You are on page 1of 4

Outpace Spinning Mills L

PROCESS CLEANING CHE

Checking Point: Shift: R/A Shift: R/B

Blow-room:
1. House Keeping
2. Floor cleaning
3. Bale cleaning & design
4. Different type waste segregation
5.Jossi rejection material cleaning & segregatio
Back Process:
1. House Keeping
2. Floor cleaning
3. Duct line greel check
4. Carding coiling zone/Cross apron
6. Drawing drafting zone & pnumo box
7. Drawing sliver piecing
8. Can cleaning & keeping (storage)
9. Simplex drafting zone
10. Roving storage / Fly on Roving
11. FIFO Maintain (Sliver & Roving)
Ring Section:
1. House Keeping
2. Floor cleaning
3. Duct line greel check
4. Roller lapping
5. Ring rail/Knee break/Inside&under the R/F
6. Wooden roller cleaning
7. Overhead condition/ Nozzle position
8. Waste segregation
9. Ring cops storage/ Fly on Ring cops
Winding:
1. Floor cleaning
2. House keeping
3. Duct greel check
4. Ring cops storage/ Fly on Ring cops
5. Gara segregation & storage
6. FIFO maintain
7. Ring cops & Bobbin under the M/C
8. SECDS, Rewinding Cone Segregation & cle
9. M/C cleaning condition
10. Waxing zone cleaning
11. Required/ accurate sticker
12. All M/C cleaning by Maint. Dept.(A & B shift)
13. Balcon codition
14. Guid condition
15. Overhead condition/ Nozzle position
Packing:
1. House Keeping
2. Floor cleaning
3. Cone storage

Action taken by: Shift in-charge

Abnormality% (Shift wise)


SHIFT OFFICER:-

__________ ____________
Checked by QCO
ace Spinning Mills Limited
ROCESS CLEANING CHECK
Date :
Shift: R/B Shift: R/C Remarks (if any)

R/A R/B R/C


Overall abnormality%

____________ ___________
AGM G.M

You might also like