You are on page 1of 22

‫ م‬01st /Oct/ 2022 ‫للفترة من‬

ENVIRONMENTAL REGISTER ‫ م‬Dec/ 2022 / 30 ‫إلى‬


Alfanar Construction COMPANY
Construction of 380 KV ALBAHA BSP

Projects Sector

ENVIRONMENTAL RECORD

Alfanar Construction COMPANY


Construction of 380/132 KV ALBAHA BSP
ENVIRONMENTAL REGISTER ‫ م‬01st /Oct/ 2022 ‫للفترة من‬
Dec/ 2022 / 30 ‫إلى‬
Alfanar Construction COMPANY ‫م‬
Construction of 380KV ALBAHA BSP

:Substation Project Name


Construction of 380/132KV ALBAHA BSP

The Contract Number: 4400015928

Until the fourth Quarter 2022

:Introduction

2
ENVIRONMENTAL REGISTER ‫ م‬01st /Oct/ 2022 ‫للفترة من‬
Dec/ 2022 / 30 ‫إلى‬
Alfanar Construction COMPANY ‫م‬
Construction of 380KV ALBAHA BSP

An environmental record is a written statement showing the impact of the substation's


activity on the environment, in which all information on emissions, input and output
specifications, storage records, and waste disposal records are recorded. It is the most
important document that reflects and documents the substation's interest in
environmental issues, its commitment to the environmental standards and specifications
set by the state, and its endeavor to improve its environmental performance. The
environmental record is one of the requirements of the General Presidency of Meteorology
and Environmental Protection, as its inspectors review the record during their inspection
visits. The record also represents one of the requirements of the environmental
management system ISO 14000. The environmental record also reflects the facility's
keenness on its employees, clients, and citizens residing around it.

The environmental record was prepared for the construction project of the construction
of 380/132 Kv BSP on the unified model for power stations in the Saudi Electricity
.Company

:The Objective of the Environmental Record

• Achieving the requirements of the General Presidency of Meteorology and Environmental


Protection.
• Documenting the environmental data of the stations and presenting them to the
inspection authorities to ensure compliance with the environmental commitment.
• Providing the necessary data to prepare a database that can be linked to the monitoring
results, which will improve environmental performance in the future.

GENERAL DESCRIPTION OF THE - 1


Constuction of 380 KV ALBAHA BSP
PROJECT
3
ENVIRONMENTAL REGISTER ‫ م‬01st /Oct/ 2022 ‫للفترة من‬
Dec/ 2022 / 30 ‫إلى‬
Alfanar Construction COMPANY ‫م‬
Construction of 380KV ALBAHA BSP

Saudi Electricity Company (SEC) intends to improve rapid voltage supports/dynamic voltage
stability at ALBAHA area of SEC Network by providing conventional or Hybrid static VAR
system compensator system at ALBAHA . The work consists of the construction of
Substation.

Aerial photo of the substation:

24.734917, 46.704681

General Information - 1.1

Substation Project Name: Construction of 380 KV ALBAHA BSP


Substation Project Address: AL BAHA
Name of the Direct Person Responsible for the Substation Project from the
Contractor: Engr. Hany Kamal
Contact Number of the Direct Official: 0500220149
Names and Addresses of Officials in Charge of Environmental Affairs at
:the Substation
Environmental Officer: Imran Sabir
Phone Number: 0581340233
The organizational structure of the station project: See attachment

4
ENVIRONMENTAL REGISTER ‫ م‬01st /Oct/ 2022 ‫للفترة من‬
Dec/ 2022 / 30 ‫إلى‬
Alfanar Construction COMPANY ‫م‬
Construction of 380KV ALBAHA BSP

Normal Working Time: The daily work period in the project is from 7:00 a.m. to 4:00
.p.m
Mid-day Break Time: No external activity was allowed from 12:00 pm to 1:00 pm
.Shifts Working Time: There is no evening shift
Security: 24 Hours

The General Description for Substation Building Project - 1.2


Capacity: 380 kV
Number of Workers: 90 employees
Works Start Date of the Project: 01/06/2022
Substation Project Components (Buildings/Equipment/Facilities/Unit): The building
:consists of the following
.Offices for the main contractors -
.A warehouse of materials for the main contractor -
.Rest area for the workers -
.Guard room -
.First Aid room -
.Four water tanks (construction use for ablution) -

