1 2015-16/395 01-04-2016 DP M/s. L & T LOA Issued
2 2016-17/605 17-01-2016 DP C.G.M. Deviation statement approval
3 2015-16/ 02-10-2016 C.G.M. M/s. L & T Original Agreement
4 2016-17/ G.M PD-III C.G.M. Proof check of hydraulic design of Rcpuram at OU
Ass. Engg., Electrical
5 2016-17/ G.M PD-VI Shifting of electric pole at chilkanagar- Uppal
Devision, Uppal
6 2016-17/384 03-05-2016 G.M PD-IV M/s. L & T Permission for field survey
7 2015-16/490 24-03-2016 C.G.M. G.M PD-III Forwarding of Agreement
8 2016-17/41 04-07-2016 C.G.M. G.M PD-VI Design & drawng of Elugutta
9 2016-17/26 28-04-2016 G.M PD-VI Director, IDIC Proof check of Elugutta

10 2016-17/48 16-05-2016 G.M PD-VI M/s. L & T Furnishing of designs, drawings, detailed layout of pipeline, GLSR, ELSR in Uppal
11 2016-17/81 17-05-2016 G.M PD-III M/s. L & T Construction of RCC Reservoirs in Alwal & Rcpuram
12 2016-17/31 17-05-2016 G.M PD-IV M/s. L & T Construction of RCC Reservoirs in Kapra
13 2016-17/88 20-05-2016 G.M PD-III M/s. L & T Construction of RCC Reservoirs in Rcpuram
14 23-05-2016 QAP for Gunniting on external surface of MS Pipes
15 05-06-2016 QAP for Cement Mortar Lining on internal surface of MS Pipes
16 2016-17/98 26-05-2016 C.G.M. Director, IDIC Proof check of Designs & Drawings of work
17 2016-17/ 28-05-2016 G.M PD-IV M/s. L & T Reply of LTCD/GHMC - 44
18 2016-17/114/2 06-06-2016 C.G.M. M/s. L & T Design & drawng of Radhika
19 2016-17/114/1 06-06-2016 C.G.M. M/s. L & T Design & drawng of OUT
20 2016-17/ 06-10-2016 G.M PD-VI Director, IDIC Proof Check of NGRI
21 2016-17/129 14/6/2016 G.M PD-III BSNL/Airtel/OFC Road cutting permission
22 2016-17/131/1 15/6/2016 C.G.M. M/s. L & T Design & drawng of Ashoknagar & LIG Colony
23 2016-17/130 15/6/2016 G.M PD-III TSCPDCL, Hyderabad Shifting of electric poles at Alwal
24 2016-17/143/1 17/6/2016 C.G.M. M/s. L & T Design & drawing of Kowkoor, under Alwal Circle - Approval
Construction of RCC Service Reservoirs and providing Inlet, Outlet, & Distribution network in
25 2016-17/87 18/6/2016 G.M PD-IV M/s. L & T
Kapra Circle.
26 20/06/IDIC/UCE/OU 20/6/2016 Director, IDIC G.M PD-VI Proof checking of 1 ML ELSR at NGRI in Uppal Circle
27 2016-17/ 26/6/2016 G.M PD-IV C.G.M. Proof check of 7.5 ML GLSR at ECIL, cherlapalli done at OU
28 26/06/IDIC/UCE/OU 26/6/2016 Director, IDIC C.G.M. Proof checking of 7.5 ML GLSR at ECIL, Cherlapalli in Kapra Circle
29 26/06/IDIC/UCE/OU 26/6/2016 Director, IDIC C.G.M. Proof checking of 2.0 ML GLSR at Gopalreddynagar in Kapra Circle
30 2016-17/144/1 28/6/2016 C.G.M. M/s. L & T Design & drawing of 2 ML GLSR at Gopalreddynagar, under kapraCircle - Approval
31 29/06/IDIC/UCE/OU 29/6/2016 Director, IDIC G.M PD-VI Proof checking of 22.5 ML GLSR at Temple Alwal in Alwal Circle
Proof check of 22.5 ML GLSR at Temple Alwal, under Alwal Circle and 2.5 ML ELSR at
32 2016-17/159 30/6/2016 G.M PD-III Director, IDIC
BHEL(MIG Colony) under Rcpuram Circle done at OU
33 02/07/IDIC/UCE/OU 07-02-2016 Director, IDIC G.M PD-III Proof checking of 2.5 ML GLSR at BHEL MIG Colony in Rcpuram Circle
34 02/07/IDIC/UCE/OU 07-04-2016 Director, IDIC G.M PD-VI Proof checking of 1 ML ELSR at Gokhalenagar in Uppal Circle
35 2016-17/169 07-05-2016 G.M PD-III Director, IDIC Proof check of 1.5 ML ELSR at yapral, under Alwal Circle done at OU
Construction of RCC Service Reservoirs and providing Inlet, Outlet, & Distribution network in
36 2016-17/137 07-06-2016 G.M PD-IV M/s. L & T
Kapra Circle.
37 08/07/IDIC/UCE/OU 07-08-2016 Director, IDIC G.M PD-III Proof checking of 1.5 ML ELSR at Yapral under Alwal Circle
38 08/07/IDIC/UCE/OU 07-08-2016 Director, IDIC G.M PD-III Proof checking of 22.5 ML GLSR at Temple Alwal under Alwal Circle
39 2016-17 07-09-2016 G.M PD-III C.G.M. Proof check of 22.5 ML GLSR at Temple Alwal, under Alwal Circle done at OU
40 2016-17/174 07-12-2016 C.G.M. M/s. L & T Design & drawing of 1 ML ELSR at NGRI Colony, under Uppal Circle - Approval
41 2016-17/173 13/7/2016 DP All GM & CGM Arranging work done payment for respective circles.
42 2016-17/187 22/7/2016 C.G.M. M/s. L & T Design & drawing of 2.5 ML ELSR at BHEL MIG Colony, under RCpuram Circle - Approval

