CONSTRUCTION OF ADDITIONAL
BUILDING OF UNODC

TENDER DRAWINGS

2015
ARCHITECTURAL
S.NO. DRAWING NO DESCRIPTION
01 B-00 LIST OF DRAWING

ARCHITECTURAL
02 B-01 GROUND FLOOR PLAN

03 B-02 FIRST FLOOR PLAN

04 B-03 ROOF PLAN

05 B-04 3D VIEW-01

06 B-05 3D VIEW-02

07 B-06 ELEVATION

08 B-07 SECTION A-A & DETAIL

09 B-08 DOOR AND WINDOW DETAIL

10 B-09 SAFE ROOM WINDOW & ENT. DOOR DETAIL

11
B-10 FURNITURE LAYOUT

12
B-11 FURNITURE LAYOUT
SCHEDULE OF FURNITURE
13 B-12 (ACCORDING TO INTERWOOD CATALOG)
STRUCTURE
14 G-01 GENERAL NOTES

15 G-02 TYPICAL DETAIL

16 G-03 FOUNDATION REINFORCEMENT LAYOUT PLAN

17 G-04 FOUNDATION BEAM LAYOUT [PLAN

18 G-05 FOUNDATION SECTION DETAIL& BEAMS DETAIL

19 G-06 COLUMNS LAYOUT PLAN

20 G-07 COLUMNS BASE PLATE LAYOUT PLAN

21 G-08 COLUMNS BASE PLATE DETAILS

22 G-09 FIRST FLOOR PLAN

23 G-10 ROOFING PLAN

24 G-11 TRUSS-01

25 G-12 TRUSS-02 AND RAFTER DESIGN

PLUMBING
26 P-01 GENERAL NOTES & LEGENDS

27 P-02 GROUND FLOOR SANITARY DRAINAGE LAYOUT

28 P-03 FIRST FLOOR SANITARY DRAINAGE LAYOUT

29 P-04 STORM WATER DRAINAGE LAYOUT

30 P-05 GROUND FLOOR WATER SUPPLY LAYOUT

31 P-06 FIRST FLOOR WATER SUPPLY LAYOUT

32 P-07 MISCELLANEOUS DETAIL-01

33 P-08 MISCELLANEOUS DETAIL-02

34 P-09 OHW.TANK STAND

35 P-10 OHW.TANK STAND FOOTING DETAIL

ELECTRICAL
36 E-01 EARTHING DETAIL

37 E-02 SYMBOLS DETAIL

38 E-03 DB.PLAN

39 E-04 GROUND FLOOR LIGHTING LAYOUT

40 E-05 FIRST FLOOR LIGHTING LAYOUT

41 E-06 GROUND FLOOR POWER LAYOUT

42 E-07 FIRST FLOOR POWER LAYOUT

43 E-08 GROUND FLOOR ALARM LAYOUT

44 E-09 FIRST FLOOR ALARM LAYOUT

45 E-10 GROUND FLOOR A/Cs LAYOUT

46 E-11 FIRST FLOOR A/Cs LAYOUT

47 E-12 GROUND FLOOR NETWORKING LAYOUT

48 E-13 FIRST FLOOR NETWORKING LAYOUT

49 E-14 LIGHTING PROECTION

ADDITION & REVISION

CONSTRUCTION OF ADDITIONAL
BUILDING OF UNODC UNITED NATION OFFICE ON DRUGS AND CRIME
DESIGNER:

TITLE:

DESIGNED BY: MI APPROVED BY: MR DATE. FEB, 2015


LIST OF DRAWINGS
DRAWN BY: SU JOB NO. 03 SCALE: AS SHOWN

CAD filename: B-00 CHECKED BY: MB DRG. NO. B-00


ADD./REV. NO. DATE DESCRIPTION DES. BY CHK. BY APP. BY
A B C

SEE DEATIL B-07a


W4 W4
1

MEETING ROOM
W4 W4
23'-10"x9'-7"

D4
2 SAFE DOOR

MALE WASHROOM

4'-0"x5'-0"
WC
V1

9'-9"x8'-3"
D6

W1

4'-0"x5'-0"
B B
D6

PASSAGE 5' WIDE

WC
D5 V1

FEMALE WASHROOM

4'-0"x5'-0"
WC
D5 V1
D6

9'-9"x8'-3"
SLIDING DOOR

D1

4'-0"x5'-0"
D6

WC
V1
WORK STATION
9'-9"x27'-6"
4
UP
D4 D4
A OFFICE A
PASSAGE 5' WIDE

W1 9'-9"x10'-6"
OF-34DK1LMW-21183

OF-34SR1R-MW-21185

W2

E-2
5
LOW CABINET
1'-6"x3'-0"

