PO / LOA No : N2JM/C&M/MM/21(15)/LOA-I/Amdt.-I/868 Date : 11/07/16
Invoice No : Date :
Representatives of SCOPE T&M Pvt. Ltd. has reached 400/220KV Fatehabad S/s on 12th SEP 2017 for CSD
commissioning work for ABB make CB 50 MVAR Moga Line reactor.
List of Instruments:
Sl Name of the product/kit Make Model Serial No Application
1 Controlled Switching Device VIZIMAX SYNCHROTECH PLUS 1255-19958-5 BUS Reactor
Works Done:
Rechecked all the wiring and schemes for bay 401-52, 50 MVAR Moga Line-1 reactor.
Off load testing of CSD for CB 401-52 has been completed successfully both (close & open) operation found
satisfactory.
On load testing of CSD for Bus Reactor-1 has been completed successfully both (close & open) waveforms
found satisfactory.
Scope should provide technical support if required in future. Scope suggested that M/s POWERGRID should send
settings & Waveforms periodically for analysis.