ENVIRONMENTAL RECORD
:Introduction
2
ENVIRONMENTAL REGISTER م01st /Oct/ 2022 للفترة من
Dec/ 2022 / 30 إلى
Alfanar Construction COMPANY م
Construction of 380KV ALBAHA BSP
The environmental record was prepared for the construction project of the construction
of 380/132 Kv BSP on the unified model for power stations in the Saudi Electricity
.Company
Saudi Electricity Company (SEC) intends to improve rapid voltage supports/dynamic voltage
stability at ALBAHA area of SEC Network by providing conventional or Hybrid static VAR
system compensator system at ALBAHA . The work consists of the construction of
Substation.
24.734917, 46.704681
4
ENVIRONMENTAL REGISTER م01st /Oct/ 2022 للفترة من
Dec/ 2022 / 30 إلى
Alfanar Construction COMPANY م
Construction of 380KV ALBAHA BSP
Normal Working Time: The daily work period in the project is from 7:00 a.m. to 4:00
.p.m
Mid-day Break Time: No external activity was allowed from 12:00 pm to 1:00 pm
.Shifts Working Time: There is no evening shift
Security: 24 Hours
A detailed map of the substation construction project is attached, showing the locations
.of buildings, equipment, waste disposal points, and storage places
5
ENVIRONMENTAL REGISTER م01st /Oct/ 2022 للفترة من
Dec/ 2022 / 30 إلى
Alfanar Construction COMPANY م
Construction of 380KV ALBAHA BSP
6
ENVIRONMENTAL REGISTER م01st /Oct/ 2022 للفترة من
Dec/ 2022 / 30 إلى
Alfanar Construction COMPANY م
Construction of 380KV ALBAHA BSP
7
ENVIRONMENTAL REGISTER م01st /Oct/ 2022 للفترة من
Dec/ 2022 / 30 إلى
Alfanar Construction COMPANY م
Construction of 380KV ALBAHA BSP
Substation project location, the type of surrounding environment, and the nearby
:residential complexes
.The substation is located in ALBAHA City. The surrounding environment is Mountain
The most important biological characteristics of the area in which the facility is located,
especially the sensitive ones (The substation is situated in between Mountain Hill Area, )
.The substation is surrounded by Hill area that is free from pollution and thermal effects
8
ENVIRONMENTAL REGISTER م01st /Oct/ 2022 للفترة من
Dec/ 2022 / 30 إلى
Alfanar Construction COMPANY م
Construction of 380KV ALBAHA BSP
Inputs - 2.1
- A complex mixture of hydrocarbons produced by distillation of crude oil mostly from C-9 to C-20
and boiling range of 160 - 400 degrees. This product can have adverse effects on terrestrial and
2.1.2 - Water
Water sources (municipal / wells / sea): from an external supplier authorized to
work and supply.
Distribution of water use:
Operational operations: for civil works and concrete pours (all concrete pours come
equipped)
Consumption for operational operations until the end of the Fourth quarter of
2022: 600 m3 of water
Others (ablution - washing and showering): 150 m 3 for the daily consumption of
workers for cleaning and toilets until the end of December 2022.