Construction of RCC Service Reservoirs and providing Inlet, Outlet, & Distribution network in
43 2016-17/159 25/7/2016 G.M PD-IV C.G.M.
Kapra Circle.
44 2016-17/113/1 28/7/2016 G.M PD-VI Director, IDIC Proof check of 1.0 ML ELSR at Gokhalenagar, under Uppal Circle done at OU
45 2016-17/98/2 28/7/2016 C.G.M. M/s. L & T Design & drawing of 1 ML ELSR at Gokhalenagar, under Uppal Circle - Approval
46 30072016/IDIC/ 30/7/2016 Director, IDIC C.G.M. Proof checking of Design and Drawing of work of Alwal package
47 2016-17/ 08-04-2016 G.M PD-III C.G.M. Proof check of 1.5 ML ELSR at Yapral, under Alwal Circle done at OU
48 No. 30072016/IDIC 08-06-2016 Director, IDIC C.G.M. Proof checking of Design and Drawing of work of Alwal, Kapra & Rcpuram package
49 No. 30072016/IDIC 08-06-2016 Director, IDIC C.G.M. Proof checking of Design and Drawing of work of Alwal package
Divisional Railway Permission for laying of 1700mm dia casing pipe under railway track by Hydraulic jacking &
50 2016-17/208 08-09-2016 G.M PD-III
Manager pushing technique
51 Proc No. 2626/B1/2011/5302 16/8/2016 Managing Director DP & C.G.M. Functional arrangement of CGM & DP

Memo No.
52 19/8/2016 Managing Director All GM & CGM Suspension of M/s GSK - Vishwa (JV) agency from the works of HMWS&SB
27616/B4/2016/2942/5364
53 2016-17/222 22/8/2016 G.M PD-III M/s. L & T Revised QAP for DI Fittings
54 2016-17/193 09-01-2016 G.M PD-IV M/s. L & T Deviation in Agreement Quantities for reservoir in OUT zone - Approval
55 Edexmp/16-17/258 09-09-2016 C.G.M. M/s. L & T EDEC for DI Pipes (D3/290/2015)
56 2016-17/248 09-07-2016 C.G.M. All GM processing of work done payments for the work
57 MOM on 12-09-2016 09-12-2016 DP All GM/CGM/L&T Minutes of review meeting
58 2016-17/26 09-12-2016 C.G.M. G.M PD-IV Designs and Drawings of Kapra under Kapra Circle
59 2016-17/P/RCp 19/9/2016 G.M PD-III Director, IDIC Proof check of 2.5 ML ELSR at Ashoknagar, under Rcpuram Circle done at OU
60 2016-17/285 10-03-2016 C.G.M. All GM Arranging work done payment for respective circles.
61 2016-17/243 10-06-2016 G.M PD-IV M/s. L & T Reply of LTCD/GHMC - 166

Construction of RCC Service Reservoirs and providing Inlet, Outlet, & Distribution network in
62 2016-17/274 10-10-2016 G.M PD-III M/s. L & T
Alwal & Rcpuram Circle.