D4
OF-34DK1LMW-21183

OFFICE
W2 9'-9"x10'-3" OFFICE W2
PASSAGE 5' WIDE

9'-9"x10'-3"

D4

6
PHOTOCOPIER

OF-32-RC-C-9778T

RECETION
10'-0"x9'-3" W2
W2

OF-32-3R

UP
D2
7
W2 W2

E-1

ADDITION & REVISION

CONSTRUCTION OF ADDITIONAL
BUILDING OF UNODC UNITED NATION OFFICE ON DRUGS AND CRIME

TITLE:

DESIGNED BY: MI APPROVED BY: MR DATE. FEB, 2015


GROUND FLOOR PLAN
DRAWN BY: SU JOB NO. 03 SCALE: AS SHOWN

CAD filename: B-01 CHECKED BY: MB DRG. NO. B-01


ADD./REV. NO. DATE DESCRIPTION DES. BY CHK. BY APP. BY
A B C

W1 W1
1

LOW HEIGHT CABINET


1'-6"x3'-0"
W3
WORK STATION
W1
15'-0"x13'-3" D3
SLIDING DOOR

D4 OFFICE
9'-9"x11'-3"
DN
2

MALE WASHROOM
PASSAGE 5' WIDE
Full HEIGHT CABINET Full HEIGHT CABINET

4'-0"x5'-0"
1'-6"x3'-0" 1'-6"x3'-0"

WC
V1

9'-9"x8'-3"
Full HEIGHT CABINET Full HEIGHT CABINET Full HEIGHT CABINET
D6

SLIDING DOOR
1'-6"x3'-0" 1'-6"x3'-0" 1'-6"x3'-0"

D4
WORK STATION

4'-0"x5'-0"
W3 9'-9"x11'-0" D6

WC
D5 V1

FEMALE WASHROOM

4'-0"x5'-0"
WC
D5 V1
D6

9'-9"x8'-3"
W

4'-0"x5'-0"
Full HEIGHT CABINET Full HEIGHT CABINET
1'-6"x3'-0" 1'-6"x3'-0"

D6

WC
V1

OFFICE
4 9'-9"x9'-0"
LOW HEIGHT CABINET
1'-6"x3'-0"

W3
A D4
A
OFFICE
PASSAGE 5' WIDE

9'-9"x10'-6" W2

RECETION
10'-0"x7'-0" D4

E-2
5

D4

OFFICE
9'-9"x10'-3" W2
PASSAGE 4' WIDE

W2
LOW HEIGHT CABINET
1'-6"x3'-0"

REPRESENTATIVE
6 10'-9"x17'-9"
SLIDING DOOR

D4
1'-6"x3'-0"
CABINET

W2
W2
1'-6"x3'-0"
CABINET

7
W2 W2

E-1

ADDITION & REVISION

CONSTRUCTION OF ADDITIONAL
BUILDING OF UNODC UNITED NATION OFFICE ON DRUGS AND CRIME

TITLE:

DESIGNED BY: MI APPROVED BY: MR DATE. FEB, 2015


FIRST FLOOR PLAN
DRAWN BY: SU JOB NO. 03 SCALE: AS SHOWN

CAD filename: B-02 CHECKED BY: MB DRG. NO. B-02


ADD./REV. NO. DATE DESCRIPTION DES. BY CHK. BY APP. BY
A B C

ADDITION & REVISION

CONSTRUCTION OF ADDITIONAL
BUILDING OF UNODC UNITED NATION OFFICE ON DRUGS AND CRIME

TITLE:

DESIGNED BY: MI APPROVED BY: MR DATE. FEB, 2015


ROOF PLAN
DRAWN BY: SU JOB NO. 03 SCALE: AS SHOWN

CAD filename: B-03 CHECKED BY: MB DRG. NO. B-03


ADD./REV. NO. DATE DESCRIPTION DES. BY CHK. BY APP. BY
ADDITION & REVISION

CONSTRUCTION OF ADDITIONAL
BUILDING OF UNODC UNITED NATION OFFICE ON DRUGS AND CRIME

TITLE:

