Professional Documents
Culture Documents
MINGGU KE 41
PERIODE
30 JULI 2022 - 05 AGUSTUS 2022
A PEKERJAAN SIPIL
I PEKERJAAN PERSIAPAN
1 Pembersihan Lapangan / Peralatan 5,955.85 ls 0.0418 % 5275.00 680.85 5,955.85 0.04 0.0048 0.0418 100.00 5,955,850.00
2 Uitzet dan Bowplank 1,282.69 bh 0.0135 % 1282.69 1,282.69 0.01 - 0.0135 100.00 1,924,035.00
5 Papan Nama Kegiatan 1.00 m' 0.0035 % 0.00 - - - - - -
6 Pagar Keliling 410.00 ls 0.1869 % 197.03 212.97 410.00 0.09 0.0971 0.1869 100.00 26,650,000.00
7 Direksi Keet & Gudang 36.00 m2 0.5050 % 36.00 36.00 0.50 - 0.5050 100.00 72,000,000.00
0.7507 %
II PEKERJAAN STRUKTUR BAWAH
1 Galian Tanah 63.65 m3 0.0268 % 253.70 168.00 421.70 0.11 0.0707 0.1775 662.53 25,302,009.60
2 Urugan Tanah Kembali 19.10 m3 0.0027 % 180.60 180.60 0.03 - 0.0253 945.81 3,612,060.00
3 Urugan Tanah + Pemadatan Peninggian Elevasi 3,800.00 m3 1.5991 % 3327.01 3,327.01 1.40 - 1.4001 87.55 199,620,411.57
4 Urugan Pasir Bawah Lantai Tb = 7 Cm 163.58 m3 0.1377 % 94.25 94.25 0.08 - 0.0793 57.62 11,309,936.40
5 Pas. Batu Kali 1 Pc : 6 Ps 101.04 m3 - % 0.00 - - - - - -
6 Lantai Kerja Bawah Footplate Tb = 10 cm 7.69 m3 0.0270 % 2.84 2.84 0.01 - 0.0099 36.87 1,417,750.00
7 Pas. Aanstampeng 41.39 m3 0.0726 % 0.00 - - - - - -
8 Pas. Rollag tebal 1 Bata 1Pc:5Ps 36.88 m2 0.0905 % 0.00 - - - - - -
2.4524 %
III PEKERJAAN STRUKTUR ATAS LANTAI 1
1 Rabat Beton Tb = 10 cm 160.00 m3 0.1683 % 73.78 73.78 0.08 - 0.0776 46.11 11,066,670.75
2 Beton Sloof
- TOC. - 0.10
- Sloof 20/50 cm ( S1 ) 3.75 m3 0.1052 % 10.00 10.00 0.28 - 0.2804 266.54 39,980,400.00
- Sloof 15/30 cm ( S2 ) 27.21 m3 0.7634 % 13.61 13.61 0.38 - 0.3818 50.02 54,443,400.00
3 Beton Balok
- TOC +2.20
- Balok Latai 11/15 cm ( B5 ) 6.45 m3 0.1810 % 1.46 1.46 0.04 - 0.0410 22.64 5,841,740.00
- TOC +3.90
- Balok 30/60 cm ( B1 ) 6.82 m3 0.1913 % 90.74 90.74 2.55 - 2.5458 1,330.57 362,979,072.00
- Balok 30/50 cm ( B2 )/ (25/50) 99.09 m3 2.7799 % 3.68 3.68 0.10 - 0.1033 3.72 14,725,000.00
- Balok 20/40 cm ( B3 )/ (25/40) 25.42 m3 0.7131 % 27.04 27.04 0.76 - 0.7587 106.39 108,178,000.00
4 Beton Plat
- TOC +2.20
- Beton Plat Raam T=15 cm 16.20 m3 0.4545 % 0.00 - - - - - -
- TOC +3.90
- Beton Plat Lantai T = 12 cm 143.50 m3 4.0258 % 170.16 170.16 4.77 - 4.7737 118.58 680,643,360.00
5 Beton Tangga
Type 1
- Plat Tangga Tb : 15 cm 2.40 m3 0.0673 % 2.30 2.30 0.06 - 0.0645 95.81 9,197,520.00
- Plat Bordes Tb : 15 cm 1.11 m3 0.0311 % 1.23 1.23 0.03 - 0.0345 110.80 4,919,400.00
- Plat Anak Tangga 1.22 m3 0.0342 % 1.14 1.14 0.03 - 0.0320 93.49 4,562,280.00
- Balok 20/40 cm ( B3 ) 0.32 m3 0.0090 % 0.51 0.51 0.01 - 0.0144 159.89 2,046,550.00
Type 2 -
1
Volume Pekerjaan Prestasi Pekerjaan Total Total
Volume
Bobot % Volume Volume Komulatif Minggu Minggu Komulatif Presetase Rupiah Ket.
No. Uraian Pekerjaan Sat.
Kontrak Minggu Minggu Lalu Ini Sesuai Harga
Kontrak
lalu Ini % % % (%) Kontrak
- Plat Tangga Tb : 15 cm 2.40 m3 0.0673 % 2.21 2.21 0.06 - 0.0621 92.22 8,852,940.00
- Plat Bordes Tb : 15 cm 0.80 m3 0.0224 % 1.21 1.21 0.03 - 0.0340 151.53 4,848,960.00
- Plat Anak Tangga 1.12 m3 0.0314 % 1.11 1.11 0.03 - 0.0312 99.16 4,442,220.00
- Balok 20/40 cm ( B3 ) 0.29 m3 0.0081 % 1.26 1.26 0.04 - 0.0352 432.98 5,022,550.00
Type 3 -
- Plat Tangga Tb : 15 cm 1.20 m3 0.0337 % 0.00 - - - - - -
- Plat Bordes Tb : 15 cm 0.17 m3 0.0048 % 0.00 - - - - - -
- Plat Anak Tangga 0.61 m3 0.0171 % 0.00 - - - - - -
Type 4 -
- Plat Tangga Tb : 15 cm 1.80 m3 0.0505 % 1.73 1.73 0.05 - 0.0487 96.37 6,938,760.00
- Plat Bordes Tb : 15 cm 0.54 m3 0.0151 % 0.63 0.63 0.02 - 0.0177 116.76 2,522,040.00
- Plat Anak Tangga 1.02 m3 0.0286 % 0.87 0.87 0.02 - 0.0244 85.34 3,481,740.00
- Balok 20/40 cm ( B3 ) 0.19 m3 0.0053 % 0.09 0.09 0.00 - 0.0025 47.70 362,500.00
9.8087 % -
IV PEKERJAAN STRUKTUR ATAS LANTAI 2 -
1 Beton Kolom -
- TOC. + 3.90 -
- Kolom 50x50 Cm (K1) 55.10 m3 1.6617 % 73.80 73.80 2.23 - 2.2257 133.94 317,340,000.00
- Kolom 40x40 Cm (K2) 14.00 m3 0.4222 % 7.04 7.04 0.21 - 0.2123 50.29 30,272,000.00
- Kolom 15x15 Cm (Kp) 22.83 m3 0.6885 % 8.71 8.71 0.26 - 0.2627 38.16 37,456,440.00
2 Beton Balok -
- TOC +6.20 -
- Balok Latai 11/15 cm ( B5 ) 5.85 m3 0.1764 % 1.82 1.82 0.05 - 0.0549 31.10 7,822,818.00
- TOC +7.90 -
- Balok 30/60 cm ( B1 ) (35/60) 7.15 m3 0.2156 % 8.11 8.11 0.24 - 0.2447 113.49 34,891,920.00
- Balok 30/50 cm ( B2 ) (30/60) 110.38 m3 3.3289 % 72.12 72.12 2.18 - 2.1752 65.34 310,136,846.40
- Balok 20/40 cm ( B3 ) (25/40) 23.70 m3 0.7148 % 22.96 22.96 0.69 - 0.6924 96.87 98,720,475.00
3 Beton Plat -
- TOC +7.90 -
- Beton Plat Lantai T = 12 cm 140.50 m3 4.2373 % 163.32 163.32 4.93 - 4.9255 116.24 702,282,192.00
4 Beton tangga -
Type 1 -
