NOTES:-

1.ALL DIMENSIONS ARE IN MM AND LEVELS ARE IN METERS . THIS DRAWIN. SHALL NOT BE
SCALED, WRITTEN DIMENSSIONS ARE TO BE FOLLOWED ONLY.
800 800 1050 #10@150 C/CBOTHWAY 2.GRADE OF STEEL MINIMUM-FE-500 AND AS PER RELEVENT I.SCODE.
#8@250 C/C MESH AT EACHFACE 3.GRADE OF CONCRETE R.C.C.M-30 (DESIGN MIX) AND P.C.C M-10 (1:3:6).
BOTHWAY MESH
250 150 150 4.LAP LENGTH/BOND ANCHORAGE -50 x DIA OF BARS FOR WATER RETAINING COMPONENTS
#8@150 C/C 200
200 AND 60 x DIA OF BARS FOR OTHERS.
#10@150 C-C 600
#8@150 C/C #8@250 C/C 5.MINIMUM CLEAR COVER TO RAINFORCEMENT FOUNDATION -50 MM COLUMN -40MM,
COLUMN C1 BOTHWAY
BOTHWAY MESH BEAM-30MM, SLAB-30MM .
125 SIZE-250X250 6-#12 3 NOS HOLES
400 250 X250 6. ALL FINISHING ITEMS, PROVISIONS,INSTRUMENTATION,PIPING AND
8 NOS EQ SPACED
VALVES,MECHANICAL ITEMS ELECTRICAL ITEMS, CONTROLLING
#8 RINGS 150 C/C DEVICES,MOTORS,REDUCTION GEARS,BEARINGS,REVOLVING ARRANGEMENT FOR
COLUMN OUTLET CHANNEL #10@180C/C(V)THROUGHOUT #8@140 C/C SCRAPER,PADDLES OF RAPID MIX AND CLARIFLOCCULATOR & ALL RELATED.ITEMS ETC
375X350+200 FB REQUIRED FOR COMPLETENESS OF WORKS SHALL BE EXECUTED REFERRING AND
#10@180C/C CIRCULARAT EACH 1 175
225 1 CONFIRMING TO DTCN & AGREEMENT REQUIREMENTS.
FACEFROM 900 HT TO TOP HT
#10@180C/C(V) 7.THIS DRAWING SHALL BE FOLLOWED IN CONGESTION WITH APPROVED HYDRAULIC FLOW
#10@180C/C THROUGHOUT+#8 EXTRA DIAGRAM,LEVEL SHEET AND LAYOUT PLAN NOTES PROVIDED.
THROUGHOUT @180 C/C (V)UPTO 1000 HT COLUMN C1
8. OTHER ITEMS AND PROVISIONS IF NOT COVERED IN THIS DESIGN AND DRAWING, THE
#10@150C/C CIRCULARAT EACH 6 NOS#12(V) SAME SHALL BE EXECUTED FOR COMPLETENESS OF THE UNITS.
FACEFROM BASE TP 900 HT
9.ALL LEVELS IN & BETWEEN UNITS SHALL BE ENSURED ON FINISHED SURFACE ON TOP OF
HUNCH BAR BEAM B1 300 DIA MS PIPE
#8@140 C/C (250 X 300) FINISHING.ACCORDINGLY PROVISIONS SHALL BE MADE IN SIZING AND CASTING.
#8@150 C/C
BEAM B2 BOTHWAYMESH 550 CORE PIPE 10.PUDDLE COLLARS HOLDS TO BE LEFT IN RELATED MEMBERS,AND LEVELS DURING CASTING
(375 X 400) #8 RINGS 150 C-C MS 6MM WITH PROVISIONS OF EXTRA STEEL AROUND THE OPENINGS.
2 11.SHEAR KEYS WITH ADEQUATE REINFORCEMENT AT JOINING PLACES SHALL BE LEFT OR
1100 2 250 600 600 JOINING OF COMPONENTS/MEMBERS.
#8@140 C/C
BOTHWAYMESH #10@140 C/C 12.IN CASE OF MISMATCH OF LEVELS/ANY CONFUSION ETC.SAME SHALL BE BROUGHT TO
300 100 P.C.C 100 THICK 250
BOTHWAYMESH THE NOTICE OF APPROVING AUTHORITY.
100
1800 13.ALL WELDING & BOLTING ETC REQUIRED FOR FABRICATION WORKS SHALL BE DONE AS
#12@150 C/C PER FIELD REQUIREMENTS AND AS PER DIRECTION OF ENGINEER-IN-CHARGE OF WORK
MAINTAINING SAFETY & SOUNDNESS OF STRUCTURE.
#8@140 C/C
BOTHWAY MESH 14.APART FROM MEMBERS SHOWN FOR FOOT BRIDGE,SCRAPPERS AND IN RESPECT OF
AT EACH FACE MECHANICAL & ELECTRICAL ITEMS OF CLARIFLOCCULATOR AND RAPID MIX.OTHER
MEMBERS(CHANNEL/ANGLES/PLATES/FLATS/NUTS/BOLTS ETC).AS WILL BE REQUIRED FOR
2450 100 SOUNDNESS & SMOOTH FUNCTIONING SHALL BE PROVIDED AS PER ACTUAL FLELD
REQUIREMENT.
P.C.C M-10
15.DISTANCE BETWEEN COLUMNS SUPPORTING OUTSIDE CHANNELS MAY BE ADJUSTED
SECTIONAL REINFORCEMENT DETAILS OF CLARIFLOCCULATOR SUITABLY FROM SMOOTH ACCOMODATION AND FEASIBILTY CONSIDERATION.

15.FOUNDATION HAS BEEN DESIGNED CONSIDERING SOIL BEARING CAPACITY AS 6.5T/Sqm.

225
4-#16
3-#16 375

300 #8 STIRRUPS 400 #8 STIRRUPS 250 12- #12


@150 C/C @100 C/C 375
3-#16 6- #12 #8@150
4-#16 250 #8@150
250 C/C LATERAL TIES
375
C/C LATERAL TIES
DETAILS OF BEAM B1 DETAILS OF BEAM B2 COLUMN C1(250X250) PEDESTAL(375X375)
250 X 300 SECTION1-1 SECTION2-2
375 X 400
AUTHORITY : EXECUTIVE ENGINEER PH DIVISION -I,CUTTACK

WALL
AGENCY : M/S GURU MAHARAJ CONSTRUCTION ,CUTTACK
#10@150 C/C
BEAM B2
100 PROJECT : IMPROVEMENT OF WATER SUPPLY TO CUTTACK.HEAD WORKS P2 PRATAP NAGRI
ODISHA (AMRUT/OD/CTC/WS/42)

UNIT :
C C CLARIFLOCCULATOR
1100
1050
DATE : REV : 0 DRG.NO. : SCALE : SHEET NO.:
PEDESTAL 25/07/2018 CIM/18/107 N.T.S 02/02
250 100
PREPARED BY : CONFIANCE INFRATECH MANAGEMENT PVT LTD
100 PLOT NO. 2093,3RD FLOOR ,RATH COMPLEX,JAYADEV VIHAR,BBSR,751013
#12@150 C/C MOB.NO.9040044991,7978601153
100 1800 100 1800 C:\Users\JYOTI\Desktop\wtp new\claricflucculator\confiance.tif

MAIL: info.confianceinfratech@gmail.com
TYP PLAN OF PEDESTAL DETAILS OF PEDESTAL
#8@140 C/C DETAILS OF SHAFT FOOTING
FOOTING SECTION AT C-C SIGNATURE :
BOTHWAY MESH
AT EACH FACE
DESIGNER ER.R.R.SAHOO