Managing Director, Construction of RCC Service Reservoirs and providing water Supply network for kapra and
63 17/10/2016 NVSS Prabhakar, MLA
HMWS&SB Uppal Circles in Uppal Constituency.
64 2016-17/287 17/10/2016 DP M/s. L & T Deviation Estimate & designs for submission of 13 ML capacity GLSR at Elugutta
Managing Director,
65 17/10/2016 NVSS Prabhakar, MLA Sanction of OH water tank in saibaba nagar, kapra
HMWS&SB
S. No. Letter No. Date From To Subject
66 2016-17/349 26/10/2016 C.G.M. M/s. L & T Drawings and QAP for valves-Approval
67 2016-17/347 26/10/2016 C.G.M. G.M PD-VI Submission of deviation estimate and designs of 13 ML GLSR Elugutta
68 No. 11112016/IDIC 11-11-2016 Director, IDIC C.G.M. Proof checking of design and drawing of work of Rcpuram
69 No. 22112016/IDIC 22/11/2016 Director, IDIC C.G.M. Proof checking of design and drawing of work of Alwal
70 2016-17/406 17/11/2016 C.G.M. All GM Sand Allotted
Commissioner of
proc No. 22/2558/T2/DCP-
71 21/11/2016 Police, Traffic, G.M PD-III Road cutting permission
Tr/CYB/2016
Cyberabad
Commissioner of Police,
Rachakonda Police
72 2016-17/332 26/11/2016 G.M PD-IV Permission for rock blasting - requested
Commissionarate at
Gachibowli, Hyderabad
Commissioner of Police,
Rachakonda Police
73 2016-17/331 26/11/2016 G.M PD-IV Diversion for traffic permission - Requested
Commissionarate at
Gachibowli, Hyderabad
74 2016-17/345 30/11/2016 G.M PD-III M/s. L & T Reply to 2016-17/406(CGM)
75 2016-17/ 12-07-2016 G.M PD-III M/s. L & T Revised Hydraulic Design Calculation & drawings of Alwal Circle
76 2016-17/447 12-08-2016 C.G.M. M/s. L & T Design & drawing of 2.5 ML ELSR at Ashoknagar, under Rcpuram Circle - Approval
Proof check of revised hydraulic deishn calculation with Nodal drawings for Kapra Circle done
77 2016-17/356 15/12/2016 G.M PD-IV Director, IDIC
at OU

78 2016-17/466 17/12/2016 C.G.M. M/s. L & T Hydraulic Design Calculation & drawings of Ramachandrapuram Circle - Approval

79 2016-17/467 17/12/2016 C.G.M. M/s. L & T Hydraulic Design Calculation & drawings of Alwal Circle - Approval
80 2016-17/534 21/12/2016 DP C.G.M. Construction of 1 ML Capacity RCC ELSR at Saibaba Nagar in Kapra Circle

Proof check of Designs & Drawings of component 1 ML ELSR at Chlkanagar under Uppal
81 2016-17/265 28/12/2016 G.M PD-VI Director, IDIC
Circle - Requested

82 2016-17/271 30/12/2016 G.M PD-VI M/s. L & T Providing basic amenities at work sites

83 2016-17/269 30/12/2016 G.M PD-VI M/s. L & T Information of Sub-letting of work