- Plat Tangga Tb : 15 cm 2.40 m3 0.0724 % 2.30 2.30 0.07 - 0.0693 95.81 9,887,334.00
- Plat Bordes Tb : 15 cm 1.11 m3 0.0335 % 1.23 1.23 0.04 - 0.0371 110.80 5,288,355.00
- Plat Anak Tangga 1.22 m3 0.0368 % 1.14 1.14 0.03 - 0.0344 93.49 4,904,451.00
- Balok 20/40 cm ( B3 ) 0.32 m3 0.0097 % 0.58 0.58 0.02 - 0.0175 181.18 2,493,032.50
Type 2 -
- Plat Tangga Tb : 15 cm 2.40 m3 0.0724 % 2.21 2.21 0.07 - 0.0667 92.22 9,516,910.50
- Plat Bordes Tb : 15 cm 0.81 m3 0.0244 % 1.53 1.53 0.05 - 0.0462 189.07 6,585,450.00
- Plat Anak Tangga 1.12 m3 0.0338 % 1.11 1.11 0.03 - 0.0335 99.16 4,775,386.50
- Balok 20/40 cm ( B3 ) 0.29 m3 0.0087 % 1.04 1.04 0.03 - 0.0313 357.32 4,455,799.75
Type 3 -
- Plat Tangga Tb : 15 cm 1.20 m3 0.0362 % 0.00 - - - - - -
- Plat Bordes Tb : 15 cm 1.17 m3 0.0353 % 0.00 - - - - - -
- Plat Anak Tangga 0.60 m3 0.0181 % 0.00 - - - - - -
Type 4 -
- Plat Tangga Tb : 15 cm 1.30 m3 0.0392 % 0.00 - - - - - -
- Plat Bordes Tb : 15 cm 0.54 m3 0.0163 % 0.00 - - - - - -
- Plat Anak Tangga 1.02 m3 0.0308 % 0.00 - - - - - -
- Balok 20/40 cm ( B3 ) 0.19 m3 0.0057 % 0.00 - - - - - -
5 Waterprofing Coating 240.00 m2 0.1683 % 0.00 - - - - - -
12.0870 % -
V PEKERJAAN ATAP -
1 Pasang Penutup Atap Selulosa Bitumen Tb = 0,3 cm 174.26 m2 0.1467 % 0.00 - - - - - -
2
Volume Pekerjaan Prestasi Pekerjaan Total Total
Volume
Bobot % Volume Volume Komulatif Minggu Minggu Komulatif Presetase Rupiah Ket.
No. Uraian Pekerjaan Sat.
Kontrak Minggu Minggu Lalu Ini Sesuai Harga
Kontrak
lalu Ini % % % (%) Kontrak
2 Pas. Kuda2 + Reng Usuk Baja Ringan Tb = 0,75 mm 174.26 m2 0.1344 % 0.00 - - - - - -
3 Pas. Alumunium Foil (Double Side) 174.26 m2 0.0306 % 0.00 - - - - - -
4 Pasang Listplang Grc T = 9 mm, Lebar 20 Cm (Rangkap) 67.05 m2 0.0118 % 0.00 - - - - - -
5 Cat Listplank 26.82 m2 0.0047 % 0.00 - - - - - -
6 Pekerjaan Penutup Void -
- Atap Polycarbonat Rangka Hollow 150.00 m2 0.2315 % 0.00 - - - - - -
7 Canopy Type 01 -
-Rafter WF 250.125.6.9 532.21 kg 0.0597 % 0.00 - - - - - -
-Rafter WF 200.100.5,5.8 358.90 kg 0.0403 % 0.00 - - - - - -
-Vute WF 250.125.6.9 61.57 kg 0.0086 % 0.00 - - - - - -
-Hollow 50 x 50 x 2 76.10 m' 0.0267 % 0.00 - - - - - -
-Anchor M16 48.00 pcs 0.0252 % 0.00 - - - - - -
-Tarikan Besi Ø 16 mm 23.99 kg 0.0030 % 0.00 - - - - - -
-Plat t : 10 mm 33.98 kg 0.0048 % 0.00 - - - - - -
-Kaca Tempered t : 12 mm 10.05 m2 0.0423 % 0.00 - - - - - -
-Alumunium Composit Panel ( ACP ) 71.33 m2 0.2626 % 0.00 - - - - - -
1.0329 % -
B PEKERJAAN ARSITEKTUR -
I PEKERJAAN PASANGAN -
Lantai 1 -
1 Pasangan dinding 1/2 bata ad. 1 : 3 128.03 m2 0.0808 % 0.00 - - - - - -
2 Pasangan dinding 1/2 bata ad. 1 : 4 1,551.85 m2 0.9796 % 809.16 52.77 861.93 0.51 0.0333 0.5441 55.54 77,573,922.30
Lantai 2 -
3 Pasangan dinding 1/2 bata ad. 1 : 3 225.00 m2 0.1420 % 0.00 - - - - - -
4 Pasangan dinding 1/2 bata ad. 1 : 4 1,211.80 m2 0.7649 % 867.51 867.51 0.55 - 0.5476 71.59 78,076,287.00
1.9673 % -
II PEKERJAAN KUSEN PINTU DAN JENDELA -
Lantai 1 -
1 Pekerjaan Kusen Pintu -
- Pasang Pintu Jendela Type 1 (PJ1) 1.00 Unit 0.0596 % 0.00 - - - - - -
- Pasang Pintu Jendela Type 3 (PJ3) 1.00 Unit 0.0736 % 0.00 - - - - - -
- Pasang Pintu Type 1 (P1) 1.00 Unit 0.0321 % 0.00 - - - - - -
- Pasang Pintu Type 2 (P2) 1.00 Unit 0.0245 % 0.00 - - - - - -
- Pasang Pintu Type 3 (P3) 30.00 Unit 0.5934 % 0.00 - - - - - -
- Pasang Pintu Type 4 (P4) 1.00 Unit 0.0193 % 0.00 - - - - - -
- Pasang Pintu Type 5 (P5) 41.00 Unit 0.7189 % 0.00 - - - - - -
- Pasang Pintu Type 6 (P6) 16.00 Unit 0.2525 % 0.00 - - - - - -
- Pasang Pintu Type 7 (P7) 5.00 Unit 0.0786 % 0.00 - - - - - -
- Pasang Pintu Type 9 (P9) 3.00 Unit 0.0074 % 0.00 - - - - - -
- Pasang Pintu Type 10 (P10) 10.00 Unit 0.1950 % 0.00 - - - - - -
- Pasang Pintu Type 11 (P11) 1.00 Unit 0.0177 % 0.00 - - - - - -
- Pasang Pintu Shaft (Ps) 12.00 Unit 0.0210 % 0.00 - - - - - -
2 Pekerjaan Kusen Jendela -
- Pasang Jendela Type 1 (J1) 22.00 Unit 0.2618 % 0.00 - - - - - -
- Pasang Jendela Type 2 (J2) 1.00 Unit 0.0118 % 0.00 - - - - - -
- Pasang Jendela Type 7 (J7) 1.00 Unit 0.0169 % 0.00 - - - - - -
- Pasang Jendela Type 8 (J8) 1.00 Unit 0.0258 % 0.00 - - - - - -
- Pasang Jendela Type 9 (J9) 1.00 Unit 0.0084 % 0.00 - - - - - -
- Pasang Jendela Type 10 (J10) 1.00 Unit 0.0048 % 0.00 - - - - - -
- Pasang Jendela Type 12 (J12) 1.00 Unit 0.0046 % 0.00 - - - - - -
- Pasang Jendela Type 15 (J15) 1.00 Unit 0.0250 % 0.00 - - - - - -
- Pasang Jendela Type 16 (J16) 1.00 Unit 0.0071 % 0.00 - - - - - -
- Pasang Bouven Type 1 (BV1) 11.00 Unit 0.0373 % 0.00 - - - - - -
- Pasang Bouven Type 2 (BV2) 37.00 Unit 0.2331 % 0.00 - - - - - -
3
Volume Pekerjaan Prestasi Pekerjaan Total Total
Volume
Bobot % Volume Volume Komulatif Minggu Minggu Komulatif Presetase Rupiah Ket.
