You are on page 1of 61

2G & 3G Flexi Multiradio BTS-MoP-Comms and Integ-

Cell C_ZA

RU30 – CONCURRENT MODE/RF Sharing

Project Name : Cell C 900 UMTS Multiradio


Customer Name : Cell C
Document No. : 10
Version : 1.3

Document Type : Method of Procedure


Document Number : 10
Originator : Multiradio SiSo Team
Reviewed By : Cornel Labuschagne
Approved By : Brando B Rioflorido
Date Approved : 16July2012
Function : NI RSO Site Solutions – Africa Region
Type of Document Guidelines - Number Revision Number

TI HB – MEA NI SiSo – 2010 1.3


TI HAND BOOK
Page 2 of 61 Date: 06/27/2012
Network
Title
Implementation
2G & 3G MR Flexi BTS-MoP-Comms and Integ Concurrent Site Solutions –
Mode - Cell C_ZA TI

Table of Content

1. INTRODUCTION

2. CONTACT INFORMATION

3. EQUIPMENT / MODULES

4. OPTICAL CABLING

5. COMMISSIONING THE 3G FLEXI WCDMA MR BTS

6. LAUNCH THE 3G BTS SITE MANAGER

7. 3G FILES FOR DOCUMENTATION

8. 3G FLEXI WCDMA BTS INTEGRATION

9. COMMISSIONING THE 2G FLEXI EDGE MR BTS

10. LAUNCH THE 2G FLEXI EDGE SITE MANAGER

11. EXTERNAL ALARM TESTING

12. REFERENCES

13. DISTRIBUTION

14. DOCUMENT REVISION HISTORY


Type of Document Guidelines - Number Revision Number

TI HB – MEA NI SiSo – 2010 1.3


TI HAND BOOK
Page 3 of 61 Date: 06/27/2012
Network
Title
Implementation
2G & 3G MR Flexi BTS-MoP-Comms and Integ Concurrent Site Solutions –
Mode - Cell C_ZA TI

1. Introduction

This document will highlight the steps in commissioning the 2g & 3g


Flexi Multiradio BTS in a Concurrent Mode/RF sharing configuration
and the correct Optical cabling between the 2 System Modules
(ESMB/C & FSMD/E) & RF Module (FXDA).

2. Contact Information
The following are the contact details of the key persons needed for
escalation and coordination in the field as shown in Table 1 below.

Project Manager Johannes Moolman +27 82 5764665


Shane Markram +27 82 3740180
TI Manager Cornel Labuschagne +27 82 5769944
OH&S Manager Johan Booysen +27 83 2760548
Africa Region SEC Brando B Rioflorido +27 72 4526615

Table1. Contacts
Type of Document Guidelines - Number Revision Number

TI HB – MEA NI SiSo – 2010 1.3


TI HAND BOOK
Page 4 of 61 Date: 06/27/2012
Network
Title
Implementation
2G & 3G MR Flexi BTS-MoP-Comms and Integ Concurrent Site Solutions –
Mode - Cell C_ZA TI

3. Equipment/Modules
3.1 FSMD/E

3.2 ESMB/C

3.3 FXDA
Type of Document Guidelines - Number Revision Number

TI HB – MEA NI SiSo – 2010 1.3


TI HAND BOOK
Page 5 of 61 Date: 06/27/2012
Network
Title
Implementation
2G & 3G MR Flexi BTS-MoP-Comms and Integ Concurrent Site Solutions –
Mode - Cell C_ZA TI

4. Optical Cabling
4.1 FLEXI Multi Radio RF Sharing with RDSA (Diversity Cable)

Details:
• Synchronization used is E1 – ports IF 1 from the 2G system module (ESMB/C) is
Connected to IF1 (FSMD/E)
• RDSA Diversity Cables used to connect Diversity Antenna Lines for 2G and 3g
system
• Power for GSM FXDA is supplied by ESMB/ESMC
• Power for WCDMA FXDA is supplied by FSMD/FSME

BTS Software:
• 2G BTS SW Version : EX3.1_MP2_Pre2_BL55_A51_A53
• 3G BTS SW Version : WN6.0_22.12-159_B

BTS Site Manager


• 2G BTS SW Manager : EX3.1_PP2.1_BL03_Site_Manager
• 3G BTS SW Manager : BTSSiteEM-WN60-6.2.1417
Type of Document Guidelines - Number Revision Number

TI HB – MEA NI SiSo – 2010 1.3


TI HAND BOOK
Page 6 of 61 Date: 06/27/2012
Network
Title
Implementation
2G & 3G MR Flexi BTS-MoP-Comms and Integ Concurrent Site Solutions –
Mode - Cell C_ZA TI

4.2 FLEXI Multi Radio RF Sharing without RDSA (Concurrent Mode with 1 RF
Module)

Details:
• Synchronization used is Optical –3G System Moduel ( FSMD/E) ports OPT IF4
EXT1 is connected to 2G System Module (ESMB/C) OPT 4/EXT
• Antenna Lines for Main and diversity is connected to single RF Module (FXDA).
• Power for the shared RF Module (FXDA) is supplied by FSMD/FSME.

BTS Software:
• 2G BTS SW Version : EX4.1_M1.0_BL058_A51_A53
• 3G BTS SW Version : WN7.0_1104_1270_04

BTS Site Manager:


• 2G BTS SW Version : EX4.1_MP1.0_2G_BTS_Site_Manager_BL055
• 3G BTS SW Version : BTSSiteEM-WN70-7.1.1077
Type of Document Guidelines - Number Revision Number

TI HB – MEA NI SiSo – 2010 1.3


TI HAND BOOK
Page 7 of 61 Date: 06/27/2012
Network
Title
Implementation
2G & 3G MR Flexi BTS-MoP-Comms and Integ Concurrent Site Solutions –
Mode - Cell C_ZA TI

5. COMMISSIONING the 3G Flexi WCDMA Multiradio


BTS
NOTE: During this setup, the 3G Flexi WCDMA Multiradio BTS must
be the Master, in that case it should be commissioned first before
commissioning the 2G Flexi Edge Multiradio BTS.