84 2016-17/270 30/12/2016 G.M PD-VI M/s. L & T Submission of Invoices
Construction of RCC Service Reservoirs and providing water Supply network in Alwal, Kapra,
85 2016-17/348 31/12/2016 G.M PD-III M/s. L & T
Uppal and Rcpuram Circle
86 No. 30122016/IDIC/01 30/12/2016 Director, IDIC G.M PD-IV Proof check of revised hydraulic deisgn calculation with Nodal drawings for Kapra Circle
Chief Enginneer, DT
87 Endt No. DT/DCE/S8/2016-17 30/12/2016 All GM Communication of Govt. orders for implementation
Office, HMWS&SB
88 2016-17/496 31/12/2016 C.G.M. M/s. L & T Supply of DI Pipes - confirmation of pipe lengths
Proof check of revised hydraulic deisgn calculation with Nodal drawings for Kapra Circle -
89 2016-17/ 01-06-2017 G.M PD-IV C.G.M.
Approval
90 No. 07/01/2017IDIC/UCE/OU 01-07-2017 Director, IDIC G.M PD-III Proof checking of 4 ML GLSR at Jonnabanda under Alwal circle
91 2016-17/ 01-09-2017 G.M PD-III C.G.M. Proof checking of 2.5 ML ELSR at Ashoknagar under Rcpuram 'circle
92 2016-17/543 01-12-2017 C.G.M. M/s. L & T Revised Hydraulic Design Calculation & drawings of Kapra Circle
93 No. 20012017/IDIC/01 20/1/2017 Director, IDIC G.M PD-VI Proof check of revised hydraulic deisgn calculation with Nodal drawings for Uppal Circle
94 2016-17/621 23/1/2017 DP C.G.M. & GM PD - VI Alternative proposals for construction of GLSR at Elugutta
95 2016-17/640 25/1/2017 DP M/s. L & T Q.C. Inspections
96 2016-17/572 30/1/2017 C.G.M. M/s. L & T Alternative proposals for construction of GLSR at Elugutta
97 2016-17/573 30/1/2017 C.G.M. M/s. L & T Construction of 1 ML Capacity RCC ELSR at Saibaba Nagar in Kapra Circle
98 2016-17/663 31/1/2017 DP M/s. L & T Change in agreement period
99 No./ MK-3/RCK/2017 30/1/2017 Uppal Police Station M/s. L & T Complete work near stadium before India Vs bamgladesh test cricket match

100 2016-17/ G.M PD-VI C.G.M. Proof check of 13.3 ML GLSR at Elugutta, under Kapra Circle done at OU

