1) Po4 c.

over due to operation drum wtr lvl at igh side


2) Standardized utilization of method calculate demin wtr prod. Cosr based on operation, capital,
manpower etc2
3) Auto ammonia dosing to be practiced in other plants
4) Review frequency of test for raw water based on critical parameter only-cost saving
5) Review usage of chemical (nalco, higard) to change to po4 in cooling wtr system to minimise
problem

MoM TNB CBSB before next meeting