DRAWING REGISTRY

SLAB MARK DESCRIPTION DATE


ROOF

SLAB
ROOF
Y1 Y2 Y3 Y4 Y5 Y6 Y7 Y8 Y9 Y10

91.49

12.00 12.00 12.00 12.00 12.00 12.00 12.00

X1
-03
FE

DECK
DECK

GA 26 G.I. ROOFING GA 26 G.I. ROOFING GA 26 G.I. ROOFING


(4% SLOPE) (4% SLOPE) (4% SLOPE)

10LBS PFE
10LBS PFE
X2
100Ø DRY STAND PIPE

FE-02
W/ 65Ø FIRE HOSE VALVE
W/ CAP & CHAIN

ROOF MANIFOLD (DRY)


100Ø x 65Ø x 65Ø INLET
SIAMESE TWIN PIPE

DECK
X3

X4
78.
60

DECK
GA 26 G.I. ROOFING GA 26 G.I. ROOFING GA 26 G.I. ROOFING
(4% SLOPE) (4% SLOPE) (4% SLOPE)

X5
0.5000

K
DEC

KEY PLAN:

FE-0
1 DEC
K
LIM KET KAI, CDO
SLAB PROPOSED ALLHOME
ROOF
100Ø DRY STAND PIPE
W/ 65Ø FIRE HOSE VALVE
4TH FLR PLAN
W/ CAP & CHAIN
K REVISION 1.0
DEC
AS OF 18 FEB 2017 AS OF 12 MAY 2017

3
64.6

R O A D L O T 1
10LBS PFE
K
DEC
X6

R O A D L O T 1
A ROOF DECK FIRE PROTECTION LAYOUT DRAWING PHASE:

FP-05 FOR CONSTRUCTION DRAWING

REPUBLIC ACT 9266


ENSIEDEL R. BLAS REYNALDO S. ALCALA JR. REYNALDO S. ALCALA JR.
ALL HOMES FP 05
3291 216-328-011 TOTAL SHEETS

4228550 01-03-17 CDO , PHILIPPINES 8