RENCANAANGGARANBIAYAREHABILIT

ASIGEDUNG MADRASAH TSANAWIYAH AN-


NUR PUJER BONDOWOSO NAMASEKOLAH
:MTs.An-Nur
Alamat :Jl.KH.UmarNo.14MengokPujerBondow
osoJawaTimur

Harga Satuan
NO JENIS KEGIATAN Vol Sat Jumlah Harga
( Rp. )
1 PEKERJAAN PERSIAPAN
Pemasangan bowplank 126 m3 15,000.00 1,890,000.00
Pembenahan lokasi 312 m1 1,500.00 468,000.00
2,358,000.00
2 PEKERJAAN PASANGAN
Pas. Tembk trastam 1.4 16 m2 30,595.00 489,520.00
Ples beton 1.4 97 m2 17,200.00 1,663,240.00
Gewel 123 m2 3,750.00 461,250.00
Pas. Batu merah 1.3.8 41 m2 41,250.00 1,691,250.00
Pas. Glasblog 16 Buah 25,000.00 400,000.00
Pas. Keramik 30/30 132 m1 45,000.00 5,940,000.00
10,645,260.00
3 PEKERJAAN BETON
Beton slof 15/15 35 m1 50,510.00 1,767,850.00
Beton kolam 15/15 32 m1 60,510.00 1,936,320.00
Beton gewel 15/15 58 m1 60,510.00 3,509,580.00
7,213,750.00
4 PEKERJAAN PLAFON
Plafond hanger 6/12 72 m1 12,500.00 900,000.00
List plafond 1/5 150 m2 3,600.00 540,000.00
1,440,000.00
5 PEKERJAAN PENUTUP ATAP
Kayu 6/12 24 m1 17,565.00 421,560.00
Kayu 8/12 80 m1 24,500.00 1,960,000.00
baja pengikat kuda-kuda 36 Kg 7,000.00 252,000.00
Usuk 5/7 dan reng 2/3 70 m1 37,540.00 2,627,800.00
Genteng 150 m1 31,000.00 4,650,000.00
Bubungan 31 m1 28,775.00 892,025.00
10,803,385.00
6 PEKERJAAN KUSEN PINTU/JENDELA
Kusen kamper 6/15 156 m1 28,000.00 4,368,000.00
Daun jendela kaca kecil 14 Buah 148,260.00 2,075,640.00
kunci tanah 4x putar 7 Buah 67,500.00 472,500.00
Engsel pintu 6" 3 Buah 5,750.00 17,250.00
Engsel Jendela 12" 12 Buah 4,900.00 58,800.00
Grendel spring knap 3 Buah 8,200.00 24,600.00
Hak angin 15 Buah 4,650.00 69,750.00
kaca matI 5 mm bening 15 Buah 41,500.00 622,500.00
7,709,040.00
7 PEKERJAAN KAYU KAP
Pas. Kayu usuk/Reng 100 m2 22,507.00 2,250,700.00
Kayu kusen 36 m3 22,575.00 812,700.00
Pas. Kayu lesplang 10 m2 124,443.00 1,244,430.00
Pien Internet 110 m2 12,734.00 1,400,740.00
Daun jendela 12 m2 55,000.00 660,000.00
6,368,570.00
8 PEKERJAAN ATAP
pasang genteng karang pilang 100 m2 28,400.00 2,840,000.00
Pas. Genteng bubung 28 m2 24,130.00 675,640.00
3,515,640.00
9 PEKERJAAN BESI
Pas. Talang seng 10 m1 36,375.00 363,750.00

10 PEKERJAAN PENGECATAN
Pengecatan kusen/pintu/jendela/lespank 56 m2 12,500.00 700,000.00
pengecatan tembok dan cat tembok 56 m2 9,500.00 532,000.00
laburan tembok 336 m2 2,250.00 756,000.00
cat kayu plafond 22 m2 21,500.00 473,000.00
Menil Rangka plafond 180 m2 2,500.00 450,000.00
2,911,000.00
11 LANTAI KERAMIK
Lantai keramik 158 m2 47,500.00 7,505,000.00
Rabatan lantai bawah tebal 3cm 242 m2 9,000.00 2,178,000.00
rabatan keliling bangunan tebal 5cm halus 72 m2 14,370.00 1,034,640.00
10,717,640.00
12 PEKERJAAN PEMBERSIHAN
pekerjaan lokasi dari sisa bahang bangunan m2 280,000.00 280,000.00