101 2016-17/310 02-02-2017 G.M PD-VI C.G.M. Submission of RAB - 2 to finance wing
102 Proc No. 50/B1/2005/823 02-06-2017 DP All GM Attachment of certain works to PD VIII
103 Edexmp/16-17/601 02-07-2017 C.G.M. M/s. L & T EDEC for DI Fittings
104 2016-17/687 02-08-2017 DP M/s. L & T Increase gangs
105 2016-17/627 20/2/2017 C.G.M. M/s. L & T Instructions
106 2016-17/652 28/2/2017 C.G.M. G.M PD-IV Supplemental Agreement Forwarded - Provisional rate communicated
107 MOM on 28-02-2017 28/2/2017 Managing Director All GM & CGM Minutes of review meeting
108 2016-17/ G.M PD-VI C.G.M. Payment for work done quantities at Elugutta
109 2016-17/469 28/2/2017 G.M PD-III M/s. L & T Subletting of work - Intimation
Proposal for construction of Chlorination Rooms, Compound Walls, approach road, lighting
110 2016-17/480 03-07-2017 G.M PD-III M/s. L & T
etc
111 2016-17/581 15/3/2017 GM Quality Control All GM Joint Inspection report - Inspection of MS pipes
Imdustries &
112 G.O.MS.No. 67 26/9/2015 Commerce (Mines) Seigniorage rate
department
113 2016-17/687 18/3/2017 C.G.M. G.M PD-III Laying of 300mm dia MS
114 2016-17/688 18/3/2017 C.G.M. G.M PD-IV Request to take additional work
115 2016-17/ 23/3/2017 G.M PD-III Director, IDIC Submission of drawings of 1.5 ML ELSR at Jonnabanda under Alwal Circle
116 2016-17/371 23/3/2017 G.M PD-VI M/s. L & T Replacement of pipelines in polluted areas in Habsiguda'
117 2016-17/500 23/3/2017 G.M PD-III C.G.M. Experience certificate issued
118 EDExemp2016-17/703 28/3/2017 C.G.M. District Collector EDEC for DI Fittings'
119 EDExemp2016-17/ C.G.M. District Collector EDEC for MS Pipes after inlining and outcoating
Submission of Design & drawing of 1 ML ELSR at Sai Baba Nagar, under Kapra Circle -
120 EDExemp2016-17/ 04-04-2017 G.M PD-IV C.G.M.
Approval
121 No. 02/04/2017/IDIC/UCE/OU 04-02-2017 Director, IDIC G.M PD-III Proof check of 1.5 ML ELSR at Yapral, under Alwal Circle done at OU
122 2017-18/12 04-04-2017 C.G.M. M/s. L & T Replacement of pipelines in polluted areas in Habsiguda'
123 2017-18/9 04-06-2017 G.M PD-IV M/s. L & T Slow Progress of work
124 2017-18/11 04-07-2017 G.M PD-VIII M/s. L & T Notice
125 2017-18/50 04-12-2017 C.G.M. M/s. L & T Certain information called for road cutting permission'
126 2017-18/47 04-12-2017 C.G.M. M/s. L & T Design & drawing of 1 ML ELSR at Sai Baba Nagar, under Kapra Circle - Approval
127 2017-18/49 04-12-2017 C.G.M. M/s. L & T Procurement of DI Pipes - Reply of Lr No 311
128 2017-18/68 17/4/2017 C.G.M. M/s. L & T Shifting of H.T. Power Supply structures for Kailashgiri
S. No. Letter No. Date From To Subject
129 2017-18/20/1 17/4/2017 G.M PD-VIII M/s. L & T Safety measures'
130 2017-18/84 20/4/2017 C.G.M. M/s. L & T QAP for DI Fittings
Commissioner of Police,
131 2017-18/3168 21/4/2017 Managing Director Rachakonda Police Road cutting permission
Commissionarate
132 2017-18/86 21/4/2017 C.G.M. M/s. L & T Improper Barricading
133 2017-18/83 25/4/2017 DP All GM Restoration of road
134 2017-18/45 29/4/2017 G.M PD-III M/s. L & T Inspection report of DP
135 2017-18/106 05-03-2017 C.G.M. M/s. L & T Notice
136 2017-18/125 05-09-2017 C.G.M. GM Quality Control Inspection of DI Fittings
137 2017-18/129 05-10-2017 C.G.M. G.M PD-IV Laying of 200mm dia DI
138 2017-18/130 05-10-2017 C.G.M. M/s. L & T Approval of QAP for valves
139 2017-18/126 05-10-2017 C.G.M. GM Quality Control Inspection of DI Fittings - Kiswok
140 2017-18/61/1 05-11-2017 G.M PD-III C.G.M. Approval of QAP for valves
141 2017-18/64 05-12-2017 G.M PD-III Director(Finance) Submission of LS 7th bill of Alwal
142 2017-18/137 05-12-2017 C.G.M. M/s. L & T Approval of QAP for valves
143 2017-18/151 16/5/2017 C.G.M. G.M PD-III taking up of improvement works
