PORT windlass shaft Claw coupling found worn out resulting in gap between them . Need to
built up the same.
Rusted and swollen Water ballast line flange in pumproom need to be cropped and renewed .
Both anchors & cables are to be ranged in the dock by yard staff disconnecting from bitter end, cables to be
thoroughly washed using high pressure jet. Loose studs to be rewelded. Cables to be checked for wear and tear,
chains calibration report to be made.
2 length of anchor chain cables to be disconnected from the leading end and transferred to the bitter end side on
both port and stbd anchor chains.
Swivels to be made free and tried out. Before stowing back in the chain lockers the chains are to be remarked
using cavas and ss band for each shackle and paining red/green on each joining shackle. Adjoining links to be
painted white for indicationg shackle number
Size of anchor chain – 111 mm grade sb0690, 14 cable lengths either side anchor weight 15t type ac-14 stockless
Port and stbd chain lockers to be de-mucked and high pressure washed upto 3000psi.
1.5 mtr from bottom to be de-scaled and painted (tar epoxy coating).
Eductor suction lines to be blown through with compressed air.
Estimated muck/rust - 4 t in each chain locker
Ship staff to witness and agree on final muck quantity removed.
1000.53 LOAD TESTING/ EXAMINATION OF HOSE HANDLING CRANES (2 Nos X 20T EACH)
Yard to carry out load testing and thorough examination of following hose handling cranes in the presence of
owner rep. And class surveyor
Remarks: One end of wire rope to have lead block as per specimen
Yard to carry out load testing and thorough examination of mono rail crane in the presence of owner rep. And class
surveyor-
Yard to carry out load testing and thorough examination of OVERHEAD crane in the presence of owner rep. And
class surveyor-
1000.58 LEAKAGE / PITTING ON SEAT OF HIGH VELOCITY VENT VALVES & VACUUM VALVES
High velocity vent valves & vacuum valves to be removed and taken to wrokshop for overhaul , seat to be
lapped/ machined. Internal areas to be painted, flame screen to be renewed, valves should be tested on both
pressure and vaccum side for proper functioning in presence of ship staff/ class surveyor. Test certificate to
be issued.
1000.59 SEA WATER VALVES IN PUMP ROOM TO OVERHAUL (7 NOS.)
Following valvs to be opened up, removed, overhauled,for survey ,if the seat condition is bad same to be
renewed.after survey box back with new joint gland packing and gland stud to be renewed apexior coating to
be done on valve chest.
1000.60 SEA WATER DRAFT GAUGE VALVES IN BALLAST TANK AND FORE PEAK TANK ( 3 NOS )
Following valvs to be opened up, removed, overhauled,for survey ,if the seat condition is bad same to be
renewed.after survey box back with new joint gland packing and gland stud to be renewed apexior coating to be
done on valve chest.
DESCRIPTION TYPE QTY.
DRAFT GAUGE FORWARD B/FLY 10 K 80 1 NO.
DRAFT GAUGE MID SHIP STBD B/FLY 10 K 80 1 NO.
DRAFT GAUGE MID SHIP PORT B/FLY 10 K 80 1 NO.
Manual demucking/ sludge removal from the tank bottom / intermediate deck / side shell upto man reachable
height of cargo tanks (17 nos) to be carried out by shore team using their own man power / resources for cleaning
materials, ventilation and lighting.
APPROVED COMPANY TO PROVIDE THE QUOTE FOR THE SLOP'S OILY WATER DISPOSAL.
1000.63 FITTING OF 32 NOS NEW ANODES IN SEA CHEST
1000.65 CCR / SHIP’S OFFICE / ECR PORTHOLES TO BE OVERHAULED / CLEANED & BOXED BACK IN POSITION
Above mentioned portholes have induced sweating / marks on the glass which results in hazy view of main deck.
Same need to be overhauled / cleaned and fitted back in position.
1000.66 3 COP, 1TCP , 2WBP & 1 STRIPPER PUMP STRAINER TO BE CLEANED INSPECTED AND BOXED BACK.
