12A - 2.50 300 X 500 20 2 2 2 2 5 2 B CURVED


- 6.50 300 X 500 20 5 2 2 5 2 2 C CURVED
2RMB - 2A = RMB-2A
3RMB - 13A = 2RMB-12A
2RMB - 3A = RMB-3A
3RMB - 14A = 2RMB-13A
2RMB - 4A - 6.00 200 X 500 16 2 2 2 5 2 2 B
3RMB - 15A -4 13.00 400 X 800 25 4 6 4 18 6 6 2 Ø 10 E
2RMB - 5A - 3.50 200 X 500 16 2 2 2 4 2 2 B
3RMB - 16A 1-2 12.00 400 X 800 25 6 3 2 10 8 4 2 Ø 10 D
2RMB - 6A - 0.70 200 X 500 16 2 2 2 2 2 2 B 2-3 12.00 400 X 800 25 8 4 2 4 6 2 2 Ø 10 C
3-4 11.86 400 X 800 25 6 2 2 6 6 2 2 Ø 10 C
2RMB - 7A = RMB-7A
3RMB - 17A 2- 5.50 400 X 600 28 4 2 2 2 8 2 2 Ø 10 C
2RMB - 8A -2 3.30 300 X 600 20 2 2 8 4 8 2 C CURVED - 5.50 400 X 800 28 8 4 16 4 16 4 2 Ø 10 D RCWB
2- 11.20 300 X 800 20 8 2 2 8 8 2 2 Ø 10 C - 2.20 400 X 800 28 16 4 16 4 8 4 2 Ø 10 E CANT'R
- 3.90 300 X 600 20 8 2 8 3 4 2 C CURVED

GENERAL CONTRACTOR:
16-STOREY OFFICE BUILDING
ASEC DEVELOPMENT AND
24
CONSTRUCTION CORPORATION
GENERAL BUILDING CONTRACTOR ENRISON HOLDINGS INC. AS - BUILT PLAN S
Tower A-3rd Floor, Regalia Park, 150 P. Tuazon
Avenue, Cubao, Quezon City 1109
30