5.1 Define the laptop IP address as shown in the figure below. This will
allow you to interrogate locally the 3G Flexi Multiradio equipment.

A 10base-T Ethernet cable with RJ-45 connector is used for connection


to the system module (FSMD/E) LAN port.

Laptop OS should be Windows XP Home/Pro, Vista and Windows 7 (for


Windows 7 & Vista, open the BTS site manager as administrator for it
to work).

Nokia Flexi BTS Site Manager (BTSSiteEM-WN70-7.1.1077) should be


installed in your laptop.

3G Datafill file is needed for the BTS parameters.


Type of Document Guidelines - Number Revision Number

TI HB – MEA NI SiSo – 2010 1.3


TI HAND BOOK
Page 8 of 61 Date: 06/27/2012
Network
Title
Implementation
2G & 3G MR Flexi BTS-MoP-Comms and Integ Concurrent Site Solutions –
Mode - Cell C_ZA TI

Concurrent mode/RF sharing licenses (Ru30) MUST be already


installed on the BTS by the ROC/NOC before starting.

Sec4.2 of this document MUST be satisfied.

Perform back up of the existing configuration of the Flexi BTS for fall
back procedure if needed.

6. Launch the BTS Site Manager

Before starting, make sure that the preparations have been made as
highlighted in sec5. The following steps will guide you interrogating
the BTS equipment.

1. Start the Nokia BTS Site Manager by clicking the icon on your
desktop. The task selection view opens as shown below.

2. If you want to establish a local connection, select the Local option


from the IP adress list.
3. If you want to establish a remote connection, define the IP
address of the remote BTS.
4. Enter the Username and Password. The default username is
Nemuadmin and the password is nemuuser.
Type of Document Guidelines - Number Revision Number

TI HB – MEA NI SiSo – 2010 1.3


TI HAND BOOK
Page 9 of 61 Date: 06/27/2012
Network
Title
Implementation
2G & 3G MR Flexi BTS-MoP-Comms and Integ Concurrent Site Solutions –
Mode - Cell C_ZA TI

5. Click connect.

If multiple versions of BTS Site manager are installed on the PC, the
appropriate BTS Site Manager version is selected automatically.

NOTE: If there is a Failure to connect to BTS, possible


cause below

- Software not compatible with new FTLB transmission Module.


- Swap FTLB with FTIB and reconnect, update software as indicated
below.
- When software is successfully uploaded, replace FTIB with FTLB
and reload software to continue with commissioning.

6.1 Updating the BTS Site software

Updating the BTS software is optional. You should do it only if the BTS
does not have the required software version. Follow the steps below.

1. If there is mismatch in the software, a dialog box opens as


shown below. Otherwise you have to go to the update SW to
BTS site menu.

2. Select file button to locate the target build of the new SW as


shown below and click open.
3. The current target build is TargetBD_WN7.0_1104_1270 04
.zip
Type of Document Guidelines - Number Revision Number

TI HB – MEA NI SiSo – 2010 1.3


TI HAND BOOK
Page 10 of 61 Date: 06/27/2012
Network
Title
Implementation
2G & 3G MR Flexi BTS-MoP-Comms and Integ Concurrent Site Solutions –
Mode - Cell C_ZA TI

4. Select the activate SW after update check the box to enable the
activation of the new SW in accordance to SW updating. Click
the update button to begin the SW update.

5. Click the close button to close the Update SW to BTS Site dialog
box.
Type of Document Guidelines - Number Revision Number

TI HB – MEA NI SiSo – 2010 1.3


TI HAND BOOK
Page 11 of 61 Date: 06/27/2012
Network
Title
Implementation
2G & 3G MR Flexi BTS-MoP-Comms and Integ Concurrent Site Solutions –
Mode - Cell C_ZA TI

6. Check “SW release version: WN7.0 1104 1270 04” is


loaded

Note: This exercise will also update the SW versions of the RF


Module: FXDA. If any case there is “incompatible SW alarm” just
reload the SW.

6.2 Manual Commissioning

Before commissioning is done, click on “Antenna line management


and un-tick all “3GPP/AISG communication” boxes as indicated. This
has to be done before any 3G Multi-radio commissioning starts. Ensure
“Reset after sending” is enabled and send new configuration to BTS.
After reset check “Antenna line management settings again to verify
“3GPP/AISG communication” boxes is unchecked. Only after this
proceed with commissioning

If no commissioning file(.xml) is available, Nokia Flexi Multiradio site


should be commissioned manually. The Flexi Multiradio BTS and/or the
flexi transport module (TRS) are commissioned with the
commissioning wizard in Nokia Flexi BTS Site Manager. The
commissioning can be started when the modules are on “initialised”
state. Follow the steps below.
Type of Document Guidelines - Number Revision Number

TI HB – MEA NI SiSo – 2010 1.3


TI HAND BOOK
Page 12 of 61 Date: 06/27/2012
Network
Title
Implementation
2G & 3G MR Flexi BTS-MoP-Comms and Integ Concurrent Site Solutions –
Mode - Cell C_ZA TI

The wizard features back, next, cancel and help buttons for
navigating. The next button brings up the following page in each
commissioning file. It guides you through the commissioning process
and prompts you for the required parameters.

1. Click View tab, choose the commissioning button on the view bar
or choose the commissioning menu item. The commissioning
introduction menu opens as shown below.

2. Choose the BTS site (will commission the BTS and TRS
parameters) and choose manual commissioning type.

6.3 Define site properties

Commissioning requires that Name, BTS ID, A2EA and IP addresses


are defined.

