You are on page 1of 3

DISPLASEMMENT = 9018.045 V. BALLAST TOTAL = 734.

7
%BALLAST = 8.146999 111.6 L
1.025 16.9 B
6.2 T
0.746 CB
1.025 RHO
12.8 H

Perhitungan Diameter Pipa


diameter pipa kapasitas tanki 734.7 =160mm
db2 = Diameter Pipa
db2 = 160 mm = 16 cm
Q = 0.575 x db 2
m /jam
3

Q = 147.2 m /jam
3

Waktu perkiraan pengurasan


waktu = (volume Ballast : massa jenis airjam
waktu = 4.869433 jam

Daya Pompa
Daya Pomp= ((vol. Ballast x massa jenis air tawar x HT)/(koefisien x 75 x 60 x 60))
HT = jarak dasar sampai maindeck + 1
= 7m
koefisien = 0,5-0,9
Daya Pom = 4.88963 HP

Perhitungan Bilge Pipe


A. Main Bilge Pipe = dH = 1,68√(B+H)xL+2 mm
= 96.74991 mm
B. Branch Bilge Pipe = dZ = 2,15√(B+H)xl+2 mm l = 7.995
= 33.26957 mm

C. Branch Bilge Pipe E = dZ = 2,15√(B+H)xl+2 mm l = 7.995


= 33.26957 mm b = 4.25

Pompa Bilge
53.82314 m3/jam

You might also like