DESIGNED BY: MI APPROVED BY: MR DATE. FEB, 2015


3D VIEW-01
DRAWN BY: SU JOB NO. 03 SCALE: AS SHOWN

CAD filename: B-04 CHECKED BY: MB DRG. NO. B-04


ADD./REV. NO. DATE DESCRIPTION DES. BY CHK. BY APP. BY
ADDITION & REVISION

CONSTRUCTION OF ADDITIONAL
BUILDING OF UNODC UNITED NATION OFFICE ON DRUGS AND CRIME

TITLE:

DESIGNED BY: MI
3D VIEW-02 APPROVED BY: MR DATE. FEB, 2015

DRAWN BY: SU JOB NO. 03 SCALE: AS SHOWN

CAD filename: B-05 CHECKED BY: MB DRG. NO. B-05


ADD./REV. NO. DATE DESCRIPTION DES. BY CHK. BY APP. BY
EL + 28'-0"

EL + 23'-0"
GLASS HOLDING SPIDERS

12MM CLEAR GLASS

GLASS JOINT
FIRST FLOOR FINISH
LEVEL + 11'-6"

F.G.L -6"

E-1 ELEVATION

EL + 28'-0"

EL + 23'-0"

FIRST FLOOR FINISH


LEVEL + 11'-6"

F.G.L -1'-0"

E-2 ELEVATION

ADDITION & REVISION

CONSTRUCTION OF ADDITIONAL
BUILDING OF UNODC UNITED NATION OFFICE ON DRUGS AND CRIME

TITLE:

DESIGNED BY: MI APPROVED BY: MR DATE. FEB, 2015


ELEVATIONS
DRAWN BY: SU JOB NO. 03 SCALE: AS SHOWN

CAD filename: B-06 CHECKED BY: MB DRG. NO. B-06


ADD./REV. NO. DATE DESCRIPTION DES. BY CHK. BY APP. BY
EL + 28'-0"

EL + 23'-0"

FALSE CEILING
GLASS PARTITION

11'-0"
5'-0"
FIRST FLOOR FINISH
3'-0"
LEVEL + 11'-6"
GLASS DOOR
3'-0"

11'-0"
5'-0"

GLASS PARTITION

GLASS DOOR
3'-0"

F.G.L -6"

A-A SECTION
3'-0"
5'-0"

BRICK MASONARY

FOUNDATION

WORK STATION
3'-0"

2'-6"

N.S.L

MASONARY WALL DETAIL

ADDITION & REVISION

CONSTRUCTION OF ADDITIONAL
BUILDING OF UNODC UNITED NATION OFFICE ON DRUGS AND CRIME

TITLE:

DESIGNED BY: MI APPROVED BY: MR DATE. FEB, 2015

SECTION
DRAWN BY: SU JOB NO. 03 SCALE: AS SHOWN

CAD filename: B-07 CHECKED BY: MB DRG. NO. B-07


ADD./REV. NO. DATE DESCRIPTION DES. BY CHK. BY APP. BY
S NO. DETAIL QUANTITY SIZE SIL DESCRIPTION

1 D1 01 6'-0"x7'-0"

2 D2 01 5'-0"x7'-0"

3 D3 01 4'-0"x7'-0"

4 D4 10 3'-6"x7'-0"

5 D5 03 3'-0"x7'-0"

6 D6 08 2'-6"x7'-0"

7 W1 06 6'-0"x5'-0" 3'-0"

8 W2 18 5'-0"x5'-0" 3'-0"

9 W3 03 4'-0"x5'-0" 3'-0"

10 W4 04 4'-6"x5'-0" 3'-0"

11 V1 08 2'-0"x2'-0" 6'-0"

GLASS WITH SHATTER PROOF COAING

W4
FFL FFL

ENT. DOOR DETAILS WINDOW DETAILS

ADDITION & REVISION

CONSTRUCTION OF ADDITIONAL
BUILDING OF UNODC UNITED NATION OFFICE ON DRUGS AND CRIME

TITLE:

DESIGNED BY: MI APPROVED BY: MR DATE. FEB, 2015


DOOR AND WINDOW DETAIL
DRAWN BY: SU JOB NO. 03 SCALE: AS SHOWN

CAD filename: B-08 CHECKED BY: MB DRG. NO. B-08


ADD./REV. NO. DATE DESCRIPTION DES. BY CHK. BY APP. BY
SAFE ROOM DOOR

1/2" THICK STEEL PANEL ROOLER WHEEL GLASS WITH SHATTER PROOF COAING

W4

SAFE ROOM WINDOW DETAILS


ADDITION & REVISION

CONSTRUCTION OF ADDITIONAL
BUILDING OF UNODC UNITED NATION OFFICE ON DRUGS AND CRIME

TITLE:

DESIGNED BY: MI APPROVED BY: MR DATE. FEB, 2015


SAFE ROOM WINDOW & ENT. DOOR
TYPICAL DETAIL
DRAWN BY: SU JOB NO. 03 SCALE: AS SHOWN

CAD filename: B-09 CHECKED BY: MB DRG. NO. B-09


ADD./REV. NO. DATE DESCRIPTION DES. BY CHK. BY APP. BY
MEETING ROOM
23'-10"x9'-7"
OF-03-04VC-JA

OF-32MT14-L

D4
SAFE DOOR

MALE WASHROOM
9'-9"x8'-3"
PASSAGE 5' WIDE

FEMALE WASHROOM
STAFF CHAIR
OF-01VCRW

9'-9"x8'-3"
WORK STATION
9'-9"x27'-6"

OF-32-WL-CH

D4
PASSAGE 5' WIDE

OFFICE
OF-34DK1LMW-21183

9'-9"x10'-6"

OFFICE STAFF CHAIR OF-34SR1R-MW-21185


OF-04-03 EC-JV W2

OF-34SR1R-MW-21185

OF-31FFC-L OFFICE STAFF CHAIR


D4 OFFICE OF-04-03 EC-JV
OF-34DK1LMW-21183 9'-9"x10'-3"
OF-34CR1-MW-21186

OF-34SR-MW-15757
OFFICE
9'-9"x10'-3"

OFFICE STAFF CHAIR


OF-04-03 EC-JV

VISITOR CHAIR
OF-04-03 EC-JV
PHOTOCOPIER

UP
OF-32-RC-C-9778T

RECETION
10'-0"x9'-3"

OF-32-3R

ADDITION & REVISION

CONSTRUCTION OF ADDITIONAL
BUILDING OF UNODC UNITED NATION OFFICE ON DRUGS AND CRIME

TITLE:

DESIGNED BY: MI APPROVED BY: MR DATE. FEB, 2015


FURNITURE LAYOUT PLAN
DRAWN BY: SU JOB NO. 03 SCALE: AS SHOWN

CAD filename: B-10 CHECKED BY: MB DRG. NO. B-10


ADD./REV. NO. DATE DESCRIPTION DES. BY CHK. BY APP. BY
W1 W1

OF-31FFC-L

OF-34SR1R-MW-21185

WORK STATION
15'-0"x13'-3"
OF-34DK1LMW-21183

OF-32-WL-CH

OFFICE
9'-9"x11'-3"

OF-31FFC-L

PASSAGE 5' WIDE

MALE WASHROOM
9'-9"x8'-3"
OF-31FFC-L

WORK STATION
9'-9"x11'-0"

OF-32-WL-CH

FEMALE WASHROOM
9'-9"x8'-3"
W
Full HEIGHT CABINET Full HEIGHT CABINET
1'-6"x3'-0" 1'-6"x3'-0"

OF-31FFC-L

OF-34SR-MW-15757
OFFICE
9'-9"x9'-0" OF-31FFC-L
PASSAGE 5' WIDE

OF-34SR1R-MW-21185

OFFICE
9'-9"x10'-6"

OF-34DK1LMW-21183

RECETION
10'-0"x7'-0"

OF-32-RC-C-9778T

OFFICE
9'-9"x10'-3"

OF-31ST-L

OF-34DK1LMW-21183
PASSAGE 4' WIDE

OF-31MT205-L
OF-34SR1R-MW-21185

OF-31-2R OF-31FFC-L

REPRESENTATIVE
10'-9"x17'-9"

OF-31DKSRL
OF-31CR-L

ADDITION & REVISION

CONSTRUCTION OF ADDITIONAL
BUILDING OF UNODC UNITED NATION OFFICE ON DRUGS AND CRIME

TITLE:

DESIGNED BY: MI APPROVED BY: MR DATE. FEB, 2015


FURNITURE LAYOUT PLAN
DRAWN BY: SU JOB NO. 03 SCALE: AS SHOWN

CAD filename: B-11 CHECKED BY: MB DRG. NO. B-11


ADD./REV. NO. DATE DESCRIPTION DES. BY CHK. BY APP. BY
S NO. CODE DESCRIPTION SIZE (MM)

1 OF-32-2R TWO SEATER SOFA WITH 1395 X 760 X 635


LEATHERITE
2 COUNTER BUDGET RECEPTION 1476 X 920 X 1065
OF-32-RC-C-9778T COUNTER C
3
OF-34DK1L-MW-21183 DESK RI-FLEX DESK 1350 X 685 X 760

4 SIDE RACK RI-FLEX 1065 X 400 X 670


OF-34SR1R-MW-21185

5 OF-31FFC-L FULL HEIGHT FILING CABINET 830 X 425 X 1947

6 OF-34SR-MW-15757 DESK

7 OF-34CR1-MW-21186 CREDENZA RI-FLEX 1354 X 350 X 670

8 OF-32-WL-CH WORKSTATIONS

MEETING TABLE
9 6400 X 1600 X 750
OF-32MT14-L (14 PERSONS)

10 DESK WITH SIDE RACK


OF-31DKSRL AND EXTENSION 1500 X 1200 X 750

11 MEETING TABLE ROUND 1050 X 1050 X 750


OF-31MT205-L
(5 PERSONS)
12 TWO SEATER SOFA
OF-31-2R
WITH LEATHERITE
13 SIDE TABLE 600 X 600 X 460
OF-31ST-L

14 STAFF CHAIR
OF-01VCRW

15 OFFICE STAFF CHAIR


OF-04-03 EC JA

16 VISITOR CHAIR
OF-03-04 VEJA

ADDITION & REVISION

CONSTRUCTION OF ADDITIONAL
BUILDING OF UNODC UNITED NATION OFFICE ON DRUGS AND CRIME

TITLE:

DESIGNED BY: MI
SCHEDULE OF FURNITURE APPROVED BY: MR DATE. FEB, 2015

(ACCORDING TO INTERWOOD CATALOG)


DRAWN BY: SU JOB NO. 03 SCALE: AS SHOWN

CAD filename: B-12 CHECKED BY: MB DRG. NO. B-12


ADD./REV. NO. DATE DESCRIPTION DES. BY CHK. BY APP. BY
STRUCTURE
ADDITION & REVISION

CONSTRUCTION OF ADDITIONAL
BUILDING OF UNODC UNITED NATION OFFICE ON DRUGS AND CRIME

TITLE:

DESIGNED BY: MI APPROVED BY: MR DATE. FEB, 2015


GENERAL NOTES
DRAWN BY: SU JOB NO. 03 SCALE: AS SHOWN

CAD filename: G-01 CHECKED BY: MB DRG. NO. G-01


ADDITION & REVISION

CONSTRUCTION OF ADDITIONAL
BUILDING OF UNODC UNITED NATION OFFICE ON DRUGS AND CRIME

TITLE:

DESIGNED BY: MI APPROVED BY: MR DATE. FEB, 2015


TYPICAL DETAILS
DRAWN BY: SU JOB NO. 03 SCALE: AS SHOWN

CAD filename: G-02 CHECKED BY: MB DRG. NO. G-02


ADDITION & REVISION

CONSTRUCTION OF ADDITIONAL
BUILDING OF UNODC UNITED NATION OFFICE ON DRUGS AND CRIME

TITLE:

DESIGNED BY: MI APPROVED BY: MR DATE. FEB, 2015

FOUNDATION REINFORCEMENT LAYOUT PLAN


DRAWN BY: SU JOB NO. 03 SCALE: AS SHOWN

CAD filename: G-03 CHECKED BY: MB DRG. NO. G-03


ADDITION & REVISION

CONSTRUCTION OF ADDITIONAL
BUILDING OF UNODC UNITED NATION OFFICE ON DRUGS AND CRIME

TITLE:

DESIGNED BY: MI APPROVED BY: MR DATE. FEB, 2015

FOUNDATION BEAM LAYOUT PLAN


DRAWN BY: SU JOB NO. 03 SCALE: AS SHOWN

CAD filename: G-04 CHECKED BY: MB DRG. NO. G-04


2' 12"

