BAHAN
KODE SATU
NO URAIAN PEKERJAAN
ANALIS AN
1 2 3 4
1 2 3 4
23,425.93
1,405.56
22,180.00
35,490.00
157,077.33
78,677.18
50,858.33
141,589.17
89,989.17
135,422.03
81,023.32
44,742.81
18,777.21
799.55
572.53
126,638.12
84,385.26
590.00
198,358.07
227,599.83
194,175.19
219,983.16
132,385.65
158,814.13
162,044.46
254,243.99
287,939.13
226,841.86
248,584.64
1,842,267.37
7,070.17
10,110.45
24,451.13
44,370.41
45,672.67
60,522.01
829,749.95
45,140.27
98,402.03
66,513.14
HARGA
SATUAN
(Rp.)
5
97,300.00
151,300.00
11,280.00
579,172.43
621,995.98
602,055.82
705,960.01
399,680.00
298,920.00
293,544.15
Pebruari 2007
BINA PROGRAM
ATEN KENDAL
FAUZIE, ST. MT
0 086 875
ANALISA HARGA SATUAN
DINAS PEKERJAAN UMUM MEMBUAT PARIT GALIAN TANAH KODE
KABUPATEN KENDAL ( MENGGUNAKAN BURUH ) K110
Versi Peb. 2007
PROPINSI : KODE KABUPATEN : KODE DISIAPKAN OLEH : TANGGAL :
JAWA TENGAH ( 33 ) KEN DAL ( 24 ) DPUK KENDAL 01 Pebruari 2007
URAIAN : ANGGAPAN / ASUMSI :
1. Gali parit. 1. Menggunakan tenaga manusia 100 m/hari.
2. Pembuangan hasil galian 2. Dimensi saluran : Lebar bawah = 0.50 m
menggunakan truck. Lebar atas = 1.30 m
Kedalaman = 0.6 m (vol = 0.54 m3/m)
3. 25 % hasil galian dibuang setempat.
4. Hasil galian dibuang sejauh 2 km.
5. Menggali dan membuang dihitung ; 1.5 m3/hari - orang.
6. Penggunaan alat bantu u. 1 bulan - orang.
PEKER JA VOL HARI KODE TOTAL VOL UPAH B IAYA SUB TOTAL
(org.hari) (Rp./Org/hari) ( Rp ) ( Rp )
P
E Mandor 1 1 L001 1 35,000.00 35,000.00
K Buruh tak terampil 36 1 L012 36 30,000.00 1,080,000.00
E
R
J
A
PEKERJA 1,115,000.00
MAT E R IAL SATUAN KODE TOTAL HAR GA B IAYA SUB TOTAL
VOL (Rp./Unit) (Rp.) ( Rp )
M
A
T Alat bantu ( set @ 3 alat ) set M039 1.50 100,000.00 150,000.00
R
I
A
L
MATERIAL 150,000.00
P E RALATAN JUMLAH HARI KODE JAM HAR GA B IAYA SUB TOTAL
P KERJA KERJA ( Rp./Jam ) ( Rp ) ( Rp )
E
R
A
L
A
T
A
N
PERALATAN 0.00
TOTAL (Rp) 1,265,000.00
VOLUME: 54 SATUAN : m3 HARGA SATUAN Rp 23,425.93 Per m3
0.666667
ANALISA HARGA SATUAN
DINAS PEKERJAAN UMUM PENGUPASAN DAN PEMBERSIHAN SEMAK PADA DAMIJA KODE
KABUPATEN KENDAL ( MENGGUNAKAN BURUH ) K210
Versi Peb. 2007
PROPINSI : KODE KABUPATEN : KODE DISIAPKAN OLEH : TANGGAL :
JAWA TENGAH ( 33 ) KEN DAL ( 24 ) DPUK KENDAL 01 Pebruari 2007
URAIAN : ANGGAPAN / ASUMSI :
1. Kupas dan membuang semak-semak 1. Menggunakan tenaga manusia ( 12 m x 100 m/hari ).
dengan tenaga manusia pada 2. Hasil kerja 25 m2/orang-hari.
( Daerah Milik Jalan ). 3. Penggunaan alat bantu rata-rata 1 bulan-orang.
4. Bakarlah sampah ditempat pekerjaan.
PEKER JA VOL HARI KODE TOTAL VOL UPAH B IAYA SUB TOTAL
(org.hari) (Rp./Org/hari) ( Rp ) ( Rp )
P
E Mandor 1 1 L001 1 35,000.00 35,000.00
K Buruh tak terampil 36 1 L012 36 30,000.00 1,080,000.00
E
R
J
A
PEKERJA 1,115,000.00
MAT E R IAL SATUAN KODE TOTAL HAR GA B IAYA SUB TOTAL
VOL (Rp./Unit) (Rp.) ( Rp )
M
A Alat bantu set M039 1.50 100,000.00 150,000.00
T
R
I
A
L
MATERIAL 150,000.00
P E RALATAN JUMLAH HARI KODE JAM HAR GA B IAYA SUB TOTAL
P KERJA KERJA ( Rp./Jam ) ( Rp ) ( Rp )
E
R
A
L
A
T
A
N
PERALATAN 0.00
TOTAL (Rp) 1,265,000.00
VOLUME: 900 SATUAN : m2 HARGA SATUAN Rp 1,405.56 Per m2
ANALISA HARGA SATUAN
DINAS PEKERJAAN UMUM GALIAN TANAH UNTUK KONSTRUKSI KODE
KABUPATEN KENDAL ( MENGGUNAKAN BURUH ) K224
Versi Peb. 2007
PROPINSI : KODE KABUPATEN : KODE DISIAPKAN OLEH : TANGGAL :
JAWA TENGAH ( 33 ) KEN DAL ( 24 ) DPUK KENDAL 01 Pebruari 2007
URAIAN : ANGGAPAN / ASUMSI :
1. Penggalian tanah dengan tenaga 1. Menggunakan tenaga manusia.
manusia ( 50 m3 /hari ). 2. Kapasitas kerja kelompok 50 m3/hari.
2. Tanah galian disingkirkan sejauh 3. Kedalaman rata-rata galian s/d 3 m.
minimal 30 m dari lubang galian. 4. Untuk jenis tanah berbatu, harga satuan pekerjaan K. 224 dikalikan dengan faktor 1,5.
PEKER JA VOL HARI KODE TOTAL VOL UPAH B IAYA SUB TOTAL
(org.hari) (Rp./Org/hari) ( Rp ) ( Rp )
P
E Mandor 1 1 L001 1 35,000.00 35,000.00
K Buruh tak terampil 30 1 L012 30 30,000.00 900,000.00
E Buruh terampil 2 1 L014 2 37,000.00 74,000.00
R
J
A
PEKERJA 1,009,000.00
MAT E R IAL SATUAN KODE TOTAL HAR GA B IAYA SUB TOTAL
VOL (Rp./Unit) (Rp.) ( Rp )
M
A Alat bantu set M039 1.00 100,000.00 100,000.00
T
R
I
A
L
MATERIAL 100,000.00
P E RALATAN JUMLAH HARI KODE JAM HAR GA B IAYA SUB TOTAL
P KERJA KERJA ( Rp./Jam ) ( Rp ) ( Rp )
E
R
A
L
A
T
A
N
PERALATAN 0.00
TOTAL (Rp) 1,109,000.00
VOLUME: 50 SATUAN : m3 HARGA SATUAN Rp 22,180.00 Per m3
ANALISA HARGA SATUAN
DINAS PEKERJAAN UMUM GALIAN TANAH UNTUK KONSTRUKSI UNTUK TANAH BERBATU KODE
KABUPATEN KENDAL ( MENGGUNAKAN BURUH ) K224.a
Versi Peb. 2007
PROPINSI : KODE KABUPATEN : KODE DISIAPKAN OLEH : TANGGAL :
JAWA TENGAH ( 33 ) KEN DAL ( 24 ) DPUK KENDAL 01 Pebruari 2007
URAIAN : ANGGAPAN / ASUMSI :
1. Penggalian tanah dengan tenaga 1. Menggunakan tenaga manusia.
manusia ( 50 m3 /hari ). 2. Kapasitas kerja kelompok 50 m3/hari.
2. Tanah galian disingkirkan sejauh 3. Kedalaman rata-rata galian s/d 3 m.
minimal 30 m dari lubang galian. 4. Untuk jenis tanah berbatu, harga satuan pekerjaan K. 224 dikalikan dengan faktor 1,5.
PEKER JA VOL HARI KODE TOTAL VOL UPAH B IAYA SUB TOTAL
(org.hari) (Rp./Org/hari) ( Rp ) ( Rp )
P
E Mandor 1.5 1 L001 1.5 35,000.00 52,500.00
K Buruh tak terampil 45 1 L012 45 30,000.00 1,350,000.00
E Buruh terampil 6 1 L014 6 37,000.00 222,000.00
R
J
A
PEKERJA 1,624,500.00
MAT E R IAL SATUAN KODE TOTAL HAR GA B IAYA SUB TOTAL
VOL (Rp./Unit) (Rp.) ( Rp )
M
A Alat bantu set M039 1.50 100,000.00 150,000.00
T
R
I
A
L
MATERIAL 150,000.00
P E RALATAN JUMLAH HARI KODE JAM HAR GA B IAYA SUB TOTAL
P KERJA KERJA ( Rp./Jam ) ( Rp ) ( Rp )
E
R
A
L
A
T
A
N
PERALATAN 0.00
TOTAL (Rp) 1,774,500.00
VOLUME: 50 SATUAN : m3 HARGA SATUAN Rp 35,490.00 Per m3
ANALISA HARGA SATUAN
DINAS PEKERJAAN UMUM PENGURUGAN DAN DIPADATKAN KODE
KABUPATEN KENDAL UNTUK JEMBATAN DAN GORONG-2 ( MENGGUNAKAN ALAT ) K225
Versi Peb. 2007
PROPINSI : KODE KABUPATEN : KODE DISIAPKAN OLEH : TANGGAL :
JAWA TENGAH ( 33 ) KEN DAL ( 24 ) DPUK KENDAL 01 Pebruari 2007
URAIAN : ANGGAPAN / ASUMSI :
1. Struktur dibersihkan dari bahan- 1. Bahan timbunan dikirim ke lapangan oleh leveransir.
bahan organik. 2. Timbunan dipadatkan berlapis tebal 10 cm.
2. Timbun kembali bagian belakang
struktur.
3. Padatkan dengan stamper dan mesin
gilas bergetar (stamper).
PEKER JA VOL HARI KODE TOTAL VOL UPAH B IAYA SUB TOTAL
(org.hari) (Rp./Org/hari) ( Rp ) ( Rp )
P
E Mandor 1 1 L001 1 35,000.00 35,000.00
K Buruh tak terampil 10 1 L012 10 30,000.00 300,000.00
E Buruh semi terampil 3 1 L013 3 35,000.00 105,000.00
R
J
A
PEKERJA 440,000.00
MAT E R IAL SATUAN KODE TOTAL HAR GA B IAYA SUB TOTAL
VOL (Rp./Unit) (Rp.) ( Rp )
M
A Alat bantu set M039 0.30 100,000.00 30,000.00
T Sirtu ( tak ayak ) m3 M005 20.00 80,000.00 1,600,000.00
R
I
A
L
MATERIAL 1,630,000.00
P E RALATAN JUMLAH HARI KODE JAM HAR GA B IAYA SUB TOTAL
P KERJA KERJA ( Rp./Jam ) ( Rp ) ( Rp )
E
R Mesin gilas bergetar 1 ton 1 1 E010 5.00 35,251.93 176,259.63
A Stamper 4 HP 1 2 E011 10.00 10,990.03 109,900.33
L
A
T
A
N
PERALATAN 286,159.96
TOTAL (Rp) 2,356,159.96
VOLUME: 15 SATUAN : m3 HARGA SATUAN Rp 157,077.33 Per m2
ANALISA HARGA SATUAN
DINAS PEKERJAAN UMUM PENIMBUNAN DAERAH RAWA KODE
KABUPATEN KENDAL ( MENGGUNAKAN BURUH ) K230
Versi Peb. 2007
PROPINSI : KODE KABUPATEN : KODE DISIAPKAN OLEH : TANGGAL :
JAWA TENGAH ( 33 ) KEN DAL ( 24 ) DPUK KENDAL 01 Pebruari 2007
URAIAN : ANGGAPAN / ASUMSI :
1. Urugan dikirim sampai ketempat 1. Menggunakan peralatan berat (120 m3/hari).
pekerjaan. 2. Material pilihan untuk timbunan dikirim ke tempat pekerjaan sejauh 10 km
2. Menghampar dan memadatkan. oleh leveransir.
3. Pemadatan mendekati pemadatan untuk LPB.
PEKER JA VOL HARI KODE TOTAL VOL UPAH B IAYA SUB TOTAL
(org.hari) (Rp./Org/hari) ( Rp ) ( Rp )
P
E Mandor 1 1 L001 1 35,000.00 35,000.00
K Operator terlatih 3 1 L006 3 46,000.00 138,000.00
E Buruh tak terampil 6 1 L012 6 30,000.00 180,000.00
R Sopir 1 1 L009 1 46,000.00 46,000.00
J
A
PEKERJA 399,000.00
MAT E R IAL SATUAN KODE TOTAL HAR GA B IAYA SUB TOTAL
VOL (Rp./Unit) (Rp.) ( Rp )
M
A Material timbunan / pilihan m3 M015 160.00 37,000.00 5,920,000.00
T Alat bantu ( set @ 3 alat ) set M039 0.40 100,000.00 40,000.00
R
I
A
L
MATERIAL 5,960,000.00
P E RALATAN JUMLAH HARI KODE JAM HAR GA B IAYA SUB TOTAL
P KERJA KERJA ( Rp./Jam ) ( Rp ) ( Rp )
E
R Buldozer 110 HP 1 1 E001 4.00 293,286.79 1,173,147.17
A Mesin gilas 3 roda 8-10 T 1 1 E006 5.00 88,511.31 442,556.54
L Mesin gilas bergetar 1 tonne 1 1 E008 5.00 125,453.27 627,266.36
A Truck tanki air 68 HP 1 1 E017 5.00 167,858.24 839,291.22
T
A
N
PERALATAN 3,082,261.29
TOTAL (Rp) 9,441,261.29
VOLUME: 120 SATUAN : m3 HARGA SATUAN Rp 78,677.18 Per m3
ANALISA HARGA SATUAN
DINAS PEKERJAAN UMUM CERUCUK KAYU DIRAWA KODE
KABUPATEN KENDAL ( MENGGUNAKAN BURUH ) K232
Versi Peb. 2007
PROPINSI : KODE KABUPATEN : KODE DISIAPKAN OLEH : TANGGAL :
JAWA TENGAH ( 33 ) KEN DAL ( 24 ) DPUK KENDAL 01 Pebruari 2007
URAIAN : ANGGAPAN / ASUMSI :
1. Potongan cerucuk dikirim ketempat 1. Memakai tenaga orang (4 group).
pekerjaan. 2. Cerucuk pendek dipukul dengan tenaga orang (100 tiang/hari/group).
2. Cerucuk ditempatkan pada lokasinya. 3. Cerucuk panang 6 m D. 15 cm dipotong dan dikirim ketempat pekerjaan.
3. Cerucuk dipukul masuk dengan
tenaga orang.
PEKER JA VOL HARI KODE TOTAL VOL UPAH B IAYA SUB TOTAL
(org.hari) (Rp./Org/hari) ( Rp ) ( Rp )
P
E Mandor 1 1 L001 1 35,000.00 35,000.00
K Kepala tukang 2 1 L004 2 46,000.00 92,000.00
E Buruh tak terlatih 18 1 L012 18 30,000.00 540,000.00
R
J
A
PEKERJA 667,000.00
MAT E R IAL SATUAN KODE TOTAL HAR GA B IAYA SUB TOTAL
VOL (Rp./Unit) (Rp.) ( Rp )
M
A Paku jembatan kg M031 13.00 17,000.00 221,000.00
T Kayu acuan m3 M033 5.00 2,200,000.00 11,000,000.00
R Alat bantu ( set @ 3 alat ) set M039 0.72 100,000.00 72,000.00
I
A
L
MATERIAL 11,293,000.00
P E RALATAN JUMLAH HARI KODE JAM HAR GA B IAYA SUB TOTAL
P KERJA KERJA ( Rp./Jam ) ( Rp ) ( Rp )
E
R Pompa air (D 50 mm) 30 m3/jam 4 1 E024 20.00 12,299.94 245,998.77
A
L
A
T
A
N
PERALATAN 245,998.77
TOTAL (Rp) 12,205,998.77
VOLUME: 240 SATUAN : m HARGA SATUAN Rp 50,858.33 Per m
ANALISA HARGA SATUAN
DINAS PEKERJAAN UMUM PENIMBUNAN BADAN JALAN KODE
KABUPATEN KENDAL ( MENGGUNAKAN BURUH ) K310
Versi Peb. 2007
PROPINSI : KODE KABUPATEN : KODE DISIAPKAN OLEH : TANGGAL :
JAWA TENGAH ( 33 ) KEN DAL ( 24 ) DPUK KENDAL 01 Pebruari 2007
URAIAN : ANGGAPAN / ASUMSI :
1. Material dihampar (maksimum) 1. Menggunakan tenaga buruh.
setiap lapis 20 cm. 2. Harga material timbunan berdasarkan harga dilokasi pekerjaan.
