COLUMN

300
RING BEAM( 450X750)
10 Ø @200 C/C 10 Ø @150 C/C
BOTH WAYS 10 Ø @150 C/C RINGS

4-16 Ø

250
300
450

C.C 1:4:8 300 2L-10 Ø @150C/C


STIRRUPS

2-16 Ø ON EACH FACE


2100CC,1500RCC

SECTION A-A

750
2-16 Ø L= 2.40mts
Under each columns

250
C.L OF RING BEAM

6-16 Ø
10 Ø @150 C/C
10 Ø @150 C/C RINGS

A A SECTION OF RING BEAM


5500

8500

BOTTOM REINFORCEMENT OF
RING FOUNDATION NOTE: The drawing for the foundation of OHBR is based
on assumed bearing capacity of soils.
NOTE: The contractor shall get the designs of the OHBR got approved.

1. Grade of Concrete : M30


Grade of steel : Fe415
2. Basic wind speed : 44M/sec
3. Depth below foundation : 2.0M
4. Staging height
Clear height between the braces : 12.75
No of stagings 4
5. 8 Nos of 16 diagonal bars shall be
provided at column brace junction Wind Speed 44 m/s
6. For detailing of reinforcement FOUNDATION DETAILS OF
IS SP- 34 Shall be followed
90KL O.H.S.R 12.75M Stg
7. All Covers minimum 45 mm.
SBC SOIL >= 10 T/M2