144 2017-18/167 23/5/2017 C.G.M. M/s. L & T EDEC issued
145 2017-18/205 26/5/2017 DP M/s. L & T Work issues
146 2017-18/223 31/5/2017 DP M/s. L & T Ban on road cutting imposed by GHMC
147 2017-18/67 31/5/2017 G.M PD-VIII M/s. L & T Notice
148 2017-18/86 06-01-2017 G.M PD-III G.M PD-V Transfer of 2200mm dia MS Pipe
149 2017-18/184 06-01-2017 C.G.M. GM Quality Control Inspection of DI Fittings - Chandranchal
150 2017-18/182 06-01-2017 C.G.M. District Collector EDEC for DI Fittings
151 2017-18/195 06-03-2017 C.G.M. All GM Supplemental Agreement Forwarded
152 2017-18/222 13/6/2017 C.G.M. M/s. L & T Submission of complete drawings
153 2017-18/227 15/6/2017 C.G.M. M/s. L & T EDEC Certificates issued
154 2017-18/228 16/6/2017 C.G.M. M/s. L & T EDEC Certificates - Requested
155 2017-18/ 30/6/2017 Manager SD-II, PD IV M/s. L & T laying of pipeline junction at ECIL
156 2016-17/141 07-01-2017 G.M PD-III M/s. L & T Deputation of manpower at night
157 2017-18/282 07-01-2017 C.G.M. G.M PD-IV Request to take additional work
158 Note Submitted Providing landscaping to the reservoir
159 2017-18/515 07-11-2017 GM O&M Division XIV C.G.M. Submitting the existing water supply network
160 2017-18/314 13/7/2017 C.G.M. GM Quality Control Inspection of DI Fittings - Kiswok
161 2017-18/320 14/7/2017 C.G.M. GM Quality Control Inspection of DI Fittings -chandranchal
162 2017-18/ 13/7/2017 G.M PD-IV C.G.M. Additional lines approval
163 2017-18/159 19/7/2017 G.M PD-III Director(Finance) Submission of LS 8th bill of Alwal
164 2017-18/326 18/7/2017 C.G.M. GM Quality Control Inspection of Valves
165 MOM on 11-07-2017 07-11-2017 C.G.M. All GM Minutes of review meeting
166 2017-18/311 07-12-2017 C.G.M. GM Quality Control MS Spirally welded bare pipes
167 2016-17/131 15/6/2017 G.M PD-III TSCPDCL, Hyderabad Shifting of LT line at yapral
168 2016-17/130 15/6/2017 G.M PD-III TSCPDCL, Hyderabad Shifting of electric poles at Alwal
169 2016-17/ 08-01-2017 G.M PD-VI Civil Aid Techno Clinic Proctor density of soil sample
170 2017-18/108 03.05.2017 C.G.M. M/s. L & T Supply of DI Pipes for laying in Uppal circle
171 2017-18/189 08-01-2017 G.M PD-IV C.G.M. Submission of workslip 2
172 2017-18/427 16/8/2017 C.G.M. G.M PD-IV Additional Work'
GM Quality Control, PD -
173 2017-18/452 09-01-2017 C.G.M. Inspection of Valves - AVK Valves
IV
Laying of 100mm MS water supply line at Cherlapally under sainikpuri section O&M Div No -
174 2017-18/496 10-04-2017 C.G.M. G.M PD-IV
XI
175 2017-18/608 10-07-2017 C.G.M. All GM Supplemental agreement forwarding
176 2017-18/ 10-10-2017 G.M PD-III C.G.M. Requirement if DI Pipes
177 2017-18/529 18/10/2017 C.G.M. M/s. L & T Progress report constraints
178 2017-18/539/1 23/10/2017 C.G.M. GM Quality Control Inspection of DI Pipes
179 2017-18/303 31/10/2017 G.M PD-III M/s. L & T Lifting of monsoon ban
180 2017-18/251 11-03-2017 G.M PD-VIII M/s. L & T Lifting of monsoon ban
GM Quality Control , GM
181 2017-18/553 11-06-2017 C.G.M. Inspection of MS pipe ICML & Gunitting
PD IV
GM Quality Control , GM
182 2017-18/557 11-08-2017 C.G.M. Inspection of DI Fittings
PD VI
183 2017-18/274/1 14/11/2017 G.M PD-VIII M/s. L & T Providing house service connections in MIG zone.
184 2017-18/410 15/11/2017 GM Quality Control GM PD III, IV, VI Inspection of DI Fittings
185 2017-18/276/1 22/11/2017 G.M PD-VIII M/s. L & T completion of balance and gap works
186 2017-18/321/1 24/11/2017 G.M PD- III M/s. L & T rate of progress
S. No. Letter No. Date From To Subject
GM Quality Control , GM
187 2017-18/577 24/11/2017 C.G.M. Inspection of RCC NP4 pipes
PD VIII
GM Quality Control , GM
188 2017-18/578 24/11/2017 C.G.M. Inspection of MS pipe ICML & Gunitting
PD III
GM Quality Control , GM
189 2017-18/585 28/11/2017 C.G.M. Inspection of DI Fittings
PD VI