2. Setiap lapis (20 cm) dipadatkan
minimal 4 kali lintasan dgn mesin
gilas roda karet ( Tire Roller ).
PEKER JA VOL HARI KODE TOTAL VOL UPAH B IAYA SUB TOTAL
(org.hari) (Rp./Org/hari) ( Rp ) ( Rp )
P
E Mandor 2 6 L001 12 35,000.00 420,000.00
K Operator terlatih 1 6 L006 6 46,000.00 276,000.00
E Sopir 1 6 L009 6 46,000.00 276,000.00
R Buruh tak terlatih 48 6 L012 288 30,000.00 8,640,000.00
J
A
PEKERJA 9,612,000.00
MAT E R IAL SATUAN KODE TOTAL HAR GA B IAYA SUB TOTAL
VOL (Rp./Unit) (Rp.) ( Rp )
M
A
T Sirtu ( tak ayak ) m3 M005 450.00 80,000.00 36,000,000.00
R Alat bantu set M039 8.00 100,000.00 800,000.00
I
A
L
MATERIAL 36,800,000.00
P E RALATAN JUMLAH HARI KODE JAM HAR GA B IAYA SUB TOTAL
P KERJA KERJA ( Rp./Jam ) ( Rp ) ( Rp )
E
R Mesin gilas tiga roda 8 - 10 ton 1 6 E006 30.00 88,511.31 2,655,339.25
A Truck tangki air 68 HP 1 6 E017 24.00 167,858.24 4,028,597.85
L
A
T
A
N
PERALATAN 6,683,937.09
TOTAL (Rp) 53,095,937.09
VOLUME: 375 SATUAN : m3 HARGA SATUAN Rp 141,589.17 Per m3
ANALISA HARGA SATUAN
DINAS PEKERJAAN UMUM PENIMBUNAN BADAN JALAN KODE
KABUPATEN KENDAL ( MENGGUNAKAN BURUH ) K310.a
Versi Peb. 2007
PROPINSI : KODE KABUPATEN : KODE DISIAPKAN OLEH : TANGGAL :
JAWA TENGAH ( 33 ) KEN DAL ( 24 ) DPUK KENDAL 01 Pebruari 2007
URAIAN : ANGGAPAN / ASUMSI :
1. Material dihampar (maksimum) 1. Menggunakan tenaga buruh.
setiap lapis 20 cm. 2. Harga material timbunan berdasarkan harga dilokasi pekerjaan.
2. Setiap lapis (20 cm) dipadatkan
minimal 4 kali lintasan dgn mesin
gilas roda karet ( Tire Roller ).
PEKER JA VOL HARI KODE TOTAL VOL UPAH B IAYA SUB TOTAL
(org.hari) (Rp./Org/hari) ( Rp ) ( Rp )
P
E Mandor 2 6 L001 12 35,000.00 420,000.00
K Operator terlatih 1 6 L006 6 46,000.00 276,000.00
E Sopir 1 6 L009 6 46,000.00 276,000.00
R Buruh tak terlatih 48 6 L012 288 30,000.00 8,640,000.00
J
A
PEKERJA 9,612,000.00
MAT E R IAL SATUAN KODE TOTAL HAR GA B IAYA SUB TOTAL
VOL (Rp./Unit) (Rp.) ( Rp )
M
A
T Tanah padas m3 M015 450.00 37,000.00 16,650,000.00
R Alat bantu set M039 8.00 100,000.00 800,000.00
I
A
L
MATERIAL 17,450,000.00
P E RALATAN JUMLAH HARI KODE JAM HAR GA B IAYA SUB TOTAL
P KERJA KERJA ( Rp./Jam ) ( Rp ) ( Rp )
E
R Mesin gilas tiga roda 8 - 10 ton 1 6 E006 30.00 88,511.31 2,655,339.25
A Truck tangki air 68 HP 1 6 E017 24.00 167,858.24 4,028,597.85
L
A
T
A
N
PERALATAN 6,683,937.09
TOTAL (Rp) 33,745,937.09
VOLUME: 375 SATUAN : m3 HARGA SATUAN Rp 89,989.17 Per m3
ANALISA HARGA SATUAN
DINAS PEKERJAAN UMUM MEMBENTUK BADAN JALAN / SUB GRADE DENGAN TIMBUNAN KODE
KABUPATEN KENDAL ( MENGGUNAKAN ALAT ) K311
Versi Peb. 2007
PROPINSI : KODE KABUPATEN : KODE DISIAPKAN OLEH : TANGGAL :
JAWA TENGAH ( 33 ) KEN DAL ( 24 ) DPUK KENDAL 01 Pebruari 2007
URAIAN : ANGGAPAN / ASUMSI :
1. Material dihampar ( maksimum 1. Menggunakan peralatan berat ( 120 m3/hari ).
setiap lapis 20 cm ). 2. Harga material galian berdasarkan harga dilokasi pekerjaan.
2. Setiap lapis (20 cm) dipadatkan
minimal 4 kali lintasan dengan
mesin gilas.
PEKER JA VOL HARI KODE TOTAL VOL UPAH B IAYA SUB TOTAL
(org.hari) (Rp./Org/hari) ( Rp ) ( Rp )
P
E Mandor 1 1 L001 1 35,000.00 35,000.00
K Operator terlatih 2 1 L006 2 46,000.00 92,000.00
E Sopir 1 1 L009 1 46,000.00 46,000.00
R Buruh tak terlatih 10 1 L012 10 30,000.00 300,000.00
J
A
PEKERJA 473,000.00
MAT E R IAL SATUAN KODE TOTAL HAR GA B IAYA SUB TOTAL
VOL (Rp./Unit) (Rp.) ( Rp )
M
A
T Sirtu ( tak ayak ) m3 M005 160.00 80,000.00 12,800,000.00
R Alat bantu set M039 1.00 100,000.00 100,000.00
I
A
L
MATERIAL 12,900,000.00
P E RALATAN JUMLAH HARI KODE JAM HAR GA B IAYA SUB TOTAL
P KERJA KERJA ( Rp./Jam ) ( Rp ) ( Rp )
E
R Grader 110 HP 1 1 E002 5.00 249,344.15 1,246,720.73
A Mesin gilas tiga roda 8 - 10 ton 1 1 E006 5.00 191,897.95 959,489.75
L Truck tangki air 68 HP 1 1 E017 4.00 167,858.24 671,432.97
A
T
A
N
PERALATAN 2,877,643.46
TOTAL (Rp) 16,250,643.46
VOLUME: 120 SATUAN : m3 HARGA SATUAN Rp 135,422.03 Per m3
ANALISA HARGA SATUAN
DINAS PEKERJAAN UMUM MEMBENTUK BADAN JALAN / SUBGRADE DI DAERAH GALIAN KODE
KABUPATEN KENDAL ( MENGGUNAKAN BURUH ) K320
Versi Peb. 2007
PROPINSI : KODE KABUPATEN : KODE DISIAPKAN OLEH : TANGGAL :
JAWA TENGAH ( 33 ) KEN DAL ( 24 ) DPUK KENDAL 01 Pebruari 2007
URAIAN : ANGGAPAN / ASUMSI :
1. Digali dengan tenaga manusia. 1. Menggunakan tenaga manusia ( 32 m3/hari ).
2. Dimuat ke truck dgn tenaga manusia. 2. 20 % dibuang ditempat, selagi truck tidak ada.
3. Buang hasil galian tak terpakai 3. 80 % dibuang dengan truck.
menggunakan truck 3,5 ton. 4. Jarak 1 rit pp < 2 km.
5. Penggunaan alat bantu 1 bln-orang.
6. Tidak termasuk pemadatan tanah dasar.
7. 1.6 rit pp/jam/truck.
PEKER JA VOL HARI KODE TOTAL VOL UPAH B IAYA SUB TOTAL
(org.hari) (Rp./Org/hari) ( Rp ) ( Rp )
P
E Mandor 1 1 L001 1 35,000.00 35,000.00
K Buruh tak terampil 36 1 L012 36 30,000.00 1,080,000.00
E Sopir 2 1 L009 2 46,000.00 92,000.00
R
J
A
PEKERJA 1,207,000.00
MAT E R IAL SATUAN KODE TOTAL HAR GA B IAYA SUB TOTAL
VOL (Rp./Unit) (Rp.) ( Rp )
M
A Alat bantu set M039 1.50 100,000.00 150,000.00
T
R
I
A
L
MATERIAL 150,000.00
P E RALATAN JUMLAH HARI KODE JAM HAR GA B IAYA SUB TOTAL
P KERJA KERJA ( Rp./Jam ) ( Rp ) ( Rp )
E
R Dump truck 3,5 ton / 44 HP 2 1 E020 10.00 123,574.62 1,235,746.23
A
L
A
T
A
N
PERALATAN 1,235,746.23
TOTAL (Rp) 2,592,746.23
VOLUME: 32 SATUAN : m3 HARGA SATUAN Rp 81,023.32 Per m3
ANALISA HARGA SATUAN
DINAS PEKERJAAN UMUM MEMBENTUK BADAN JALAN / SUBGRADE DI DAERAH GALIAN TANAH BIASA KODE
KABUPATEN KENDAL ( MENGGUNAKAN ALAT ) K321
Versi Peb. 2007
PROPINSI : KODE KABUPATEN : KODE DISIAPKAN OLEH : TANGGAL :
JAWA TENGAH ( 33 ) KEN DAL ( 24 ) DPUK KENDAL 01 Pebruari 2007
URAIAN : ANGGAPAN / ASUMSI :
1. Penggalian dengan buldozer. 1. Menggunakan peralatan berat ( 200 m3/hari ).
2. Hasil galian dibuang dengan truck 2. 20 % terbuang ditempat.
sejauh 1 km. 3. 80 % diangkut dan dibuang dengan truck.
3. Permukaan tanah dibentuk dan 4. 2,5 rit pp/jam/truck.
dirapihkan dengan grader. 5. Jarak 1 rit pp < 2 km.
6. Tidak termasuk pekerjaan pemadatan tanah dasar.
PEKER JA VOL HARI KODE TOTAL VOL UPAH B IAYA SUB TOTAL
(org.hari) (Rp./Org/hari) ( Rp ) ( Rp )
P
E Mandor 1 1 L001 1 35,000.00 35,000.00
K Operator terlatih 3 1 L006 3 46,000.00 138,000.00
E Sopir 4 1 L009 4 46,000.00 184,000.00
R Buruh tak terlatih 5 1 L012 5 30,000.00 150,000.00
J
A
PEKERJA 507,000.00
MAT E R IAL SATUAN KODE TOTAL HAR GA B IAYA SUB TOTAL
VOL (Rp./Unit) (Rp.) ( Rp )
M
A Alat bantu set M039 0.20 100,000.00 20,000.00
T
R
I
A
L
MATERIAL 20,000.00
P E RALATAN JUMLAH HARI KODE JAM HAR GA B IAYA SUB TOTAL
P KERJA KERJA ( Rp./Jam ) ( Rp ) ( Rp )
E
R Buldozzer 110 HP 1 1 E001 5.00 293,286.79 1,466,433.96
A Grader 110 HP 1 1 E002 5.00 249,344.15 1,246,720.73
L Exavator Hydr. 1,0 m3 1 1 E003 5.00 320,517.06 1,602,585.29
A Dump truck (5 T) - 68 HP 4 1 E019 20.00 205,291.12 4,105,822.49
T
A
N
PERALATAN 8,421,562.48
TOTAL (Rp) 8,948,562.48
VOLUME: 200 SATUAN : m3 HARGA SATUAN Rp 44,742.81 Per m3
ANALISA HARGA SATUAN
DINAS PEKERJAAN UMUM STABILISASI TANAH / LPB DGN KAPUR KODE
KABUPATEN KENDAL ( MENGGUNAKAN BURUH ) K322
Versi Peb. 2007
PROPINSI : KODE KABUPATEN : KODE DISIAPKAN OLEH : TANGGAL :
JAWA TENGAH ( 33 ) KEN DAL ( 24 ) DPUK KENDAL 01 Pebruari 2007
URAIAN : ANGGAPAN / ASUMSI :
1. Tanah dasar/LPB digemburkan 1. Menggunakan tenaga manusia ( 5 m x 360 m/hari ).
setebal 15 cm. 2. dasar jalan sudah diratakan.
2. Kapur dihampar dan dicampur dgn 3. Tanah digemburkan setebal 15 cm dengan tenaga manusia.
tanah gembur. 4. Pengiriman bahan kapur sampai ditempat kerja oleh leveransir.
3. Pemadatan dengan kondisi air 5. kapur dicampur dengan tanah setebal 15 cm dengan tenaga manusia.
maksimum.
PEKER JA VOL HARI KODE TOTAL VOL UPAH B IAYA SUB TOTAL
(org.hari) (Rp./Org/hari) ( Rp ) ( Rp )
P
E Mandor 3 1 L001 3 35,000.00 105,000.00
K Operator terlatih 1 1 L006 1 46,000.00 46,000.00
E Buruh tak terampil 99 1 L012 99 30,000.00 2,970,000.00
R Buruh semi terampil 6 1 L013 6 35,000.00 210,000.00
J Sopir 1 1 L009 1 46,000.00 46,000.00
A
PEKERJA 3,377,000.00
MAT E R IAL SATUAN KODE TOTAL HAR GA B IAYA SUB TOTAL
VOL (Rp./Unit) (Rp.) ( Rp )
M
A Kapur m3 M017 11.00 1,000.00 11,000.00
T Alat bantu set M039 4.00 100,000.00 400,000.00
R
I
A
L
MATERIAL 411,000.00
P E RALATAN JUMLAH HARI KODE JAM HAR GA B IAYA SUB TOTAL
P KERJA KERJA ( Rp./Jam ) ( Rp ) ( Rp )
E
R Mesin gilas tiga roda 8-10 ton 1 1 E006 5.00 88,511.31 442,556.54
A Truck tangki air 68 HP 1 1 E017 5.00 167,858.24 839,291.22
L
A
T
A
N
PERALATAN 1,281,847.76
TOTAL (Rp) 5,069,847.76
VOLUME: 270 SATUAN : m3 HARGA SATUAN Rp 18,777.21 Per m3
ANALISA HARGA SATUAN
DINAS PEKERJAAN UMUM PEMADATAN TANAH PADAS KODE
KABUPATEN KENDAL ( DENGAN BURUH ) K341
Versi Peb. 2007
PROPINSI : KODE KABUPATEN : KODE DISIAPKAN OLEH : TANGGAL :
JAWA TENGAH ( 33 ) KEN DAL ( 24 ) DPUK KENDAL 01 Pebruari 2007
URAIAN : ANGGAPAN / ASUMSI :
1. Pembentukan tanah dasar dengan 1. Menggunakan tenaga orang ( 8 m x 400 m/hari ).
tenaga manusia. 2. 40 m2/hari orang.
2. Padatkan dengan mesin gilas roda 3. Penggunaan alat bantu 1 bulan-orang.
besi. 4. Tenaga dicari setempat.