No. Uraian Pekerjaan Sat.
Kontrak Minggu Minggu Lalu Ini Sesuai Harga
Kontrak
lalu Ini % % % (%) Kontrak
- Pasang Bouven Type 3 (BV3) 1.00 Unit 0.0092 % 0.00 - - - - - -
3 Pekerjaan Dinding Partisi -
- Pasang Dinding Partisi Type 1 (PT1) 2.00 Unit 0.0125 % 0.00 - - - - - -
- Pasang Dinding Partisi Type 2 (PT2) 2.00 Unit 0.0078 % 0.00 - - - - - -
- Pasang Dinding Partisi Type 3 (PT3) 2.00 Unit 0.0042 % 0.00 - - - - - -
- Pasang Dinding Partisi Type 4 (PT4) 1.00 Unit 0.0051 % 0.00 - - - - - -
- Pasang Dinding Partisi Type 5 (PT5) 2.00 Unit 0.0012 % 0.00 - - - - - -
- Pasang Dinding Partisi Type 6 (PT6) 4.00 Unit 0.0174 % 0.00 - - - - - -
- Pasang Dinding Partisi Type 7 (PT7) 1.00 Unit 0.0032 % 0.00 - - - - - -
- Pasang Dinding Partisi Type 8 (PT8) 1.00 Unit 0.0023 % 0.00 - - - - - -
- Pasang Dinding Partisi Type 9 (PT9) 1.00 Unit 0.0028 % 0.00 - - - - - -
- Pasang Dinding Partisi Type 10 (PT10) 3.00 Unit 0.0083 % 0.00 - - - - - -
- Pasang Dinding Partisi Type 11 (PT11) 1.00 Unit 0.0090 % 0.00 - - - - - -
- Pasang Dinding Partisi Type 12 (PT12) 1.00 Unit 0.0055 % 0.00 - - - - - -
- Pasang Dinding Partisi Type 13 (PT13) 1.00 Unit 0.0009 % 0.00 - - - - - -
- Pasang Dinding Partisi Type 14 (PT14) 1.00 Unit 0.0079 % 0.00 - - - - - -
- Pasang Dinding Partisi Type 15 (PT15) 1.00 Unit 0.0068 % 0.00 - - - - - -
- Pasang Dinding Partisi Type 16 (PT16) 1.00 Unit 0.0047 % 0.00 - - - - - -
- Pasang Dinding Partisi Type 17 (PT17) 1.00 Unit 0.0102 % 0.00 - - - - - -
- Pasang Dinding Partisi Type 18 (PT18) 1.00 Unit 0.0071 % 0.00 - - - - - -
- Pasang Dinding Partisi Type 19 (PT19) 1.00 Unit 0.0032 % 0.00 - - - - - -
- Pasang Dinding Partisi Type 20 (PT20) 1.00 Unit 0.0040 % 0.00 - - - - - -
- Pasang Dinding Partisi Type 21 (PT21) 1.00 Unit 0.0048 % 0.00 - - - - - -
- Pasang Dinding Partisi Type 22 (PT22) 2.00 Unit 0.0096 % 0.00 - - - - - -
- Pasang Dinding Partisi Type 23 (PT23) 3.00 Unit 0.0200 % 0.00 - - - - - -
- Pasang Dinding Partisi Type 24 (PT24) 1.00 Unit 0.0018 % 0.00 - - - - - -
- Pasang Dinding Partisi Type 25 (PT25) 1.00 Unit 0.0010 % 0.00 - - - - - -
- Pasang Dinding Partisi Type 26 (PT26) 1.00 Unit 0.0054 % 0.00 - - - - - -
- Pasang Dinding Partisi Type 27 (PT27) 1.00 Unit 0.0127 % 0.00 - - - - - -
- Pasang Dinding Partisi Type 28 (PT28) 1.00 Unit 0.0110 % 0.00 - - - - - -
- Pasang Dinding Partisi Type 29 (PT29) 1.00 Unit 0.0020 % 0.00 - - - - - -
- Pasang Dinding Partisi Type 30 (PT30) 1.00 Unit 0.0036 % 0.00 - - - - - -
- Pasang Dinding Partisi Type 31 (PT31) 1.00 Unit 0.0032 % 0.00 - - - - - -
- Pasang Dinding Partisi Type 32 (PT32) 1.00 Unit 0.0016 % 0.00 - - - - - -
- Pasang Dinding Partisi Type 33 (PT33) 1.00 Unit 0.0044 % 0.00 - - - - - -
- Pasang Dinding Partisi Type 34 (PT34) 1.00 Unit 0.0145 % 0.00 - - - - - -
Lantai 2 -
4 Pekerjaan Kusen Pintu -
- Pasang Pintu Jendela Type 2 (PJ2) 1.00 Unit 0.0596 % 0.00 - - - - - -
- Pasang Pintu Type 3 (P3) 29.00 Unit 0.5736 % 0.00 - - - - - -
- Pasang Pintu Type 5 (P5) 14.00 Unit 0.2455 % 0.00 - - - - - -
- Pasang Pintu Type 6 (P6) 11.00 Unit 0.1736 % 0.00 - - - - - -
- Pasang Pintu Type 7 (P7) 6.00 Unit 0.0943 % 0.00 - - - - - -
- Pasang Pintu Type 8 (P8) 19.00 Unit 0.3758 % 0.00 - - - - - -
- Pasang Pintu Shaft (Ps) 12.00 Unit 0.0210 % 0.00 - - - - - -
5 Pekerjaan Kusen Jendela -
- Pasang Jendela Type 1 (J1) 1.00 Unit 0.0119 % 0.00 - - - - - -
- Pasang Jendela Type 3 (J3) 15.00 Unit 0.1330 % 0.00 - - - - - -
- Pasang Jendela Type 4 (J4) 5.00 Unit 0.1429 % 0.00 - - - - - -
- Pasang Jendela Type 5 (J5) 19.00 Unit 0.3526 % 0.00 - - - - - -
- Pasang Jendela Type 6 (J6) 4.00 Unit 0.0569 % 0.00 - - - - - -
- Pasang Jendela Type 7 (J7) 1.00 Unit 0.0169 % 0.00 - - - - - -
- Pasang Jendela Type 13 (J13) 2.00 Unit 0.0350 % 0.00 - - - - - -
- Pasang Bouven Type 1 (BV1) 6.00 Unit 0.0203 % 0.00 - - - - - -
4
Volume Pekerjaan Prestasi Pekerjaan Total Total
Volume
Bobot % Volume Volume Komulatif Minggu Minggu Komulatif Presetase Rupiah Ket.
No. Uraian Pekerjaan Sat.
