6 Accommodation AC HEATER
Accommodation a/c heater to be taken out from air handling unit, same shifted to work
shop, heating coils to be repaired and pressure tested. Heater boxed back and air handling
unit insulation to be done.
MAKE: YORK JAPAN CO LTD.
Tank cleaning heater to be opened up, inspected, cleaned, Anode to be inspected and
renewed if require. Pressure testing to be carried out and certificate for the same.
Securing brackets / Cleats with funnel deck to be cut and removed. Funnel deck penetration
protective plate deformed section to be cropped and renewed. Thickness gauging of funnel
stack to be carried out.
Funnel stack to be gauged /inspected at penetration area if thin down same to be renewed.
Funnel deck
engine
room
4 4000.9 AUXILLIARY BOILER
To carry out inner UT for bank tubes( Near plugged tubes), detailed Fibroscopy to be carried
out by makers engineer in the presence of ship rep & tube condition accessed & report to be
furnished with recommendation if any.
Model: MAC-80B
Evaporation: 79000 kg
Design Pressure: 1.77MPa
Working Pressure: 1.57MPa
Main engine Air distributor, Start air shut off valve, Rotation direction safe guard, and safety
cut out device, VIT & FQS, positioning units, VEC positioning units to overhaul by service
engineer.
Fresh water generator evaporator to remove taken to workshop cleaned and pressure tested,
witnessed by ship staff.
Condenser both end cover to open up , cleaned, pressure tested, end cover anode to be
changed.
9. 5000. 5 OVERBOARD SOIL & SCUPPER PIPE LINE BEFORE STORM VALVES 1 MTR. ( APPROX )
SECTION RENEW - 4 NOS
FOLLOWING SOIL & ACCOMODATION SCUPPER OVBD. BEFORE STORM VALVE 1 MTR.PIPE SECTION TO BE
OPENED UP, TO BE GAUGED AND IF REQUIRED SAME TO RENEW.
Accommodation old AC unit to be removed and new a/c unit to be fitted, all connections to be
made and unit to be tested.
Accommodation a/c unit to be taken to the authorized service workshop, compressor & motor
to be overhauled, bearings to be renewed. All parts to be cleaned & inspected. Rings & gaskets
to be renewed, valve plates to be checked if damage same to be replaced.
14. 5000.6 M/E AIR COOLER DRAIN PIPE LINE IN BOTTOM PLATFORM 15 METRES SECTION TO BE
RENEWED.
APPROXIMATE LENGTH : 15METER
PIPE SIZE : OD : 90 MM
FLANGE PCD : 125 MM
FLANGE THICNESS : 16 MM
FLANGE OD : 180 MM
NO OF BOLTS : 4 PCS PER FLANGE ( M16)
15. 5000.7 ENGINE ROOM BILGE PIPE 5 METRES SECTION (BELOW FLOOR PLATE
. NEAR ME SUMP FWD MANHOLE)
APPROXIMATE LENGTH : 5 METER
PIPE SIZE : OD : 165 MM
FLANGE PCD : 230 MM
FLANGE THICNESS : 18 MM
FLANGE OD : 265 MM
NO OF BOLTS : 8 PCS PER FLANGE ( M16)
16. 5000.8 COPT STEAM LINE DRAIN PIPE 5 METRES SECTION TO BE RENEWED
APPROXIMATE LENGTH : 5 METER
PIPE SIZE : OD : 20 MM
FLANGE PCD : 68 MM
FLANGE THICNESS : 14 MM
FLANGE OD : 95 MM
NO OF BOLTS : 4 PCS PER FLANGE ( M12)
No.1 blower casing to be taken out with the foundation, taken to the
workshop, thinned down near drain pipe, same be cropped & renewed.
Internal coating has to be redone.
Fresh Water Generator sea water suction pipe with branch to be renewed
and internal rubber coating to be carried out.
Main section
APPROXIMATE LENGTH : 1.5 METER
PIPE SIZE : OD : 114MM
FLANGE PCD : 165MM
FLANGE THICNESS : 20 MM
FLANGE OD : 200 MM
NO OF BOLTS : 8 PCS PER FLANGE ( M16)
Branch section
APPROXIMATE LENGTH : 1.5 METER
PIPE SIZE : OD : 60MM
FLANGE PCD : 105MM
FLANGE THICNESS : 20 MM
FLANGE OD : 130 MM
NO OF BOLTS : 4 PCS PER FLANGE ( M12)
22. 1000.29 LADDER STEPS
Steps of ladders leading to funnel deck badly corroded & holed/ wasted. Same has to be cropped & renewed.
