I. PEKERJAAN PERSIAPAN
1 Pembersihan Lapangan M2 180.0000
2 Pasangan Bouwplank M1 113.2500
IV PEKERJAAN PASANGAN
1 Pas. Pondasi Batu Belah Hitam adk 1:6 M3 49.8300
2 Pas. Dinding Bata adk 1:6 M3 193.1080
3 Plesteran + Acian dinding adk 1:6 M3 96.5540
V PEKERJAAN BETON
1 Pas. Sloof Beton 15/20 adk 1:2:3 M3 2.0360
2 Pas. Kolom Praktis 10/10 adk 1:2:3 M3 1.7330
3 Pas. Ring Balk 15/10 adk 1:2:3 M3 2.0360
4 Pas. Dak Beton tebal 10 cm adk 1:2:3 M3 3.2000
V PEKERJAAN LANTAI
1 Pas. Urugan pasir bawah lantai M3 1.4375
2 Pas. Rabat Floor M2 9.6000
3 Pas. Lantai Keramik 30/30 M2 19.0000
4 Pas. Lantai Keramik 20/20 (Bagian KM/WC) M2 2.2500
5 Pas. Dinding Keramik 20/20 (Bagian KM/WC) M2 9.0000
IV PEKERJAAN PENGECETAN
1 Pengecetan Dinding dengan cat tembok M2 155.3370
2 Pengecetan plafond dengan cat tembok M2 27.2500
3 Pengecetan kayu, kusen, pintu, jendela & lisplank M2 25.3236
Sub Total
REKAPITULASI
I PEKERJAAN PERSIAPAN
II PEKERJAAN GALIAN
III PEKERJAAN URUGAN
IV PEKERJAAN PASANGAN
V PEKERJAAN BETON
VI PEKERJAAN KUSEN, PINTU
VII PEKERJAAN PENGGANTUNG
VIII PEKERJAAN ATAP & PLAFOND
IX PEKERJAAN LANTAI
X PEKERJAAN PENGECETAN
XI PEKERJAAN INSTALASI LISTRIK
XII PEKERJAAN INSTALASI AIR BERSIH & KOTOR
JUMLAH =
PPN 10 % =
Total
Dibulatkan =
N BIAYA
4,300.00 774,000.00
18,896.00 2,139,972.00
Jumlah 2,913,972.00
14,500.00 1,642,125.00
Jumlah 1,642,125.00
125,800.00 712,405.40
81,925.00 1,368,147.50
81,925.00 3,340,082.25
Jumlah 5,420,635.15
566,155.00 28,211,503.65
501,505.00 96,844,627.54
38,861.00 3,752,184.99
Jumlah 128,808,316.18
4,084,662.50 8,316,372.85
4,084,662.50 7,078,720.11
4,084,662.50 8,316,372.85
5,688,037.50 18,201,720.00
Jumlah 41,913,185.81
3,600,100.00 1,360,837.80
243,555.00 1,636,689.60
870,570.00 2,394,763.96
781,050.00 3,117,014.34
Jumlah 8,509,305.70
115,000.00 805,000.00
25,000.00 375000
18,000.00 144,000.00
12,000.00 144,000.00
3,500.00 14,000.00
12,000.00 96,000.00
Jumlah 1,578,000.00
1,922,400.00 830,669.04
1,922,400.00 893,339.28
17,000.00 593,177.60
67,860.00 393,588.00
60,550.00 1,066,648.80
94,550.00 2,576,487.50
5,000.00 120,600.00
Jumlah 6,474,510.22
125,800.00 180,837.50
34,423.50 330,465.60
108,286.75 2,057,448.25
97,286.75 218,895.19
97,286.75 875,580.75
Jumlah 3,663,227.29
17,009.00 2,642,127.03
17,009.00 463,495.25
34,995.50 886,212.04
Jumlah 3,991,834.33
35,000.00 35,000.00
25,000.00 75,000.00
61,000.00 183,000.00
30,000.00 150,000.00
75,000.00 150,000.00
162,500.00 162,500.00
20,000.00 20,000.00
50,000.00 350,000.00
Jumlah 1,125,500.00
64,662.86 452,640.02
243,985.80 243,985.80
3,500,000.00 3,500,000.00
20,000.00 60,000.00
23,500.00 70,500.00
121,000.00 363,000.00
- -
200,000.00 200,000.00