Kontrak Minggu Minggu Lalu Ini Sesuai Harga
Kontrak
lalu Ini % % % (%) Kontrak
- Pasang Bouven Type 2 (BV2) 15.00 Unit 0.0945 % 0.00 - - - - - -
- Pasang Kisi - Kisi (KS) 1.00 Unit 0.0092 % 0.00 - - - - - -
6 Pekerjaan Dinding Partisi -
- Pasang Dinding Partisi Type 2 (PT2) 1.00 Unit 0.0039 % 0.00 - - - - - -
- Pasang Dinding Partisi Type 6 (PT6) 1.00 Unit 0.0044 % 0.00 - - - - - -
- Pasang Dinding Partisi Type 10 (PT10) 2.00 Unit 0.0055 % 0.00 - - - - - -
- Pasang Dinding Partisi Type 35 (PT35) 1.00 Unit 0.0044 % 0.00 - - - - - -
- Pasang Dinding Partisi Type 36 (PT36) 1.00 Unit 0.0061 % 0.00 - - - - - -
- Pasang Dinding Partisi Type 37 (PT37) 1.00 Unit 0.0074 % 0.00 - - - - - -
- Pasang Dinding Partisi Type 38 (PT38) 1.00 Unit 0.0040 % 0.00 - - - - - -
- Pasang Dinding Partisi Type 39 (PT39) 3.00 Unit 0.0177 % 0.00 - - - - - -
- Pasang Dinding Partisi Type 40 (PT40) 1.00 Unit 0.0039 % 0.00 - - - - - -
- Pasang Dinding Partisi Type 41 (PT41) 1.00 Unit 0.0015 % 0.00 - - - - - -
- Pasang Dinding Partisi Type 42 (PT42) 1.00 Unit 0.0060 % 0.00 - - - - - -
- Pasang Dinding Partisi Type 43 (PT43) 2.00 Unit 0.0138 % 0.00 - - - - - -
- Pasang Dinding Partisi Type 44 (PT44) 1.00 Unit 0.0012 % 0.00 - - - - - -
- Pasang Dinding Partisi Type 45 (PT45) 1.00 Unit 0.0028 % 0.00 - - - - - -
- Pasang Dinding Partisi Type 46 (PT46) 1.00 Unit 0.0018 % 0.00 - - - - - -
- Pasang Dinding Partisi Type 47 (PT47) 1.00 Unit 0.0017 % 0.00 - - - - - -
5.4620 % -
III PEKERJAAN PLESTERAN -
Lantai 1 -
1 Plesteran dinding ad. 1 : 3 256.05 m2 0.0808 % 0.00 - - - - - -
2 Plesteran dinding ad. 1 : 4 3,103.70 m2 0.9796 % 0.00 - - - - - -
3 Plesteran beton ad. 1 : 3 680.60 m2 0.2864 % 0.00 - - - - - -
4 Acian 3,784.30 m2 0.6635 % 0.00 - - - - - -
Lantai 2 -
5 Plesteran dinding ad. 1 : 3 550.75 m2 0.1738 % 0.00 - - - - - -
6 Plesteran dinding ad. 1 : 4 2,423.60 m2 0.7649 % 0.00 - - - - - -
7 Plesteran beton ad. 1 : 3 648.60 m2 0.2729 % 0.00 - - - - - -
8 Acian 3,622.95 m2 0.6353 % 0.00 - - - - - -
3.8573 % -
IV PEKERJAAN AKSESORIS -
Tampak 01 -
1 Pekerjaan ACP rangka Hollow 128.00 m2 0.4489 % 0.00 - - - - - -
2 Penebalan Dinding Finishing Cat 212.52 m2 0.1863 % 0.00 - - - - - -
3 Pasang Batu Sisir 4.50 m2 0.0079 % 0.00 - - - - - -
4 Kisi - Kisi Hollow 18.64 m2 0.0327 % 0.00 - - - - - -
5 Tulisan Stainless steel Tinggi :60cm 28.00 Bh 0.0393 % 0.00 - - - - - -
6 Tulisan Stainless steel Tinggi :80cm 19.00 Bh 0.0400 % 0.00 - - - - - -
7 Pasangan dinding 1/2 bata ad. 1 : 4 112.99 m2 0.0357 % 0.00 - - - - - -
8 Plesteran dinding ad. 1 : 4 225.98 m2 0.0713 % 0.00 - - - - - -
9 Acian 225.98 m2 0.0396 % 0.00 - - - - - -
Tampak 02 -
10 Pekerjaan ACP rangka Hollow 6.32 m2 0.0222 % 0.00 - - - - - -
11 Penebalan Dinding Finishing Cat 28.28 m2 0.0248 % 0.00 - - - - - -
12 Pasangan dinding 1/2 bata ad. 1 : 4 34.83 m2 0.0220 % 0.00 - - - - - -
13 Plesteran dinding ad. 1 : 4 69.66 m2 0.0220 % 0.00 - - - - - -
14 Acian 69.66 m2 0.0122 % 0.00 - - - - - -
Tampak 03 -
15 Kisi - Kisi Hollow 8.08 m2 0.0142 % 0.00 - - - - - -
16 Railling Balkon 9.31 m2 0.0229 % 0.00 - - - - - -
17 Tampak 04 -
18 Pasangan dinding 1/2 bata ad. 1 : 4 16.79 m2 0.0106 % 0.00 - - - - - -
5
Volume Pekerjaan Prestasi Pekerjaan Total Total
Volume
Bobot % Volume Volume Komulatif Minggu Minggu Komulatif Presetase Rupiah Ket.
No. Uraian Pekerjaan Sat.
Kontrak Minggu Minggu Lalu Ini Sesuai Harga
Kontrak
lalu Ini % % % (%) Kontrak
19 Plesteran dinding ad. 1 : 4 33.58 m2 0.0106 % 0.00 - - - - - -
20 Acian 33.58 m2 0.0059 % 0.00 - - - - - -
Ruangan Khusus -
21 Dinding Partisi Panel Insulasi Rangka Metal Stud 125.82 m2 0.0971 % 0.00 - - - - - -
22 Finishing Cat Anti Bacteri 250.35 m2 0.2107 % 0.00 - - - - - -
23 Pas. Lapisan Dinding Plat Timbal Tebal 3mm 94.83 m2 0.1663 % 0.00 - - - - - -
1.5429 % -
V PEKERJAAN PLAFOND -
Lantai 1 -
1 Plafond gypsum 9 mm + rangka Metal Furing 1,401.15 m2 0.9336 % 0.00 - - - - - -
2 Plafond Kalsiboard 12mm + rangka Metal Furing 32.88 m2 0.0231 % 0.00 - - - - - -
3 Expose plat beton 226.75 m2 0.1193 % 0.00 - - - - - -
Lantai 2 -
4 Plafond gypsum 9 mm + rangka Metal Furing 1,267.21 m2 0.8443 % 0.00 - - - - - -
5 Plafond Kalsiboard 12mm + rangka Metal Furing 136.19 m2 0.0955 % 0.00 - - - - - -
2.0158 % -
VI PEKERJAAN PENUTUP LANTAI -
Lantai 1 -
1 Granite Tile 60x60 cm Type 1 + Hospital Plint (Polish) 1,316.47 m2 1.2465 % 0.00 - - - - - -
2 Granite Tile 60x60 cm Type 2 + Hospital Plint (Polish) 311.12 m2 0.2946 % 0.00 - - - - - -
3 Granite Tile 60x60 cm Type 3 + Hospital Plint (Unpolish) 51.29 m2 0.0594 % 0.00 - - - - - -
4 Granite Tile 60x60 cm Type 4 (Unpolish Anti Slip) 147.43 m2 0.1706 % 0.00 - - - - - -
5 Granite Tile 60x60 cm (Tangga + Step noise) 72.86 m2 0.0843 % 0.00 - - - - - -
6 Railling Tangga 62.07 m2 0.1088 % 0.00 - - - - - -
7 Granite Tile 30x30 cm (Area Basah) 57.49 m2 0.0484 % 0.00 - - - - - -
8 Lantai Vynil 122.93 m2 0.1509 % 0.00 - - - - - -
9 Keramik Dinding Toiltet 20cm x 40cm 247.59 m2 0.2084 % 0.00 - - - - - -
10 Hospital Plint 800.00 m' 0.2244 % 0.00 - - - - - -
