GLGR HRSG LP2 STEAM Cat. Cond. Over limit since 3/2/2018 at 0.7uS/cm

To get photo for temporary SW Storage Awaiting Cbsb

Email from Shahid CBSB

Update re-reg pond UJLI & SJCH sediment issue

UJLI re-reg pond DSCEO decided to has that pond, cost ~200mil

2/1/2018

Chemical Community Meeting Feb 2018

PC&E, AO services to REMACO plant:

-environmental assessment/audit & guidance; GSR, reporting, EIA, emission monitoring

-cycle chemistry monitoring & guidance, guidelines development

Prowess-strength, superior ability

To include plant status in CEMS daily monitoring sheet

Azhari – hraf1678/2018 9nov2017 (7541) 032296 6252 rm8105 latif-gaji 032296 6295

4/12/2017

KPI setting to draf

Monthly environment performance report – to check status of submission by station. HT, CBSB, Prai &
UJelai submitted already.
15.11.2017

Presentation on competencies by Noor Azhar:

10.11.2017

Siapkan draf KPI individu

Target guideline cycle Chemistry guideline & DH2

Amik PI P&ID folder ; yet to complete

KEV BTF to get info on the root cause ; awaiting feedback from Siva KEV

Check flue gas flow data from PI stations for TNBR R&D project

Check on PRAI emission for GB10

8.11.2017

Final revision P&D KPI – end of Nov 2017

25.10.2017

Cost saving for P&D KPI – own project / initiative starts from P&D

Look into TST format & operation ; preparation for Melaka trip

12.10.17

Reminder psl internal mtg gelugor (email)

Outage finding from Glgr plant HRSG2

Check drawing cooler CCCW & chiller for case CBSB GF3

SLA PD (TJPS) – cannot operate open cycle. Whether block run or no run.

PAKA chemist

PAKA – forecast will operates only 36 days in 16 months.


System1 – vibration

Smartsignal

IPDM

Oil spillage at Cameron Highland , Mahang Dam 3/10/2017

SHE Generation :

Data performance & analytic – Zaim

Farhana – engagement & culture

KZ - Training