You are on page 1of 7

Create

new TAG into Plant Check


 Log in as Admin
 Go to Setting
 Select related check type

 Create Group 1 if not there


 Create Group 2 if not there

 Select check point


 Click on Group 1 All Check Box to show all

 It will Show all the Group 1 and group 2 records


o If not selected check box it will not show all data.
 Now Select Group-1 and Group-2 where you want to add this check point.
 Enter TAG name Check name properly

 Click the create new button and it will create the TAG into the selected Groups.
 Go to LIST now to add the created Tag into proper list
 Select proper check type
 Select proper Check list
 Select proper Shift

 Now from Right side select proper Group-1 and Group-2

 Now Select the listed TAG in right pane and click on Add All.
o It will add the selected TAG to particular
 Check type
 Check List and
 Shift
o This will be added to select data in left Pane.
o Do it for all new created Group-1 and Group-2
 Now check it all appears in the proper Check type , List and Shift
 Now you can also create QR code by pressing QR Code button

 Print the QR code and scan and write into the NFC TAG

You might also like