Lantai 2 -
11 Granite Tile 60x60 cm Type 1 + Hospital Plint (Polish) 1,071.00 m2 1.0141 % 0.00 - - - - - -
12 Granite Tile 60x60 cm Type 2 + Hospital Plint (Polish) 96.45 m2 0.0913 % 0.00 - - - - - -
13 Granite Tile 60x60 cm Type 3 + Hospital Plint (Unpolish) 9.56 m2 0.0111 % 0.00 - - - - - -
14 Granite Tile 60x60 cm Type 4 (Unpolish Anti Slip) 112.68 m2 0.1304 % 0.00 - - - - - -
15 Granite Tile 30x30 cm (Area Basah) 122.80 m2 0.1421 % 0.00 - - - - - -
16 Keramik Dinding Toiltet 20cm x 40cm 392.60 m2 0.3304 % 0.00 - - - - - -
17 Hospital Plint 900.00 m2 0.2525 % 0.00 - - - - - -
18 Hand Rail 55.90 m' 0.0529 % 0.00 - - - - - -
4.6211 % -
VII PEKERJAAN SANITASI AIR -
Lantai 1 -
1 Closed Duduk Ex. Toto 12.00 Unit 0.1262 % 0.00 - - - - - -
2 Shower Spray Ex. Toto 12.00 Set 0.0210 % 0.00 - - - - - -
3 Wastafel Ex. Toto 10.00 Unit 0.1227 % 0.00 - - - - - -
4 Urinoir Ex. Toto 4.00 Unit 0.0491 % 0.00 - - - - - -
5 Sekat Urinoir 3.00 Set 0.0210 % 0.00 - - - - - -
6 Spoelhoek 5.00 Unit 0.0053 % 0.00 - - - - - -
7 Kitchen zink (Single) Ex. Toto 3.00 Unit 0.0053 % 0.00 - - - - - -
8 Kitchen zink (Double) Ex. Toto 1.00 Unit 0.0053 % 0.00 - - - - - -
9 Floordrain Ex. Toto 15.00 Bh 0.0158 % 0.00 - - - - - -
10 Kran Air Ex. Toto 15.00 Bh 0.0079 % 0.00 - - - - - -
11 Kran Air Wastafel Ex. Toto 17.00 Bh 0.0298 % 0.00 - - - - - -
12 Kran Air Kitchen zink Ex. Toto 4.00 Bh 0.0070 % 0.00 - - - - - -
13 Handrail/Nurse Call 1.00 Bh 0.0018 % 0.00 - - - - - -
14 Paper Holder 12.00 Bh 0.0101 % 0.00 - - - - - -
6
Volume Pekerjaan Prestasi Pekerjaan Total Total
Volume
Bobot % Volume Volume Komulatif Minggu Minggu Komulatif Presetase Rupiah Ket.
No. Uraian Pekerjaan Sat.
Kontrak Minggu Minggu Lalu Ini Sesuai Harga
Kontrak
lalu Ini % % % (%) Kontrak
15 Cermin Tebal 5mm 17.00 Bh 0.0179 % 0.00 - - - - - -
Lantai 2 -
16 Closed Duduk Ex. Toto 26.00 Unit 0.2735 % 0.00 - - - - - -
17 Shower Spray Ex. Toto 26.00 Set 0.0456 % 0.00 - - - - - -
18 Shower Ex. Toto 20.00 Set 0.0175 % 0.00 - - - - - -
19 Wastafel Bulat Ex. Toto 19.00 Unit 0.2332 % 0.00 - - - - - -
20 Wastafel kotak Ex. Toto 6.00 Unit 0.0736 % 0.00 - - - - - -
21 Urinoir Ex. Toto 1.00 Unit 0.0123 % 0.00 - - - - - -
22 Spoelhoek 2.00 Unit 0.0021 % 0.00 - - - - - -
23 Kitchen zink (Single) Ex. Toto 1.00 Unit 0.0018 % 0.00 - - - - - -
24 Floordrain Ex. Toto 29.00 Bh 0.0305 % 0.00 - - - - - -
25 Kran Air Ex. Toto 29.00 Bh 0.0153 % 0.00 - - - - - -
26 Kran Air Wastafel Ex. Toto 27.00 Bh 0.0473 % 0.00 - - - - - -
27 Kran Air Kitchen zink Ex. Toto 1.00 Bh 0.0018 % 0.00 - - - - - -
28 Handrail/Nurse call 38.00 Bh 0.0666 % 0.00 - - - - - -
29 Paper Holder 26.00 Bh 0.0219 % 0.00 - - - - - -
30 Cermin Tebal 5 mm Besar 23.00 Bh 0.0403 % 0.00 - - - - - -
31 Cermin Tebal 5 mm Kecil 2.00 Bh 0.0021 % 0.00 - - - - - -
1.3316 % -
VIII PEKERJAAN PENGECETAN -
Lantai 1 -
1 Cat dinding luar watershield ICI 1,511.89 m2 0.2651 % 0.00 - - - - - -
2 Cat dinding dalam - emulsion Setara Vinilex 1,847.86 m2 0.2592 % 0.00 - - - - - -
3 Cat plafond emulsion Setara Vinilex 1,860.78 m2 0.2610 % 0.00 - - - - - -
Lantai 2 -
4 Cat dinding luar watershield ICI 1,511.89 m2 0.2651 % 0.00 - - - - - -
5 Cat dinding dalam - emulsion Setara Vinilex 1,847.86 m2 0.2592 % 0.00 - - - - - -
6 Cat plafond emulsion Setara Vinilex 1,427.40 m2 0.2002 % 0.00 - - - - - -
1.5098 % -
C PEKERJAAN ELEKTRIKAL -
I PEKERJAAN POWER HOUSE -
I.A PEKERJAAN INSTALASI PENERANGAN DAN KOTAK KONTAK -
1 Instalasi Penerangan dg Kabel NYM 3 x 2.5 mm dlm Pipa Conduit dia. 20 mm2 11.00 titik 0.0116 % 0.00 - - - - - -
2 Instalasi Kotak kontak Biasa dg Kabel NYM 3 x 2.5 mm dlm Pipa Conduit dia. 20 mm2 5.00 titik 0.0053 % 0.00 - - - - - -
3 Instalasi Exshaust FAN dg kabel NYM 3 x 2.5 mm2 dlm Pipa Conduit dia. 20 mm2 5.00 titik 0.0053 % 0.00 - - - - - -
4 Balk Tube 1 x 20 W 11.00 bh 0.0096 % 0.00 - - - - - -
5 Kotak Kontak Biasa 5.00 bh 0.0018 % 0.00 - - - - - -
6 Saklar Ganda 3.00 bh 0.0009 % 0.00 - - - - - -
7 Saklar Tunggal 2.00 bh 0.0005 % 0.00 - - - - - -
8 Memasang Wall Type Exshaust Fan 2500 CMH w/ Louvers 5.00 unit 0.0228 % 0.00 - - - - - -
I.B PEKERJAAN PASANG DAYA LISTRIK 414 KVA -
1 Transformator 500 KVA 20 KV/ 380 Volt, 50 HZ, indoor type 1.00 2.4548 % 0.00 - - - - - -
2 Biaya Penyambungan (BP) 950.00 2.7585 % 0.00 - - - - - -
3 Sertifikat Layak Operasional (SLO) 165.00 0.4791 % 0.00 - - - - - -
4 Uang Jaminan Langganan (UJL) 165.00 0.4791 % 0.00 - - - - - -
5 Biaya Admistrasi (keur gambar + pengurusan ijin PLN). 1.00 0.1052 % 0.00 - - - - - -
I.C PEKERJAAN PANEL MVMDP -
Panel MVMDP lengkap terpasang dengan Accessories dan material bantu -
sesuai gambar perencanaan dan spesifikasi teknis -
1 Incoming LBS, 24kV, busbar 630A, 16kA 1.00 unit 0.7715 % 0.00 - - - - - -
Type SM6 - IM, c/w: -
- Switch Cubicle (LBS-SF6) 24kV, 16kA, 630 A -
- Voltage Indicators 3 Pcs -
- Busbar 630 A 3 unit -
7
Volume Pekerjaan Prestasi Pekerjaan Total Total
Volume
Bobot % Volume Volume Komulatif Minggu Minggu Komulatif Presetase Rupiah Ket.