1. Enter the name of the BTS site in the name field


2. Enter the location.
3. Enter the description or configuration of the site as per profile in
the plan.
4. Define the BTS Id ( for Cell C site name = BTS Id).
5. Define the IP address of the: TRS BTS, RNC and NTP server (refer
to the example IP Plan for Cell C Project).
Type of Document Guidelines - Number Revision Number

TI HB – MEA NI SiSo – 2010 1.3


TI HAND BOOK
Page 13 of 61 Date: 06/27/2012
Network
Title
Implementation
2G & 3G MR Flexi BTS-MoP-Comms and Integ Concurrent Site Solutions –
Mode - Cell C_ZA TI

WBTS-IP Plan-PROES
STREET Site RNC-3G CellC-SouthAfrica-version1 1-03 05 2010.xls

6. Pls refer to the figure as shown below.

6.4 Define security configuration

Not much is defined here as per plan. Only the ping and trace route is
enabled.
Type of Document Guidelines - Number Revision Number

TI HB – MEA NI SiSo – 2010 1.3


TI HAND BOOK
Page 14 of 61 Date: 06/27/2012
Network
Title
Implementation
2G & 3G MR Flexi BTS-MoP-Comms and Integ Concurrent Site Solutions –
Mode - Cell C_ZA TI

6.5 Define the physical interface properties

We will define the Ethernet interface and use IuB IP transport mode as
per high level design in this Cell C project.

- IF1 previously activated in RF sharing with diversityis now


“DEACTIVATED” in
Concurrent Mode. Optical Interface OPT IF4 is now used as the
synchronization
Source for Concurrent Mode

- EIF 2 must be checked “In Use”, speed of 100mbps full duplex mode

-EIF 3 must be checked ”In Use”, speed and duplex “Autodetect”, this
parameter enables the Fast Ethernet port for Ethernet connection to
2G ESMB/C module
Type of Document Guidelines - Number Revision Number

TI HB – MEA NI SiSo – 2010 1.3


TI HAND BOOK
Page 15 of 61 Date: 06/27/2012
Network
Title
Implementation
2G & 3G MR Flexi BTS-MoP-Comms and Integ Concurrent Site Solutions –
Mode - Cell C_ZA TI

6.6 Define transport address and quality of service


configuration

1. Ethernet Switching:

• Queue Weights
o 1 - Strict
o 2-8
o 3-4
o 4, 5,6 -1
o 5
o 6
Type of Document Guidelines - Number Revision Number

TI HB – MEA NI SiSo – 2010 1.3


TI HAND BOOK
Page 16 of 61 Date: 06/27/2012
Network
Title
Implementation
2G & 3G MR Flexi BTS-MoP-Comms and Integ Concurrent Site Solutions –
Mode - Cell C_ZA TI

• DSCP Priority Mapping


o 1 – 46,48
o 2 -34, 36, 38
o 3 – 26, 28, 30
o 4 – 10, 12, 14, 18, 20, 22
o 5 – no settings

• All other parameters: default

2. VLAN Aware Configuration / Ethernet Interface Shaper

• VLAN aware switching – not in use


• Ethernet Interface shaper for each Interface
o EIF 1
 Egress Shaper – Speed and Duplex
 Ingress Rate – Speed and Duplex
 Speed and Duplex – Autodetect
o EIF 2
Type of Document Guidelines - Number Revision Number

TI HB – MEA NI SiSo – 2010 1.3


TI HAND BOOK
Page 17 of 61 Date: 06/27/2012
Network
Title
Implementation
2G & 3G MR Flexi BTS-MoP-Comms and Integ Concurrent Site Solutions –
Mode - Cell C_ZA TI

 Egress Shaper – Speed and Duplex


 Ingress Rate – 100 Mbps Full duplex
 Speed and Duplex – Autodetect
o EIF 23
 Egress Shaper – Speed and Duplex
 Ingress Rate – 100 Mbps Full duplex
 Speed and Duplex – Autodetect

3. Ethernet Link OAM - no setting needed, on this page the 2G


system module is introduced, this is for testing purpose only.
Type of Document Guidelines - Number Revision Number

TI HB – MEA NI SiSo – 2010 1.3


TI HAND BOOK
Page 18 of 61 Date: 06/27/2012
Network
Title
Implementation
2G & 3G MR Flexi BTS-MoP-Comms and Integ Concurrent Site Solutions –
Mode - Cell C_ZA TI

4. Committed Information Rate Set according to planned datafill.


Type of Document Guidelines - Number Revision Number

TI HB – MEA NI SiSo – 2010 1.3


TI HAND BOOK
Page 19 of 61 Date: 06/27/2012
Network
Title
Implementation
2G & 3G MR Flexi BTS-MoP-Comms and Integ Concurrent Site Solutions –
Mode - Cell C_ZA TI

5. Define Quality of Service as follows:

• NBAP, Expedited Forwarding, DSCP 46


• CES 2,3 and 4, DSCP 46
• All other parameters: default

6.7 Define IP Interfaces

We need to define the following transport address:

1. Transport Ethernet Interface (refer to the IP plan). The BW is


100Mbps and includes Ethernet overhead with MTU of 1500
bytes.
2. Define VLAN mapping in use. The VLAN Id = Site Id ( refer to IP
Plan)
Type of Document Guidelines - Number Revision Number

TI HB – MEA NI SiSo – 2010 1.3


TI HAND BOOK
Page 20 of 61 Date: 06/27/2012
Network
Title
Implementation
2G & 3G MR Flexi BTS-MoP-Comms and Integ Concurrent Site Solutions –
Mode - Cell C_ZA TI

IP Interface:
- “Total shaper information rate” define at 24.0Mbit/s
- “Commited Information rate” as per RF planner/NPO configuration
- “Include Ethernet overhead” checked
-

IP Interface:
- “New VLAN ID” and define as per RF planner/NPO configuration
- “Address” define as per RF planner/NPO configuration
- “Committed Information Rate” define as per RF planner/NPO configuration
- “Enable QoS” checked
Type of Document Guidelines - Number Revision Number

TI HB – MEA NI SiSo – 2010 1.3


TI HAND BOOK
Page 21 of 61 Date: 06/27/2012
Network
Title
Implementation
2G & 3G MR Flexi BTS-MoP-Comms and Integ Concurrent Site Solutions –
Mode - Cell C_ZA TI