1000.67 LADDER STEPS NEAR EMBARKATION LADDER CORRODED AND HOLED TO BE CROPED AND
RENEWED.
No. OF LADDERS: 2
NO. OF STEPS: 2 X 4
SIZE: 600MM X 180MM
6MM CHECKERED PLATE
CORRODED,
NEED TO
BUILT UP
SR. RANGE OF
ITEM SR.NO TYPE MAKE Status As on
NO. SCALE
OMC- WORKING
1 No.1 COP-Suction 04K7332AK1-4 NSPSD790N _0.1 to 0.4 MPA SATISFACTORY
ITALY
Nakakita WORKING
3 No.2 COP-Suction 04K7332AK1-5 NSPSD790N _0.1 to 0.4 MPA
Seisakusho SATISFACTORY
Nakakita WORKING
5 No.3 COP-Suction 04K7332AK1-6 NSPSD790N _0.1 to 0.4 MPA
Seisakusho SATISFACTORY
Nakakita WORKING
7 TCP-Suction 04K7332AK2-2 NSPSD790N _0.1 to 0.4 MPA
Seisakusho SATISFACTORY
Nakakita WORKING
8 TCP-Discharge 04K7332AK2-1 NSPSD790N 0 to 2.5 MPA SATISFACTORY
Seisakusho
TCP-Discharge pr Nakakita WORKING
9 04K7332AK8 NA 0 to 2.5 MPA
on deck Seisakusho SATISFACTORY
1000.75 RENEWAL OF STEEL WIRE MESH AND FRAMING IN PUMP ROOM EXHAUSTS.
NO OF BLOWERS: 2
1000.78 CATWALK RAILING ONE PILLAR NEAR 4C COT WASTED TO BE CROPPED AND WELDED ON
DECK PLATE
APPROX PILLAR DIA : 8CM
APPROX PILLAR HT :105CM
1000.79 VAPOUR LINE HOLED NEAR STBD MAINFOLD,TO BE CROPPED AND NEW PLATE TO BE
WELDED.
1000.82 BALLAST TANK LEVEL GAUGE COVERS TO BE RENEWED NEAR PORT AND STDB WINDLASS.
APPROX 50 X 30 CM
6MM PLATE
1000.83 PORT DRIP TRAY BOTTOM PLATE CORRODED AND HOLED , TO BE CROPED AND RENEWED.
1000.86 PLATFORM NEAR DECK IG ISO. VALVE CORRODED AND HOLED, CHECKERED PLATE TO BE
RENEWED
SIZE: 1000MM X 450 MM
6MM CHECKERED PLATE
1000.87 CATWALK RAMPS AND LADDERS CORRODED AND HOLED, TO BE CROPED AND RENEWED
NOS OF RAMPS: 13
SIZE: 650MM X650 MM
6MM CHECKERED PLATE
NOS OF LADDERS: 12
SIZE: 650MM X180 MM
6MM CHECKERED PLATE
1000.88 BALLAST TANKS (10 NOS.) ALL LEVEL GAUGE COVER CAPS TO BE RENEWED AS PER SAMPLE.
1000.89 FIVE NOS. BALLAST TANKS LEVEL GAUGES STUB PIECE AND FLANGE TO BE CROPED AND
RENEWED.
1000.90 GANGWAY AIR LINE SUPPORTS CORRODED AND HOLED TO BE CROPED AND RENEWED.
1000.91 BALLAST GAS SAMPLE LINE SUPPORTS (10 NOS.) CORRODED AND HOLED TO BE CROPED AND
RENEWED.
ANGLE BAR 3CM X 3CM
LENGTH: 20CM
1000.92 GANGWAY AIR LINE COVERS AND SUPPORT BARS CORRODED AND HOLED TO BE CROPED
AND RENEWED.
TOTAL COVERS 8 NOS
SIZE OF 1 COVER: 1400MM X350MM
6MM CHECKERED PLATE
NO OF AIR VENTS: 2
NO OF DOORS: 10