RINCIAN PEKERJAAN

NO. URAIAN VOLUME SATUAN HARGA SATUAN JUMLAH HARGA

I PEKERJAAN PERSIAPAN
1. Mobilisasi/Demobilisasi 1.00 LS 700,000.00 700,000.00
2 Rencana Keselamatan Kerja (RKK) 1.00 LS 1,450,000.00 1,450,000.00
3 Pembersihan 1.00 LS 500,000.00 500,000.00
2,650,000.00
II PEKERJAAN TANAH
1 Pek. Galian Tanah Biotank 2.88 m3 105,875.00 304,920.00
304,920.00
II PEKERJAAN LANGIT - LANGIT
1 Pek. Rangka Plafond Besi Hollow Sincromate 525.87 M2 151,129.00 79,474,207.23
2 Pas. Plafond Gypsum board 9 mm/ Int. 430.50 M2 53,427.00 23,000,323.50
3 Pas. Plafond Kalsiboard 3.5 mm/ Ekst. 95.37 M2 73,447.00 7,004,640.39
4 Pas. List Plafod Gypsum 8 cm 302.68 M1 29,568.00 8,949,642.24
5 Pas. List Plafon (Kayu kls 2) 174.60 M' 24,766.50 4,324,230.90
122,753,044.26
III PEKERJAAN PENATAAN HALAMAN
1 Pek. Pasir urug Bawah Lantai t. 7 cm 6.66 m3 213,950.00 1,424,907.00
2 Pek. Rabat Beton t. 10 cm dalam Ruangan (mutu beton K.100) 13.32 m3 946,600.34 12,608,716.53
3 Pek. Pas. Lantai Keramik Kasar 50 x 50 cm 118.00 m2 314,233.92 37,079,602.56
4 Pek. Menanam Rumpu Gajah Mini 88.50 m2 35,000.00 3,097,500.00
54,210,726.09
Jumlah Biaya Rp 179,918,690.35
PPN 11% Rp 19,791,055.94
Jumlah Keseluruhan Rp 199,709,746.29