IP Interface:
- “VLAN Type” define all as per RF planner/NPO same as VLAN of Transport
Ethernet Interface

6.8 CES over PSN settings

Define “Minimum UDP port” to 49152

6.9 Define the Iub IP settings

Refer to the Datafill for “Far end SCTP subnet”, “Minimum SCTP port”,
“Minimum UDP port”, “CAC committed bit rate same as ‘Commited
information rate’ ” parameters. “Signalling bit rate” set to 450kbit/s
and “DCN bit rate” is at 100kbit/s, “Local” and “remote UDP port”.
Type of Document Guidelines - Number Revision Number

TI HB – MEA NI SiSo – 2010 1.3


TI HAND BOOK
Page 22 of 61 Date: 06/27/2012
Network
Title
Implementation
2G & 3G MR Flexi BTS-MoP-Comms and Integ Concurrent Site Solutions –
Mode - Cell C_ZA TI

6.10 Configure the Timing over Packet parameters

Refer to the Datafill for ‘Master clock address’ plan. Message rate is
16 T/S

6.11 Application Addresses

• IP addresses are reflected on this page


Type of Document Guidelines - Number Revision Number

TI HB – MEA NI SiSo – 2010 1.3


TI HAND BOOK
Page 23 of 61 Date: 06/27/2012
Network
Title
Implementation
2G & 3G MR Flexi BTS-MoP-Comms and Integ Concurrent Site Solutions –
Mode - Cell C_ZA TI

o User Plane1, Control Plane, Synchronization plane IP – same as


Transport Ethernet IP address.
o Management Plane IP – same as transmission IP

6.12 RTT Measurement

• Default settings, nothing to define


Type of Document Guidelines - Number Revision Number

TI HB – MEA NI SiSo – 2010 1.3


TI HAND BOOK
Page 24 of 61 Date: 06/27/2012
Network
Title
Implementation
2G & 3G MR Flexi BTS-MoP-Comms and Integ Concurrent Site Solutions –
Mode - Cell C_ZA TI

6.13 Define synchronization timing source

1. “Timing Source Priority 1” set to “Timing


over packet”
2. “Priority 2 and 3” set to default
3. All other parameters set to default

6.14 Define BTS Static Route

- “Default Gateway” defined as per RF Planner/NPO datafill


Type of Document Guidelines - Number Revision Number

TI HB – MEA NI SiSo – 2010 1.3


TI HAND BOOK
Page 25 of 61 Date: 06/27/2012
Network
Title
Implementation
2G & 3G MR Flexi BTS-MoP-Comms and Integ Concurrent Site Solutions –
Mode - Cell C_ZA TI

6.15 Define IP Filtering exception rules for site support


equipment

This is not defined in this project.

6.16 Define settings for BTS


Type of Document Guidelines - Number Revision Number

TI HB – MEA NI SiSo – 2010 1.3


TI HAND BOOK
Page 26 of 61 Date: 06/27/2012
Network
Title
Implementation
2G & 3G MR Flexi BTS-MoP-Comms and Integ Concurrent Site Solutions –
Mode - Cell C_ZA TI

Define:
- “Configuration name” is set as per Profile # accdg to Datafill.
- “Time Zone” set to (GMT+2)Africa/Johannesburg
- “Transmission Sync(TDM/SuncE/Top) in use” must be checked
- 6.17 Automatic License Distribution Settings
- “Module Locations” as per RF planner/NPO datafill
• Automatic licensing in use is enabled. Channel Elements are generated and we
leave it as it is. No need to change.
Type of Document Guidelines - Number Revision Number

TI HB – MEA NI SiSo – 2010 1.3


TI HAND BOOK
Page 27 of 61 Date: 06/27/2012
Network
Title
Implementation
2G & 3G MR Flexi BTS-MoP-Comms and Integ Concurrent Site Solutions –
Mode - Cell C_ZA TI

6.18 Concurrent Mode Settings

• RF sharing is enabled
• Ensure System Module Product Code and Serial Number are filled up with the
valid data
• FXDA Radio Module Connection is “ENABLED” for sharing (ESMX 1 Optical IF1)

6.19 Creating Local Resources


Type of Document Guidelines - Number Revision Number

TI HB – MEA NI SiSo – 2010 1.3


TI HAND BOOK
Page 28 of 61 Date: 06/27/2012
Network
Title
Implementation
2G & 3G MR Flexi BTS-MoP-Comms and Integ Concurrent Site Solutions –
Mode - Cell C_ZA TI

Create new cell and define the antennas that will be used for the 3/3
cells created. If 40W carrier power is used, a license is required to be
downloaded before the grace period expires.

6.20 Local Cell Settings


- RNC type used for CELL C is “Nokia Siemens Network” only
Type of Document Guidelines - Number Revision Number

TI HB – MEA NI SiSo – 2010 1.3


TI HAND BOOK
Page 29 of 61 Date: 06/27/2012
Network
Title
Implementation
2G & 3G MR Flexi BTS-MoP-Comms and Integ Concurrent Site Solutions –
Mode - Cell C_ZA TI

6.21 Define the WCDMA Carrier Candidates

Local cell group is not supported therefore not defined. The carrier
frequency, UARFCN, is defined for Frequency Band 900MHz -2961
(932.2Mhz) and for Frequency Band 2100MHz -
10663(2132.6Mhz) in this Cell C Project.

6.22 Define HSDPA and HSUPA settings


Type of Document Guidelines - Number Revision Number

TI HB – MEA NI SiSo – 2010 1.3


TI HAND BOOK
Page 30 of 61 Date: 06/27/2012
Network
Title
Implementation
2G & 3G MR Flexi BTS-MoP-Comms and Integ Concurrent Site Solutions –
Mode - Cell C_ZA TI

The 16QAM modulation, PFRP and shared scheduler are enabled for
HSDPA. Resource Allocation should be at “16 HSDPA users per cell”.
The HSUPA uses the default settings. The Iub delay threshold are
define as shown in the above snapshot.