100,000.00 100,000.00
25,000.00 50,000.00
Jumlah 5,040,125.82
2,913,972.00
1,642,125.00
5,420,635.15
128,808,316.18
41,913,185.81
8,509,305.70
1,578,000.00
6,474,510.22
3,663,227.29
3,991,834.33
1,125,500.00
5,040,125.82
Rp. 211,080,737.50
Rp. 21,108,073.75
Rp. 232,188,811.25
Rp. 55,000,000.00
DAFTAR HARGA UPAH, BAHAN DAN PERALATAN
TEKNIK SIPIL UNIVERSITAS BENGKULU
1 2 3 5
A UPAH
1 Mandor Hari Rp 55,000.00
2 Kepala Tukang Hari Rp 51,000.00
3 Tukang Hari Rp 48,500.00
4 Pekerja Hari Rp 37,500.00
B BAHAN
1 Pasir urug M3 Rp 95,000.00
2 Tanah urug M3 Rp 60,000.00
3 Pasir pasang M3 Rp 115,000.00
4 Pasir beton M3 Rp 125,000.00
5 Batu Split 1/2 M3 Rp 200,000.00
6 Batu Split 2/3 M3 Rp 250,000.00
7 Batu Split 3/5 M3 Rp 250,000.00
8 Batu belah M3 Rp 150,000.00
9 Batu belah hitam 10/15 M3 Rp 135,000.00
10 Batu belah hitam 5/7 M3 Rp 150,000.00
11 Batu belah Putih 20-40 cm M3 Rp 130,000.00
12 Batu bata Bh Rp 300.00
13 Semen PC 50 kg ( Batu raja ) Sak Rp 50,000.00
14 Semen putih Sak Rp 82,500.00
15 Besi beton / beugel Ulir Kg Rp 13,000.00
16 Besi beton / beugel Polos Kg Rp 12,500.00
17 Kawat Beton Kg Rp 14,000.00
18 Keramik 20/20 M2 Rp 45,000.00
19 Keramik 30/30 M2 Rp 55,000.00
20 Keramik 40/40 M2 Rp 62,000.00
21 Kayu balok, kasau, reng kls I Merbau M3 Rp 6,750,000.00
22 Papan kls I Merbau M3 Rp 8,000,000.00
23 Kayu balok, kasau, reng kls II Meranti M3 Rp 2,650,000.00
24 Papan kls II Meranti,Cempaka M3 Rp 3,400,000.00
25 Kayu balok, kasau, reng kls III M3 Rp 1,850,000.00
26 Papan kls III M3 Rp 1,950,000.00
27 Kayu kasau kls. IV M3 Rp 1,500,000.00
28 Papan kls IV M3 Rp 1,750,000.00
29 Triplek 3 mm Lbr Rp 50,000.00
30 Triplek 4 mm Lbr Rp 65,000.00
31 Triplek 5 mm Lbr Rp 75,000.00
32 Genteng Mantili Bh Rp 1,500.00
33 Kerpus genteng mantili Bh Rp 3,750.00
34 Genteng plentong Bh Rp 850.00
35 Karpus genteng plentong Bh Rp 3,750.00
36 Seng Aluminium m2 Rp 35,000.00
37 Asbes gelombang kecil Lbr Rp 35,000.00
38 Kerpus Asbes gelombang kecil Ps Rp 35,000.00
39 Nok asbes Ps Rp 35,000.00
40 Paku Kg Rp 15,000.00
41 Paku triplek Kg Rp 20,000.00
42 Paku Seng Kg Rp 20,000.00
43 Paku asbes Kg Rp 20,000.00
44 Kaca bening 5 mm M2 Rp 760,000.00
45 Kaca Ryband 5 mm Bh Rp 97,000.00
46 Cat tembok setara platon Ltr Rp 16,500.00
47 Cat kayu Ltr Rp 37,000.00
48 Cat meni Ltr Rp 6,500.00
49 Minyak cat Ltr Rp 18,000.00
50 Car dasar Ltr Rp 36,000.00
51 Plamir Kg Rp 12,800.00
52 Minyak pelumas Ltr Rp 27,500.00
53 Bensin Ltr Rp 4,500.00
54 Dempul Kg Rp 9,000.00
55 Amplas Lbr Rp 3,800.00
56 Teer Kg Rp 6,000.00
57 Pipa Paralon PVC 0,75" AW 1 Btg Rp 20,000.00
58 Pipa Paralon PVC 3" AW 1 Btg Rp 23,500.00
59 Pipa Paralon PVC 4" AW 1 Btg Rp 121,000.00
60 Bak Fiber Plastik Bh Rp 200,000.00
