Table of Content
1. INTRODUCTION
2. CONTACT INFORMATION
3. EQUIPMENT / MODULES
4. OPTICAL CABLING
12. REFERENCES
13. DISTRIBUTION
1. Introduction
2. Contact Information
The following are the contact details of the key persons needed for
escalation and coordination in the field as shown in Table 1 below.
Table1. Contacts
Type of Document Guidelines - Number Revision Number
3. Equipment/Modules
3.1 FSMD/E
3.2 ESMB/C
3.3 FXDA
Type of Document Guidelines - Number Revision Number
4. Optical Cabling
4.1 FLEXI Multi Radio RF Sharing with RDSA (Diversity Cable)
Details:
• Synchronization used is E1 – ports IF 1 from the 2G system module (ESMB/C) is
Connected to IF1 (FSMD/E)
• RDSA Diversity Cables used to connect Diversity Antenna Lines for 2G and 3g
system
• Power for GSM FXDA is supplied by ESMB/ESMC
• Power for WCDMA FXDA is supplied by FSMD/FSME
BTS Software:
• 2G BTS SW Version : EX3.1_MP2_Pre2_BL55_A51_A53
• 3G BTS SW Version : WN6.0_22.12-159_B
4.2 FLEXI Multi Radio RF Sharing without RDSA (Concurrent Mode with 1 RF
Module)
Details:
• Synchronization used is Optical –3G System Moduel ( FSMD/E) ports OPT IF4
EXT1 is connected to 2G System Module (ESMB/C) OPT 4/EXT
• Antenna Lines for Main and diversity is connected to single RF Module (FXDA).
• Power for the shared RF Module (FXDA) is supplied by FSMD/FSME.
BTS Software:
• 2G BTS SW Version : EX4.1_M1.0_BL058_A51_A53
• 3G BTS SW Version : WN7.0_1104_1270_04
5.1 Define the laptop IP address as shown in the figure below. This will
allow you to interrogate locally the 3G Flexi Multiradio equipment.
Perform back up of the existing configuration of the Flexi BTS for fall
back procedure if needed.
Before starting, make sure that the preparations have been made as
highlighted in sec5. The following steps will guide you interrogating
the BTS equipment.
1. Start the Nokia BTS Site Manager by clicking the icon on your
desktop. The task selection view opens as shown below.
5. Click connect.
If multiple versions of BTS Site manager are installed on the PC, the
appropriate BTS Site Manager version is selected automatically.
Updating the BTS software is optional. You should do it only if the BTS
does not have the required software version. Follow the steps below.
4. Select the activate SW after update check the box to enable the
activation of the new SW in accordance to SW updating. Click
the update button to begin the SW update.
5. Click the close button to close the Update SW to BTS Site dialog
box.
Type of Document Guidelines - Number Revision Number
The wizard features back, next, cancel and help buttons for
navigating. The next button brings up the following page in each
commissioning file. It guides you through the commissioning process
and prompts you for the required parameters.
1. Click View tab, choose the commissioning button on the view bar
or choose the commissioning menu item. The commissioning
introduction menu opens as shown below.
2. Choose the BTS site (will commission the BTS and TRS
parameters) and choose manual commissioning type.
WBTS-IP Plan-PROES
STREET Site RNC-3G CellC-SouthAfrica-version1 1-03 05 2010.xls
Not much is defined here as per plan. Only the ping and trace route is
enabled.
Type of Document Guidelines - Number Revision Number
We will define the Ethernet interface and use IuB IP transport mode as
per high level design in this Cell C project.
- EIF 2 must be checked “In Use”, speed of 100mbps full duplex mode
-EIF 3 must be checked ”In Use”, speed and duplex “Autodetect”, this
parameter enables the Fast Ethernet port for Ethernet connection to
2G ESMB/C module
Type of Document Guidelines - Number Revision Number
1. Ethernet Switching:
• Queue Weights
o 1 - Strict
o 2-8
o 3-4
o 4, 5,6 -1
o 5
o 6
Type of Document Guidelines - Number Revision Number
IP Interface:
- “Total shaper information rate” define at 24.0Mbit/s
- “Commited Information rate” as per RF planner/NPO configuration
- “Include Ethernet overhead” checked
-
IP Interface:
- “New VLAN ID” and define as per RF planner/NPO configuration
- “Address” define as per RF planner/NPO configuration
- “Committed Information Rate” define as per RF planner/NPO configuration
- “Enable QoS” checked
Type of Document Guidelines - Number Revision Number
IP Interface:
- “VLAN Type” define all as per RF planner/NPO same as VLAN of Transport
Ethernet Interface
Refer to the Datafill for “Far end SCTP subnet”, “Minimum SCTP port”,
“Minimum UDP port”, “CAC committed bit rate same as ‘Commited
information rate’ ” parameters. “Signalling bit rate” set to 450kbit/s
and “DCN bit rate” is at 100kbit/s, “Local” and “remote UDP port”.
Type of Document Guidelines - Number Revision Number
Refer to the Datafill for ‘Master clock address’ plan. Message rate is
16 T/S
Define:
- “Configuration name” is set as per Profile # accdg to Datafill.
- “Time Zone” set to (GMT+2)Africa/Johannesburg
- “Transmission Sync(TDM/SuncE/Top) in use” must be checked
- 6.17 Automatic License Distribution Settings
- “Module Locations” as per RF planner/NPO datafill
• Automatic licensing in use is enabled. Channel Elements are generated and we
leave it as it is. No need to change.