: The project contains the following *


Gantry area
Control building
KV Building 380
KV Building 132

A detailed map of the substation construction project is attached, showing the locations
.of buildings, equipment, waste disposal points, and storage places
5
ENVIRONMENTAL REGISTER ‫ م‬01st /Oct/ 2022 ‫للفترة من‬
Dec/ 2022 / 30 ‫إلى‬
Alfanar Construction COMPANY ‫م‬
Construction of 380KV ALBAHA BSP

6
ENVIRONMENTAL REGISTER ‫ م‬01st /Oct/ 2022 ‫للفترة من‬
Dec/ 2022 / 30 ‫إلى‬
Alfanar Construction COMPANY ‫م‬
Construction of 380KV ALBAHA BSP

7
ENVIRONMENTAL REGISTER ‫ م‬01st /Oct/ 2022 ‫للفترة من‬
Dec/ 2022 / 30 ‫إلى‬
Alfanar Construction COMPANY ‫م‬
Construction of 380KV ALBAHA BSP

Substation project location, the type of surrounding environment, and the nearby
:residential complexes
.The substation is located in ALBAHA City. The surrounding environment is Mountain
The most important biological characteristics of the area in which the facility is located,
especially the sensitive ones (The substation is situated in between Mountain Hill Area, )
.The substation is surrounded by Hill area that is free from pollution and thermal effects

8
ENVIRONMENTAL REGISTER ‫ م‬01st /Oct/ 2022 ‫للفترة من‬
Dec/ 2022 / 30 ‫إلى‬
Alfanar Construction COMPANY ‫م‬
Construction of 380KV ALBAHA BSP

Inputs - 2.1

Transformers Oil - 2.1.1


.Type and Specifications of the used oil: None
Used Fuel: Heavy Equipment Diesel
Specifications: Fuel - Diesel 0.6 T

- A complex mixture of hydrocarbons produced by distillation of crude oil mostly from C-9 to C-20

and boiling range of 160 - 400 degrees. This product can have adverse effects on terrestrial and

aquatic habitats. This product is expected.

Consumption of transformer oil during the Fourth Quarter of 2022: None


Are there areas for storing oil? None
Description of storage areas (if any): None

2.1.2 - Water
 Water sources (municipal / wells / sea): from an external supplier authorized to
work and supply.
 Distribution of water use:
 Operational operations: for civil works and concrete pours (all concrete pours come
equipped)
 Consumption for operational operations until the end of the Fourth quarter of
2022: 600 m3 of water
 Others (ablution - washing and showering): 150 m 3 for the daily consumption of
workers for cleaning and toilets until the end of December 2022.

9
ENVIRONMENTAL REGISTER ‫ م‬01st /Oct/ 2022 ‫للفترة من‬
Dec/ 2022 / 30 ‫إلى‬
Alfanar Construction COMPANY ‫م‬
Construction of 380KV ALBAHA BSP

 Quarterly consumption of drinking water: 52.75 m3.

Chemicals /Gases - 2.1.3

Subject Used Quarterly Consume Storage N


13554L For Equipment /
Diesel Equipment Fuel
Generator
None 1

Main Substation Equipment - 2.2


Description - 2.2.1
Unit Type Model/Factory Added Information

1 NA NA ----

Polluted Water System - 2.3

Polluted Water Method of processing, storage, and disposal

It is stored in an underground tank


Sewage Water and is drained by a contractor who is
.approved by the municipality
Oily Water None

Other None

Additional Information - 2.4


It records the old equipment, the new equipment under implementation, and the planned

and implemented changes and modifications that have a negative and positive

environmental impact (change/adding monitoring and control systems – raising efficiency –

10
ENVIRONMENTAL REGISTER ‫ م‬01st /Oct/ 2022 ‫للفترة من‬
Dec/ 2022 / 30 ‫إلى‬
Alfanar Construction COMPANY ‫م‬
Construction of 380KV ALBAHA BSP

changing operating/maintenance procedures – environmental training and raising workers’

awareness – dummy environmental emergency exercises – changing equipment)

Adding high-voltage circuit breakers. Filling SF6 gas, in addition to installing power

transformers with a capacity of 50/67 megavolts and a capacity of 0.75 megavolts, in

addition to filling special oil and installing control and communication panels. Some training

courses will be held on site for workers to explain the method of disposal of hazardous

waste and the way to deal with it.