61 Kran Air Ø 0,5" Bh Rp 25,000.00
62 Kunci pintu 2 x putar ( kwalitas baik ) ex. Italy Bh Rp 115,000.00
63 Engsel pintu type ring nylon Bh Rp 25,000.00
64 Engsel jendela type ring nylon Bh Rp 18,000.00
65 Grendel jendela Bh Rp 12,000.00
66 Hak kait angin jendela Bh Rp 12,000.00
67 Sewa stemper kodok Jam Rp 200,000.00
68 Kabel listrik 1.5 mm Rol Rp 20,000.00
69 Bok termis 3 group Bh Rp 162,500.00
70 Saklar tunggal ex National lengkap dengan prim Bh Rp 25,000.00
71 Saklar ganda ex National lengkap dengan prim Bh Rp 35,000.00
72 Stop kontak ex National lengkap dengan prim Bh Rp 61,000.00
73 Lampu SL 18 watt (lengkap) + frim (philips) Bh Rp 40,250.00
74 Lampu Pijar 40 watt lengkap dengan fitting Bh Rp 30,000.00
75 Pas. Lampu TL2x20 watt Bh Rp 75,000.00
76 Paving Block T = 6 cm Bh Rp 1,650.00
77 Paving Block T = 8 cm Bh Rp 2,000.00
78 Tegel Abu-abu 30/30 Bh Rp 3,350.00
79 Tegel Abu-abu 20/20 Bh Rp 1,500.00
80 Genteng Beton Bh Rp 6,000.00
81 Mur Baut plat kg Rp 18,000.00
82 Lem Kayu kg Rp 8,500.00
83 Kloset jongkok Bh Rp 170,000.00
84 Kunci 1 slaag Bh Rp 35,000.00
85 Kunci 2 slaag Bh Rp 115,000.00
86 Tarikan Jendela Bh Rp 3,500.00
87 Ijuk
Ket
5
DAFTAR ANALISA UPAH DAN BAH
TAHUN ANGGARAN 2011
1 2
1 M' Pengukuran dan Pasang Bouwplank
Supl
0.009 m3 Kayu papan klas IV
0.069 kg Paku
0.010 Tukang
0.001 Kepala Tukang
0.042 Pekerja
1 M3 Tanah diratakan
A.16.A
0.250 Pekerja
0.010 Mandor
L.9 10 M2 Menurunkan rangka atap dari kayu (jika rangka atap tsb dipakai kembali)
1.0000 Pekerja
0.2500 Tukang
0.025 Kepala Tukang
0.050 Mandor
1 m2 membongkar loteng dari kayu, dinding luar lantai jembatan 1/10 x L.11
Jika bongkaran lama tersebut tidak akan dipakai kembali maka 1 m2 pekerjaannya
0.0600 Tukang Kayu
0.0060 Kepala Tukang
L12 1 M3 Membongkar kayu dari balok-balok loteng, kuda-kuda gelagar jembatan dsb
(Kayu bongkaran akan dipakai kembali)
4.0000 Pekerja
6.0000 Tukang
0.6000 Kepala Tukang
0.2000 Mandor
Supl.b 1 M2 Pas,kaca
1.0000 m2 Kaca Polos t=5 cm
0.4000 Tukang
0.0300 Mandor
HARGA SATUAN
JUMLAH
HARGA
(Rp)
UPAH BAHAN
3 4 5 6
1,750,000.00 15,750.000
15,000.000 1,035.000
48,500.000 485.00
51,000.000 51.00
37,500.000 1,575.00
2,111.00 16,785.00 18,896.00
37,500.00 13,125.00 -
55,000.00 1,375.00 -
14,500.00 0.00 14,500.00
37,500.00 9,375.00 -
55,000.00 550.00 -
60,000.00 - 72,000.00
9,925.00 72,000.00 81,925.00
37,500.00 11,250.00 -
55,000.00 550.00 -
95,000.00 - 114,000.00
11,800.00 114,000.00 125,800.00
37,500.00 9,375.00 -
55,000.00 550.00 -
11,800.00 0.00 11,800.00
37,500.00 3,750.00 -
55,000.00 550.00 -
4,300.00 0.00 4,300.00
50,000.00 - 17,500.00
20,000.00 - 400.00
15,000.00 - 300.00
1,850,000.00 - 22,200.00
48,500.00 38,800.00 -