6.23 Define HSUPA settings

• HSUPA resource allocation “ enabled”


• Happy Bit Ratio Measurement
o Small transmission filtering “in use”
o User equipment power headroom filtering “in use”
 UPH threshold is “default” no need to manually set it.
o BTS processing set is “default” no need to manually set it.
Type of Document Guidelines - Number Revision Number

TI HB – MEA NI SiSo – 2010 1.3


TI HAND BOOK
Page 31 of 61 Date: 06/27/2012
Network
Title
Implementation
2G & 3G MR Flexi BTS-MoP-Comms and Integ Concurrent Site Solutions –
Mode - Cell C_ZA TI

6.24 Define HSUPA settings

1.For QoS, the default settings were used. Unless specified in this project.
Type of Document Guidelines - Number Revision Number

TI HB – MEA NI SiSo – 2010 1.3


TI HAND BOOK
Page 32 of 61 Date: 06/27/2012
Network
Title
Implementation
2G & 3G MR Flexi BTS-MoP-Comms and Integ Concurrent Site Solutions –
Mode - Cell C_ZA TI

6.25 Antenna Line Management

• No settings defined for antenna line management

6.26 Antenna Line Settings

FXDA 1/2/3/4/5/6 feeder loss is set at a value defined by RF Planner/NPO.


Triplexer is used and The RTT measurement is DISABLED and define the
Antenna cable length as per RF Planner/NPO. No need to define the MHA
setting. Additional RX Gain 0.0dbm. Uplink Delay 85.0ns
Type of Document Guidelines - Number Revision Number

TI HB – MEA NI SiSo – 2010 1.3


TI HAND BOOK
Page 33 of 61 Date: 06/27/2012
Network
Title
Implementation
2G & 3G MR Flexi BTS-MoP-Comms and Integ Concurrent Site Solutions –
Mode - Cell C_ZA TI

6.27 No need to define settings for Siemens proprietary AI


SiemSG1.1 TMARET and RET Units since RET/TMARETS
are not used in this project.
Type of Document Guidelines - Number Revision Number

TI HB – MEA NI SiSo – 2010 1.3


TI HAND BOOK
Page 34 of 61 Date: 06/27/2012
Network
Title
Implementation
2G & 3G MR Flexi BTS-MoP-Comms and Integ Concurrent Site Solutions –
Mode - Cell C_ZA TI

6.28 Define settings for external fault and control lines for
system module

The external alarms are defined on the 2G GSM equipment. No need


to define the external alarms on the 3G equipment.
Type of Document Guidelines - Number Revision Number

TI HB – MEA NI SiSo – 2010 1.3


TI HAND BOOK
Page 35 of 61 Date: 06/27/2012
Network
Title
Implementation
2G & 3G MR Flexi BTS-MoP-Comms and Integ Concurrent Site Solutions –
Mode - Cell C_ZA TI

6.29 Send BTS Parameters to BTS

Click send parameters button to send the commissioning parameters


to BTS site. After the parameters have been successfully sent, the site
will reset and the new parameters are activated. The BTS and TRS will
now be in a “commissioned” state. An option to save, if needed for
documentation, is prompted prior to sending the parameters.

NOTE: 3G Commissioning File – is needed on the


commissioning of the Flexi Multi Radio 2G System.

The commissioning file *.xml will be needed to configure the 2G BTS


in order
for the 3G system and 2G system to detect and share the same RF
Module.
(sample:
BTS_Commissioning_Teraco_Test_BTS2_RNC2_BTS_20120605.xml)

6.30 Define additional setting

No additional settings defined as per high level design.


Type of Document Guidelines - Number Revision Number

TI HB – MEA NI SiSo – 2010 1.3


TI HAND BOOK
Page 36 of 61 Date: 06/27/2012
Network
Title
Implementation
2G & 3G MR Flexi BTS-MoP-Comms and Integ Concurrent Site Solutions –
Mode - Cell C_ZA TI

6.31 Site Tests

You can run tests on the commissioned BTS. The test results and
reports are attached to the commissioning report.

For this part, only the Ethernet Test is done and saved for
documentation. WCDMA loop test can be done if the site is on air or
when the BTS is on Test State (if not yet integrated).
Type of Document Guidelines - Number Revision Number

TI HB – MEA NI SiSo – 2010 1.3


TI HAND BOOK
Page 37 of 61 Date: 06/27/2012
Network
Title
Implementation
2G & 3G MR Flexi BTS-MoP-Comms and Integ Concurrent Site Solutions –
Mode - Cell C_ZA TI

6.32 Commissioning Report

View the contents of the commissioning report and save the report to
a file for documentation. Click finish to complete the commissioning
procedure.
Type of Document Guidelines - Number Revision Number

TI HB – MEA NI SiSo – 2010 1.3


TI HAND BOOK
Page 38 of 61 Date: 06/27/2012
Network
Title
Implementation
2G & 3G MR Flexi BTS-MoP-Comms and Integ Concurrent Site Solutions –
Mode - Cell C_ZA TI

7. Files for documentation

7.1 Site information

This file contains all the details of the hardware elements installed at
site. This is needed in the BTS site folder documentation. From the
tool tab, check the site information menu and save the data.