Type of Document Guidelines - Number Revision Number
• RF sharing is enabled
• Ensure System Module Product Code and Serial Number are filled up with the
valid data
• FXDA Radio Module Connection is “ENABLED” for sharing (ESMX 1 Optical IF1)
Create new cell and define the antennas that will be used for the 3/3
cells created. If 40W carrier power is used, a license is required to be
downloaded before the grace period expires.
Local cell group is not supported therefore not defined. The carrier
frequency, UARFCN, is defined for Frequency Band 900MHz -2961
(932.2Mhz) and for Frequency Band 2100MHz -
10663(2132.6Mhz) in this Cell C Project.
The 16QAM modulation, PFRP and shared scheduler are enabled for
HSDPA. Resource Allocation should be at “16 HSDPA users per cell”.
The HSUPA uses the default settings. The Iub delay threshold are
define as shown in the above snapshot.
1.For QoS, the default settings were used. Unless specified in this project.
Type of Document Guidelines - Number Revision Number
6.28 Define settings for external fault and control lines for
system module
You can run tests on the commissioned BTS. The test results and
reports are attached to the commissioning report.
For this part, only the Ethernet Test is done and saved for
documentation. WCDMA loop test can be done if the site is on air or
when the BTS is on Test State (if not yet integrated).
Type of Document Guidelines - Number Revision Number
View the contents of the commissioning report and save the report to
a file for documentation. Click finish to complete the commissioning
procedure.
Type of Document Guidelines - Number Revision Number
This file contains all the details of the hardware elements installed at
site. This is needed in the BTS site folder documentation. From the
tool tab, check the site information menu and save the data.
7.2 Snapshot
This data contains the site log files and settings of the TRS and BTS.
From the File Tab, choose Snapshot menu and save the data.
Type of Document Guidelines - Number Revision Number
This test will verify the IP routing of the BTS. Ping the remote address
(RNC, NTP server, Timing over Packet, BTS routing gateway) and if
there is no connectivity, this test fails. This can be done on the
commissioned state of the BTS prior to integration. Click the Tool Tab
and choose IP connectivity test.
Type of Document Guidelines - Number Revision Number
8.1 Pre-requisites
1. The BTS and TRS are commissioned; all parameters needed are
configured as per plan.
4. Call NOC to download Licence’s and Unlock the Site. See status
below.
9.1 Define the laptop IP address as shown in the figure below. This will
enable you to interrogate the 2G Flexi Multi Radio BTS equipment.
Type of Document Guidelines - Number Revision Number
Updated file for BTS parameters e.g. site id, bcf id, configuration, A-
BIS plan etc. This should be provided by Network Planning.
Perform back up of the existing configuration of the Flexi BTS for fall
back procedure if needed.
Type of Document Guidelines - Number Revision Number
Before starting, make sure that the preparations have been made as
highlighted in sec4. The following steps will guide you interrogating
the BTS equipment.
Start the Nokia 2G Flexi BTS Manager by clicking the icon on your
desktop. The task selection view opens as shown below.
Press the “update SW”. The progress bar will help us to follow the
process. Notice that FIREWALL SW running on PC could BLOCK the
downloading. When the Download is finished, The BTS will restart and
the PC automatically connect to the BTS.
Multi Radio BTS doesn’t autodetect un-commissioned radio modules,
thats the reason why only the system module appears on the screen.
This will last a few minutes and when finished, the BTS will restart.
Notice that any change in the BTS configuration needs a BTS reset to
be effective.
This will last a few minutes and when finished, the BTS will restart.
Notice that any change in the BTS configuration needs a BTS reset to
be effective.
Just populate the BCFID of the site, then proceed to the next step.
Specify from file and browse the 3G commissioning file (XML) earlier
saved then proceed to the next step.
Note that OPT1 is untick and your synchronization is also untick since
your 3G BTS is your master. Note also that the RF module (FXDA) is
already defined.
If DCS1800 is being used, then we need to add new RF chain for FXEA
using OPT2.
Since we hav Rx Sharing of FXDA (sector 4,5 & 6), the máximum
allowable Carrier power is 60W. Since 3G BTS uses 40W carrier power
already, our 2G BTS will now have a máximum of 20W carrier power to
be used. It can be 10W depending on the RF plan. While your FXEA
(sector 1,2 &3) will still have a máximum 60W carrier power since its
not shared.
Type of Document Guidelines - Number Revision Number
Associated antennas are defined for the FXDA and FXEA. Antenna
settings use default values.
FRM EAC settings are not used therefore this are not defined.
FSEB box is defined with its serial number, Product code is self-
generated.
PWE1 and PWE2 is enabled and the UDP ports are populated as per
plan.
Enable ABIS mapping and allow ABIS allocations from BTS Manager
Type of Document Guidelines - Number Revision Number
Populate the Abis Allocation as per ABIS plan per PWE for 900 and
1800 BTS.
Commissioning in Progress
Site Information
Indoor Sites
Once the BTS is commissioned, test the alarms with the NOC. Ask the NOC to
save and email you the log file. The Alarms will be tested twice. First before
moving the Alarm cable and second when the alarm cable is moved. Ensure
that the alarms on the old BTS are the same as on the MR BTS. Please note
that not all the sites will have the same alarms. The most common alarms are
listed below. If the alarm is not listed below simulate the alarm to test that it
is functional.
Outdoor Sites
Once the BTS is commissioned, test the alarms with the NOC. Ask the NOC to
save and email you the log file. The Alarms will be tested twice. First before
moving the Alarm cable and second when the alarm cable is moved. Ensure
that the alarms on the old BTS are the same as on the MR BTS. Please note
that not all the sites will have the same alarms. The most common alarms are
listed below. If the alarm is not listed below simulate the alarm to test that it
is functional.
10. References