PEKER JA VOL HARI KODE TOTAL VOL UPAH B IAYA SUB TOTAL
(org.hari) (Rp./Org/hari) ( Rp ) ( Rp )
P
E Mandor 1 2 L001 2 35,000.00 70,000.00
K Operator terlatih 1 1 L006 1 46,000.00 46,000.00
E Buruh tak terlatih 66 1 L012 66 30,000.00 1,980,000.00
R
J
A
PEKERJA 2,096,000.00
MAT E R IAL SATUAN KODE TOTAL HAR GA B IAYA SUB TOTAL
VOL (Rp./Unit) (Rp.) ( Rp )
M
A Alat bantu set M039 0.20 100,000.00 20,000.00
T
R
I
A
L
MATERIAL 20,000.00
P E RALATAN JUMLAH HARI KODE JAM HAR GA B IAYA SUB TOTAL
P KERJA KERJA ( Rp./Jam ) ( Rp ) ( Rp )
E
R Mesin gilas tiga roda 8 - 10 ton 1 1 E006 5.00 88,511.31 442,556.54
A
L
A
T
A
N
PERALATAN 442,556.54
TOTAL (Rp) 2,558,556.54
VOLUME: 3200 SATUAN : m3 HARGA SATUAN Rp 799.55 Per m3
PEKER JA VOL HARI KODE TOTAL VOL UPAH B IAYA SUB TOTAL
(org.hari) (Rp./Org/hari) ( Rp ) ( Rp )
P
E Mandor 1 1 L001 1 35,000.00 35,000.00
K Operator terlatih 2 1 L006 2 46,000.00 92,000.00
E Buruh tak terlatih 4 1 L012 4 30,000.00 120,000.00
R
J
A
PEKERJA 247,000.00
MAT E R IAL SATUAN KODE TOTAL HAR GA B IAYA SUB TOTAL
VOL (Rp./Unit) (Rp.) ( Rp )
M
A Alat bantu set M039 0.16 100,000.00 16,000.00
T
R
I
A
L
MATERIAL 16,000.00
P E RALATAN JUMLAH HARI KODE JAM HAR GA B IAYA SUB TOTAL
P KERJA KERJA ( Rp./Jam ) ( Rp ) ( Rp )
E
R Mesin gilas tiga roda 8-10 ton 1 1 E006 6.00 88,511.31 531,067.85
A Grader 110 HP 1 1 E002 6.00 249,344.15 1,496,064.88
L
A
T
A
N
PERALATAN 2,027,132.73
TOTAL (Rp) 2,290,132.73
VOLUME: 4000 SATUAN : m2 HARGA SATUAN Rp 572.53 Per m2
ANALISA HARGA SATUAN
DINAS PEKERJAAN UMUM PEMBENTUKAN BAHU JALAN KERAS KODE
KABUPATEN KENDAL ( DENGAN BURUH ) K410
Versi Peb. 2007
PROPINSI : KODE KABUPATEN : KODE DISIAPKAN OLEH : TANGGAL :
JAWA TENGAH ( 33 ) KEN DAL ( 24 ) DPUK KENDAL 01 Pebruari 2007
URAIAN : ANGGAPAN / ASUMSI :
1. Material timbunan yang baik diham 1. Menggunakan tenaga orang ( 96 m3/hari, pemadatan 960 m bahu jalan ).
par dengan tenaga orang. 2. Material pilihan dikirim sampai tempat pekerjaan oleh leveransir.
2. Pemadatan bahu jalan dengan 3. Leveransir meletakkan material timbunan sepanjang bahu jalan.
mesin gilas bergetar. 4. 10 cm timbunan padat dibutuhkan pada 1 m lebar bahu jalan.
5. Penghamparan timbunan dengan tenaga manusia.
6. Pemadatan dengan mesin gilas getar kecil.
PEKER JA VOL HARI KODE TOTAL VOL UPAH B IAYA SUB TOTAL
(org.hari) (Rp./Org/hari) ( Rp ) ( Rp )
P
E Mandor 2 1 L001 2 35,000.00 70,000.00
K Buruh agak terampil 1 1 L013 1 35,000.00 35,000.00
E Buruh tak terampil 66 1 L012 66 30,000.00 1,980,000.00
R Operator terampil 1 1 L006 1 46,000.00 46,000.00
J
A
PEKERJA 2,131,000.00
MAT E R IAL SATUAN KODE TOTAL HAR GA B IAYA SUB TOTAL
VOL (Rp./Unit) (Rp.) ( Rp )
M
A
T Kerikil ( tidak disaring ) m3 M004 120.00 80,000.00 9,600,000.00
R Alat bantu set M039 2.50 100,000.00 250,000.00
I
A
L
MATERIAL 9,850,000.00
P E RALATAN JUMLAH HARI KODE JAM HAR GA B IAYA SUB TOTAL
P KERJA KERJA ( Rp./Jam ) ( Rp ) ( Rp )
E
R Mesin gilas bergetar 1 ton 1 1 E010 5.00 35,251.93 176,259.63
A
L
A
T
A
N
PERALATAN 176,259.63
TOTAL (Rp) 12,157,259.63
VOLUME: 96 SATUAN : m3 HARGA SATUAN Rp 126,638.12 Per m3
ANALISA HARGA SATUAN
DINAS PEKERJAAN UMUM MEMOTONG BAHU JALAN TINGGI KODE
KABUPATEN KENDAL ( DENGAN BURUH ) K420
Versi Peb. 2007
PROPINSI : KODE KABUPATEN : KODE DISIAPKAN OLEH : TANGGAL :
JAWA TENGAH ( 33 ) KEN DAL ( 24 ) DPUK KENDAL 01 Pebruari 2007
URAIAN : ANGGAPAN / ASUMSI :
1. Perbaiki bahu jalan yang tingginya 1. Menggunakan tenaga manusia ( 48 m2/hari ).
melebihi lapisan permukaan jalan 2. rata-rata bahu jalan dipotong setinggi 10 cm dengan tenaga manusia.
antara parit & perkerasan jalan. 3. Semua sampah/kotoran dibuang sejauh 1 km, kapasitas 1,6 rit pp/jam/trk.
2. Muat dan bongkar ke/dari dengan 4. Memuat dan membuang dengan tenaga manusia.
tenaga manusia. 5. Hasil kerja rata-rata 1,2 m2/hari-orang.
3. Buang semua tanah buangan. 6. Penggunaan alat bantu 1 bulan-orang.
PEKER JA VOL HARI KODE TOTAL VOL UPAH B IAYA SUB TOTAL
(org.hari) (Rp./Org/hari) ( Rp ) ( Rp )
P
E Mandor 1 1 L001 1 35,000.00 35,000.00
K Sopir 4 1 L009 4 46,000.00 184,000.00
E Buruh tak terampil 40 1 L012 40 30,000.00 1,200,000.00
R
J
A
PEKERJA 1,419,000.00
MAT E R IAL SATUAN KODE TOTAL HAR GA B IAYA SUB TOTAL
VOL (Rp./Unit) (Rp.) ( Rp )
M
A
T Alat bantu set M039 1.60 100,000.00 160,000.00
R
I
A
L
MATERIAL 160,000.00
P E RALATAN JUMLAH HARI KODE JAM HAR GA B IAYA SUB TOTAL
P KERJA KERJA ( Rp./Jam ) ( Rp ) ( Rp )
E
R Dump truck 3,5 t / 115 HP 4 1 E020 20.00 123,574.62 2,471,492.45
A
L
A
T
A
N
PERALATAN 2,471,492.45
TOTAL (Rp) 4,050,492.45
VOLUME: 48 SATUAN : m3 HARGA SATUAN Rp 84,385.26 Per m3
ANALISA HARGA SATUAN
DINAS PEKERJAAN UMUM PEMBERSIHAN SEMAK DLL PADA DAMIJA KODE
KABUPATEN KENDAL ( MENGGUNAKAN BURUH ) K422
Versi Peb. 2007
PROPINSI : KODE KABUPATEN : KODE DISIAPKAN OLEH : TANGGAL :
JAWA TENGAH ( 33 ) KEN DAL ( 24 ) DPUK KENDAL 01 Pebruari 2007
URAIAN : ANGGAPAN / ASUMSI :
1. Potong semak belukar yang tumbuh 1. Menggunakan tenaga manusia ( 2 x 1,5 m x 500 m/hari ).
pada bahu jalan. 2. Dengan lebar 1,5 m dari tepi jalan, rata-2 luas yang dibersihkan 1500 m2/km satu sisi.
2. Bersihkan rumput/semak dari bahu 3. Hasil kerja : 60 m2/orang-hari.
jalan dan aspalan. 4. Sampah / reruntuhan dibuang sejauh 1 km.
5. Umur alat bantu rata-rata 1 bulan/orang/set @ 3 alat.
PEKER JA VOL HARI KODE TOTAL VOL UPAH B IAYA SUB TOTAL
(org.hari) (Rp./Org/hari) ( Rp ) ( Rp )
P
E Mandor 1 1 L001 1 35,000.00 35,000.00
K Buruh tak terlatih 25 1 L012 25 30,000.00 750,000.00
E
R
J
A
PEKERJA 785,000.00
MAT E R IAL SATUAN KODE TOTAL HAR GA B IAYA SUB TOTAL
VOL (Rp./Unit) (Rp.) ( Rp )
M
A Alat bantu set M039 1.00 100,000.00 100,000.00
T
R
I
A
L
MATERIAL 100,000.00
P E RALATAN JUMLAH HARI KODE JAM HAR GA B IAYA SUB TOTAL
P KERJA KERJA ( Rp./Jam ) ( Rp ) ( Rp )
E
R
A
L
A
T
A
N
PERALATAN 0.00
TOTAL (Rp) 885,000.00
VOLUME: 1500 SATUAN : m2 HARGA SATUAN Rp 590.00 Per m2
ANALISA HARGA SATUAN
DINAS PEKERJAAN UMUM KONSTRUKSI LAPIS PONDASI BAWAH ( LPB ) KLAS A KODE
KABUPATEN KENDAL ( MENGGUNAKAN ALAT ) K510
Versi Peb. 2007
PROPINSI : KODE KABUPATEN : KODE DISIAPKAN OLEH : TANGGAL :
JAWA TENGAH ( 33 ) KEN DAL ( 24 ) DPUK KENDAL 01 Pebruari 2007
URAIAN : ANGGAPAN / ASUMSI :
1. Membentuk/meratakan kembali 1. Menggunakan peralatan berat (150 m3/hari).
permukaan jalan lama. 2. Dimulai dengan pekerjaan memperbaiki penurunan.
2. Material didatangkan dari base camp. 3. Koefisien pemadatan = 1,2,
4. Harga material berdasarkan harga dilokasi proyek.
PEKER JA VOL HARI KODE TOTAL VOL UPAH B IAYA SUB TOTAL
(org.hari) (Rp./Org/hari) ( Rp ) ( Rp )
P
E Mandor 1 1 L001 1 35,000.00 35,000.00
K Operator terampil 2 1 L006 2 46,000.00 92,000.00
E Sopir 1 1 L009 1 46,000.00 46,000.00
R Buruh tak terampil 4 1 L012 4 30,000.00 120,000.00
J
A
PEKERJA 293,000.00
MAT E R IAL SATUAN KODE TOTAL HAR GA B IAYA SUB TOTAL
VOL (Rp./Unit) (Rp.) ( Rp )
M
A LPB Klas A ( beli ) m3 M042 180.00 150,000.00 27,000,000.00
T Alat bantu set M039 1.00 100,000.00 100,000.00
R
I
A
L
MATERIAL 27,100,000.00
P E RALATAN JUMLAH HARI KODE JAM HAR GA B IAYA SUB TOTAL
P KERJA KERJA ( Rp./Jam ) ( Rp ) ( Rp )
E Grader 110 HP 1 1 E002 5.00 249,344.15 1,246,720.73
R Mesin gilas 3 roda 8-10 ton 1 1 E006 5.00 88,511.31 442,556.54
A Truck tangki air 68 HP 1 1 E017 4.00 167,858.24 671,432.97
L
A
T
A
N
PERALATAN 2,360,710.25
TOTAL (Rp) 29,753,710.25
VOLUME: 150 SATUAN : m3 HARGA SATUAN Rp 198,358.07 Per m3
ANALISA HARGA SATUAN
DINAS PEKERJAAN UMUM LAPIS PONDASI BAWAH ( LPB ) KLAS A KODE
KABUPATEN KENDAL ( MENGGUNAKAN BURUH ) K511
Versi Peb. 2007
PROPINSI : KODE KABUPATEN : KODE DISIAPKAN OLEH : TANGGAL :
JAWA TENGAH ( 33 ) KEN DAL ( 24 ) DPUK KENDAL 01 Pebruari 2007
URAIAN : ANGGAPAN / ASUMSI :
1. Membentuk/meratakan kembali 1. Menggunakan buruh (160 m3/hari).
permukaan jalan lama. 2. Dimulai dengan pekerjaan memperbaiki penurunan.
2. Material didatangkan dari base camp. 3. Bahan dicampur dan diratakan +/- 12 cm.
4. Tebal lapis 10 cm.
5. Harga material berdarakan harga dilokasi proyek.
PEKER JA VOL HARI KODE TOTAL VOL UPAH B IAYA SUB TOTAL
(org.hari) (Rp./Org/hari) ( Rp ) ( Rp )
P
E Mandor 2 1 L001 2 35,000.00 70,000.00
K Operator terampil 1 1 L006 1 46,000.00 46,000.00
E Sopir 1 1 L009 1 46,000.00 46,000.00
R Buruh tak terampil 46 1 L012 46 30,000.00 1,380,000.00
J
A
PEKERJA 1,542,000.00
MAT E R IAL SATUAN KODE TOTAL HAR GA B IAYA SUB TOTAL
VOL (Rp./Unit) (Rp.) ( Rp )
M
A LPB Klas A ( beli ) m3 M042 72.00 150,000.00 10,800,000.00
T Alat bantu set M039 2.00 100,000.00 200,000.00
R
I
A
L
MATERIAL 11,000,000.00
P E RALATAN JUMLAH HARI KODE JAM HAR GA B IAYA SUB TOTAL
P KERJA KERJA ( Rp./Jam ) ( Rp ) ( Rp )
E
R Mesin gilas 3 roda 8-10 ton 1 1 E006 5.00 88,511.31 442,556.54
A Truck tangki air 68 HP 1 1 E017 4.00 167,858.24 671,432.97
L
A
T
A
N
PERALATAN 1,113,989.52
TOTAL (Rp) 13,655,989.52
VOLUME: 60 SATUAN : m3 HARGA SATUAN Rp 227,599.83 Per m3
ANALISA HARGA SATUAN
DINAS PEKERJAAN UMUM KONSTRUKSI LAPIS PONDASI BAWAH (LPB) KLAS B KODE
KABUPATEN KENDAL ( MENGGUNAKAN ALAT ) K512
Versi Peb. 2007
PROPINSI : KODE KABUPATEN : KODE DISIAPKAN OLEH : TANGGAL :
JAWA TENGAH ( 33 ) KEN DAL ( 24 ) DPUK KENDAL 01 Pebruari 2007
URAIAN : ANGGAPAN / ASUMSI :
1. Membentuk kembali permukaan 1. Menggunakan peralatanberat.
jalan lama. 2. Agregat ditimbun oleh leveransir ditempat pekerjaan.
2. Material didatangkan dari base camp. 3. Menghampar dan memadatkan lapisan - lapisan tiap 15 cm.
4. Produksi LPB padat 1000 m2/hari.
PEKER JA VOL HARI KODE TOTAL VOL UPAH B IAYA SUB TOTAL
(org.hari) (Rp./Org/hari) ( Rp ) ( Rp )
P
E Mandor 1 1 L001 1 35,000.00 35,000.00
K Operator terampil 2 1 L006 2 46,000.00 92,000.00
E Sopir 1 1 L009 1 46,000.00 46,000.00
R Buruh tak terampil 4 1 L012 4 30,000.00 120,000.00
J
A
PEKERJA 293,000.00
MAT E R IAL SATUAN KODE TOTAL HAR GA B IAYA SUB TOTAL
VOL (Rp./Unit) (Rp.) ( Rp )
M
A LPB Klas B ( beli ) m3 M043 180.00 145,000.00 26,100,000.00
T Alat bantu ( set @ 3 alat ) set M039 0.20 100,000.00 20,000.00
R
I
A
L
MATERIAL 26,120,000.00
P E RALATAN JUMLAH HARI KODE JAM HAR GA B IAYA SUB TOTAL
P KERJA KERJA ( Rp./Jam ) ( Rp ) ( Rp )
E Grader 110 HP 1 1 E002 5.00 249,344.15 1,246,720.73
R Mesin gilas bergetar 1 tonne 1 1 E008 5.00 125,453.27 627,266.36
A Truck tangki air 68 HP 1 1 E017 5.00 167,858.24 839,291.22
L
A
T
A
N
PERALATAN 2,713,278.31
TOTAL (Rp) 29,126,278.31
VOLUME: 150 SATUAN : m3 HARGA SATUAN Rp 194,175.19 Per m3
ANALISA HARGA SATUAN
DINAS PEKERJAAN UMUM KONSTRUKSI LAPIS PONDASI BAWAH (LPB) KLAS B KODE
KABUPATEN KENDAL ( MENGGUNAKAN BURUH ) K513
Versi Peb. 2007
PROPINSI : KODE KABUPATEN : KODE DISIAPKAN OLEH : TANGGAL :
JAWA TENGAH ( 33 ) KEN DAL ( 24 ) DPUK KENDAL 01 Pebruari 2007
URAIAN : ANGGAPAN / ASUMSI :
1. Membentuk kembali permukaan 1. Menggunakan buruh ( 60 m3/hari ).
jalan lama. 2. Dimulai dengan pekerjaan memperbaiki penurunan.