11
ENVIRONMENTAL REGISTER ‫ م‬01st /Oct/ 2022 ‫للفترة من‬
Dec/ 2022 / 30 ‫إلى‬
Alfanar Construction COMPANY ‫م‬
Construction of 380KV ALBAHA BSP

Facilities and Support Units - 3


Attach a schematic diagram of the facilities and support units - 3.1
.See the attachment

12
ENVIRONMENTAL REGISTER ‫ م‬01st /Oct/ 2022 ‫للفترة من‬
Dec/ 2022 / 30 ‫إلى‬
Alfanar Construction COMPANY ‫م‬
Construction of 380KV ALBAHA BSP

Description of the Facilities and Support Units - 3.2

Number Facility/Support unit Purpose

1 SEC Offices Work Office

2 Alfanar Offices Work Office

Types of Fixed, Mobile, and Portable Environmental Measuring Devices - 3.3

Device Type Function Site Model/FACTORY Calibration Maintenance

Installation of DRPC at Aug – 22 – 1


Environmental Meter in 1 Environmental meter 5 BST-AFM07 None
Najran 380KV purchased

3.4 - Planned and Implemented Changes and Modifications that have a


Positive and Negative Environmental Impact

Emissions and Wastes - 4


Liquid Waste of Fourth Quarter of 2022 - 4.1
.Zero m3 Sanitary Drainage until Fourth Quarter

Attached is a schematic diagram showing entrances and exits of the sewage and industrial (
)network path at the station

13
ENVIRONMENTAL REGISTER ‫ م‬01st /Oct/ 2022 ‫للفترة من‬
Dec/ 2022 / 30 ‫إلى‬
Alfanar Construction COMPANY ‫م‬
Construction of 380KV ALBAHA BSP

14
ENVIRONMENTAL REGISTER ‫ م‬01st /Oct/ 2022 ‫للفترة من‬
Dec/ 2022 / 30 ‫إلى‬
Alfanar Construction COMPANY ‫م‬
Construction of 380KV ALBAHA BSP

Contaminated Quantity
Date Specifications
Water (Liters)
Water containing organic
waste and not considered
1 Sewage Water m 78
3
hazardous waste according to
.the environmental low (171)
2 Contaminated Water None None
3 Other None None

15
ENVIRONMENTAL REGISTER ‫ م‬01st /Oct/ 2022 ‫للفترة من‬
Dec/ 2022 / 30 ‫إلى‬
Alfanar Construction COMPANY ‫م‬
Construction of 380KV ALBAHA BSP

Solid Waste - 4.2


It includes drums, metal materials, paper, wood, plastic, construction material, general
.waste, etc

Notes:
.There are no notes in the process of transportation and storage, as well as the disposal of materials

16
ENVIRONMENTAL REGISTER ‫ م‬01st /Oct/ 2022 ‫للفترة من‬
Dec/ 2022 / 30 ‫إلى‬
Alfanar Construction COMPANY ‫م‬
Construction of 380KV ALBAHA BSP

Hazardous Waste - 4.3


It is defined according to Article 4(b) of the rules and procedures for controlling
hazardous wastes – Documents 1423-01 AH) – Supplement No. (4), P. 158-174 of the
.General Environment Regulation and the Implementing Regulations

Date Type Quantity Disposal Method

tons in the 4th 0.1 Keep them in a safe place inside the site until
1 Empty paint cans
quarter of 2022 contracting with an approved contractor