190 2017-18/174 29/11/2017 G.M PD- VI C.G.M. Prrocurement of 200mm dia & above MS pipes for laying iin Uppal Circle.

191 2017-18/175 29/11/2017 G.M PD- VI C.G.M. Prrocurement of 600mm dia & above MS pipes for laying iin Uppal Circle.

GM Quality Control , GM
192 2017-18/622 12-11-2017 C.G.M. Inspection of MS pipe ICML & Gunitting
PD VI
193 2017-18/658 01-03-2018 C.G.M. M/s. L & T Inspection of DI Fittings
194 2017-18/664 01-05-2018 C.G.M. M/s. L & T Inspection of MS Internal CML & External Guniting pipes
195 2017-18/395 01-06-2018 G.M PD- III M/s. L & T Renewal of BG
196 2017-18/672 01-09-2018 C.G.M. M/s. L & T Inspection of DI Fittings
197 2017-18/736 27/1/2018 C.G.M. M/s. L & T Taking of house service connection -request
198 2017-18/766 02-06-2018 C.G.M. M/s. L & T Procurement and laying of pipes
199 2017-18/445 02-09-2018 G.M PD- IV M/s. L & T Extension of bank gurantee towards security deposit
200 2017-18/238 02-09-2018 G.M PD- VI M/s. L & T Renewal of BG
Ref:
201 GAIL/VSPL/RT/PL/PGB/PERM/ 16/02/2018 GAIL G.M PD- IV Permission for crossing GAIL LPG crossline
2018/01
202 2017-18/793 17/2/2018 C.G.M. M/s. L & T Inspection of DI Double Flanged Pipes
203 2017-18/794 17/2/2018 C.G.M. M/s. L & T Inspection of DI Fittings
204 2017-18/795 17/2/2018 C.G.M. M/s. L & T Inspection of MS Bare Pipes
205 2017-18/796 17/2/2018 C.G.M. M/s. L & T Inspection of DI Pipes
206 2017-18/410 20/2/2018 G.M PD- III M/s. L & T Slow progress in alwal circle
207 2017-18/811 24/2/2018 C.G.M. M/s. L & T Inspection of MS pipe with inlining and outcoating
208 2017-18/352 26-02-2018 GM PD IV M/s. L & T Request for handover of Radhika GLSR and inlet mains of OUT, GRN & radhika
209 2017-18/829 03-05-2018 C.G.M. M/s. L & T Deviation approved - concluding supplimental agreement
210 2017-18/271 03-12-2018 G.M PD- VI M/s. L & T Submission of extended bank guarantee request
211 2017-18/859 13/3/2018 C.G.M. M/s. L & T Inspection of DI Pipes
212 2017-18/860 13/3/2018 C.G.M. M/s. L & T Inspection of DI Fittings
GM, O&M Division No. Request to handing over to regular O&M for completion of 2 ML capacity ELSR at Alwal MBR
213 2018-19/439 15/3/2018 G.M PD- III
XIII premises
214 2017-18/280 21/03/2018 G.M PD- VI M/s. L & T Appearance of surface cracks on newly laid roof slab
215 2017-18/842 21/03/2018 D.P. M/s. L & T Poor execution of works in Uppal circle
216 2018-19/8 04-04-2018 C.G.M. M/s. L & T Construction of 2ML GLSR under Kowkur zone - Alwal Circle
217 2018-19/46/1 23-05-2018 G.M PD- III M/s. L & T Furnishing of VAT /GST Reciept
218 2018-19/45/1 23-05-2018 G.M PD - VI M/s. L & T Furnishing of GST Reciept
219 2018-19/232 01-06-2018 D.P. C.G.M. Balance CC Road restoration