2. Material didatangkan dari base camp. 3. Bahan dicampur dan diratakan +/- 12 cm.
4. Harga material berdasarkan harga dilokasi proyek.
5. Tebal lapisan 10 cm.
PEKER JA VOL HARI KODE TOTAL VOL UPAH B IAYA SUB TOTAL
(org.hari) (Rp./Org/hari) ( Rp ) ( Rp )
P
E Mandor 2 1 L001 2 35,000.00 70,000.00
K Operator terampil 1 1 L006 1 46,000.00 46,000.00
E Sopir 1 1 L009 1 46,000.00 46,000.00
R Buruh tak terampil 46 1 L012 46 30,000.00 1,380,000.00
J
A
PEKERJA 1,542,000.00
MAT E R IAL SATUAN KODE TOTAL HAR GA B IAYA SUB TOTAL
VOL (Rp./Unit) (Rp.) ( Rp )
M
A LPB Klas B ( beli ) m3 M043 72.00 145,000.00 10,440,000.00
T Alat bantu ( set @ 3 alat ) set M039 1.03 100,000.00 103,000.00
R
I
A
L
MATERIAL 10,543,000.00
P E RALATAN JUMLAH HARI KODE JAM HAR GA B IAYA SUB TOTAL
P KERJA KERJA ( Rp./Jam ) ( Rp ) ( Rp )
E
R Mesin gilas 3 roda 8-10 ton 1 1 E008 5.00 88,511.31 442,556.54
A Truck tangki air 68 HP 1 1 E017 4.00 167,858.24 671,432.97
L
A
T
A
N
PERALATAN 1,113,989.52
TOTAL (Rp) 13,198,989.52
VOLUME: 60 SATUAN : m3 HARGA SATUAN Rp 219,983.16 Per m3
ANALISA HARGA SATUAN
DINAS PEKERJAAN UMUM KONSTRUKSI LAPIS PONDASI BAWAH ( LPB ) KLAS C KODE
KABUPATEN KENDAL ( MENGGUNAKAN ALAT ) K514
Versi Peb. 2007
PROPINSI : KODE KABUPATEN : KODE DISIAPKAN OLEH : TANGGAL :
JAWA TENGAH ( 33 ) KEN DAL ( 24 ) DPUK KENDAL 01 Pebruari 2007
URAIAN : ANGGAPAN / ASUMSI :
1. Kerikil ditimbun sepanjang jalan 1. Menggunakan alat berat.
oleh leveransir. 2. Kerikil ditimbun disepanjang jalan oleh leveransir.
2. Grader menghampar kerikil dan 3. Material kerikil kali tanpa disating dikirimkan leveransir sampai tempat pekerjaan.
ukuran yang besar dipisah. 4. 6 % kerikil dgn ukuran lebih (oversize), yang tersingkir saat penghamparan dgn grader.
3. Pemadatan menggunakan mesin 5. Dihampar setebal 15 cm dipadatkan menjadi 10 cm padat.
gilas dan truk air. 6. Hasil kerja 1200 m2 perhari (max 300 meter).
PEKER JA VOL HARI KODE TOTAL VOL UPAH B IAYA SUB TOTAL
(org.hari) (Rp./Org/hari) ( Rp ) ( Rp )
P
E Mandor 1 1 L001 1 35,000.00 35,000.00
K Operator terlatih 2 1 L006 2 46,000.00 92,000.00
E Sopir 1 1 L009 1 46,000.00 46,000.00
R Buruh tak terlatih 6 1 L012 6 30,000.00 180,000.00
J
A
PEKERJA 353,000.00
MAT E R IAL SATUAN KODE TOTAL HAR GA B IAYA SUB TOTAL
VOL (Rp./Unit) (Rp.) ( Rp )
M
A Alat bantu set M039 0.20 100,000.00 20,000.00
T Kerikil ( tidak disaring ) m3 M004 160.00 80,000.00 12,800,000.00
R
I
A
L
MATERIAL 12,820,000.00
P E RALATAN JUMLAH HARI KODE JAM HAR GA B IAYA SUB TOTAL
P KERJA KERJA ( Rp./Jam ) ( Rp ) ( Rp )
E
R Grader 110 HP 1 1 E002 5.00 249,344.15 1,246,720.73
A Mesin gilas bergetar 1 tonne 1 1 E008 5.00 125,453.27 627,266.36
L Truck tangki air 68 HP 1 1 E017 5.00 167,858.24 839,291.22
A
T
A
N
PERALATAN 2,713,278.31
TOTAL (Rp) 15,886,278.31
VOLUME: 120 SATUAN : m3 HARGA SATUAN Rp 132,385.65 Per m3
ANALISA HARGA SATUAN
DINAS PEKERJAAN UMUM LAPIS PONDASI BAWAH KLAS C KODE
KABUPATEN KENDAL ( MENGGUNAKAN BURUH ) K515
Versi Peb. 2007
PROPINSI : KODE KABUPATEN : KODE DISIAPKAN OLEH : TANGGAL :
JAWA TENGAH ( 33 ) KEN DAL ( 24 ) DPUK KENDAL 01 Pebruari 2007
URAIAN : ANGGAPAN / ASUMSI :
1. Agregat ditempatkan sepanjang 1. Menggunakan tenaga manusia setempat.
jalan oleh leveransir. 2. Kerikil ditimbun sepanjang jalan oleh leveransir.
2. Menghampar agregat dengan 3. Kerikil dengan ukuran lebih ( ovversize ) yang tersingkir saat penghamparan dengan
tenaga orang. orang dihitung 6 %.
3. Pemadatan dalam 2 lapis memakai 4. Dihampar dalam 2 lapis dan dipadatkan, tebal padat 10 cm padat.
truk air & mesin gilas roda baja 5. Penggunaan alat bantu +/- 1 bulan-orang.
4. Perapihan dengan tangan. 6. Hasil kerja menghampar dan memadatkan 600 m2/hari (4 m x 150 m).
7. Kerikil kali tanpa disaring dikirim leveransir sampai ditempat pekerjaan.
PEKER JA VOL HARI KODE TOTAL VOL UPAH B IAYA SUB TOTAL
(org.hari) (Rp./Org/hari) ( Rp ) ( Rp )
P
E Mandor 3 1 L001 3 35,000.00 105,000.00
K Operator terampil 1 1 L006 1 46,000.00 46,000.00
E Sopir terampil 1 1 L009 1 46,000.00 46,000.00
R Buruh tak terampil 60 1 L012 60 30,000.00 1,800,000.00
J
A
PEKERJA 1,997,000.00
MAT E R IAL SATUAN KODE TOTAL HAR GA B IAYA SUB TOTAL
VOL (Rp./Unit) (Rp.) ( Rp )
M
A Alat bantu set M039 2.50 100,000.00 250,000.00
T Kerikil ( tidak disaring ) m3 M004 75.00 80,000.00 6,000,000.00
R
I
A
L
MATERIAL 6,250,000.00
P E RALATAN JUMLAH HARI KODE JAM HAR GA B IAYA SUB TOTAL
P KERJA KERJA ( Rp./Jam ) ( Rp ) ( Rp )
E
R Mesin gilas 3 roda 8-10 ton 1 1 E006 5.00 88,511.31 442,556.54
A Truck tangki air 68 HP 1 1 E017 5.00 167,858.24 839,291.22
L
A
T
A
N
PERALATAN 1,281,847.76
TOTAL (Rp) 9,528,847.76
VOLUME: 60 SATUAN : m3 HARGA SATUAN Rp 158,814.13 Per m3
ANALISA HARGA SATUAN
DINAS PEKERJAAN UMUM KONSTRUKSI LAPIS PONDASI BAWAH ( KONST. TELFOORD ) KODE
KABUPATEN KENDAL ( MENGGUNAKAN BURUH ) K516
Versi Peb. 2007
PROPINSI : KODE KABUPATEN : KODE DISIAPKAN OLEH : TANGGAL :
JAWA TENGAH ( 33 ) KEN DAL ( 24 ) DPUK KENDAL 01 Pebruari 2007
URAIAN : ANGGAPAN / ASUMSI :
1. Meterial disiapkan dilokasi pekerjaan. 1. Menggunakan tenaga manusia 400 m2 per hari.
2. Menghampar pasir setebal 5 cm. 2. Material-material dikirim ketempat pekerjaan oleh leveransir.
3. Batu pecah berukuran besar 3. Batu sudah dipecah.
(10-15 cm) disusun berdiri. 4. Tanah dasar sudah disiapkan.
4. Batu pecah yg lebih kecil mengisi 5. Dipadatkan sampai tebal 15 cm.
rongga di atasnya sehingga rata
kemudian dipadatkan/digilas
dengan mesin gilas.
PEKER JA VOL HARI KODE TOTAL VOL UPAH B IAYA SUB TOTAL
(org.hari) (Rp./Org/hari) ( Rp ) ( Rp )
P
E Mandor 3 1 L001 3 35,000.00 105,000.00
K Operator terampil 1 1 L006 1 46,000.00 46,000.00
E Buruh tak terampil 99 1 L012 99 30,000.00 2,970,000.00
R
J
A
PEKERJA 3,121,000.00
MAT E R IAL SATUAN KODE TOTAL HAR GA B IAYA SUB TOTAL
VOL (Rp./Unit) (Rp.) ( Rp )
M
A Batu pecah ( 10-15 ) m3 M008 50.00 80,000.00 4,000,000.00
T Batu pecah ( 5-7 ) m3 M010 20.00 130,000.00 2,600,000.00
R Pasir hurug m3 M001 30.00 80,000.00 2,400,000.00
I Alat bantu set M039 4.00 100,000.00 400,000.00
A
L
MATERIAL 9,400,000.00
P E RALATAN JUMLAH HARI KODE JAM HAR GA B IAYA SUB TOTAL
P KERJA KERJA ( Rp./Jam ) ( Rp ) ( Rp )
E
R Mesin gilas 3 roda 8-10 ton 1 1 E006 5.00 88,511.31 442,556.54
A
L
A
T
A
N
PERALATAN 442,556.54
TOTAL (Rp) 12,963,556.54
VOLUME: 80 SATUAN : m3 HARGA SATUAN Rp 162,044.46 Per m3
ANALISA HARGA SATUAN
DINAS PEKERJAAN UMUM KONSTRUKSI LAPIS PONDASI ATAS (LPA) KLAS A KODE
KABUPATEN KENDAL ( MENGGUNAKAN ALAT ) K520
Versi Peb. 2007
PROPINSI : KODE KABUPATEN : KODE DISIAPKAN OLEH : TANGGAL :
JAWA TENGAH ( 33 ) KEN DAL ( 24 ) DPUK KENDAL 01 Pebruari 2007
URAIAN : ANGGAPAN / ASUMSI :
1. Agregat ditempatkan disepanjang 1. Menggunakan peralatan berat.
jalan oleh leveransir 2. Pengadaan LPA oleh leveransir.
2. Menghampar LPA denganmesin gilas.
3. Pemadatan dengan mesin gilas
bergetar, disertai dengan truk air
PEKER JA VOL HARI KODE TOTAL VOL UPAH B IAYA SUB TOTAL
(org.hari) (Rp./Org/hari) ( Rp ) ( Rp )
P
E Mandor 1 1 L001 1 35,000.00 35,000.00
K Operator terampil 2 2 L006 4 46,000.00 184,000.00
E Sopir terampil 1 2 L009 2 46,000.00 92,000.00
R Buruh tak terampil 4 2 L012 8 30,000.00 240,000.00
J
A
PEKERJA 551,000.00
MAT E R IAL SATUAN KODE TOTAL HAR GA B IAYA SUB TOTAL
VOL (Rp./Unit) (Rp.) ( Rp )
M
A Alat bantu ( set @ 3 alat ) set M039 0.20 100,000.00 20,000.00
T LPA Klas A ( beli ) m3 M040 165.00 165,000.00 27,225,000.00
R
I
A
L
MATERIAL 27,245,000.00
P E RALATAN JUMLAH HARI KODE JAM HAR GA B IAYA SUB TOTAL
P KERJA KERJA ( Rp./Jam ) ( Rp ) ( Rp )
E Grader 110 HP 1 1 E002 5.00 249,344.15 1,246,720.73
R Mesin gilas bergetar 1 tonne 1 1 E008 5.00 125,453.27 627,266.36
A Truck tangki air 68 HP 1 1 E017 5.00 167,858.24 839,291.22
L
A
T
A
N
PERALATAN 2,713,278.31
TOTAL (Rp) 30,509,278.31
VOLUME: 120 SATUAN : m3 HARGA SATUAN Rp 254,243.99 Per m3
ANALISA HARGA SATUAN
DINAS PEKERJAAN UMUM KONSTRUKSI LAPIS PONDASI ATAS (LPA) KLAS A KODE
KABUPATEN KENDAL ( MENGGUNAKAN BURUH ) K521
Versi Peb. 2007
PROPINSI : KODE KABUPATEN : KODE DISIAPKAN OLEH : TANGGAL :
JAWA TENGAH ( 33 ) KEN DAL ( 24 ) DPUK KENDAL 01 Pebruari 2007
URAIAN : ANGGAPAN / ASUMSI :
1. Agregat ditimbun disepanjang jalan. 1. Menggunakan tenaga manusia.
2. LPA dihampar dengan tenaga 2. Pengadaan LPA oleh leveransir.
manusia. 3. Buruh menghampar LPA 15 cm.
3. Pemadatan perkerasan dengan 4. Dipadatkan sampai 10 cm padat.
mesin gilas roda baja dan tanki air. 5. Hasil kerja menghampar dan memadatkan 600 m2/hari.
PEKER JA VOL HARI KODE TOTAL VOL UPAH B IAYA SUB TOTAL
(org.hari) (Rp./Org/hari) ( Rp ) ( Rp )
P
E Mandor 2 1 L001 2 35,000.00 70,000.00
K Operator terampil 1 2 L006 2 46,000.00 92,000.00
E Sopir terampil 1 2 L009 2 46,000.00 92,000.00
R Buruh tak terampil 66 2 L012 132 30,000.00 3,960,000.00
J
A
PEKERJA 4,214,000.00
MAT E R IAL SATUAN KODE TOTAL HAR GA B IAYA SUB TOTAL
VOL (Rp./Unit) (Rp.) ( Rp )
M
A Alat bantu ( set @ 3 alat ) set M039 5.50 100,000.00 550,000.00
T LPA Klas A ( beli ) m3 M040 165.00 165,000.00 27,225,000.00
R
I
A
L
MATERIAL 27,775,000.00
P E RALATAN JUMLAH HARI KODE JAM HAR GA B IAYA SUB TOTAL
P KERJA KERJA ( Rp./Jam ) ( Rp ) ( Rp )
E
R Mesin gilas 3 roda 8-10 ton 1 2 E006 10.00 88,511.31 885,113.08
A Truck tangki air 68 HP 1 2 E017 10.00 167,858.24 1,678,582.44
L
A
T
A
N
PERALATAN 2,563,695.52
TOTAL (Rp) 34,552,695.52
VOLUME: 120 SATUAN : m3 HARGA SATUAN Rp 287,939.13 Per m3
ANALISA HARGA SATUAN
DINAS PEKERJAAN UMUM KONSTRUKSI LAPIS PONDASI ATAS (LPA) KLAS B KODE
KABUPATEN KENDAL ( MENGGUNAKAN ALAT ) K522
Versi Peb. 2007
PROPINSI : KODE KABUPATEN : KODE DISIAPKAN OLEH : TANGGAL :
JAWA TENGAH ( 33 ) KEN DAL ( 24 ) DPUK KENDAL 01 Pebruari 2007
URAIAN : ANGGAPAN / ASUMSI :
1. LPA Klas B disuplai dan ditimbun di 1. Menggunakan alat berat.
sepanjang jalan oleh leveransir. 2. Kerikil ditimbun disepanjang jalan oleh leveransir.