51,000.00 4,080.00 -
37,500.00 10,500.00 -
55,000.00 770.00 -
760,000.00 - 760,000.00
3,400,000.00 - 23,800.00
15,000.00 - 450.00
48,500.00 58,200.00 -
51,000.00 6,120.00 -
55,000.00 22,000.00 -
86,320.00 784,250.00 870,570.00
1,950,000.00 - 68,250.00
15,000.00 - 3,750.00
48,500.00 363,750.00 -
51,000.00 38,250.00 -
37,500.00 93,750.00 -
55,000.00 6,875.00 -
502,625.00 72,000.00 574,625.00
2,650,000.00 - 39,750.00
1,950,000.00 - 33,150.00
15,000.00 - 3,000.00
50,000.00 - 35,000.00
48,500.00 29,100.00 -
51,000.00 1,785.00 -
37,500.00 18,750.00 -
55,000.00 2,750.00 -
52,385.00 110,900.00 163,285.00
1,500,000.00 - 27,000.00
15,000.00 - 3,750.00
37,500.00 3,750.00 -
48,500.00 4,850.00 -
51,000.00 510.00 -
55,000.00 275.00 -
9,385.00 30,750.00 40,135.00
3,400,000.00 - 34,000.00
15,000.00 - 1,500.00
37,500.00 10,500.00 -
48,500.00 9,700.00 -
51,000.00 4,080.00 -
55,000.00 770.00 -
25,050.00 35,500.00 60,550.00
1,950,000.00 - 546,000.00
15,000.00 - 210.00
2,650,000.00 - 530,000.00
18,000.00 - 126,000.00
37,500.00 300,000.00 -
48,500.00 873,000.00 -
51,000.00 71,400.00 -
55,000.00 22,000.00 -
1,266,400.00 656,000.00 1,922,400.00
2,650,000.00 - 2,120,000.00
15,000.00 - 37,500.00
37,500.00 450,000.00 -
48,500.00 776,000.00 -
51,000.00 183,600.00 -
55,000.00 33,000.00 -
1,442,600.00 2,157,500.00 3,600,100.00
3,400,000.00 - 68,000.00
8,500.00 - 680.00
15,000.00 - 750.00
37,500.00 56,250.00 -
48,500.00 72,750.00 -
51,000.00 38,250.00 -
55,000.00 6,875.00 -
174,125.00 69,430.00 243,555.00
3,400,000.00 - 85,000.00
75,000.00 - 52,500.00
15,000.00 - 750.00
37,500.00 37,500.00 -
48,500.00 291,000.00 -
51,000.00 30,600.00 -
55,000.00 6,875.00 -
365,975.00 138,250.00 504,225.00
3,400,000.00 - 136,000.00
15,000.00 - 3,750.00
37,500.00 3,750.00 -
48,500.00 7,275.00 -
51,000.00 765.00 -
55,000.00 275.00 -
12,065.00 139,750.00 151,815.00
3,400,000.00 - 85,000.00
15,000.00 - 1,050.00
35,000.00 - 35,000.00
50,000.00 - 17,500.00
8,500.00 - 6,375.00
48,500.00 291,000.00 -
37,500.00 37,500.00 -
328,500.00 144,925.00 473,425.00
50,000.00 - 587,500.00
115,000.00 - 109,250.00
0.00 696,750.00 696,750.00
50,000.00 - 450,000.00
115,000.00 - 115,000.00
0.00 565,000.00 565,000.00
50,000.00 - 112,500.00
115,000.00 - 225,400.00
0.00 337,900.00 337,900.00
135,000.00 - 162,000.00
50,000.00 - 64,500.00
115,000.00 - 95,335.00
37,500.00 45,000.00 -
48,500.00 5,820.00 -
51,000.00 183,600.00 -
55,000.00 9,900.00 -
244,320.00 321,835.00 566,155.00
300.00 - 240,000.00
50,000.00 - 175,100.00
115,000.00 - 38,295.00
37,500.00 168,750.00 -
48,500.00 72,750.00 -
51,000.00 7,650.00 -
55,000.00 12,375.00 -
261,525.00 453,395.00 714,920.00
300.00 - 240,000.00
50,000.00 - 61,800.00