220 2018-19/61 02-06-2018 G.M PD - III M/s. L & T Completion of Balance works and including safety precautionery measures - Alwal Circle
221 2018-19/78 13-06-2018 G.M PD - III M/s. L & T Confirmation of Bank Guarantees
222 2018-19/306 26-06-2018 DP M/s. L & T Published in vaartha news report -notice issued
223 2018-19/240 08-07-2018 C.G.M. M/s. L & T supplemental agreement -2 forwarding regarding
224 2018-19/145 01-08-2018 G.M PD - IV M/s. L & T Withhold amounts in part bills submitting replay
225 2018-19/146 18-08-2018 G.M PD - III M/s. L & T Handover of 22.50 ml GLSR at alwal MBR Premises
226 2018-19/145 18-08-2018 G.M PD - III M/s. L & T Handover of MS Pipeline laid under 22.50 ml GLSR at alwal MBR Premises
227 2018-19/144 18-08-2018 G.M PD - III M/s. L & T Handover of 1.5 ml ELSR at Yapral alwal circle Premises
228 2018-19/ 14-09-2018 DY-GM G.M PD - III Submission of workslip- 3
229 2018-19/206 03-10-2018 GM PD -III M/s. L & T Renewal of BG
230 2018-19/418 04-10-2018 CGM M/s. L & T Construction of 2ML GLSR under Kowkur zone - Alwal Circle
231 2018-19/215 15-10-2018 GM PD - IV M/s. L & T Slow progress
232 2018-19/ 16-10-2018 Dy-GM PD- IV M/s. L & T Pending works and certain issues
233 2018-19/190 22-10-2018 GM PD - VI M/s. L & T Slow progress
234 2018-19/227 23-10-2018 GM PD-III M/s. L & T Completion of balance works in Alwal circle
235 2018-19/232 24-10-2018 GM PD-III M/s. L & T Encashment of BGs
236 2018-19/462 24-10-2018 CGM M/s. L & T Slow progress
237 2018-19/474 29-10-2018 CGM PD GM EOT
238 2018-19/526 30-11-2018 CGM M/s. L & T Regularization of payments as per the updated works
239 2018-19/296 12-12-2018 GM PD IV GM O&M Dv XIV request for taking over of MS, Di pipeline network under OUT, Vijayapuri, sainikpuri]
240 2018-19/297 12-12-2018 GM PD IV GM O&M Dv XIV request for taking over of MS, Di pipeline network under kailashgiri, snehapuri zones
241 2018-19/298 17-12-2018 GM PD III CGM IDBI bank Encashment of BGs
242 2018-19/575 04-01-2019 CGM M/s. L & T Deletion of Kowkur GLSR in alwal circle
243 2018-19/341 29-01-2018 GM PD III AGM IDBI Confirmation of Bank Guarantees
244 2018-19/837 02-02-2019 DP-I CGM EOT orders issued
245 2018-19/629 06-02-2019 CGM M/s. L & T Concluding supplemental agreement
246 2018-19/654 14-02-2019 CGM M/s. L & T Workslip approved- Supplement agreement
247 2018-19/450 01-03-2019 GM PD-VIII GM IDBI Revalidation of BGs
248 2018-19/396 19-03-2019 GM PD III M/s. L & T Workslip approved- Procurement of 100mm dia distribution pipes for alwal circle
249 2019-20/380/1 30-03-2019 GM PD IV CGM submission of EOT proposal
250 2019-20/40 18-04-2019 CGM M/s. L & T Workslip approved- Procurement of 100mm dia distribution pipes for alwal circle
251 2019-20/44 22-04-2019 CGM M/s. L & T DLP Release of BG
252 2019-20/80 09-05-2019 CGM M/s. L & T Providing inlet, outlet and distribution mains - bandlaguda
253 2019-20/203 16-07-2019 CGM M/s. L & T Commencement of work- bandlaguda
254 2019-20/255 24-07-2019 DP M/s. L & T Commencement of work- bandlaguda
255 2019-20/53 07-06-2019 GM PD IV M/s. L & T Extension of bank gurantee towards security deposit
GM Quality Control , GM
256 2019-20/150 22-06-2019 CGM Inspection of DI pipes
PD IV
257 2019-20/112 05-07-2019 GM PD III AGM IDBI Confirmation of Bank Guarantees
258 2019-20/255 24-07-2019 DP M/s. L & T Bandlaguda-Commencement of work
259 2019-20/232 24-07-2019 CGM PD GM, L&T Labour cess assessment
260 2019-20/233 24-07-2019 CGM Director(finance) Labour cess assessment
261 2019-20/256 25-07-2019 DP M/s. L & T EOT approved- Alwal
262 2019-20/259 30-07-2019 DP M/s. L & T EOT approved- Kapra
S. No. Letter No. Date From To Subject
GM Quality Control , GM
263 2019-20/264 09-08-2019 CGM Inspection of MS pipes
PD IV
264 2019-20/150 26-10-2019 GM PD VI M/s. L & T Attending pipeline leakages and chokages
265 2019-20/291 12-12-2019 GM PD III GM O&M Dv XIII father balaih nagar- handover of distribution network
266 2019-20/328 18-01-2020 GM PD III M/s. L & T Renewal of BG
267 2019-20/541 16-01-2020 CGM M/s. L & T Concluding supplemental agreement & release of GST impact liabilities
268 2020-21/09 21-04-2020 GM PD III M/s. L & T COVID19 resume of work under lockdown
269 2020-21/16 25-04-2020 GM PD III M/s. L & T Renewal of BG
270 2020-21/13 24-04-2020 GM PD III CGM Submission of workslip IV
271 2020-21/52 30-05-2020 CGM GM PD III release of retention & PBG
272 2020-21/37 15-05-2020 DP-II M/s. L & T Extension of Ring main along ORR- Commencement of works
273 2020-21/78 06-07-2020 CGM M/s. L & T Concluding supplemental agreement
274 2020-21/106 29-06-2020 CGM M/s. L & T Concluding supplemental agreement- RC puram
275 2020-21/97 27-06-2020 CGM M/s. L & T Concluding supplemental agreement- Kapra
276 2020-21/98 27-06-2020 CGM M/s. L & T Concluding supplemental agreement- Uppal
277 2020-21/107 30-06-2020 CGM M/s. L & T Concluding supplemental agreement- Alwal
278 2020-21/138 18-07-2020 DP M/s. L & T Concluding supplemental agreement
279 2020-21/144 14-08-2020 DP II M/s. L & T EOT approval
280 2020-21/144 26-08-2020 CGM M/s. L & T EOT granted & communicated
281 2020-21/156 01-09-2020 GM M/s. L & T Renewal of BG