2. Menghampar dengan grader. 3. Dihampar dan dipadatkan hingga dipadat tebal padat 10 cm.
3. Pemadatan dengan mesin gilas 4. Hasil kerja menghampar dan memadatkan 1500 m2/hari (4 m x 375 m).
bergetar dengan tanki air dan mesin
gilas roda baja.
PEKER JA VOL HARI KODE TOTAL VOL UPAH B IAYA SUB TOTAL
(org.hari) (Rp./Org/hari) ( Rp ) ( Rp )
P
E Mandor 1 1 L001 1 35,000.00 35,000.00
K Operator terampil 2 1 L006 2 46,000.00 92,000.00
E Sopir terampil 1 1 L009 1 46,000.00 46,000.00
R Buruh tak terampil 4 1 L012 4 30,000.00 120,000.00
J
A
PEKERJA 293,000.00
MAT E R IAL SATUAN KODE TOTAL HAR GA B IAYA SUB TOTAL
VOL (Rp./Unit) (Rp.) ( Rp )
M
A Alat bantu set M039 0.20 100,000.00 20,000.00
T LPA Klas B m3 M041 200.00 155,000.00 31,000,000.00
R
I
A
L
MATERIAL 31,020,000.00
P E RALATAN JUMLAH HARI KODE JAM HAR GA B IAYA SUB TOTAL
P KERJA KERJA ( Rp./Jam ) ( Rp ) ( Rp )
E
R Grader 110 HP 1 1 E002 5.00 249,344.15 1,246,720.73
A Mesin gilas getar 68 HP 1 1 E008 5.00 125,453.27 627,266.36
L Truck tangki air 1 1 E017 5.00 167,858.24 839,291.22
A
T
A
N
PERALATAN 2,713,278.31
TOTAL (Rp) 34,026,278.31
VOLUME: 150 SATUAN : m3 HARGA SATUAN Rp 226,841.86 Per m3
ANALISA HARGA SATUAN
DINAS PEKERJAAN UMUM LAPIS PONDASI ATAS ( LPA ) KLAS B KODE
KABUPATEN KENDAL ( MENGGUNAKAN BURUH ) K523
Versi Peb. 2007
PROPINSI : KODE KABUPATEN : KODE DISIAPKAN OLEH : TANGGAL :
JAWA TENGAH ( 33 ) KEN DAL ( 24 ) DPUK KENDAL 01 Pebruari 2007
URAIAN : ANGGAPAN / ASUMSI :
1. LPA Klas B disuplai dan ditimbun 1. Menggunakan tenaga manusia.
disepanjang jalan oleh leveransir. 2. Kerikil ditimbun dan diletakkan disepanjang jalan oleh leveransir.
2. Material dihampar dengan tenaga 3. Buruh menghampar kerikil pecah di atas LPB dalam dua lapis.
manusia. 4. Dipadatkan hingga didapat tebal padat 10 cm.
3. Dipadatkan dengan mesin gilas roda 5. Hasil kerja menghampar dan memadatkan 750 m2/hari.
baja disertai truk air.
PEKER JA VOL HARI KODE TOTAL VOL UPAH B IAYA SUB TOTAL
(org.hari) (Rp./Org/hari) ( Rp ) ( Rp )
P
E Mandor 2 2 L001 4 35,000.00 140,000.00
K Operator terampil 1 2 L006 2 46,000.00 92,000.00
E Sopir terampil 1 2 L009 2 46,000.00 92,000.00
R Buruh tak terampil 50 2 L012 100 30,000.00 3,000,000.00
J
A
PEKERJA 3,324,000.00
MAT E R IAL SATUAN KODE TOTAL HAR GA B IAYA SUB TOTAL
VOL (Rp./Unit) (Rp.) ( Rp )
M
A Alat bantu ( set @ 3 alat ) set M039 4.00 100,000.00 400,000.00
T LPA Klas B m3 M041 200.00 155,000.00 31,000,000.00
R
I
A
L
MATERIAL 31,400,000.00
P E RALATAN JUMLAH HARI KODE JAM HAR GA B IAYA SUB TOTAL
P KERJA KERJA ( Rp./Jam ) ( Rp ) ( Rp )
E
R Mesin gilas 3 roda 8-10 ton 1 2 E006 10.00 88,511.31 885,113.08
A Truck tangki air 68 HP 1 2 E017 10.00 167,858.24 1,678,582.44
L
A
T
A
N
PERALATAN 2,563,695.52
TOTAL (Rp) 37,287,695.52
VOLUME: 150 SATUAN : m3 HARGA SATUAN Rp 248,584.64 Per m3
ANALISA HARGA SATUAN
DINAS PEKERJAAN UMUM MENGHAMPAR LAPIS PONDASI ATAS ASPAL BETON KODE
KABUPATEN KENDAL ( LASTON ATAS ) ( MENGGUNAKAN ALAT ) K528
Versi Peb. 2007
PROPINSI : KODE KABUPATEN : KODE DISIAPKAN OLEH : TANGGAL :
JAWA TENGAH ( 33 ) KEN DAL ( 24 ) DPUK KENDAL 01 Pebruari 2007
URAIAN : ANGGAPAN / ASUMSI :
1. Permukaan jalan dibersihkan & kering 1. Menggunakan alat berat.
2. Siram aspal pengikat pd tara 0,5 l/m2 2. ATB dihampar dan dipadatkan ketebalan maksimal 10 cm.
3. ATB dihampar dgn aspal finisher. 3. Spesifikasi BM No. 03/PT/B/1983
4. Temperatur ATB 120° C dan tidak
kurang dari 80° C.
PEKER JA VOL HARI KODE TOTAL VOL UPAH B IAYA SUB TOTAL
(org.hari) (Rp./Org/hari) ( Rp ) ( Rp )
P
E Mandor 1 1 L001 1 35,000.00 35,000.00
K Operator terampil 4 1 L006 4 46,000.00 184,000.00
E Buruh terampil 8 1 L014 8 37,000.00 296,000.00
R Buruh tak terampil 12 1 L012 12 30,000.00 360,000.00
J
A
PEKERJA 875,000.00
MAT E R IAL SATUAN KODE TOTAL HAR GA B IAYA SUB TOTAL
VOL (Rp./Unit) (Rp.) ( Rp )
M
A
T Aspal kg M019 135.00 5,910.00 797,850.00
R Minyak bakar lt M035 90.00 2,300.00 207,000.00
I Alat bantu set M039 0.50 100,000.00 50,000.00
A Campuran Laston atas ( ATB ) tonne M044 100.60 800,000.00 80,480,000.00
L
MATERIAL 81,534,850.00
P E RALATAN JUMLAH HARI KODE JAM HAR GA B IAYA SUB TOTAL
P KERJA KERJA ( Rp./Jam ) ( Rp ) ( Rp )
E
R Mesin gilas 3 roda 8-10 ton 1 1 E006 1.00 88,511.31 88,511.31
A Mesin gilas roda karet 8-15 ton 1 1 E009 1.00 191,897.95 191,897.95
L Mesin penyemprot aspal 1000 l 1 1 E014 1.00 51,370.39 51,370.39
A Mesin penghampar 1,82 m 1 1 E016 1.00 103,548.92 103,548.92
T Compressor 210 m3/jam 1 1 E023 1.00 56,853.19 56,853.19
A
N
PERALATAN 492,181.76
TOTAL (Rp) 82,902,031.76
VOLUME: 45 SATUAN : m3 HARGA SATUAN Rp 1,842,267.37 Per m3
ANALISA HARGA SATUAN
DINAS PEKERJAAN UMUM LABURAN ASPAL PASIR ( BURAS ) KODE
KABUPATEN KENDAL ( MENGGUNAKAN ALAT ) K612
Versi Peb. 2007
PROPINSI : KODE KABUPATEN : KODE DISIAPKAN OLEH : TANGGAL :
JAWA TENGAH ( 33 ) KEN DAL ( 24 ) DPUK KENDAL 01 Pebruari 2007
URAIAN : ANGGAPAN / ASUMSI :
1. Hanya berfungsi sbg penutup permu 1. Kemampuan kerja 2400 ( 4 x 600 ) m2/hari.
kaan jalan supaya tdk berdebu. 2. Pasir dikirim oleh leveransir sampai ditempat kerja.
2. Lubang-lubang yg ada harus ditambal 3. Kebutuhan aspal 0,75 lt/m2 aspal residu 0.96 l/m3.
& permukaan hrs kering bebas debu 4. Pasir disebar rata-rata 100 m2/m3.
3. Aspal yang telah dipanaskan s/d 110 5. Pemanasan aspal dilakukan di lokasi pekerjaan.
disiramkan secara merata. 6. Pasir dimuat ulang kedaam r\truk dengan tenaga manusia dan dihampar
4. Kemudian pasir disebarkan diatasnya dengan mesin penghampar.
dan digilas dengan mesin gilas. 7. Spesifikasi BM. 05/PT/B/1983.
PEKER JA VOL HARI KODE TOTAL VOL UPAH B IAYA SUB TOTAL
(org.hari) (Rp./Org/hari) ( Rp ) ( Rp )
P
E Mandor 1 1 L001 1 35,000.00 35,000.00
K Operator Terampil 2 1 L006 2 46,000.00 92,000.00
E Buruh Tak Terampil 10 1 L012 10 30,000.00 300,000.00
R Buruh semi Terampil 2 1 L013 2 35,000.00 70,000.00
J Buruh Terampil 2 1 L014 2 37,000.00 74,000.00
A
PEKERJA 571,000.00
MAT E R IAL SATUAN KODE TOTAL HAR GA B IAYA SUB TOTAL
VOL (Rp./Unit) (Rp.) ( Rp )
M
A Pasir beton m3 M002 24.00 180,000.00 4,320,000.00
T Aspal kg M019 1,800.00 5,910.00 10,638,000.00
R Minyak bakar lt M035 300.00 2,300.00 690,000.00
I Alat bantu set M039 0.50 100,000.00 50,000.00
A
L
MATERIAL 15,698,000.00
P E RALATAN JUMLAH HARI KODE JAM HAR GA B IAYA SUB TOTAL
P KERJA KERJA ( Rp./Jam ) ( Rp ) ( Rp )
E
R Mesin gilas 3 roda 8-10 ton 1 1 E006 5.00 88,511.31 442,556.54
A Mesin penyemprot aspal 1000 l 1 1 E014 5.00 51,370.39 256,851.93
L
A
T
A
N
PERALATAN 699,408.47
TOTAL (Rp) 16,968,408.47
VOLUME: 2400 SATUAN : m2 HARGA SATUAN Rp 7,070.17 Per m2
ANALISA HARGA SATUAN
DINAS PEKERJAAN UMUM PELAPISAN ULANG ATAU LABURAN ASPAL LAPIS KEDUA KODE
KABUPATEN KENDAL ( BURDA 2 ) ( MENGGUNAKAN ALAT ) K616
Versi Peb. 2007
PROPINSI : KODE KABUPATEN : KODE DISIAPKAN OLEH : TANGGAL :
JAWA TENGAH ( 33 ) KEN DAL ( 24 ) DPUK KENDAL 01 Pebruari 2007
URAIAN : ANGGAPAN / ASUMSI :
1. Bersihkan perkerasan aspal yg lama. 1. Hasil kerja 1800 m2/hari.
2. Panaskan dan semprotkan aspal dgn 2. Agregat halus hasil saringan 10 mm mesin pemecah batu.
heater / sprayer. 3. Aspal disemprotkan tiap 1.3 liter/m2.
3. Taburkan pasir kerikil dan digilas dgn 4. Agregat halus tersaring 10 mm dihampar tiap 100 m2/m3.
mesin gilas pneumatic.
PEKER JA VOL HARI KODE TOTAL VOL UPAH B IAYA SUB TOTAL
(org.hari) (Rp./Org/hari) ( Rp ) ( Rp )
P
E Mandor 1 1 L001 1 35,000.00 35,000.00
K Operator terampil 3 1 L006 3 46,000.00 138,000.00
E Buruh tak terampil 10 1 L012 10 30,000.00 300,000.00
R Buruh semi terampil 2 1 L013 2 35,000.00 70,000.00
J Buruh terampil 2 1 L014 2 37,000.00 74,000.00
A
PEKERJA 617,000.00
MAT E R IAL SATUAN KODE TOTAL HAR GA B IAYA SUB TOTAL
VOL (Rp./Unit) (Rp.) ( Rp )
M
A Aspal kg M019 2,340.00 5,910.00 13,829,400.00
T Alat Bantu set M039 0.50 100,000.00 50,000.00
R Batu pecah mesin 0,5 cm m3 M014 18.00 140,000.00 2,520,000.00
I Minyak bakar lt M035 210.00 2,300.00 483,000.00
A
L
MATERIAL 16,882,400.00
P E RALATAN JUMLAH HARI KODE JAM HAR GA B IAYA SUB TOTAL
P KERJA KERJA ( Rp./Jam ) ( Rp ) ( Rp )
E
R Mesin gilas 3 roda 8-10 ton 1 1 E006 5.00 88,511.31 442,556.54
A Mesin penyemprot aspal 1000 l 1 1 E014 5.00 51,370.39 256,851.93
L
A
T
A
N
PERALATAN 699,408.47
TOTAL (Rp) 18,198,808.47
VOLUME: 1800 SATUAN : m2 HARGA SATUAN Rp 10,110.45 Per m2
ANALISA HARGA SATUAN
DINAS PEKERJAAN UMUM LABURAN ASPAL DUA LAPIS KODE
KABUPATEN KENDAL BURDA ( MENGGUNAKAN ALAT ) K617
Versi Peb. 2007
PROPINSI : KODE KABUPATEN : KODE DISIAPKAN OLEH : TANGGAL :
JAWA TENGAH ( 33 ) KEN DAL ( 24 ) DPUK KENDAL 01 Pebruari 2007
URAIAN : ANGGAPAN / ASUMSI :
1. Permukaan hrs rata, kering & bersih. 1. Menggunakan peralatan berat, kapasitas 450 m2/hari.
2. Utk permukaan jalan yg tak beraspal 2. Agregat ukuran 0,5-2 cm dan pemecah batu ditimbun dilokasi pekerjaan oleh leveransir.
perlu prime coat 0.7 lt/m2. 3. Permukaan yg diaspal harus sudah dipadatkan diadakan binding disiram.
3. Menebarkan agregat/batu pecah 4. Bitumen residu yang dipakai : lapis 1, sebanyak 1,8 l/m2.
1-2 cm dgn gradasi seragam dua lps. lapis 2, sebanyak 1,0 l/m2.
4. Pemadatan dengan mesin gilas.
PEKER JA VOL HARI KODE TOTAL VOL UPAH B IAYA SUB TOTAL
(org.hari) (Rp./Org/hari) ( Rp ) ( Rp )
P
E Mandor 1 4 L001 4 35,000.00 140,000.00
K Operator terampil 2 4 L006 8 46,000.00 368,000.00
E Buruh tak terampil 10 4 L012 40 30,000.00 1,200,000.00
R Buruh semi terampil 2 4 L013 8 35,000.00 280,000.00
J Buruh terampil 2 4 L014 8 37,000.00 296,000.00
A
PEKERJA 2,284,000.00
MAT E R IAL SATUAN KODE TOTAL HAR GA B IAYA SUB TOTAL
VOL (Rp./Unit) (Rp.) ( Rp )
M
A Aspal kg M019 5,040.00 5,910.00 29,786,400.00
T Minyak Bakar lt M035 580.00 2,300.00 1,334,000.00
R Alat Bantu set M039 2.50 100,000.00 250,000.00
I Batu pecah mesin 0,5 cm m3 M014 54.00 140,000.00 7,560,000.00
A
L
MATERIAL 38,930,400.00
P E RALATAN JUMLAH HARI KODE JAM HAR GA B IAYA SUB TOTAL
P KERJA KERJA ( Rp./Jam ) ( Rp ) ( Rp )
E
R
A
L Mesin gilas 3 roda 8-10 ton 1 3 E006 20.00 88,511.31 1,770,226.16
A Mesin penyemprot aspal 1000 ltr 1 3 E014 20.00 51,370.39 1,027,407.73
T
A
N
PERALATAN 2,797,633.90
TOTAL (Rp) 44,012,033.90
VOLUME: 1800 SATUAN : m2 HARGA SATUAN Rp 24,451.13 Per m2
ANALISA HARGA SATUAN
DINAS PEKERJAAN UMUM LAPIS PENETRASI MAKADAM 50 MM ( LAPEN ) KODE
KABUPATEN KENDAL ( MENGGUNAKAN BURUH ) K618
Versi Peb. 2007
PROPINSI : KODE KABUPATEN : KODE DISIAPKAN OLEH : TANGGAL :
JAWA TENGAH ( 33 ) KEN DAL ( 24 ) DPUK KENDAL 01 Pebruari 2007
URAIAN : ANGGAPAN / ASUMSI :
1. Semprotkan aspal tack coat 0.8 l/m3. 1. Menggunakan tenaga buruh.
2. Hamparkan agregat pokok 3-5, 2. Harga material (agregat pokok, agregat pengunci, agregat penutup aspal) adalah
25 m2/m3 dan padatkan. harga dilokasi proyek.