115,000.00 - 81,190.00
37,500.00 56,250.00 -
48,500.00 53,350.00 -
51,000.00 7,650.00 -
55,000.00 1,265.00 -
118,515.00 382,990.00 501,505.00
250,000.00 - 205,000.00
125,000.00 - 67,500.00
50,000.00 - 340,000.00
37,500.00 225,000.00 -
55,000.00 16,500.00 -
48,500.00 48,500.00 -
51,000.00 5,100.00 -
295,100.00 612,500.00 907,600.00
12,500.00 - 1,375,000.00
14,000.00 - 28,000.00
48,500.00 327,375.00 -
51,000.00 114,750.00 -
37,500.00 253,125.00 -
695,250.00 1,403,000.00 2,098,250.00
1,750,000.00 - 700,000.00
15,000.00 - 60,000.00
37,500.00 75,000.00 -
55,000.00 5,500.00 -
48,500.00 242,500.00 -
51,000.00 25,500.00 -
348,500.00 760,000.00 1,108,500.00
1,850,000.00 - 1,295,000.00
15,000.00 - 60,000.00
48,500.00 509,250.00 -
51,000.00 2,550.00 -
37,500.00 131,250.00 -
55,000.00 9,625.00 -
652,675.00 1,355,000.00 2,007,675.00
om praktis)
- 907,600.00
- 2,622,812.50
- 554,250.00
4,084,662.50 4,084,662.50
- 907,600.00
- 3,671,937.50
- 1,108,500.00
5,688,037.50 5,688,037.50
250,000.00 - 250,000.00
125,000.00 - 62,500.00
50,000.00 - 212,000.00
37,500.00 225,000.00 -
55,000.00 33,000.00 -
48,500.00 24,250.00 -
51,000.00 2,550.00 -
284,800.00 524,500.00 809,300.00
82,548.60 -
115,648.97 -
165,178.13 -
- 809,300.00
50,000.00 - 10,750.00
115,000.00 - 1,955.00
37,500.00 16,875.00 -
48,500.00 7,760.00 -
51,000.00 816.00 -
55,000.00 1,100.00 -
26,551.00 12,705.00 39,256.00
50,000.00 - 1,500.00
115,000.00 - 10,810.00
37,500.00 16,875.00 -
48,500.00 7,760.00 -
51,000.00 816.00 -
55,000.00 1,100.00 -
26,551.00 12,310.00 38,861.00
50,000.00 5,200.00
115,000.00 2,403.50
48,500.00 9,700.00
51,000.00 1,020.00
37,500.00 15,000.00
55,000.00 1,100.00
26,820.00 7,603.50 34,423.50
2,000.00 - 80,000.00
125,000.00 - 12,500.00
37,500.00 15,000.00 -
48,500.00 12,125.00 -
53,945.00 100,103.50 154,048.50
3,350.00 - 37,185.00
1,500.00 - 37,875.00
45,000.00 - 49,500.00
55,000.00 - 60,500.00
62,000.00 - 68,200.00
696,750.00 - 14,631.75
115,000.00 - 3,680.00
50,000.00 - 800.00
37,500.00 18,750.00 -
55,000.00 1,375.00 -
48,500.00 7,275.00 -
51,000.00 1,275.00 -
28,675.00 272,371.75 301,046.75
45,000.00 - 49,500.00
82,500.00 - 9,693.75
50,000.00 - 900.00
115,000.00 - 1,092.50
37,500.00 18,750.00 -
55,000.00 4,125.00 -
48,500.00 48,500.00 -
51,000.00 5,100.00 -
76,475.00 61,186.25 137,661.25
300.00 - 120,000.00
337,900.00 - 180,438.60
37,500.00 168,750.00 -
48,500.00 140,650.00 -
51,000.00 14,790.00 -
55,000.00 22,000.00 -
346,190.00 300,438.60 646,628.60
646,628.60
34,619.00 30,043.86 64,662.86
850.00 - 18,700.00
1,500.00 - 37,500.00
6,000.00 - 54,000.00
37,500.00 15,000.00 -
48,500.00 9,700.00 -
51,000.00 1,020.00 -
55,000.00 825.00 -