No. Uraian Pekerjaan Sat.
Kontrak Minggu Minggu Lalu Ini Sesuai Harga
Kontrak
lalu Ini % % % (%) Kontrak
- Heater 50 W, 220 VAC -
- CIT Operating Mechanism -
2 Lightning Arrester Cubicle, tipe GAM2LA -
- Casing Cubicle 24 kV 1.00 unit 0.0175 % 0.00 - - - - - -
- Lightning Arrester 24 kV 3 buah -
- Busbar 630A 3 buah -
- Aksesoris -
3 Trafo Protection, tipe QM- SM6 1.00 unit 0.1753 % 0.00 - - - - - -
lengkap dengan : -
- Switch Cubicle (LBS-SF6) 24kV, 16 kA , 400/630 A -
- Voltage indicator -
- Heater 50W 220V -
- Busbar 630 Ampere 3 Pcs. -
- Shunt Trip 220VAC -
- Fusarc x 3 -
I.D PEKERJAAN PANEL DAN KABEL TOUVUR -
Pengadaan dan pemasangan Panel & Kabel-kabel, lengkap terpasang dengan -
alat bantu Accessories lain yang diperlukan sesuai gambar dan spesifikasi teknis. -
1 Kabel N2XSY 3 x 70 mm2 dari MVMDP PLN Scope s/d MVMDP Pelanggan 10.00 m' 0.0576 % 0.00 - - - - - -
2 Kabel N2XSY 3 x 70 mm2 dari MVMDP Pelanggan s/d Trafo 14.00 m' 0.0806 % 0.00 - - - - - -
3 Kabel NYY 2 (4 x 1c x 240 mm2) dari Trafo s/d LVMDP 16.00 m' 0.3260 % 0.00 - - - - - -
4 Kabel NYY 2 (4 x 1c x 240 mm2) dari Genset s/d Panel ATS 22.00 m' 0.4482 % 0.00 - - - - - -
5 Kabel NYFGbY 4 x 6 mm2 dari Panel LVMDP s/d Panel Incenerator 20.00 m' 0.2195 % 0.00 - - - - - -
6 Kabel NYY 3 x 4 mm2 dari Panel LVMDP s/d PP. Power House 8.00 m' 0.0018 % 0.00 - - - - - -
7 Kabel NYFGbY 4 x 6 mm2 dari Panel LVMDP s/d PP. LP.OL.1 27.00 m' 0.0129 % 0.00 - - - - - -
8 Kabel NYFGbY 4 x 6 mm2 dari Panel LVMDP s/d PP. LP.OL.2 105.00 m' 0.0501 % 0.00 - - - - - -
9 Kabel NYY 4 x 6 mm2 dari Panel LVMDP s/d Panel DP Pompa Air Bersih 165.00 m' 0.0660 % 0.00 - - - - - -
10 Kabel NYY 4 x 6 mm2 dari Panel LVMDP s/d Panel DP Pompa Air kotor 110.00 m' 0.0440 % 0.00 - - - - - -
11 Memasang Panel IN-TRAFO 1.00 unit 0.1964 % 0.00 - - - - - -
12 Memasang Panel Auto COS ATyS g 800 A/ 4P 1.00 unit 0.3156 % 0.00 - - - - - -
13 Memasang Panel Genset (AMF) 1.00 unit 0.2455 % 0.00 - - - - - -
14 Memasang Kapasitor Bank 320 KVAR 1.00 unit 1.2625 % 0.00 - - - - - -
15 Memasang Panel LVMDP 1.00 unit 0.4559 % 0.00 - - - - - -
16 Memasang PP. Power House 1.00 unit 0.0210 % 0.00 - - - - - -
17 Memasang Panel penerangan Luar 1 (LP-OL.1) 1.00 unit 0.0351 % 0.00 - - - - - -
18 Memasang Panel penerangan Luar 2 (LP-OL.2) 1.00 unit 0.0351 % 0.00 - - - - - -
19 Memasang DP- Air Bersih 1.00 unit 0.0351 % 0.00 - - - - - -
20 Memasang DP- Air Kotor 1.00 unit 0.0351 % 0.00 - - - - - -
21 Memasang Pipa PVC dia. 4'' kelas AW 22.00 m' 0.0193 % 0.00 - - - - - -
22 Kabel Ladder ukuran 300 mm x 100 mm 13.00 m' 0.0191 % 0.00 - - - - - -
23 Elbow ukuran 300 mm x 100 mm 4.00 m' 0.0070 % 0.00 - - - - - -
24 Checkered Plate penutup pit kabel di Power House 0,8 x 15 m1 12.00 m2 0.0379 % 0.00 - - - - - -
GROUNDING SYSTEM -
Pekerjaan Pengadaan dan pemasangan sistem Pembumian/ Grounding lengkap -
dengan elektroda, bak kontrol dan assesories sesuai dengan gambar dan spek teknis -
25 Sumuran Grounding Arus Kuat tahanan max. 5 ohm c/w TM, LVMDP, Travo, genset 4.00 ls 0.1403 % 5.00 5.00 0.18 - 0.1753 125.00 25,000,000.00
- Grounding Netral Trafo + Grounding Body Trafo -
- Grounding Panel TM -
- Grounding Panel LVMDP -
- Grounding Genset -
26 Kabel BC 240 mm 35.00 m' 0.0614 % 0.00 - - - - - -
27 Kabel BC 70 mm tersambung atar Sumur grounding 43.00 m' 0.0202 % 0.00 - - - - - -
28 Kabel BC 50 mm tersambung atar BKT perlengkapan dengan konduktor penyama potensial 20.00 m' 0.0069 % 0.00 - - - - - -
29 Kabel BC 70 mm dibawah pondasi Gardu (Potensial Equivalen) tersambung dengan CU 25.00 m' 0.0117 % 0.00 - - - - - -
8
Volume Pekerjaan Prestasi Pekerjaan Total Total
Volume
Bobot % Volume Volume Komulatif Minggu Minggu Komulatif Presetase Rupiah Ket.
No. Uraian Pekerjaan Sat.
