BREAKER DRAW FRAME COT ROLLER CHANGE & CLEANING CHECK
R/B Shift
Time Roller Change Drafting Suction Box Time Roller Change
Creel
1st 2nd 3rd 4th Zone 1st
2.30 10.30
4.30 12.30
6.30 2.30
8.30 4.30
2.30 10.30
4.30 12.30
6.30 2.30
8.30 4.30
2.30 10.30
4.30 12.30
6.30 2.30
8.30 4.30
2.30 10.30
4.30 12.30
6.30 2.30
8.30 4.30
2.30 10.30
4.30 12.30
6.30 2.30
8.30 4.30
____________
AGM
Date:
R/C Shift
Roller Change Drafting Suction Box Remarks
Creel
2nd 3rd 4th Zone
_______
G.M