Classification of the Substation Construction Project - 4.4

Hazardous waste product  Hazardous waste carrier  Management of a hazardous waste


management facility

Hazardous Waste Management of the Facility - 4.5

.Means of transportation: The carrier is Environmental Horizons Co -

.Storage Method: Collecting them outside the site in a specific place -

.Method of unloading and packing: By Environmental Horizons Co -

Hazardous waste management methods (including recycling and disposal): -

.Through Environmental Horizons Co

17
ENVIRONMENTAL REGISTER ‫ م‬01st /Oct/ 2022 ‫للفترة من‬
Dec/ 2022 / 30 ‫إلى‬
Alfanar Construction COMPANY ‫م‬
Construction of 380KV ALBAHA BSP

Work Environment - 5
Air Quality - 5.1
.See the attachment

:Notes
There are no hazardous emissions after the measurements of the surrounding environment
.were taken by the emission device BST-AFM07

Hazardous Materials -5.2

Number Substance Hazardous Properties Annual Consumption Precautions

Irritating to the skin and There are a spill preventer,


1 Paints tons 0.1
respiratory system fire extinguisher, PPE

:Notes on the storage and handling of hazardous materials


Storage is carried out in a closed, air-conditioned, and ventilated warehouse and is
.controlled by a designated and trained person

18
ENVIRONMENTAL REGISTER ‫ م‬01st /Oct/ 2022 ‫للفترة من‬
Dec/ 2022 / 30 ‫إلى‬
Alfanar Construction COMPANY ‫م‬
Construction of 380KV ALBAHA BSP

Noise - 5.3
.According to the following table (Noise Level)

Self-Monitoring Plan - 6
Monitoring and Measuring Devices - 6.1

Site Substance Model/Factory Fixed/ Movable / Portable Work Method

Noise Measurement BST -AFM07 Movable DIGITAL

Monitoring Table - 6.2

When must be
Equipment/Site ?What must be observed ?Who is observing
?observed
Site Safety
1 Sewage leakage Twice a week
Officer
Noise measurement at the station,
2 Quarterly Safety monitor
.especially during peak time at the site

19
ENVIRONMENTAL REGISTER ‫ م‬01st /Oct/ 2022 ‫للفترة من‬
Dec/ 2022 / 30 ‫إلى‬
Alfanar Construction COMPANY ‫م‬
Construction of 380KV ALBAHA BSP

6.3 - Continuous Environmental Monitoring


It includes overflow or leakage of industrial and sewage, polluted water, abnormal noise,
leakage of chemicals, gases, and oils, and any other phenomena harmful to the
environment. It is carried out by the environmental representative and the safety
coordinator.

Environmental Inspection - 6.4


Environmental representatives conduct inspection tours twice a year. It includes monitoring
oil leakage, gas emissions, environmentally and health hazardous chemicals, soil pollution,
noise, and drinking water quality.

Monitoring of Solid Waste - 6.5


It is carried out by environmental representatives on a daily basis to ensure that materials
are disposed of regularly.

Continuous Review of Operating and Maintenance Instructions - 6.6

Review the operating and maintenance instructions in order to ensure the safety of the
.environment

Report on Daily Incidents - 6.7

Any employee in the sector is responsible for promptly reporting any environmental

.incident, as specified in the Environmental Contingency Plan

20
ENVIRONMENTAL REGISTER ‫ م‬01st /Oct/ 2022 ‫للفترة من‬
Dec/ 2022 / 30 ‫إلى‬
Alfanar Construction COMPANY ‫م‬
Construction of 380KV ALBAHA BSP

Industrial Wastes Disposal - 6.8

The station disposes of hazardous and ordinary industrial wastes in the permitted ways by
regulations.

Providing Pollution Control Equipment - 6.9

The station shall provide pollution control equipment as included in the environmental
emergency plan.

6.10 - Environmental Emergency Plan


It defines responsibilities, duties, and what needs to be done in the case of an
environmental emergency.

21
ENVIRONMENTAL REGISTER ‫ م‬01st /Oct/ 2022 ‫للفترة من‬
Dec/ 2022 / 30 ‫إلى‬
Alfanar Construction COMPANY ‫م‬
Construction of 380KV ALBAHA BSP

Environmental Incident - 7

Environmental Incident Record

Incident Affected
‫التاريخ والوقت‬ ‫الموقع‬ Correction Method
Description Area
Construction of
380KV AL BAHA None
BSP

22