Kontrak Minggu Minggu Lalu Ini Sesuai Harga
Kontrak
lalu Ini % % % (%) Kontrak
30 Grounding CU BAR uk. 20 x 5 mm2 31.00 m' 0.0544 % 0.00 - - - - - -
31 Rekolit (dudukan CU BAR Grounding) 25.00 bh 0.0526 % 0.00 - - - - - -
I.E PEKERJAAN GENSET 500 KVA -
Pekerjaan Genset lengkap terpasang sesuai spesifikasi yang telah ditentukan -
dan dilengkapi dengan surat / sertifikat keaslian -
1 Genset 500 KVA. 220/ 380 V, 50 Hz, Type Silent 1.00 Unit 4.5589 % 0.00 - - - - - -
Kapasitas : 500 KVA 3 Phase lengkap dengan -
- Spring Vibration Residential Silencer -
- Radiator -
- Accessories -
2 Intake Louvre sound attenuator 1.00 unit 0.0105 % 0.00 - - - - - -
3 Intake Louvre sound attenuator 1.00 unit 0.0105 % 0.00 - - - - - -
4 Tanki bahan bakar mingguan kapasitas ; 5.880 liter 1.00 Unit 0.1052 % 0.00 - - - - - -
5 Pompa Bahan bakar 10 LPM ( Pompa Elektrik ) 1.00 Unit 0.0351 % 0.00 - - - - - -
6 Pemipaan Bahan Bakar lengkap dengan Gate Valve 1.00 ls 0.0245 % 0.00 - - - - - -
- Termasuk Fitting, Check Valve, Foot Valve dan accessories -
7 Instalasi Cerobong Asap dari Genset ke area luar /pembuangan dan Silincer 1.00 ls 0.0351 % 0.00 - - - - - -
8 Testing & Commisioning 1.00 ls 0.0351 % 0.00 - - - - - -
9 Perijinan 1.00 ls 0.0526 % 0.00 - - - - - -
16.5408 % -
II PEKERJAAN INSTALASI PERANGAN DAN KOTAK KONTAK -
II.A1 PEKERJAAN INSTALASI PENERANGAN DAN KOTAK KONTAK -
Pekerjaan Pengadaan dan pemasangan penerangan dan kotak kontak -
lengkap dengan assesories/ alat bantu sesuai gambar dan spek teknis -
Lantai 1 -
1 Instalasi Penerangan dg Kabel NYM 3 x 2.5 mm dlm Pipa Conduit dia. 20 mm2 180.00 titik 0.2992 % 0.00 - - - - - -
2 Instalasi Kotak kontak Biasa dg Kabel NYM 3 x 2.5 mm dlm Pipa Conduit dia. 20 mm2 59.00 titik 0.0981 % 0.00 - - - - - -
3 Instalasi Kotak kontak Lantai dg Kabel NYM 3 x 2.5 mm dlm Pipa Conduit dia. 20 mm2 2.00 titik 0.0033 % 0.00 - - - - - -
4 Instalasi Kotak kontak Bed Head dg Kabel NYM 3 x 2.5 mm dlm Pipa Conduit dia. 20 mm2 8.00 titik 0.0133 % 0.00 - - - - - -
5 Downlight LED 7 W 95.00 bh 0.0833 % 0.00 - - - - - -
6 Downlight LED 3 W 12.00 bh 0.0093 % 0.00 - - - - - -
7 Fitting Rosset E27 LED bulb 7 W 6.00 bh 0.0058 % 0.00 - - - - - -
8 Downlight slim Surface LED 14 W 10.00 bh 0.0105 % 0.00 - - - - - -
9 Spot Light LED 7 W 7.00 bh 0.0123 % 0.00 - - - - - -
10 RM LED Tube 2 x 10 W 3.00 bh 0.0126 % 0.00 - - - - - -
11 RM LED Tube 2 x 10 W Arcylic Cover 3.00 bh 0.0168 % 0.00 - - - - - -
12 RM LED Tube 3 x 10 W 13.00 bh 0.0757 % 0.00 - - - - - -
13 RM LED Tube 3 x 10 W Arcylic Cover 6.00 bh 0.0400 % 0.00 - - - - - -
14 RM LED Tube 2 x 20 W 3.00 bh 0.0147 % 0.00 - - - - - -
15 RM LED Tube 2 x 20 W Arcylic Cover 8.00 bh 0.0505 % 0.00 - - - - - -
16 Balk Tube 1 x 20 W 10.00 bh 0.0421 % 0.00 - - - - - -
17 Barret LED 16 W 6.00 bh 0.0231 % 0.00 - - - - - -
18 Lampu Strip LED 4.6 m (@.7 W/m) terpasang lengkap dgn Power Suplay 1.00 set 0.0032 % 0.00 - - - - - -
19 Lampu Strip LED 6.5 m (@.7 W/m) terpasang lengkap dgn Power Suplay 1.00 set 0.0039 % 0.00 - - - - - -
20 Lampu Strip LED 8.8 m (@.7 W/m) terpasang lengkap dgn Power Suplay 1.00 set 0.0053 % 0.00 - - - - - -
21 Lampu Strip LED 12.8 m (@.7 W/m) terpasang lengkap dgn Power Suplay 1.00 set 0.0067 % 0.00 - - - - - -
22 Lampu Strip LED 13.5 m (@.7 W/m) terpasang lengkap dgn Power Suplay 1.00 set 0.0074 % 0.00 - - - - - -
23 Lampu Strip LED 15.5 m (@.7 W/m) terpasang lengkap dgn Power Suplay 1.00 set 0.0081 % 0.00 - - - - - -
24 Kotak Kontak Lantai 2.00 bh 0.0100 % 0.00 - - - - - -
25 Kotak Kontak Meja 4.00 bh 0.0018 % 0.00 - - - - - -
26 Kotak Kontak Biasa 50.00 bh 0.0193 % 0.00 - - - - - -
27 Kotak Kontak TV 1.00 bh 0.0009 % 0.00 - - - - - -
28 Kotak Kontak Bed Head 4 Gang 8.00 bh 0.0126 % 0.00 - - - - - -
29 Saklar Ganda 34.00 bh 0.0155 % 0.00 - - - - - -
9
Volume Pekerjaan Prestasi Pekerjaan Total Total
Volume
Bobot % Volume Volume Komulatif Minggu Minggu Komulatif Presetase Rupiah Ket.
No. Uraian Pekerjaan Sat.