26,545.00 110,200.00 136,745.00
3,750.00 - 18,750.00
3,750.00 - 18,750.00
565,000.00 - 16,950.00
37,500.00 7,500.00 -
48,500.00 4,850.00 -
51,000.00 510.00 -
55,000.00 550.00 -
13,410.00 54,450.00 67,860.00
35,000.00 - 31,500.00
35,000.00 - 31,500.00
20,000.00 - 1,600.00
37,500.00 3,750.00 -
48,500.00 9,700.00 -
51,000.00 1,020.00 -
55,000.00 275.00 -
14,745.00 64,600.00 79,345.00
18,000.00 - 1,728.00
37,000.00 - 4,625.00
3,800.00 - 760.00
48,500.00 24,250.00 -
51,000.00 382.50 -
37,500.00 1,875.00 -
55,000.00 1,375.00 -
27,882.50 7,113.00 34,995.50
b dipakai kembali)
37,500.00 37,500.00 -
48,500.00 12,125.00 -
51,000.00 1,275.00 -
55,000.00 2,750.00 -
81,532.50 - 81,532.50
8,153.25 - 8,153.25
0.00
0.00
8,153.25 - 8,153.25
37,500.00 150,000.00 -
48,500.00 291,000.00 -
51,000.00 30,600.00 -
55,000.00 11,000.00 -
490,753.25 - 490,753.25
37,500.00 75,000.00 -
48,500.00 291,000.00 -
51,000.00 3,060.00 -
55,000.00 5,500.00 -
374,560.00 - 374,560.00
374,560.00 37,456.00 -
m2 pekerjaannya
37,456.00 - 37,456.00
elagar jembatan dsb
37,500.00 150,000.00 -
48,500.00 291,000.00 -
51,000.00 30,600.00 -
55,000.00 11,000.00 -
482,600.00 - 482,600.00
760,000.00 760,000.00
48,500.00 19,400.00 -
55,000.00 1,650.00 -
21,050.00 760,000.00 781,050.00
501,505.00 - 20,060.20
39,256.00 - 3,925.60
170,000.00 - 170,000.00
50,000.00 50,000.00 -
50,000.00 193,985.80 243,985.80
35,000.00 - 35,000.00
115,000.00 - 115,000.00
48,500.00 10,185.00 -
10,185.00 150,000.00 160,185.00
12,800.00 - 1,024.00
16,500.00 - 5,775.00
3,800.00 - 190.00
48,500.00 3,637.50 -
51,000.00 382.50 -
37,500.00 1,875.00 -
55,000.00 4,125.00 -
10,020.00 6,989.00 17,009.00
COST BREAKDOWN STRUCTURE
1 2 3 4
Persentase (%)
1.3805
3.3460
0.7780
2.5680
83.9470
3.0673
19.8565
61.0232
8.4055
4.0313
0.7476
1.7355
1.8911
0.5332
2.3878
S Curve
Pembangunan Rumah Tinggal Type xxx M2, TEKNIK SIPIL UNIVERSITAS BENGKULU
Tahun 2011
Lokasi : Natar- Lampung Selatan
Jumlah Pekerja diperkirakan =5 orang
Waktu Pelaksanaan = 40 hari kerja
Hari ke-
NO. Kegiatan Biaya Waktu (hari) Bobot %
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40
Rencana Progress Harian 0.69 1.53 0.84 0.84 4.90 4.07 4.07 4.07 4.07 6.55 6.55 6.55 6.55 6.55 6.55 6.55 6.55 4.47 4.47 0.88 0.88 0.88 0.88 0.78 0.78 0.78 0.78 0.78 0.78 0.31 0.44 0.44 0.44 0.57 0.43 0.43 0.43 0.63 0.63 0.63
TOTAL 211,080,737.50 Hari Ke - 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40.00
Kumulatif Rencana Progress Harian 0.69 2.22 3.05 3.89 8.79 12.86 16.93 21.00 25.07 31.62 38.17 44.72 51.27 57.82 64.37 70.92 77.47 81.94 86.40 87.28 88.15 89.03 89.91 90.69 91.47 92.26 93.04 93.83 94.61 94.92 95.36 95.80 96.24 96.81 97.24 97.67 98.11 98.74 99.37 100.00