You are on page 1of 2

Status of Abutments subject for analysis and design.

(As of 04/18/2017)

Succeeding/Preceeding
Pier No. Station Nearest Borehole Nearest Location
Girder Type

P47B 1 + 414.000 NA-BH-36 28.0 AASHTO Type V Near Veteran's Hospital Opening

P52 4 + 544.080 TS-BH-2 32.0 AASHTO Type V Tandang Sora Station

P54(B) 4 + 664.080 TS-BH-8 28.0 AASHTO Type V Tandang Sora Station

P58(-C) 7 + 382.868 DA-BH-11 28.0 AASHTO Type V Batasan Station

P64D 8 + 042.868 BS-BH-07 28.0 AASHTO Type V Batasan Station

P65 10 + 088.203 MS-BH-23 28.0 AASHTO Type V Dona Carmen Station

P287 16 + 741.5 QS-BH-15 28.0 AASHTO Type V Quirino Station

P290 18 + 060.646 QS-BH-30 28.0 AASHTO Type V Tala Station

P390 20 + 980.647 TL-BH-22 28.0 AASHTO Type V Tala Station


Remarks

No Global Model yet as of 04/18/2017

No Global Model yet as of 04/18/2017

No Global Model yet as of 04/18/2017

No Global Model yet as of 04/18/2017

No Global Model yet as of 04/18/2017

Model with AASHTO is available. A Model


with VSL will be prepared later.

Model with VSL is available. C/o JR.

Global Model for Column and Boredpile are


scheduled to be completed on or before
04/26/17.

Global Model for Column and Boredpile are


scheduled to be completed on or before
04/26/17.