7.2 Snapshot

This data contains the site log files and settings of the TRS and BTS.
From the File Tab, choose Snapshot menu and save the data.
Type of Document Guidelines - Number Revision Number

TI HB – MEA NI SiSo – 2010 1.3


TI HAND BOOK
Page 39 of 61 Date: 06/27/2012
Network
Title
Implementation
2G & 3G MR Flexi BTS-MoP-Comms and Integ Concurrent Site Solutions –
Mode - Cell C_ZA TI

7.3 IP connectivity Test

This test will verify the IP routing of the BTS. Ping the remote address
(RNC, NTP server, Timing over Packet, BTS routing gateway) and if
there is no connectivity, this test fails. This can be done on the
commissioned state of the BTS prior to integration. Click the Tool Tab
and choose IP connectivity test.
Type of Document Guidelines - Number Revision Number

TI HB – MEA NI SiSo – 2010 1.3


TI HAND BOOK
Page 40 of 61 Date: 06/27/2012
Network
Title
Implementation
2G & 3G MR Flexi BTS-MoP-Comms and Integ Concurrent Site Solutions –
Mode - Cell C_ZA TI

8. 3G Flexi Multiradio BTS Integration

8.1 Pre-requisites

1. The BTS and TRS are commissioned; all parameters needed are
configured as per plan.

2. The IP connectivity test Passed. Ping test of the remote address is


possible.

3. Site parameters, DCN, Connection Configuration and AAL2 user


planes have been configured in RNC.

4. Call NOC to download Licence’s and Unlock the Site. See status
below.

7. COMMISSIONING the 2G Flexi EDGE MULTIRADIO


BTS
NOTE: on the 2G BTS, First thing to be done is to run “Undo
Commissioning & remove Traffic Bypass capacity” to ensure all data is
cleared from the flash memory.

9.1 Define the laptop IP address as shown in the figure below. This will
enable you to interrogate the 2G Flexi Multi Radio BTS equipment.
Type of Document Guidelines - Number Revision Number

TI HB – MEA NI SiSo – 2010 1.3


TI HAND BOOK
Page 41 of 61 Date: 06/27/2012
Network
Title
Implementation
2G & 3G MR Flexi BTS-MoP-Comms and Integ Concurrent Site Solutions –
Mode - Cell C_ZA TI

A 10base-T straight Ethernet LAN cable with rj-45 connector is used


for connection to the system module (ESMB/ESMC) LMP port.

2g Flexi BTS Site Manager


(EX4.1_MP1.0_2G_BTS_Site_Manager_BL055) should be installed in
your laptop with the latest BTS SW release
(EX4.1_M1.0_BL058_A51_A53).

Laptop OS should be Windows XP Home/Pro, Vista and Windows 7 (for


Windows 7 & Vista, open the BTS site manager as administrator for it
to work).

Updated file for BTS parameters e.g. site id, bcf id, configuration, A-
BIS plan etc. This should be provided by Network Planning.

3G Commissioning file (XML) previously saved from the 3g


commissioning earlier.

Sec4.2 of this document MUST be satisfied.

Perform back up of the existing configuration of the Flexi BTS for fall
back procedure if needed.
Type of Document Guidelines - Number Revision Number

TI HB – MEA NI SiSo – 2010 1.3


TI HAND BOOK
Page 42 of 61 Date: 06/27/2012
Network
Title
Implementation
2G & 3G MR Flexi BTS-MoP-Comms and Integ Concurrent Site Solutions –
Mode - Cell C_ZA TI

8. Launch the 2g Flexi BTS Site Manager

Before starting, make sure that the preparations have been made as
highlighted in sec4. The following steps will guide you interrogating
the BTS equipment.

Start the Nokia 2G Flexi BTS Manager by clicking the icon on your
desktop. The task selection view opens as shown below.

10.1 BTS SW Update

The first step of the commissioning is BTS SW Downloading/Update.


This is necessary to align the current SW packet of the BTS with the
new release BTS SW. It starts with selecting the “BTS SW” and
followed by “SW update”

Then, we must browse and select the “header” or “master” file to


start the download. The SW version BTSM4113.3A
Type of Document Guidelines - Number Revision Number

TI HB – MEA NI SiSo – 2010 1.3


TI HAND BOOK
Page 43 of 61 Date: 06/27/2012
Network
Title
Implementation
2G & 3G MR Flexi BTS-MoP-Comms and Integ Concurrent Site Solutions –
Mode - Cell C_ZA TI

It is recommended to select the option “Forcé Download” to guarantee


the downloading of all files of the new SW. If we don’t mark this
option, only the changes in between versions will be downloaded
(depending on the versions).

Press the “update SW”. The progress bar will help us to follow the
process. Notice that FIREWALL SW running on PC could BLOCK the
downloading. When the Download is finished, The BTS will restart and
the PC automatically connect to the BTS.
Multi Radio BTS doesn’t autodetect un-commissioned radio modules,
thats the reason why only the system module appears on the screen.

Check ‘Force BTS Download All Application


Files’
ON-LINE commissioning is when you are physically connected
to the BTS via your straight LAN cable.
Type of Document Guidelines - Number Revision Number

TI HB – MEA NI SiSo – 2010 1.3


TI HAND BOOK
Page 44 of 61 Date: 06/27/2012
Network
Title
Implementation
2G & 3G MR Flexi BTS-MoP-Comms and Integ Concurrent Site Solutions –
Mode - Cell C_ZA TI

10.2 Perform “Undo Commissioning of BTS”

This will last a few minutes and when finished, the BTS will restart.
Notice that any change in the BTS configuration needs a BTS reset to
be effective.

This will last a few minutes and when finished, the BTS will restart.
Notice that any change in the BTS configuration needs a BTS reset to
be effective.

NOTE: 3g Commissioning file(XML) is needed to be downloaded into


the 2g Flexi Multiradio BTS.

After restarting, we choose again “commissioning wizard” and then


“Commission manually” to bring you to the Site Specific
Information.

10.3 Site Specific Information


Type of Document Guidelines - Number Revision Number

TI HB – MEA NI SiSo – 2010 1.3


TI HAND BOOK
Page 45 of 61 Date: 06/27/2012
Network
Title
Implementation
2G & 3G MR Flexi BTS-MoP-Comms and Integ Concurrent Site Solutions –
Mode - Cell C_ZA TI

Just populate the BCFID of the site, then proceed to the next step.

10.4 Hardware configuration

Specify from file and browse the 3G commissioning file (XML) earlier
saved then proceed to the next step.