3. Hamparkan split 2-3 ; 45 m2/m3 3. Volume aspal cair untuk tack coat/prime coat 0.8 l/m2.
dan padatkan. 4. Tebal lapisan penetrasi +/- 5 cm.
4. Semprotkan aspal (2.5 kg/m2). 5. Agregat dikirim sampai tempat pekerjaan oleh leveransir.
5. Hamparkan agregat pengunci split
1-2 ; 90 m2/m3 dan padatkan.
6. Semprotkan aspal 1.5 kg/m & gilas
7. Taburkan kerikil pecah tersaring
rata-2 400 m2/m3.
PEKER JA VOL HARI KODE TOTAL VOL UPAH B IAYA SUB TOTAL
(org.hari) (Rp./Org/hari) ( Rp ) ( Rp )
P
E Mandor 2 3 L001 6 35,000.00 210,000.00
K Operator terampil 2 3 L006 6 46,000.00 276,000.00
E Buruh tak terampil 66 3 L012 198 30,000.00 5,940,000.00
R Buruh terampil 2 3 L014 6 37,000.00 222,000.00
J
A
PEKERJA 6,648,000.00
MAT E R IAL SATUAN KODE TOTAL HAR GA B IAYA SUB TOTAL
VOL (Rp./Unit) (Rp.) ( Rp )
M Batu pecah 3 - 5 cm m3 M011 56.00 140,000.00 7,840,000.00
A Batu pecah 2 - 3 cm m3 M012 31.00 140,000.00 4,340,000.00
T Batu pecah 1 - 2 cm m3 M013 12.00 140,000.00 1,680,000.00
R Batu pecah mesin 0,5 cm m3 M014 7.00 140,000.00 980,000.00
I Aspal kg M019 6,270.00 5,910.00 37,055,700.00
A Minyak bakar lt M035 450 2,300.00 1,035,000.00
L Alat bantu set M039 8.1 100,000.00 810,000.00
MATERIAL 53,740,700.00
P E RALATAN JUMLAH HARI KODE JAM HAR GA B IAYA SUB TOTAL
P KERJA KERJA ( Rp./Jam ) ( Rp ) ( Rp )
E
R Mesin gilas 3 roda 8 - 10 ton 1 3 E006 15.00 88,511.31 1,327,669.62
A Mesin penyemprot aspal 200 ltr 1 3 E015 15.00 26,813.83 402,207.43
L
A
T
A
N
PERALATAN 1,729,877.05
TOTAL (Rp) 62,118,577.05
VOLUME: 1400 SATUAN : m2 HARGA SATUAN Rp 44,370.41 Per m2
ANALISA HARGA SATUAN
DINAS PEKERJAAN UMUM PENGHAMPARAN DAN PEMADATAN LATASIR 20 MM KODE
KABUPATEN KENDAL ( MENGGUNAKAN ALAT ) K621
Versi Peb. 2007
PROPINSI : KODE KABUPATEN : KODE DISIAPKAN OLEH : TANGGAL :
JAWA TENGAH ( 33 ) KEN DAL ( 24 ) DPUK KENDAL 01 Pebruari 2007
URAIAN : ANGGAPAN / ASUMSI :
1. Supplier mengirim material sampai 1. Menggunakan peralatan berat 1750 m2/hari.
bin spreader. 2. Pasir aspal dikirim pleh leveransir ketempat pekerjaan.
2. Material dihampar dengan spreader 3. BJ asbuton padat 1.9 ton/m3.
dan dipadatkan dengan mesin gilas 4. Rata-rata tebal lapisan padat 2 cm.
roda baja dan roda ban pneumatic.
PEKER JA VOL HARI KODE TOTAL VOL UPAH B IAYA SUB TOTAL
(org.hari) (Rp./Org/hari) ( Rp ) ( Rp )
P
E Mandor 1 3 L001 3 35,000.00 105,000.00
K Operator terampil 4 3 L006 12 46,000.00 552,000.00
E Buruh tak terampil 12 3 L012 36 30,000.00 1,080,000.00
R Buruh semi terampil 8 3 L013 24 35,000.00 840,000.00
J
A
PEKERJA 2,577,000.00
MAT E R IAL SATUAN KODE TOTAL HAR GA B IAYA SUB TOTAL
VOL (Rp./Unit) (Rp.) ( Rp )
M
A Campuran panas LATASIR (HRSS) tonne M047 200.00 1,110,000.00 222,000,000.00
T Aspal kg M019 1,320.00 5,910.00 7,801,200.00
R Minyak bakar lt M035 200.00 2,300.00 460,000.00
I Alat bantu (set @ 3 alat ) set M039 1.00 100,000.00 100,000.00
A
L
MATERIAL 230,361,200.00
P E RALATAN JUMLAH HARI KODE JAM HAR GA B IAYA SUB TOTAL
P KERJA KERJA ( Rp./Jam ) ( Rp ) ( Rp )
E
R
A Mesin gilas tandem 6-10 ton 1 3 E007 15.00 109,402.90 1,641,043.49
L Mesin gilas roda karet 8-15 ton 1 3 E009 15.00 191,897.95 2,878,469.25
A Mesin penyemprot aspal 1000 lt 1 3 E014 15.00 51,370.39 770,555.80
T Msn penghampar 1820 mm/30 HP 1 3 E016 15.00 103,548.92 1,553,233.85
A
N
PERALATAN 6,843,302.38
TOTAL (Rp) 239,781,502.38
VOLUME: 5250 SATUAN : m2 HARGA SATUAN Rp 45,672.67 Per m2
ANALISA HARGA SATUAN
DINAS PEKERJAAN UMUM PENGHAMPARAN DAN PEMADATAN LATASTON ( HRS ) 3 cm KODE
KABUPATEN KENDAL ( MENGGUNAKAN ALAT ) K636
Versi Peb. 2007
PROPINSI : KODE KABUPATEN : KODE DISIAPKAN OLEH : TANGGAL :
JAWA TENGAH ( 33 ) KEN DAL ( 24 ) DPUK KENDAL 01 Pebruari 2007
URAIAN : ANGGAPAN / ASUMSI :
1. Pengiriman material sampai ke 1. Menggunakan alat berat 1500 m2/hari.
bin spreader. 2. Lataston campuran panas dikirim oleh leveransir ketempat pekerjaan.
2. Material dihampar dengan mesin 3. BJ Lataston padat 2.2 ton/m3
spreader, dipadatkan dgn mesin gilas 4. Rata-rata tebal lapisan 3 cm.
roda baja & roda ban pneumatic.
PEKER JA VOL HARI KODE TOTAL VOL UPAH B IAYA SUB TOTAL
(org.hari) (Rp./Org/hari) ( Rp ) ( Rp )
P
E Mandor 1 1 L001 1 35,000.00 35,000.00
K Operator terlatih 4 1 L006 4 46,000.00 184,000.00
E Buruh terlatih 8 1 L014 8 37,000.00 296,000.00
R Buruh tak terlatih 12 1 L012 12 30,000.00 360,000.00
J
A
PEKERJA 875,000.00
MAT E R IAL SATUAN KODE TOTAL HAR GA B IAYA SUB TOTAL
VOL (Rp./Unit) (Rp.) ( Rp )
M
A Aspal kg M019 450.00 5,910.00 2,659,500.00
T Minyak bakar ltr M035 300.00 2,300.00 690,000.00
R Alat bantu set M039 0.50 100,000.00 50,000.00
I Campuran Lapis Tipis Aspal Beton tonne M040 100.00 840,000.00 84,000,000.00
A ( HRS )
L
MATERIAL 87,399,500.00
P E RALATAN JUMLAH HARI KODE JAM HAR GA B IAYA SUB TOTAL
P KERJA KERJA ( Rp./Jam ) ( Rp ) ( Rp )
E
R Mesin gilas tandem 6 - 10 t 1 1 E007 5.00 109,402.90 547,014.50
A Mesin gilas roda karet 8 - 15 ton 1 1 E009 5.00 191,897.95 959,489.75
L Mesin penyemprot aspal 1000 lt 1 1 E014 5.00 51,370.39 256,851.93
A Mesin penghampar 1,82 m 1 1 E016 5.00 103,548.92 517,744.62
T Compressor 210 m3/jam 1 1 E023 4.00 56,853.19 227,412.76
A
N
PERALATAN 2,508,513.55
TOTAL (Rp) 90,783,013.55
VOLUME: 1500 SATUAN : m2 HARGA SATUAN Rp 60,522.01 Per m2
ANALISA HARGA SATUAN
DINAS PEKERJAAN UMUM PELAPISAN ULANG ATAU PENETRASI MAKADAM 7 CM, LPA KODE
KABUPATEN KENDAL ( MENGGUNAKAN BURUH ) K637
Versi Peb. 2007
PROPINSI : KODE KABUPATEN : KODE DISIAPKAN OLEH : TANGGAL :
JAWA TENGAH ( 33 ) KEN DAL ( 24 ) DPUK KENDAL 01 Pebruari 2007
URAIAN : ANGGAPAN / ASUMSI :
1. Hampar split 3-5 cm, rata-2 16 m2/m3. 1. Menggunakan tenaga manusia.
2. Hampar agregat 2-3 cm 60 m2/m3. 2. Batu pecah dikirim ketempat pekerjaan oleh leveransir.
3. Padatkan masing-masing lap. batu. 3. Tebal perkerasan total 7 cm.
4. Semprotkan aspal 3,7 l/m3. 4. Hasil kerja 2000 m2/minggu (6 hari).
5. Tabur agregat 1-2 cm, 70 m2/m3.
6. Semprotkan aspal 1,5 l/m2.
7. Taburkan pasir (binder) pd 90 m2/m3.
PEKER JA VOL HARI KODE TOTAL VOL UPAH B IAYA SUB TOTAL
(org.hari) (Rp./Org/hari) ( Rp ) ( Rp )
P
E Mandor 2 3 L001 6 35,000.00 210,000.00
K Operator terampil 2 3 L006 6 46,000.00 276,000.00
E Buruh tak terampil 66 3 L012 198 30,000.00 5,940,000.00
R Buruh terampil 2 3 L014 6 37,000.00 222,000.00
J
A
PEKERJA 6,648,000.00
MAT E R IAL SATUAN KODE TOTAL HAR GA B IAYA SUB TOTAL
VOL (Rp./Unit) (Rp.) ( Rp )
M
A Batu pecah 3 - 5 cm m3 M011 62.00 140,000.00 8,680,000.00
T Batu pecah 2 - 3 cm m3 M012 16.60 140,000.00 2,324,000.00
R Batu pecah 1 - 2 cm m3 M013 14.20 140,000.00 1,988,000.00
I Batu pecah mesin 0,5 cm m3 M014 11.10 140,000.00 1,554,000.00
A As p a l kg M019 5,500.00 5,910.00 32,505,000.00
L Alat bantu set M039 8.00 100,000.00 800,000.00
MATERIAL 47,851,000.00
P E RALATAN JUMLAH HARI KODE JAM HAR GA B IAYA SUB TOTAL
P KERJA KERJA ( Rp./Jam ) ( Rp ) ( Rp )
E
R Mesin gilas 3 roda 8 - 10 ton 1 3 E006 15.00 88,511.31 1,327,669.62
A Sprayer aspal 200 lt 1 3 E015 15.00 26,813.83 402,207.43
L Dump truck (3,5 T ) / 44 HP 1 3 E020 15.00 123,574.62 1,853,619.34
A
T
A
N
PERALATAN 3,583,496.39
TOTAL (Rp) 58,082,496.39
VOLUME: 70 SATUAN : m3 HARGA SATUAN Rp 829,749.95 Per m3
PEKER JA VOL HARI KODE TOTAL VOL UPAH B IAYA SUB TOTAL
(org.hari) (Rp./Org/hari) ( Rp ) ( Rp )
P
E Mandor 1 1 L001 1 35,000.00 35,000.00
K Operator terampil 2 1 L006 2 46,000.00 92,000.00
E Buruh tak terampil 10 1 L012 10 30,000.00 300,000.00
R Buruh semi terampil 8 1 L013 8 35,000.00 280,000.00
J
A
PEKERJA 707,000.00
MAT E R IAL SATUAN KODE TOTAL HAR GA B IAYA SUB TOTAL
VOL (Rp./Unit) (Rp.) ( Rp )
M
A As p a l kg M019 480.00 5,910.00 2,836,800.00
T Minyak bakar lt M035 480.00 2,300.00 1,104,000.00
R Alat bantu set M039 4.00 100,000.00 400,000.00
I Campuran Latasir (HRSS) tonne M047 60.00 1,110,000.00 66,600,000.00
A
L
MATERIAL 70,940,800.00
P E RALATAN JUMLAH HARI KODE JAM HAR GA B IAYA SUB TOTAL
P KERJA KERJA ( Rp./Jam ) ( Rp ) ( Rp )
E
R Mesin gilas 3 roda 6 - 10 ton 1 1 E006 5.00 88,511.31 442,556.54
A Penyemprot aspal 200 lt 1 1 E015 5.00 26,813.83 134,069.14
L
A
T
A
N
PERALATAN 576,625.68
TOTAL (Rp) 72,224,425.68
VOLUME: 1600 SATUAN : m2 HARGA SATUAN Rp 45,140.27 Per m2
PEKER JA VOL HARI KODE TOTAL VOL UPAH B IAYA SUB TOTAL
(org.hari) (Rp./Org/hari) ( Rp ) ( Rp )
P
E Mandor 1 1 L001 1 35,000.00 35,000.00
K Operator terlatih 4 1 L006 4 46,000.00 184,000.00
E Buruh terlatih 8 1 L014 8 37,000.00 296,000.00
R Buruh tak terlatih 12 1 L012 12 30,000.00 360,000.00
J
A
PEKERJA 875,000.00
MAT E R IAL SATUAN KODE TOTAL HAR GA B IAYA SUB TOTAL
VOL (Rp./Unit) (Rp.) ( Rp )
M
A
T Alat bantu set M039 0.80 100,000.00 80,000.00
R Campuran Laston / AC tonne M045 100.00 820,000.00 82,000,000.00
I Aspal kg M019 350.00 5,910.00 2,068,500.00
A Minyak bakar ltr M035 300.00 2,300.00 690,000.00
L
MATERIAL 84,838,500.00
P E RALATAN JUMLAH HARI KODE JAM HAR GA B IAYA SUB TOTAL
P KERJA KERJA ( Rp./Jam ) ( Rp ) ( Rp )
E
R Mesin gilas 3 roda 6 - 10 t 1 1 E006 5.00 88,511.31 442,556.54
A Mesin gilas tandem 6 - 10 t 1 1 E007 5.00 109,402.90 547,014.50
L Mesin gilas roda karet 8 - 15 ton 1 1 E009 5.00 191,897.95 959,489.75
A Mesin penyemprot aspal 1000 lt 1 1 E014 3.00 51,370.39 154,111.16
T Mesin penghampar 1,82 m 1 1 E016 5.00 103,548.92 517,744.62
A Compressor 210 m3/jam 1 1 E023 4.00 56,853.19 227,412.76
N
PERALATAN 2,848,329.32
TOTAL (Rp) 88,561,829.32
VOLUME: 900 SATUAN : m2 HARGA SATUAN Rp 98,402.03 Per m2
PEKER JA VOL HARI KODE TOTAL VOL UPAH B IAYA SUB TOTAL
(org.hari) (Rp./Org/hari) ( Rp ) ( Rp )
P
E Mandor 1 1 L001 1 35,000.00 35,000.00
K Operator terlatih 4 1 L006 4 46,000.00 184,000.00
E Buruh terlatih 8 1 L014 8 37,000.00 296,000.00
R Buruh tak terlatih 12 1 L012 12 30,000.00 360,000.00
J
A
PEKERJA 875,000.00
MAT E R IAL SATUAN KODE TOTAL HAR GA B IAYA SUB TOTAL
VOL (Rp./Unit) (Rp.) ( Rp )
M
A
T Alat bantu set M039 0.80 100,000.00 80,000.00
R Campuran Laston / AC tonne M045 65.00 820,000.00 53,300,000.00
I Aspal kg M019 350.00 5,910.00 2,068,500.00
A Minyak bakar ltr M035 300.00 2,300.00 690,000.00
L
MATERIAL 56,138,500.00
P E RALATAN JUMLAH HARI KODE JAM HAR GA B IAYA SUB TOTAL
P KERJA KERJA ( Rp./Jam ) ( Rp ) ( Rp )
E
R Mesin gilas 3 roda 6 - 10 t 1 1 E006 5.00 88,511.31 442,556.54
A Mesin gilas tandem 6 - 10 t 1 1 E007 5.00 109,402.90 547,014.50
L Mesin gilas roda karet 8 - 15 ton 1 1 E009 5.00 191,897.95 959,489.75
A Mesin penyemprot aspal 1000 lt 1 1 E014 3.00 51,370.39 154,111.16
T Mesin penghampar 1,82 m 1 1 E016 5.00 103,548.92 517,744.62
A Compressor 210 m3/jam 1 1 E023 4.00 56,853.19 227,412.76
N
PERALATAN 2,848,329.32
TOTAL (Rp) 59,861,829.32
VOLUME: 900 SATUAN : m2 HARGA SATUAN Rp 66,513.14 Per m2
0.0400 100 4.00
0.0221 100 2.21
0.0086 100 0.86
0.0050 100 0.50
4.4786 7.57
333.333333
PEKER JA VOL HARI KODE TOTAL VOL UPAH B IAYA SUB TOTAL
(org.hari) (Rp./Org/hari) ( Rp ) ( Rp )
P
E Mandor 1 5 L001 5 35,000.00 175,000.00
K Tukang 4 5 L005 20 37,000.00 740,000.00
E Buruh tak terampil 7 5 L012 35 30,000.00 1,050,000.00
R Buruh semi terampil 3 5 L013 15 35,000.00 525,000.00
J
A
PEKERJA 2,490,000.00
MAT E R IAL SATUAN KODE TOTAL HAR GA B IAYA SUB TOTAL
VOL (Rp./Unit) (Rp.) ( Rp )
M
A Paku jembatan kg M031 20.00 17,000.00 340,000.00
T Kayu bekisting m3 M033 3.00 2,200,000.00 6,600,000.00
R Alat bantu set M039 3.00 100,000.00 300,000.00
I
A
L
MATERIAL 7,240,000.00
P E RALATAN JUMLAH HARI KODE JAM HAR GA B IAYA SUB TOTAL
P KERJA KERJA ( Rp./Jam ) ( Rp ) ( Rp )
E
R
A
L
A
T
A
N
PERALATAN 0.00
TOTAL (Rp) 9,730,000.00
VOLUME: 100 SATUAN : m2 HARGA SATUAN Rp 97,300.00 Per m2
ANALISA HARGA SATUAN
DINAS PEKERJAAN UMUM BEKISTING KALIMANTAN MERANTI UNTUK BETON BERTULANG KODE
KABUPATEN KENDAL ( MENGGUNAKAN BURUH ) K710.a
Versi Peb. 2007
PROPINSI : KODE KABUPATEN : KODE DISIAPKAN OLEH : TANGGAL :
JAWA TENGAH ( 33 ) KEN DAL ( 24 ) DPUK KENDAL 01 Pebruari 2007
URAIAN : ANGGAPAN / ASUMSI :