9
ENVIRONMENTAL REGISTER م01st /Oct/ 2022 للفترة من
Dec/ 2022 / 30 إلى
Alfanar Construction COMPANY م
Construction of 380KV ALBAHA BSP
1 NA NA ----
Other None
and implemented changes and modifications that have a negative and positive
10
ENVIRONMENTAL REGISTER م01st /Oct/ 2022 للفترة من
Dec/ 2022 / 30 إلى
Alfanar Construction COMPANY م
Construction of 380KV ALBAHA BSP
Adding high-voltage circuit breakers. Filling SF6 gas, in addition to installing power
addition to filling special oil and installing control and communication panels. Some training
courses will be held on site for workers to explain the method of disposal of hazardous
11
ENVIRONMENTAL REGISTER م01st /Oct/ 2022 للفترة من
Dec/ 2022 / 30 إلى
Alfanar Construction COMPANY م
Construction of 380KV ALBAHA BSP
12
ENVIRONMENTAL REGISTER م01st /Oct/ 2022 للفترة من
Dec/ 2022 / 30 إلى
Alfanar Construction COMPANY م
Construction of 380KV ALBAHA BSP
Attached is a schematic diagram showing entrances and exits of the sewage and industrial (
)network path at the station
13
ENVIRONMENTAL REGISTER م01st /Oct/ 2022 للفترة من
Dec/ 2022 / 30 إلى
Alfanar Construction COMPANY م
Construction of 380KV ALBAHA BSP
14
ENVIRONMENTAL REGISTER م01st /Oct/ 2022 للفترة من
Dec/ 2022 / 30 إلى
Alfanar Construction COMPANY م
Construction of 380KV ALBAHA BSP
Contaminated Quantity
Date Specifications
Water (Liters)
Water containing organic
waste and not considered
1 Sewage Water m 78
3
hazardous waste according to
.the environmental low (171)
2 Contaminated Water None None
3 Other None None
15
ENVIRONMENTAL REGISTER م01st /Oct/ 2022 للفترة من
Dec/ 2022 / 30 إلى
Alfanar Construction COMPANY م
Construction of 380KV ALBAHA BSP
Notes:
.There are no notes in the process of transportation and storage, as well as the disposal of materials
16
ENVIRONMENTAL REGISTER م01st /Oct/ 2022 للفترة من
Dec/ 2022 / 30 إلى
Alfanar Construction COMPANY م
Construction of 380KV ALBAHA BSP
tons in the 4th 0.1 Keep them in a safe place inside the site until
1 Empty paint cans
quarter of 2022 contracting with an approved contractor
17
ENVIRONMENTAL REGISTER م01st /Oct/ 2022 للفترة من
Dec/ 2022 / 30 إلى
Alfanar Construction COMPANY م
Construction of 380KV ALBAHA BSP
Work Environment - 5
Air Quality - 5.1
.See the attachment
:Notes
There are no hazardous emissions after the measurements of the surrounding environment
.were taken by the emission device BST-AFM07
18
ENVIRONMENTAL REGISTER م01st /Oct/ 2022 للفترة من
Dec/ 2022 / 30 إلى
Alfanar Construction COMPANY م
Construction of 380KV ALBAHA BSP
Noise - 5.3
.According to the following table (Noise Level)
Self-Monitoring Plan - 6
Monitoring and Measuring Devices - 6.1
When must be
Equipment/Site ?What must be observed ?Who is observing
?observed
Site Safety
1 Sewage leakage Twice a week
Officer
Noise measurement at the station,
2 Quarterly Safety monitor
.especially during peak time at the site
19
ENVIRONMENTAL REGISTER م01st /Oct/ 2022 للفترة من
Dec/ 2022 / 30 إلى
Alfanar Construction COMPANY م
Construction of 380KV ALBAHA BSP
Review the operating and maintenance instructions in order to ensure the safety of the
.environment
Any employee in the sector is responsible for promptly reporting any environmental
20
ENVIRONMENTAL REGISTER م01st /Oct/ 2022 للفترة من
Dec/ 2022 / 30 إلى
Alfanar Construction COMPANY م
Construction of 380KV ALBAHA BSP
The station disposes of hazardous and ordinary industrial wastes in the permitted ways by
regulations.
The station shall provide pollution control equipment as included in the environmental
emergency plan.
21
ENVIRONMENTAL REGISTER م01st /Oct/ 2022 للفترة من
Dec/ 2022 / 30 إلى
Alfanar Construction COMPANY م
Construction of 380KV ALBAHA BSP
Environmental Incident - 7
Incident Affected
التاريخ والوقت الموقع Correction Method
Description Area
Construction of
380KV AL BAHA None
BSP
22