10.5 Module configuration


Type of Document Guidelines - Number Revision Number

TI HB – MEA NI SiSo – 2010 1.3


TI HAND BOOK
Page 46 of 61 Date: 06/27/2012
Network
Title
Implementation
2G & 3G MR Flexi BTS-MoP-Comms and Integ Concurrent Site Solutions –
Mode - Cell C_ZA TI

Note that OPT1 is untick and your synchronization is also untick since
your 3G BTS is your master. Note also that the RF module (FXDA) is
already defined.

If DCS1800 is being used, then we need to add new RF chain for FXEA
using OPT2.

10.6 Local Sector Settings

Since we hav Rx Sharing of FXDA (sector 4,5 & 6), the máximum
allowable Carrier power is 60W. Since 3G BTS uses 40W carrier power
already, our 2G BTS will now have a máximum of 20W carrier power to
be used. It can be 10W depending on the RF plan. While your FXEA
(sector 1,2 &3) will still have a máximum 60W carrier power since its
not shared.
Type of Document Guidelines - Number Revision Number

TI HB – MEA NI SiSo – 2010 1.3


TI HAND BOOK
Page 47 of 61 Date: 06/27/2012
Network
Title
Implementation
2G & 3G MR Flexi BTS-MoP-Comms and Integ Concurrent Site Solutions –
Mode - Cell C_ZA TI

10.7 Antenna Settings


Type of Document Guidelines - Number Revision Number

TI HB – MEA NI SiSo – 2010 1.3


TI HAND BOOK
Page 48 of 61 Date: 06/27/2012
Network
Title
Implementation
2G & 3G MR Flexi BTS-MoP-Comms and Integ Concurrent Site Solutions –
Mode - Cell C_ZA TI

Associated antennas are defined for the FXDA and FXEA. Antenna
settings use default values.

10.8 RET Settings

RETs are not used therefore this are not defined.


Type of Document Guidelines - Number Revision Number

TI HB – MEA NI SiSo – 2010 1.3


TI HAND BOOK
Page 49 of 61 Date: 06/27/2012
Network
Title
Implementation
2G & 3G MR Flexi BTS-MoP-Comms and Integ Concurrent Site Solutions –
Mode - Cell C_ZA TI

10.9 FRM EAC Settings

FRM EAC settings are not used therefore this are not defined.

10.10 BBU Settings

No BBU used therefore this are not defined.

10.11 Passive Unit Settings


Type of Document Guidelines - Number Revision Number

TI HB – MEA NI SiSo – 2010 1.3


TI HAND BOOK
Page 50 of 61 Date: 06/27/2012
Network
Title
Implementation
2G & 3G MR Flexi BTS-MoP-Comms and Integ Concurrent Site Solutions –
Mode - Cell C_ZA TI

FSEB box is defined with its serial number, Product code is self-
generated.

10.12 Transmission Parameter Settings

Transmission parameter is specified manually by choosing the correct


TRS PIU.
Type of Document Guidelines - Number Revision Number

TI HB – MEA NI SiSo – 2010 1.3


TI HAND BOOK
Page 51 of 61 Date: 06/27/2012
Network
Title
Implementation
2G & 3G MR Flexi BTS-MoP-Comms and Integ Concurrent Site Solutions –
Mode - Cell C_ZA TI

10.13 Network Settings

Packet Switched Network is used with transmission mode as PWE.

10.14 Ethernet Settings

EIF1 is enabled for the BTS transmission.


Type of Document Guidelines - Number Revision Number

TI HB – MEA NI SiSo – 2010 1.3


TI HAND BOOK
Page 52 of 61 Date: 06/27/2012
Network
Title
Implementation
2G & 3G MR Flexi BTS-MoP-Comms and Integ Concurrent Site Solutions –
Mode - Cell C_ZA TI

10.15 PWE Settings

PWE1 and PWE2 is enabled and the UDP ports are populated as per
plan.

10.16 Tunnel Settings


Type of Document Guidelines - Number Revision Number

TI HB – MEA NI SiSo – 2010 1.3


TI HAND BOOK
Page 53 of 61 Date: 06/27/2012
Network
Title
Implementation
2G & 3G MR Flexi BTS-MoP-Comms and Integ Concurrent Site Solutions –
Mode - Cell C_ZA TI

Tunnel settings of the PWE1 and PWE2 are populated according to


plan.

10.17 Ethernet OAM Settings

This setting is not defined.


Type of Document Guidelines - Number Revision Number

TI HB – MEA NI SiSo – 2010 1.3


TI HAND BOOK
Page 54 of 61 Date: 06/27/2012
Network
Title
Implementation
2G & 3G MR Flexi BTS-MoP-Comms and Integ Concurrent Site Solutions –
Mode - Cell C_ZA TI

10.18 Synchronization Settings

TOP is enabled and Master clock IP address is populated (same as


what is defined in the 3G BTS). PWE1 and PWE2 are defined as
priority1 & 2 respectively.

10.19 ABIS Termination

Enable ABIS mapping and allow ABIS allocations from BTS Manager
Type of Document Guidelines - Number Revision Number

TI HB – MEA NI SiSo – 2010 1.3


TI HAND BOOK
Page 55 of 61 Date: 06/27/2012
Network
Title
Implementation
2G & 3G MR Flexi BTS-MoP-Comms and Integ Concurrent Site Solutions –
Mode - Cell C_ZA TI

10.20 ABIS Allocation

Populate the Abis Allocation as per ABIS plan per PWE for 900 and
1800 BTS.

10.21 Ethernet Monitoring

Ethernet monitoring is not defined in this BTS.


Type of Document Guidelines - Number Revision Number

TI HB – MEA NI SiSo – 2010 1.3


TI HAND BOOK
Page 56 of 61 Date: 06/27/2012
Network
Title
Implementation
2G & 3G MR Flexi BTS-MoP-Comms and Integ Concurrent Site Solutions –
Mode - Cell C_ZA TI

10.22 Local Management Port settings

This BTS setting is not defined.

10.23 Send SCF to BTS

Save the SCF before sending it to the BTS.