Steps of ladders leading to Blower spacebadly corroded & holed/ wasted. Same has to be cropped & renewed.
Aft Fire winch supporting brackets badly corroded/ wasted / holes. Same to be cropped & renewed.
25. 1000.32 AFT WINCH HYD. TANK AIRE VENT HEAD TO BE RENWED
26. 1000.33 AFT ETA BOX
Aft ETA box badly corroded covers/ bottom plate / brackets. To be repaired// SUGGEST TO CROP &
FABRICATE NEW ETA BOX.
Winch brake liners have swollen up due to formation of rust between liner & brake shoe. This results in
resistance to rotary motion of winch. All old brake liners to be removed / brake shoe to be chipped & cleaned
and liners to be renewed and wich brake testing to be carried out by yard and certificate for same to be issued..
END BEARING
29. 1000.36 DRAFT GUAGES FWD , MIDSHIP & AFT TO BE SERVICED & CALIBRATED.
30.1000.37 EXISTING OPEN GARBAGE AREA ON POOP DECK TO BE CONVERTED TO SHELTERED ONE
4,500 mm
31.1000.38 EXISITING SBM CHAIN STOPPER & PANAMA LEAD TO BE CROPPED & RENEWED WITH NEW BY YARD
TO MEET OCIMF GUIDELINES. NEW CHAIN STOPPER & PANAMA LEAD ALREADY RECIVED ON BOARD.
32.1000.39 MOORING WINCH HDRAULIC MOTOR & CONTROL V/V BOLTS HEAD WASTED . SAME TO BE
RENEWED.
33.1000.40 CABLE PIPELINE SUPPORTS / BRACKETS NEAR LIFERAFT TO BE CROPPED & RENEWED.
SIZE : 50X50X200 MM
34.1000.41 WALKWAY NEAR DECK SEAL COAMING WASTED / HOLED. SAME TO BE CROPPED & RENEWED.
SIZE : 50 X 10 MM ( FLAT )
APPROX. LENGTH : 10 METRES
35. 1000.42 DECK SEAL SEA WATER PIPELINE SUPPORTING BRACKETS TO BE CROPPED &
RENEWED;
SIZE : 40X40X10 MM
LENGTH : 2 MTRS.
36. 1000.43 CARGO & COW LINES FLANGES/ DRESSOR COUPLING BONDING TO BE DONE.
37. 1000.44 LINE MASTER VALVE BOLTS THINNED DOWN . SAME TO BE REPLACED WITH NEW
BOLTS.
SIZE : M 36 X 400 MM LENGTH
NO OF BOLTS : APPROX 100
38. 1000.45 MANIFOLFD CROSSOVER VALVE BOLTS THINNED DOWN . SAME TO BE REPLACED
WITH NEW BOLTS.
SIZE : M 36 X 400 MM LENGTH
NO OF BOLTS : APPROX 100
39.1000.46 WBT LEVEL GUAGE PIPE SUPPORTING ANGLE AND ASSOCIATED BRACKETS
WASTED/ HOLED . SAME TO BE RENEWED .
ANGLE SIZE : 75X 125 MM
APPROX LENGTH : 200 MTRS.
40. 1000.47 CARGO LINE BULKHEAD MASTER VALVE IN PUMPROOM LEAKING TO BE OVERHAULED
NO1 CARGO LINE BULKHEAD MASTER VALVE LEAKING TO BE OVERHAULED, SEATRING TO BE
RENEWED IF REQUIRED
DESCRIPTION TYPE QTY.
NO1 LINE BULKHEAD MASTER VALVE IN
B/FLY 10 K 750 1 NO.
P/ROOM
PORT windlass shaft Claw coupling found worn out resulting in gap between them . Need to
built up the same.
42. 1000.49 WATER BALLAST LINE FLANGE SWOLLEN AND LEAKING IN PUMPROOM.
Rusted and swollen Water ballast line flange in pumproom need to be cropped and renewed .