1. Pengadaan bahan oleh leveransir. 1. Kelompok tukang kayu memasang 100 m2 dalam 5 hari kerja.
2. Tukang kayu memotong & membuat 2. 1/3 material dapat dipakai kembali.
acuan/perancah. 3. Pengadaan bahan oleh leveransir.
3. Tukang kayu membongkar acuan/ 4. Tukang kayu membongkar bekisting.
bekisting stl disetujui oleh direksi.
PEKER JA VOL HARI KODE TOTAL VOL UPAH B IAYA SUB TOTAL
(org.hari) (Rp./Org/hari) ( Rp ) ( Rp )
P
E Mandor 1 5 L001 5 35,000.00 175,000.00
K Tukang 4 5 L005 20 37,000.00 740,000.00
E Buruh tak terampil 7 5 L012 35 30,000.00 1,050,000.00
R Buruh semi terampil 3 5 L013 15 35,000.00 525,000.00
J
A
PEKERJA 2,490,000.00
MAT E R IAL SATUAN KODE TOTAL HAR GA B IAYA SUB TOTAL
VOL (Rp./Unit) (Rp.) ( Rp )
M
A Paku jembatan kg M031 20.00 17,000.00 340,000.00
T Kayu bekisting m3 M033 3.00 4,000,000.00 12,000,000.00
R Alat bantu set M039 3.00 100,000.00 300,000.00
I
A
L
MATERIAL 12,640,000.00
P E RALATAN JUMLAH HARI KODE JAM HAR GA B IAYA SUB TOTAL
P KERJA KERJA ( Rp./Jam ) ( Rp ) ( Rp )
E
R
A
L
A
T
A
N
PERALATAN 0.00
TOTAL (Rp) 15,130,000.00
VOLUME: 100 SATUAN : m2 HARGA SATUAN Rp 151,300.00 Per m2
ANALISA HARGA SATUAN
DINAS PEKERJAAN UMUM MEMOTONG, MEMBENGKOK & MEMASANG TULANGAN BESI BETON KODE
KABUPATEN KENDAL ( MENGGUNAKAN BURUH ) K715
Versi Peb. 2007
PROPINSI : KODE KABUPATEN : KODE DISIAPKAN OLEH : TANGGAL :
JAWA TENGAH ( 33 ) KEN DAL ( 24 ) DPUK KENDAL 01 Pebruari 2007
URAIAN : ANGGAPAN / ASUMSI :
1. Batang besi beton dipotong sesuai 1. 200 kg tulangan jadi disiapkan dalam 1 hari.
ukuran panjang yang diperlukan. 2. Besi tulangan dikirim ketempat pekerjaan oleh pemasok.
2. Batang dan beugel besi beton di 3. Penyusutan akibat pemotongan 10 % dan pakai kawat baja dll dianggap 1 %.
bengkok sesuai yang diperlukan. 4. Membengkok dan memasang batang besi beton dilaksanakan dengan
3. Perakitan tulangan besi beton dan tangan ditempat pekerjaan.
diikat dengan kawat baja.
PEKER JA VOL HARI KODE TOTAL VOL UPAH B IAYA SUB TOTAL
(org.hari) (Rp./Org/hari) ( Rp ) ( Rp )
P
E Mandor 1 1 L001 1 35,000.00 35,000.00
K Tukang batu 1 1 L004 1 46,000.00 46,000.00
E Buruh tak terampil 2 1 L012 2 30,000.00 60,000.00
R Buruh semi terampil 2 1 L013 2 35,000.00 70,000.00
J
A
PEKERJA 211,000.00
MAT E R IAL SATUAN KODE TOTAL HAR GA B IAYA SUB TOTAL
VOL (Rp./Unit) (Rp.) ( Rp )
M
A Besi beton dan kawat beton kg M028 225.00 9,000.00 2,025,000.00
T Alat bantu set M039 0.20 100,000.00 20,000.00
R
I
A
L
MATERIAL 2,045,000.00
P E RALATAN JUMLAH HARI KODE JAM HAR GA B IAYA SUB TOTAL
P KERJA KERJA ( Rp./Jam ) ( Rp ) ( Rp )
E
R
A
L
A
T
A
N
PERALATAN 0.00
TOTAL (Rp) 2,256,000.00
VOLUME: 200 SATUAN : kg HARGA SATUAN Rp 11,280.00 Per kg
ANALISA HARGA SATUAN
DINAS PEKERJAAN UMUM BETON NON STRUKTUR / RABAT KODE
KABUPATEN KENDAL KLAS K 125 K720
Versi Peb. 2007
PROPINSI : KODE KABUPATEN : KODE DISIAPKAN OLEH : TANGGAL :
JAWA TENGAH ( 33 ) KEN DAL ( 24 ) DPUK KENDAL 01 Pebruari 2007
URAIAN : ANGGAPAN / ASUMSI :
1. Material dikirim oleh leveransir. 1. Bahan-bahan dikirim ketempat pekerjaan oleh leveransir.
2. Pencampuran beton ditempat 2. Dipakai agregat pecah dan tersaring.
pekerjaan. 3. Hasil kerja 6,0 m3/hari - 6 jam ( 9 campuran per jam ).
4. Campuran 1 PC : 3 Ps : 5 Kr
5. Dalam 1 m2 beton dibutuhkan 6.25 zak (40 kg/zak) PC (250 kg/m3).
6. Dibutuhkan untuk alas pondasi beton.
PEKER JA VOL HARI KODE TOTAL VOL UPAH B IAYA SUB TOTAL
(org.hari) (Rp./Org/hari) ( Rp ) ( Rp )
P
E Mandor 1 1 L001 1 35,000.00 35,000.00
K Tukang batu 1 1 L004 1 46,000.00 46,000.00
E Buruh tak terlatih 12 1 L012 12 30,000.00 360,000.00
R Buruh semi terlatih 2 1 L013 2 35,000.00 70,000.00
J
A
PEKERJA 511,000.00
MAT E R IAL SATUAN KODE TOTAL HAR GA B IAYA SUB TOTAL
VOL (Rp./Unit) (Rp.) ( Rp )
M
A Pasir beton ( Muntilan ) m3 M041 3.00 180,000.00 540,000.00
T Semen 40 kg M016 40.00 37,600.00 1,504,000.00
R Alat bantu set M039 0.60 100,000.00 60,000.00
I Batu pecah mesin 2-3 cm / 1-2 CM m3 M012 / 5.00 140,000.00 700,000.00
A M013
L
MATERIAL 2,804,000.00
P E RALATAN JUMLAH HARI KODE JAM HAR GA B IAYA SUB TOTAL
P KERJA KERJA ( Rp./Jam ) ( Rp ) ( Rp )
E
R Alat penggetar beton 4 HP 1 1 E012 5.00 10,182.91 50,914.53
A Pengaduk beton 125 lt / 6 HP 1 1 E021 5.00 9,524.07 47,620.37
L Pompa air ( D 5 cm ) 30 m3 / jam 1 1 E024 5.00 12,299.94 61,499.69
A
T
A
N
PERALATAN 160,034.59
TOTAL (Rp) 3,475,034.59
VOLUME: 6 SATUAN : m3 HARGA SATUAN Rp 579,172.43 Per m3
ANALISA HARGA SATUAN
DINAS PEKERJAAN UMUM BETON STRUKTUR KLAS K 225 KODE
KABUPATEN KENDAL ( MENGGUNAKAN ALAT PENGADUK BTN 125 Lt ) K722
Versi Peb. 2007
PROPINSI : KODE KABUPATEN : KODE DISIAPKAN OLEH : TANGGAL :
JAWA TENGAH ( 33 ) KEN DAL ( 24 ) DPUK KENDAL 01 Pebruari 2007
URAIAN : ANGGAPAN / ASUMSI :
1. Material dikirim oleh leveransir. 1. Keperluan material dikirim ketempat pekerjaan oleh leveransir.
2. Pengadukan btn ditempat pekerjaan 2. Produksi 6,4 m3/hari - 6 jam, 9 campuran/jam.
3. Adukan beton dituang ditempat yg 3. Campran beton 1:2:3 (atau 1*5).
dikehendaki & digetar supaya padat. 4. Untuk 1m3 dibutuhkan 7,5 PC (40 kg/zak) atau 300 kg PC/m3.
5. Tidak termasuk pekerjaan pembesian.
6. Dipakai agregat pecah dan tersaring.
PEKER JA VOL HARI KODE TOTAL VOL UPAH B IAYA SUB TOTAL
(org.hari) (Rp./Org/hari) ( Rp ) ( Rp )
P
E Mandor 1 6 L001 6 35,000.00 210,000.00
K Buruh tak terampil 12 6 L012 72 30,000.00 2,160,000.00
E Buruh terampil 2 6 L014 12 37,000.00 444,000.00
R
J
A
PEKERJA 2,814,000.00
MAT E R IAL SATUAN KODE TOTAL HAR GA B IAYA SUB TOTAL
VOL (Rp./Unit) (Rp.) ( Rp )
M
A Pasir ayak untuk beton (Muntilan) m3 M041 18.00 180,000.00 3,240,000.00
T Semen 40 kg M016 324.00 37,600.00 12,182,400.00
R Alat bantu ( set @ 3 alat ) set M039 2.88 100,000.00 288,000.00
I Batu pecah mesin 2-3 cm / 1-2 cm m3 M012 / 27.00 140,000.00 3,780,000.00
A M013
L
MATERIAL 19,490,400.00
P E RALATAN JUMLAH HARI KODE JAM HAR GA B IAYA SUB TOTAL
P KERJA KERJA ( Rp./Jam ) ( Rp ) ( Rp )
E
R Alat penggetar beton 4 HP 1 6 E012 36.00 10,182.91 366,584.62
A Pengaduk beton 125 lt / 6 HP 1 6 E021 36.00 9,524.07 342,866.65
L
A
T
A
N
PERALATAN 709,451.27
TOTAL (Rp) 23,013,851.27
VOLUME: 37 SATUAN : m3 HARGA SATUAN Rp 621,995.98 Per m3
ANALISA HARGA SATUAN
DINAS PEKERJAAN UMUM BETON STRUKTUR / UNTUK KONSTRUKSI KODE
KABUPATEN KENDAL KLAS K. 175 K725
Versi Peb. 2007
PROPINSI : KODE KABUPATEN : KODE DISIAPKAN OLEH : TANGGAL :
JAWA TENGAH ( 33 ) KEN DAL ( 24 ) DPUK KENDAL 01 Pebruari 2007
URAIAN : ANGGAPAN / ASUMSI :
1. Material dikirim oleh leveransir. 1. Keperluan material dikirim ketempat pekerjaan oleh leveransir.
2. Pengadukan btn ditempat pekerjaan 2. Produksi 6,4 m3/hari - 6 jam, 9 campuran/jam.
3. Adukan beton dituang ditempat yg 3. Campran beton 1:2:3 (atau 1*5).
dikehendaki & digetar supaya padat. 4. Untuk 1m3 dibutuhkan 7,5 PC (40 kg/zak) atau 300 kg PC/m3.
5. Tidak termasuk pekerjaan pembesian.
6. Dipakai agregat pecah dan tersaring.
PEKER JA VOL HARI KODE TOTAL VOL UPAH B IAYA SUB TOTAL
(org.hari) (Rp./Org/hari) ( Rp ) ( Rp )
P
E Mandor 1 1 L001 1 35,000.00 35,000.00
K Buruh tak terlatih 12 1 L012 12 30,000.00 360,000.00
E Buruh semi terlatih 2 1 L014 2 35,000.00 70,000.00
R
J
A
PEKERJA 465,000.00
MAT E R IAL SATUAN KODE TOTAL HAR GA B IAYA SUB TOTAL
VOL (Rp./Unit) (Rp.) ( Rp )
M
A Pasir beton ( Muntilan) m3 M041 3.00 180,000.00 540,000.00
T Semen 40 kg M016 48.00 37,600.00 1,804,800.00
R Alat bantu set M039 0.60 100,000.00 60,000.00
I Batu pecah mesin 2-3 cm / 1-2 cm m3 M012 / 4.60 140,000.00 644,000.00
A M013
L
MATERIAL 3,048,800.00
P E RALATAN JUMLAH HARI KODE JAM HAR GA B IAYA SUB TOTAL
P KERJA KERJA ( Rp./Jam ) ( Rp ) ( Rp )
E
R Alat penggetar beton 4 HP 1 1 E012 5.00 10,182.91 50,914.53
A Pengaduk beton 125 lt / 6 HP 1 1 E021 5.00 9,524.07 47,620.37
L
A
T
A
N
PERALATAN 98,534.90
TOTAL (Rp) 3,612,334.90
VOLUME: 6 SATUAN : m3 HARGA SATUAN Rp 602,055.82 Per m3
ANALISA HARGA SATUAN
DINAS PEKERJAAN UMUM BETON STRUKTUR KLAS K. 350 KODE
KABUPATEN KENDAL ( MENGGUNAKAN ALAT PENGADUK BETON 500 LT ) K730
Versi Peb. 2007
PROPINSI : KODE KABUPATEN : KODE DISIAPKAN OLEH : TANGGAL :
JAWA TENGAH ( 33 ) KEN DAL ( 24 ) DPUK KENDAL 01 Pebruari 2007
URAIAN : ANGGAPAN / ASUMSI :
1. Pemasok mengirim material. 1. Bahan-bahan dasar dikirim kelokasi pekerjaan oleh pemasok.
2. Acuan dan tulangan besi beton 2. Dipakai agregat pecah tersaring.
dipasang. 3. Dicor 22,6 m3/hari dengan 48 adukan/6 jam/hari.