Type of Document Guidelines - Number Revision Number

TI HB – MEA NI SiSo – 2010 1.3


TI HAND BOOK
Page 57 of 61 Date: 06/27/2012
Network
Title
Implementation
2G & 3G MR Flexi BTS-MoP-Comms and Integ Concurrent Site Solutions –
Mode - Cell C_ZA TI

Commissioning in Progress

BTS will reset once completed

Local commissioning completed


successfully and ‘O&M Link
Established’
Type of Document Guidelines - Number Revision Number

TI HB – MEA NI SiSo – 2010 1.3


TI HAND BOOK
Page 58 of 61 Date: 06/27/2012
Network
Title
Implementation
2G & 3G MR Flexi BTS-MoP-Comms and Integ Concurrent Site Solutions –
Mode - Cell C_ZA TI

Fetching the commissioning report


Type of Document Guidelines - Number Revision Number

TI HB – MEA NI SiSo – 2010 1.3


TI HAND BOOK
Page 59 of 61 Date: 06/27/2012
Network
Title
Implementation
2G & 3G MR Flexi BTS-MoP-Comms and Integ Concurrent Site Solutions –
Mode - Cell C_ZA TI

Site Information

9. External Alarm Testing

Indoor Sites
Once the BTS is commissioned, test the alarms with the NOC. Ask the NOC to
save and email you the log file. The Alarms will be tested twice. First before
moving the Alarm cable and second when the alarm cable is moved. Ensure
that the alarms on the old BTS are the same as on the MR BTS. Please note
that not all the sites will have the same alarms. The most common alarms are
listed below. If the alarm is not listed below simulate the alarm to test that it
is functional.

1. Intruder (External Alarm 18)


Close the door and monitor on BTS manager for alarm to clear.
Open door and monitor to alarm condition

2. Movement(if installed) (External Alarm 19)


Cover movement sensor and wait for at least 3 minutes.
Remove cover from sensor and monitor alarm condition.

3. Rectifier Module Fail(External Alarm 8)


Switch off rectifier module at rectifier or disconnect module to generate
alarm.
Switch on again and see that alarm clears.

4. High Temp(External Alarm 7)


Warm-up the sensor near the aircon control box to generate an alarm.
Extractor fan will activate
Type of Document Guidelines - Number Revision Number

TI HB – MEA NI SiSo – 2010 1.3


TI HAND BOOK
Page 60 of 61 Date: 06/27/2012
Network
Title
Implementation
2G & 3G MR Flexi BTS-MoP-Comms and Integ Concurrent Site Solutions –
Mode - Cell C_ZA TI

Wait for sensor to cool down and alarms will clear.

5. AC Mains Fail(External Alarm 2)


Switch off AC Mains breaker inside container to generate an alarm. The
rectifier alarms will also
come on.
Switch on AC Mains breaker to clear the alarms.

6. Rec SYS/Batt Low(External Alarm 3)


Switch off rectifier module at rectifier or disconnect module to generate
alarm.
Switch on again and see that alarm clears.

7. Smoke(External Alarm 17)


Make some smoke and hold it near the smoke sensor. The light will come on
and all aircons will
switch off.
Remove the sensor by unscrewing it and put it back again. The alarm will
clear.

8. Aircon Fail(External Alarm 9)


Switch of aircons at the AC DB to generate alarms.
Switch on to clear the alarms

9. DC Low/Batt Low(External Alarm 4)


Switch off rectifier module at rectifier or disconnect module to generate
alarm.
Switch on again and see that alarm clears.

10. Dual Aircon(External Alarm 5)


Aircon alarm will activate when temp inside container exceeds 28degC
Close container door and wait +/- 10 min before entering and see if alarm
clears

11. DC High/Rectifier SYS(External Alarm 6)


Switch off rectifier module at rectifier or disconnect module to generate
alarm.
Switch on again and see that alarm clears.

Outdoor Sites
Once the BTS is commissioned, test the alarms with the NOC. Ask the NOC to
save and email you the log file. The Alarms will be tested twice. First before
moving the Alarm cable and second when the alarm cable is moved. Ensure
that the alarms on the old BTS are the same as on the MR BTS. Please note
that not all the sites will have the same alarms. The most common alarms are
listed below. If the alarm is not listed below simulate the alarm to test that it
is functional.

1. Intruder (External Alarm 18)


Close the DELTA cabinet door and monitor on BTS manager for alarm to
clear.
Open DELTA cabinet door and monitor to alarm condition
Type of Document Guidelines - Number Revision Number

TI HB – MEA NI SiSo – 2010 1.3


TI HAND BOOK
Page 61 of 61 Date: 06/27/2012
Network
Title
Implementation
2G & 3G MR Flexi BTS-MoP-Comms and Integ Concurrent Site Solutions –
Mode - Cell C_ZA TI

2. Rectifier Module Fail(External Alarm 8)


Switch off rectifier module at rectifier or disconnect module to generate
alarm.
Switch on again and see that alarm clears.

3. High Temp(External Alarm 7)


Warm-up the sensor behind the DELTA rectifier control box to generate an
alarm.
Wait for sensor to cool down and alarms will clear.

4. AC Mains Fail(External Alarm 2)


Switch off AC Mains breaker inside DELTA Rectifier to generate an alarm. The
rectifier alarms will also come on.
Switch on AC Mains breaker to clear the alarms.

5. DC Low/Batt Low(External Alarm 4)


Switch off rectifier circuit breaker at DELTA rectifier or disconnect module to
generate alarm.
Switch on again and see that alarm clears.

10. References
2G/3G Flexi Multiradio Commissioning

11. Distribution

NSN TI Manager, Cell C


NI SISO Manager, Africa

12. Document Revision History

DATE Revision Summary of changes


No

25Jan201 V1.2 Revised the antenna line settings for FXDA


2
26June20 V1.3 Added Module Photos cabling (item 3)
12
Added RF cabling (item 4)
Revised SW Versions
Revised antenna line settings
Commissioning File (4.25)