AS PER SITE

18"
21"
OR

3" 3"

DETAIL-"B"

PLINTH PROTECTION DETAIL

PLINTH PROTECTION DETAIL

DETAIL - B
6"

4#6 #3@9" #3@9" 4#6


#3@9" #3@9"

BEAM REINF. #3@4"


3"

N.S.L N.S.L

3" THICK
P.C.C 1:4:8 WELL COMPACTED EARTH
FOOTING SECTION TYPICAL

ADDITION & REVISION

CONSTRUCTION OF ADDITIONAL
BUILDING OF UNODC UNITED NATION OFFICE ON DRUGS AND CRIME

TITLE:

FOUNDATION SECTION DETAIL DESIGNED BY: MI APPROVED BY: MR DATE. FEB, 2015
&
BEAMS DETAIL DRAWN BY: SU JOB NO. 03 SCALE: AS SHOWN

CAD filename: G-05 CHECKED BY: MB DRG. NO. G-05


ADDITION & REVISION

CONSTRUCTION OF ADDITIONAL
BUILDING OF UNODC UNITED NATION OFFICE ON DRUGS AND CRIME

TITLE:

DESIGNED BY: MI APPROVED BY: MR DATE.FEB, 2015


COLUMNS LAYOUT PLAN
DRAWN BY: SU JOB NO. 03 SCALE: AS SHOWN

CAD filename: G-06 CHECKED BY: MB DRG. NO. G-06


ADDITION & REVISION

CONSTRUCTION OF ADDITIONAL
BUILDING OF UNODC UNITED NATION OFFICE ON DRUGS AND CRIME

TITLE:

DESIGNED BY: MI APPROVED BY: MR DATE.FEB, 2015


COLUMNS BASE PLATE LAYOUT PLAN
DRAWN BY: SU JOB NO. 03 SCALE: AS SHOWN

CAD filename: G-07 CHECKED BY: MB DRG. NO. G-07


ADDITION & REVISION

CONSTRUCTION OF ADDITIONAL
BUILDING OF UNODC UNITED NATION OFFICE ON DRUGS AND CRIME

TITLE:

DESIGNED BY: MI APPROVED BY: MR DATE.FEB, 2015


COLUMNS BASE PLATE LAYOUT PLAN
DRAWN BY: SU JOB NO. 03 SCALE: AS SHOWN

CAD filename: G-08 CHECKED BY: MB DRG. NO. G-08


ADDITION & REVISION

CONSTRUCTION OF ADDITIONAL
BUILDING OF UNODC UNITED NATION OFFICE ON DRUGS AND CRIME

TITLE:

DESIGNED BY: MI APPROVED BY: MR DATE.FEB, 2015


FIRST FLOOR PLAN
DRAWN BY: SU JOB NO. 03 SCALE: AS SHOWN

CAD filename: G-09 CHECKED BY: MB DRG. NO. G-09


ADDITION & REVISION

CONSTRUCTION OF ADDITIONAL
BUILDING OF UNODC UNITED NATION OFFICE ON DRUGS AND CRIME

TITLE:

DESIGNED BY: MI APPROVED BY: MR DATE.FEB, 2015


ROOFING PLAN
DRAWN BY: SU JOB NO. 03 SCALE: AS SHOWN

CAD filename: G-10 CHECKED BY: MB DRG. NO. G-10


ADDITION & REVISION

CONSTRUCTION OF ADDITIONAL
BUILDING OF UNODC UNITED NATION OFFICE ON DRUGS AND CRIME

TITLE:

DESIGNED BY: MI APPROVED BY: MR DATE.FEB, 2015


TRUSS-1
DRAWN BY: SU JOB NO. 03 SCALE: AS SHOWN

CAD filename: G-11 CHECKED BY: MB DRG. NO. G-11


ADDITION & REVISION

CONSTRUCTION OF ADDITIONAL
BUILDING OF UNODC UNITED NATION OFFICE ON DRUGS AND CRIME

TITLE:

DESIGNED BY: MI APPROVED BY: MR DATE.FEB, 2015


TRUSS-2 AND RAFTER DESIGN
DRAWN BY: SU JOB NO. 03 SCALE: AS SHOWN

CAD filename: G-12 CHECKED BY: MB DRG. NO. G-12


PLUMBING
GENERAL NOTES.
1 - PIPE PASSING THROUGH WALL, FLOOR OR
ROOF SHALL BE PROTECTED WITH SLEEVES
2 - PIPE SIZES & DIMENSIONS ARE IN INCHES,
UNLESS OTHERWISE MENTIONED

