PHASES 17& 18
CONTRACT NO: POGC-84-801-244
ONSHORE FACILITIES
Inspection & Test Plan for
Paint Work
Rev.3 PAGE
PAGE Rev.0 Rev.1 Rev.2
1
*
2 *
3 *
4 *
5 *
6 *
7 *
8 *
CONTENTS
Page
1. PURPOSE …………………………… 4
2. TERMS AND DEFINITIONS …………… 4
3. REFERENCES …………………………… 4
4. RESPONSIBILITIES …………… 4
5. INSPECTION & TEST PLAN …………… 5
6. ATTACHMENTS …………………………… 5
1. PURPOSE
The purpose of this Inspection & Test Plan (ITP) is to describe the methods and establish the
Quality Plan for the Inspection & Test Plan for the Stationary Equipment Installation Activities
for South Pars 9&10 Project.
COMPANY: NATIONAL IRANIAN OIL COMPANY (NIOC) / Pars Oil and Gas Company
(COMPANY) or his nominated representative.
SUBCONTRACTOR : shall mean any company, firm or person with whom CONTRACTOR
enters into a subcontract.
TPA(Third Party Authorities) : any inspection service person or company who is independent
from COMPANY, CONTRACTOR AND SUBCONTRACTOR.
SITE : the location for installation of the facilities at ASSALUYEH or the vicinity thereof in
the IRAN.
3. REFERENCES
4. RESPONSIBILITIES
4.1 SUBCONTRACTOR Field QA/QC Manager is responsible for Quality Control for all
kinds of Equipment Installation Work Activities.
g) Request the inspection & witness to Company Site Engineer/Contractor filed inspector
as per the ITP required for inspection on witness and hold point. (At least in one day
advance)
h) Perform Inspection.
6. ATTACHEMENTS
DISCIPLINE :PAINTING
RP-6340S-999-6600- PAI-001,006
2 SURFACE PREPARATION (BLASTING)
0001
ONS-09-0-PR-4600 X W SW
1) Check surface cleanliness
- SIS 05 5900 SA 2.5 / SSPC SP-10-63T
/ NACE Standard TM-01-70 NACE No.2
LEGEND : R : Review SW : Spot Witness W : Witness H : Hold X : Execution of Inspection & Test
DISCIPLINE :PAINTING
INSPECTION & TEST PLAN FOR PAINT WORK SUBCON : REV: 0
DESCRIPTION OF WORK : PAINT WORK
Applicable Spec. REPORTING PARTICIPATION BY
NO. DESCRIPTION OF INSPECTION / TEST REMARK
or Procedure FORMAT SUBCON. CONTRACTOR COMPANY TPA
3 PAINTING RP-6340S-999-6600-
0001 PAI-001,006
1) Verify the manufacturer painting material
X W SW
2) Verify the Painting System
X R R
3)Check the Humidity and Dew point Temperature
- Surface temperature : great than 3℃ over dew
point
- Relative Humidity : less than 85% X W
SW
4) Check Dry Film Thickness
- Min 80% of Specified Thickness
- Max. 200% of Specified Thickness
X W W
LEGEND : R : Review SW : Spot Witness W : Witness H : Hold X : Execution of Inspection & Test
DISCIPLINE :PAINTING
5) Check the Porosity ( for internal lining only) RP-6340S-999-6600- PAI -001,006 X W SW
- Min 10% of Painted surface 0001
- 5 Volts per microns