13 PEKERJAAN INSTALASI LISTRIK


Titik penerangan 6 ttk 60,000.00 360,000.00
Titik stop kontak 6 ttk 40,000.00 240,000.00
Stop kontak 6 ttk 9,450.00 56,700.00
Lampu pijar 25 Watt 3 Buah 5,755.00 17,265.00
673,965.00
TOTAL Rp 65,000,000
`
RENCANAANGGARAN
BIAYAREHABILITASIGEDUNG
MADRASAH IBTIDAIYAH
GUPPITALAGENING

NAMASEKOLAH :MIGUPPITALAGENING
Alam at :DesaTalagening,RT01/RW
02KecamatanBobotsari

Harga Satuan
NO JENIS KEGIATAN Vol Sat Jumlah Harga
( Rp. )
1 PEKERJAAN PERSIAPAN
Ongkos Pembongkaran atap 6 orang 50,000.00 300,000.00
Ongkos Pekerjaan Pembongkaran Keramik 48 m2 5,000.00 240,000.00
2 MATRIAL -
Batu Bata 6,000 buah 700.00 4,200,000.00
Pasir pasang 3 dam 1,000,000.00 3,000,000.00
Batu Split 1 dam 1,500,000.00 1,500,000.00
Besi Cor 86 m3 70,000.00 6,020,000.00
Semen 70 sak 70,000.00 4,900,000.00
3 PEKERJAAN PASANGAN -
Pas dinding bata merah 84 m2 30,000.00 2,520,000.00
Kusen Jendela 10 m2 17,000.00 170,000.00
Kusen Pintu 3 m2 17,000.00 51,000.00
pemasangan plester 84 m2 41,250.00 3,465,000.00
pemasangan kaca 12 Buah 5,000.00 60,000.00
Pas. Keramik 30/30 55 m2 45,000.00 2,475,000.00
Beton kuda-kuda atap 58 m 50,000.00 2,900,000.00
Beton Tiang 30 batang 60,000.00 1,800,000.00
4 PEKERJAAN PLAFON -
Plafond hanger 6/12 50 m1 10,000.00 500,000.00
List plafond 1/5 28 m2 5,000.00 140,000.00
kalsibod 10 m 55,000.00 550,000.00
5 PEKERJAAN PENUTUP ATAP -
pemasangan Penglari 30 m 17,000.00 510,000.00
Pemasangan Ter 2 blik 20,000.00 40,000.00
Usuk 5/7 dan reng 2/3 150 m 37,000.00 5,550,000.00
Seng gelombang 75 lembar 55,000.00 4,125,000.00
Bubungan 32 m1 20,000.00 640,000.00
Paku Usuk 150 buah 100.00 15,000.00
Paku kait 150 buah 100.00 15,000.00
Paku Reng 200 buah 100.00 20,000.00
Seng Plat 45 10 m 13,000.00 130,000.00
Seng Plat 90 20 m 400,000.00 8,000,000.00
Upah 10 orang/hari 75,000.00 750,000.00
6 PEKERJAAN KUSEN PINTU/JENDELA -
Kusen 150 m1 28,000.00 4,200,000.00
Daun jendela kaca kecil 12 Buah 146,000.00 1,752,000.00
kaca matI 5 mm bening 20 Buah 40,000.00 800,000.00
7 PEKERJAAN KAYU KAP -
Pas. Kayu usuk/Reng 75 m2 20,000.00 1,500,000.00
Kayu kusen 20 m3 20,000.00 400,000.00
Daun jendela 10 m2 40,000.00 400,000.00
8 PEKERJAAN PENGECATAN -
Pengecatan kusen/pintu/jendela/lespank 45 m2 12,000.00 540,000.00
pengecatan tembok dan cat tembok 45 m2 8,000.00 360,000.00
cat kayu plafond 22 m2 21,000.00 462,000.00
-
TOTAL 65,000,000.00

Talagening, 8 Oktober 2015


Mengetahui
Komite Kepala Madrasah

SLAMET SARWONO, S.Pd.I


NIP. 1959060919820311003