3. Beton diaduk dilokasi pekerjaan. 4. Adukan 4 Pc : 6 Ps : 11 Kr (yaitu 4 : 17) ; semen : 45 kg/m3 ; air : 180 kg/m3 ;
4. Beton dicor dan digetar sampai 2642 kg/m3.
padat. 5. Angap tiap adukan membutuhkan : 5,0 zak (138,9 liter lepas) semen portland ;
208,3 liter pasir ; 381,9 liter kerikil dan 84,7 liter air.
6. Tidak termasuk acuan dan tulangan besi beton yang sudah dipasang.
7. Beton dipakai utk bagian-bagian struktur pratekan, lantai jembatan dll.
8. Sesuai Peraturan Beton Bertulang Indonesia ( PBI 1971 N.I. 2).
PEKER JA VOL HARI KODE TOTAL VOL UPAH B IAYA SUB TOTAL
(org.hari) (Rp./Org/hari) ( Rp ) ( Rp )
P
E Mandor 2 6 L001 12 35,000.00 420,000.00
K Buruh tak terlatih 50 6 L012 300 30,000.00 9,000,000.00
E Buruh terlatih 5 6 L014 30 37,000.00 1,110,000.00
R
J
A
PEKERJA 10,530,000.00
MAT E R IAL SATUAN KODE TOTAL HAR GA B IAYA SUB TOTAL
VOL (Rp./Unit) (Rp.) ( Rp )
M
A Pasir ayak untuk beton (Muntilan) m3 M041 60.00 180,000.00 10,800,000.00
T Semen 40 kg M016 1,440.00 37,600.00 54,144,000.00
R Alat bantu ( set @ 3 alat ) set M039 12.00 100,000.00 1,200,000.00
I Batu pecah mesin 2-3 cm / 1-2 cm m3 M012 / 110.00 140,000.00 15,400,000.00
A M013
L
MATERIAL 81,544,000.00
P E RALATAN JUMLAH HARI KODE JAM HAR GA B IAYA SUB TOTAL
P KERJA KERJA ( Rp./Jam ) ( Rp ) ( Rp )
E
R Alat penggetar beton 4 HP 4 6 E012 144.00 10,182.91 1,466,338.48
A Pengaduk beton 500 lt / 20 HP 1 6 E022 36.00 49,007.31 1,764,263.06
L
A
T
A
N
PERALATAN 3,230,601.54
TOTAL (Rp) 95,304,601.54
VOLUME: 135 SATUAN : m3 HARGA SATUAN Rp 705,960.01 Per m3
0.05
0.2
0.35
0.15
0.2
0.03
0.03
ANALISA HARGA SATUAN
DINAS PEKERJAAN UMUM KONSTRUKSI PASANGAN BATU DENGAN SIAR KODE
KABUPATEN KENDAL ( MENGGUNAKAN BURUH ) K810
Versi Peb. 2007
PROPINSI : KODE KABUPATEN : KODE DISIAPKAN OLEH : TANGGAL :
JAWA TENGAH ( 33 ) KEN DAL ( 24 ) DPUK KENDAL 01 Pebruari 2007
URAIAN : ANGGAPAN / ASUMSI :
1. Material disiapkan dilokasi oleh 1. Dilakukan untuk pekerjaan gorong-gorong, jembatan, dinding penahan tanah dan
leveransir. struktur lainnya yang menggunakan konstruksi pasangan batu.
2. Pekerja membawa batu belah 2. Material - material dikirim ketempat pekerjaan oleh leveransir.
ketempat tukang batu pekerja. 3. Tidak termasuk galian/timbunan.
3. Tukang batu memasang batu belah 4. Bagian M 170 diperbolehkan pakai bambu.
dengan adukan pasir semen. 5. Campuran spesi 1 PC : 4 Psr Muntilan.
6. Pekerjaan termasuk pekerjaan siar dan plesteran kepala pasangan.
PEKER JA VOL HARI KODE TOTAL VOL UPAH B IAYA SUB TOTAL
(org.hari) (Rp./Org/hari) ( Rp ) ( Rp )
P
E Mandor 1 1 L001 1 35,000.00 35,000.00
K Tukang batu 4 1 L005 4 37,000.00 148,000.00
E Buruh tak terlatih 12 1 L012 12 30,000.00 360,000.00
R
J
A
PEKERJA 543,000.00
MAT E R IAL SATUAN KODE TOTAL HAR GA B IAYA SUB TOTAL
VOL (Rp./Unit) (Rp.) ( Rp )
M
A Batu belah m3 M006 5.00 91,000.00 455,000.00
T Pasir beton ( Muntilan ) m3 M002 1.20 180,000.00 216,000.00
R Semen 40 kg M016 19.00 37,600.00 714,400.00
I Alat bantu set M039 0.70 100,000.00 70,000.00
A
L
MATERIAL 1,455,400.00
P E RALATAN JUMLAH HARI KODE JAM HAR GA B IAYA SUB TOTAL
P KERJA KERJA ( Rp./Jam ) ( Rp ) ( Rp )
E
R
A
L
A
T
A
N
PERALATAN 0.00
TOTAL (Rp) 1,998,400.00
VOLUME: 5 SATUAN : m3 HARGA SATUAN Rp 399,680.00 Per m3
ANALISA HARGA SATUAN
DINAS PEKERJAAN UMUM BRONJONG PENAHAN KODE
KABUPATEN KENDAL ( MENGGUNAKAN BURUH ) K815
Versi Peb. 2007
PROPINSI : KODE KABUPATEN : KODE DISIAPKAN OLEH : TANGGAL :
JAWA TENGAH ( 33 ) KEN DAL ( 24 ) DPUK KENDAL 01 Pebruari 2007
URAIAN : ANGGAPAN / ASUMSI :
1. Gali muka tnh utk tempat bronjong. 1. Batu dikirim ke lapangan oleh leveransir.
2. Rangkai & bentuk anyaman bronjong 2. Anyaman bronjong dikirim ke lapangan oleh leveransir.
3. Isi anyaman kawat dgn batu. 3. Selesai dalam 2 hari.
4. Anyaman dibuat kokoh dengan
ikatan kuat.
5. Timbunan kembali hingga mantap.
PEKER JA VOL HARI KODE TOTAL VOL UPAH B IAYA SUB TOTAL
(org.hari) (Rp./Org/hari) ( Rp ) ( Rp )
P
E Mandor 1 2 L001 2 35,000.00 70,000.00
K Buruh tak terampil 35 2 L012 70 30,000.00 2,100,000.00
E Buruh semi terlatih 5 2 L013 10 35,000.00 350,000.00
R Buruh terlatih 2 2 L014 4 37,000.00 148,000.00
J
A
PEKERJA 2,668,000.00
MAT E R IAL SATUAN KODE TOTAL HAR GA B IAYA SUB TOTAL
VOL (Rp./Unit) (Rp.) ( Rp )
M
A Alat bantu set M039 3.30 100,000.00 330,000.00
T Batu belah m3 M006 25.00 91,000.00 2,275,000.00
R Kawat bronjong kg M030 200.00 11,000.00 2,200,000.00
I
A
L
MATERIAL 4,805,000.00
P E RALATAN JUMLAH HARI KODE JAM HAR GA B IAYA SUB TOTAL
P KERJA KERJA ( Rp./Jam ) ( Rp ) ( Rp )
E
R
A
L
A
T
A
N
PERALATAN 0.00
TOTAL (Rp) 7,473,000.00
VOLUME: 25 SATUAN : m3 HARGA SATUAN Rp 298,920.00 Per m3
ANALISA HARGA SATUAN
DINAS PEKERJAAN UMUM PEMBENTUKAN DAN PERATAAN BAHU JALAN KODE
KABUPATEN KENDAL ( MENGGUNAKAN ALAT ) K855
Versi Peb. 2007
PROPINSI : KODE KABUPATEN : KODE DISIAPKAN OLEH : TANGGAL :
JAWA TENGAH ( 33 ) KEN DAL ( 24 ) DPUK KENDAL 01 Pebruari 2007
URAIAN : ANGGAPAN / ASUMSI :
1. Grader melakukan 1 lintasan untuk 1. Menggunakan alat berat.
memotong dan 1 lintasan untuk 2. Mandor mengawasi juga pekerjaan lain dengan baik.
meratakan sepanjang bahu jalan. 3. Meratakan bahu jalan 5 km/hari.
2. Buruh membersihkan sampai pada 4. Harga satuan ini untuk satu sisi bahu jalan.
gorong-2 dan rintangan-2.
PEKER JA VOL HARI KODE TOTAL VOL UPAH B IAYA SUB TOTAL
(org.hari) (Rp./Org/hari) ( Rp ) ( Rp )
P
E Mandor 1 1 L001 1 35,000.00 35,000.00
K Buruh tak terlatih 4 1 L012 4 30,000.00 120,000.00
E Operator terlatih 1 1 L006 1 46,000.00 46,000.00
R
J
A
PEKERJA 201,000.00
MAT E R IAL SATUAN KODE TOTAL HAR GA B IAYA SUB TOTAL
VOL (Rp./Unit) (Rp.) ( Rp )
M
A Alat bantu set M039 0.20 100,000.00 20,000.00
T
R
I
A
L
MATERIAL 20,000.00
P E RALATAN JUMLAH HARI KODE JAM HAR GA B IAYA SUB TOTAL
P KERJA KERJA ( Rp./Jam ) ( Rp ) ( Rp )
E
R Grader 110 HP 1 1 E002 5.00 249,344.15 1,246,720.73
A
L
A
T
A
N
PERALATAN 1,246,720.73
TOTAL (Rp) 1,467,720.73
VOLUME: 5 SATUAN : km HARGA SATUAN Rp 293,544.15 Per km
UMUR DAN KAPASITAS ALAT
URAIAN UNIT INSTALASI DAN KODE TOTAL BIAYA CRF
KODE
ALAT BERAT ALAT MODAL (Rp.) 12,5 %
TOTAL UMUR JAM / TENAGA
TAHUN PAKAI JAM TAHUN KUDA
2. Lain - lain :
Asuransi 3 % thn + PPN 10 % = 0.033 x ( Harga / (jam/thn) )
= 0.033 x 808,771,900.00 / 1.500 = Rp. -
Sub Total = Rp. 126,429.25
2. Lain - lain :
Asuransi 3 % thn + PPN 10 % = 0.033 x ( Harga / (jam/thn) )
= 0.033 x 723,135,200.00 / 1.500 = Rp. -
Sub Total = Rp. 90,433.84
2. Lain - lain :
Asuransi 3 % thn + PPN 10 % = 0.033 x ( Harga / (jam/thn) )
= 0.033 x 951,493,800.00 / 1.500 = Rp. -
Sub Total = Rp. 118,991.91
2. Lain - lain :
Asuransi 3 % thn + PPN 10 % = 0.033 x ( Harga / (jam/thn) )
= 0.033 x 523,323,700.00 / 1.500 = Rp. -
Sub Total = Rp. 65,445.82
2. Lain - lain :
Asuransi 3 % thn + PPN 10 % = 0.033 x ( Harga / (jam/thn) )
= 0.033 x 186,166,700.00 / 1.500 = Rp. -
Sub Total = Rp. 20,175.26
2. Lain - lain :
Asuransi 3 % thn + PPN 10 % = 0.033 x ( Harga / (jam/thn) )
= 0.033 x 242,805,500.00 / 1.500 = Rp. -
Sub Total = Rp. 26,313.32
2. Lain - lain :
Asuransi 3 % thn + PPN 10 % = 0.033 x ( Harga / (jam/thn) )
= 0.033 x 421,020,300.00 / 1.500 = Rp. -
Sub Total = Rp. 45,626.81
2. Lain - lain :
Asuransi 3 % thn + PPN 10 % = 0.033 x ( Harga / (jam/thn) )
= 0.033 x 467,799,300.00 / 1.500 = Rp. -
Sub Total = Rp. 58,502.04
B. BIAYA OPERASI ( OPERATING COST ) : ( Rp. / Jam )
2. Lain - lain :
Asuransi 3 % thn + PPN 10 % = 0.033 x ( Harga / (jam/thn) )
= 0.033 x 97,568,800.00 / 1.500 = Rp. -
Sub Total = Rp. 18,051.20
2. Lain - lain :
Asuransi 3 % thn + PPN 10 % = 0.033 x ( Harga / (jam/thn) )
= 0.033 x 15,248,400.00 / 1.500 = Rp. -
Sub Total = Rp. 4,513.77
2. Lain - lain :
Asuransi 3 % thn + PPN 10 % = 0.033 x ( Harga / (jam/thn) )
= 0.033 x 9,517,100.00 / 1.500 = Rp. -
Sub Total = Rp. 4,009.32
2. Lain - lain :
Asuransi 3 % thn + PPN 10 % = 0.033 x ( Harga / (jam/thn) )
= 0.033 x 37,231,600.00 / 1.500 = Rp. -
Sub Total = Rp. 13,776.44
2. Lain - lain :
Asuransi 3 % thn + PPN 10 % = 0.033 x ( Harga / (jam/thn) )
= 0.033 x 151,263,400.00 / 1.500 = Rp. -
Sub Total = Rp. 27,985.24
2. Lain - lain :
Asuransi 3 % thn + PPN 10 % = 0.033 x ( Harga / (jam/thn) )
= 0.033 x 44,680,500.00 / 1.500 = Rp. -
Sub Total = Rp. 13,226.14
2. Lain - lain :
Asuransi 3 % thn + PPN 10 % = 0.033 x ( Harga / (jam/thn) )
= 0.033 x 285,448,200.00 / 1.500 = Rp. -
Sub Total = Rp. 47,655.58
2. Lain - lain :
Asuransi 3 % thn + PPN 10 % = 0.033 x ( Harga / (jam/thn) )
= 0.033 x 147,417,500.00 / 1.500 = Rp. -
Sub Total = Rp. 39,505.15
2. Lain - lain :
Asuransi 3 % thn + PPN 10 % = 0.033 x ( Harga / (jam/thn) )
= 0.033 x 206,467,200.00 / 1.500 = Rp. -
Sub Total = Rp. 35,260.15
2. Lain - lain :
Asuransi 3 % thn + PPN 10 % = 0.033 x ( Harga / (jam/thn) )
= 0.033 x 268,407,400.00 / 1.500 = Rp. -
Sub Total = Rp. 45,838.20
2. Lain - lain :
Asuransi 3 % thn + PPN 10 % = 0.033 x ( Harga / (jam/thn) )
= 0.033 x 185,820,500.00 / 1.500 = Rp. -
Sub Total = Rp. 31,734.14
2. Lain - lain :
Asuransi 3 % thn + PPN 10 % = 0.033 x ( Harga / (jam/thn) )
= 0.033 x 12,122,900.00 / 1.500 = Rp. -
Sub Total = Rp. 2,420.05
B. BIAYA OPERASI ( OPERATING COST ) : ( Rp. / Jam )
2. Lain - lain :
Asuransi 3 % thn + PPN 10 % = 0.033 x ( Harga / (jam/thn) )
= 0.033 x 94,988,900.00 / 1.500 = Rp. -
Sub Total = Rp. 23,758.24
2. Lain - lain :
Asuransi 3 % thn + PPN 10 % = 0.033 x ( Harga / (jam/thn) )
= 0.033 x 7,457,600.00 / 1.500 = Rp. -
Sub Total = Rp. 2,977.46
2. Lain - lain :
Asuransi 3 % thn + PPN 10 % = 0.033 x ( Harga / (jam/thn) )
= 0.033 x 94,672,400.00 / 1.500 = Rp. -
Sub Total = Rp. 39,883.12