3 - PLUMBING SERVICES, SHALL BE CO-ORDINATED DIAMETER OF PIPE


O/
WITH OTHER SERVICES SUCH AS ELECTRICAL,
CW or C COLD WATER PIPE
ETC. TO AVOID CONFLIT OR INTERFERENCE WITH
RWP RAIN WATER PIPE
THEM.
SP SOIL PIPE

4 - SIZE OF FLOOR DRAIN UNLESS OTHERWISE WP WASTE PIPE


STATED SHALL BE SAME AS THE SIZE OF
VP VENT PIPE
OUTLET DRAIN PIPE.
V/S VENT STACK

5 - WHEREVER FLOOR DRAIN/TRAP IS SHOWN, T/A TO ABOVE

SLOPE FLOOR TOWARDS DRAIN/TRAP. U/G. UNDER GROUND

U/F. UNDER FLOOR


6 - MINIMUM AND MAXIMUN SLOPE OF UPVC DRAINAGE PIPES
MH MANHOLE
AS PER MANNING FORMULA
N.T.S. NOT TO SCALE

PIPE DIA SLOPE


/O6" 0.30% MIN 4.50% MAX

/O4" 0.50% MIN 8 % MAX


/O3" 1% MIN 13 % MAX
/O2" 1.50% MIN 20% MAX

7 - EXTENSION OF VENT PIPES THROUGH A ROOF


COLD WATER PIPE
SHALL BE TERMINATED AT LEAST 6 INCHES
ABOVE FINISHED ROOF LEVEL. EACH VENT SOIL PIPE

TERMINAL SHALL BE MADE WATER TIGHT WITH WASTE PIPE


THE ROOF BY PROPER FLASHING
VENT PIPE

8 - SIZE OF ANYTHING GIVEN ON PLUMBING DRAWING RAIN WATER PIPE


MEANS ITS CLEAR DIMENSIONS (CAPACITY), GATE VALVE ON VERTICAL PIPE
UNLESS OTHERWISE MENTIONED.
FLOAT VALVE

GATE VALVE ON HORIZONTAL PIPE


9 - THE "VERTICAL DISTANCE" FROM FIXTURE OUTLET
CHECK VALVE
TO THE TRAP WEIR SHALL PREFERABLY BE NOT
MORE THAN 12 INCHES. DIRECTION OF FLOW

WATER TAP
10 - WHERE THE CHANGE OF DIRECTION IS 45° OR LESS,
MUSLIM SHOWER
IT IS NOT NECESSARY TO PROVIDE A CLEAN OUT.
BUT WHEN THE CHANGE IN DIRECTION IS MORE THAN GULLY TRAP
45°, A CLEAN OUT SHOULD BE REQUIRED. MULTI FLOOR TRAP

11 - ALL TRAPS AND FLOOR DRAINS SHALL HAVE A WATER FLOOR TRAP

SEAL NOT LESS THAN 2 INCHES. GREASE INTERCEPTOR

12 - (EXTERNAL SERVICES) THE BOTTOM OF WATER-SERVICES


PIPE , AT ALL POINTS,SHALL BE AT LEAST 12 INCHES
ABOVE THE TOP OF THE SEWER LINE AT ITS HIGHEST
POINT.

13 - NO "T" FITTING IS ALLOWED IN SANITARY DRAINAGE LAYOUT.


USE ONLY "Y" FITTINGS.

14 - PLACE START (FIRST) MANHOLE INVERT AT 2'-6" BELOW FGL OR NSL (WHICHEVER
IS LOWER). THEN SLOPE SEWER AT MINIMUM S=1%.

15 - PLEASE CHECK THE DIRECTION OF QIBLA WHILE FIXING WCs /URINALS


16 - ALL PPR PIPE SIZES SHOWN ON DRAWING ARE OUTER DIAMTERS.

ADDITION & REVISION

CONSTRUCTION OF ADDITIONAL
BUILDING OF UNODC UNITED NATION OFFICE ON DRUGS AND CRIME

TITLE:

DESIGNED BY: MI APPROVED BY: MR DATE. FEB, 2014


GENERAL NOTES & LEGEND
DRAWN BY: SU JOB NO. 02 SCALE: AS SHOWN

CAD filename: P-01 CHECKED BY: MB DRG. NO. P-01


ADDITION & REVISION

CONSTRUCTION OF ADDITIONAL
BUILDING OF UNODC UNITED NATION OFFICE ON DRUGS AND CRIME

TITLE:

DESIGNED BY: MI APPROVED BY: MR DATE. FEB, 2014


ROOF PLAN
STORM WATER DRAINAGE LAYOUT
DRAWN BY: SU JOB NO. 02 SCALE: AS SHOWN

CAD filename: P-04 CHECKED BY: MB DRG. NO. P-04


INLET OUTLET

P.C.C. (1:2:4)

PLAN

FLOOR CLEANOUT DETAILS

VARIES
MIN 6"
INLET OUTLET

2"
PVC BODY

ELEVATION
MULTI FLOOR TRAP'S DETAIL
DETAIL OF FLOOR TRAP
OR
FLOOR DRAIN'S DETAIL

6"x6"C.I COVER
AND FRAME
FGL
4½" 4½"

FGL
BACKFILL

VARIES
2' MIN
INLET
12"(Min.)

6"

OUTLET
SAND

PIPE
18"

PCC. CLASS-"C"(1:2:4)
4"

6"

4" 4"

24"
4"

PIPE TRENCH DETAIL


DETAILS OF GULLY TRAP

ADDITION & REVISION

CONSTRUCTION OF ADDITIONAL
BUILDING OF UNODC UNITED NATION OFFICE ON DRUGS AND CRIME

TITLE:

DESIGNED BY: MI APPROVED BY: MR DATE. FEB, 2015


MISCELLANEOUS DETAILS-01
DRAWN BY: SU JOB NO. 02 SCALE: AS SHOWN

CAD filename: P-07 CHECKED BY: MB DRG. NO. P-07


C.I MH. COVER
WITH FRAME
(LIGHT DUTY) 421"

3"
PCC (1:2:4)

(3/4"THICK 1:4 C/S PLASTER)

3"
Ø3/4"GALVANIZED
MS.LADDER RUNG
AT 12"C/C.
12"

S LO :10
PE 1
:10 PE 1 BENCHING PCC.
S LO
(1:2:4)

P.C.C CLASS -"C"

P.C.C CLASS -"E"

PLAN OF BRICK MASONRY MANHOLE SECTION "C-C"

FGL
1'-6" 3"
6" MIN

3" 6" A A #3,12"C/C


3"

3"
1'

#3,6"C/C

1'
PCC (1:2:4) REINFORCEMENT DETAIL
OF PRECAST COVER
2'
3"

PCC (1:4:8)

PLAN OF DRAIN WITH PRE CAST COVERS


3'

DRAIN WITH PRE CAST COVERS


SECTION A-A
1'X1-1/2'X3"THICK

ADDITION & REVISION

CONSTRUCTION OF ADDITIONAL
BUILDING OF UNODC UNITED NATION OFFICE ON DRUGS AND CRIME

TITLE:

DESIGNED BY: MI APPROVED BY: MR DATE. FEB, 2015


MISCELLANEOUS DETAILS-02
DRAWN BY: SU JOB NO. 02 SCALE: AS SHOWN

CAD filename: P-08 CHECKED BY: MB DRG. NO. P-08


ADDITION & REVISION

CONSTRUCTION OF ADDITIONAL
BUILDING OF UNODC UNITED NATION OFFICE ON DRUGS AND CRIME

TITLE:

DESIGNED BY: MI APPROVED BY: MR DATE. FEB, 2015


OHWT.TANK STAND
DRAWN BY: SU JOB NO. 02 SCALE: AS SHOWN

CAD filename: P-09 CHECKED BY: MB DRG. NO. P-09


ADDITION & REVISION

CONSTRUCTION OF ADDITIONAL
BUILDING OF UNODC UNITED NATION OFFICE ON DRUGS AND CRIME

TITLE:

DESIGNED BY: MI APPROVED BY: MR DATE. FEB, 2015


OHW.TANK STAND FOOTING DETAIL
DRAWN BY: SU JOB NO. 02 SCALE: AS SHOWN

CAD filename: P-10 CHECKED BY: MB DRG. NO. P-10

You might also like