Kontrak Minggu Minggu Lalu Ini Sesuai Harga
Kontrak
lalu Ini % % % (%) Kontrak
30 Saklar Tunggal 28.00 bh 0.0088 % 0.00 - - - - - -
31 Saklar Hotel Tunggal 2.00 bh 0.0011 % 0.00 - - - - - -
32 Saklar Hotel Ganda 10.00 bh 0.0067 % 0.00 - - - - - -
33 Saklar Grid 6 Gang 2.00 set 0.0021 % 0.00 - - - - - -
II.A2 Ruang Operasi -
1 Instalasi Penerangan dg Kabel NYM 3 x 2.5 mm dlm Pipa Conduit dia. 20 mm2 55.00 titik 0.0914 % 0.00 - - - - - -
2 Instalasi Kotak kontak Biasa dg Kabel NYM 3 x 2.5 mm dlm Pipa Conduit dia. 20 mm2 26.00 titik 0.0432 % 0.00 - - - - - -
3 Instalasi Kotak kontak Bed Head dg Kabel NYM 3 x 2.5 mm dlm Pipa Conduit dia. 20 mm2 8.00 titik 0.0133 % 0.00 - - - - - -
4 Downlight LED 7 W 8.00 bh 0.0070 % 0.00 - - - - - -
5 Downlight LED 3 W 3.00 bh 0.0023 % 0.00 - - - - - -
6 Lampu Operasi LED 150 W 2.00 bh 0.1543 % 0.00 - - - - - -
7 RM LED Tube 2 x 10 W Arcylic Cover 16.00 bh 0.0898 % 0.00 - - - - - -
8 RM LED Tube 3 x 10 W Arcylic Cover 4.00 bh 0.0267 % 0.00 - - - - - -
9 RM LED Tube 2 x 20 W Arcylic Cover 20.00 bh 0.1262 % 0.00 - - - - - -
10 Kotak Kontak Biasa 26.00 bh 0.0100 % 0.00 - - - - - -
11 Kotak Kontak Bed Head 4 Gang 8.00 bh 0.0126 % 0.00 - - - - - -
12 Saklar Ganda 10.00 bh 0.0046 % 0.00 - - - - - -
13 Saklar Tunggal 15.00 bh 0.0047 % 0.00 - - - - - -
14 Saklar Hotel Ganda 2.00 bh 0.0013 % 0.00 - - - - - -
II.A3 Ruang ICU -
1 Instalasi Penerangan dg Kabel NYM 3 x 2.5 mm dlm Pipa Conduit dia. 20 mm2 25.00 titik 0.0416 % 0.00 - - - - - -
2 Instalasi Kotak kontak Biasa dg Kabel NYM 3 x 2.5 mm dlm Pipa Conduit dia. 20 mm2 9.00 titik 0.0150 % 0.00 - - - - - -
3 Instalasi Kotak kontak lantai dg Kabel NYM 3 x 2.5 mm dlm Pipa Conduit dia. 20 mm2 1.00 titik 0.0017 % 0.00 - - - - - -
4 Instalasi Kotak kontak Bed Head dg Kabel NYM 3 x 2.5 mm dlm Pipa Conduit dia. 20 mm2 8.00 titik 0.0133 % 0.00 - - - - - -
5 Downlight LED 7 W 6.00 bh 0.0053 % 0.00 - - - - - -
6 Downlight LED 3 W 2.00 bh 0.0015 % 0.00 - - - - - -
7 Spot Light LED 7 W 2.00 bh 0.0035 % 0.00 - - - - - -
8 Lampu Bed Head LED 2 x 10 W 2.00 bh 0.0140 % 0.00 - - - - - -
9 RM LED Tube 2 x 10 W Arcylic Cover 5.00 bh 0.0281 % 0.00 - - - - - -
10 RM LED Tube 3 x 10 W Arcylic Cover 7.00 bh 0.0466 % 0.00 - - - - - -
11 Lampu Strip LED 11 m (@.7 W/m) terpasang lengkap dgn Power Suplay 1.00 set 0.0063 % 0.00 - - - - - -
12 Kotak Kontak Lantai 1.00 bh 0.0050 % 0.00 - - - - - -
13 Kotak Kontak Biasa 7.00 bh 0.0027 % 0.00 - - - - - -
14 Kotak Kontak Power BED 2.00 bh 0.0008 % 0.00 - - - - - -
15 Kotak Kontak Bed Head 4 Gang 8.00 bh 0.0126 % 0.00 - - - - - -
16 Saklar Ganda lampu Bed Head 2.00 bh 0.0009 % 0.00 - - - - - -
17 Saklar Ganda 9.00 bh 0.0041 % 0.00 - - - - - -
18 Saklar Tunggal 15.00 bh 0.0047 % 0.00 - - - - - -
19 Saklar Hotel Ganda 2.00 bh 0.0013 % 0.00 - - - - - -
II.A4 Ruang IPRS -
1 Instalasi Penerangan dg Kabel NYM 3 x 2.5 mm dlm Pipa Conduit dia. 20 mm2 30.00 titik 0.0499 % 0.00 - - - - - -
2 Instalasi Kotak kontak Biasa dg Kabel NYM 3 x 2.5 mm dlm Pipa Conduit dia. 20 mm2 14.00 titik 0.0233 % 0.00 - - - - - -
3 Downlight LED 7 W 9.00 bh 0.0079 % 0.00 - - - - - -
4 Downlight LED 3 W 2.00 bh 0.0015 % 0.00 - - - - - -
5 Spot Light LED 7 W 2.00 bh 0.0035 % 0.00 - - - - - -
6 RM LED Tube 3 x 10 W 12.00 bh 0.0673 % 0.00 - - - - - -
7 Barret LED 16 W 5.00 bh 0.0193 % 0.00 - - - - - -
8 Kotak Kontak Biasa 14.00 bh 0.0054 % 0.00 - - - - - -
9 Saklar Ganda 4.00 bh 0.0018 % 0.00 - - - - - -
10 Saklar Tunggal 10.00 bh 0.0032 % 0.00 - - - - - -
11 Saklar Hotel Tunggal 1.00 bh 0.0007 % 0.00 - - - - - -
II.A5 Ruang Radiologi -
1 Instalasi Kotak kontak Biasa dg Kabel NYM 3 x 2.5 mm dlm Pipa Conduit dia. 20 mm2 5.00 titik 0.0083 % 0.00 - - - - - -
2 Instalasi Kotak kontak 3 Phasa dg Kabel NYM 4 x 2.5 mm dlm Pipa Conduit dia. 20 mm2 4.00 titik 0.0066 % 0.00 - - - - - -
10
Volume Pekerjaan Prestasi Pekerjaan Total Total
Volume
Bobot % Volume Volume Komulatif Minggu Minggu Komulatif Presetase Rupiah Ket.
No. Uraian Pekerjaan Sat.
Kontrak Minggu Minggu Lalu Ini Sesuai Harga
Kontrak
lalu Ini % % % (%) Kontrak
3 Kotak Kontak Biasa 5.00 bh 0.0019 % 0.00 - - - - - -
4 Kotak Kontak 3 phasa 4.00 bh 0.0070 % 0.00 - - - - - -
II.A6 Lantai 2 -
1 Instalasi Penerangan dg Kabel NYM 3 x 2.5 mm dlm Pipa Conduit dia. 20 mm2 240.00 titik 0.3989 % 0.00 - - - - - -
2 Instalasi Kotak kontak Biasa dg Kabel NYM 3 x 2.5 mm dlm Pipa Conduit dia. 20 mm2 110.00 titik 0.1828 % 0.00 - - - - - -
3 Instalasi Kotak kontak Bed Head dg Kabel NYM 3 x 2.5 mm dlm Pipa Conduit dia. 20 mm2 56.00 titik 0.0931 % 0.00 - - - - - -
4 Downlight LED 7 W 112.00 bh 0.0982 % 0.00 - - - - - -
5 Downlight LED 3 W 30.00 bh 0.0231 % 0.00 - - - - - -
6 Spot Light LED 7 W 6.00 bh 0.0105 % 0.00 - - - - - -
7 RM LED Tube 2 x 10 W 20.00 bh 0.0842 % 0.00 - - - - - -
8 RM LED Tube 3 x 10 W 62.00 bh 0.3609 % 0.00 - - - - - -
9 RM LED Tube 3 x 10 W Arcylic Cover 4.00 bh 0.0267 % 0.00 - - - - - -
10 Lampu Bed Head LED 2 x 10 W 44.00 bh 0.3086 % 0.00 - - - - - -
11 Barret LED 16 W 10.00 bh 0.0386 % 0.00 - - - - - -
12 Lampu Strip LED 8.5 m (@.7 W/m) terpasang lengkap dgn Power Suplay 1.00 set 0.0063 % 0.00 - - - - - -
13 Lampu Strip LED 6.5 m (@.7 W/m) terpasang lengkap dgn Power Suplay 1.00 set 0.0049 % 0.00 - - - - - -
14 Lampu Strip LED 10.8 m (@.7 W/m) terpasang lengkap dgn Power Suplay 1.00 set 0.0084 % 0.00 - - - - - -
15 Lampu Strip LED 11 m (@.7 W/m) terpasang lengkap dgn Power Suplay 1.00 set 0.0091 % 0.00 - - - - - -
16 Lampu Strip LED 17.2 m (@.7 W/m) terpasang lengkap dgn Power Suplay 1.00 set 0.0112 % 0.00 - - - - - -
17 Lampu Strip LED 20 m (@.7 W/m) terpasang lengkap dgn Power Suplay 1.00 set 0.0126 % 0.00 - - - - - -
18 Lampu Strip LED 22 m (@.7 W/m) terpasang lengkap dgn Power Suplay 1.00 set 0.0136 % 0.00 - - - - - -
19 Lampu Strip LED 27 m (@.7 W/m) terpasang lengkap dgn Power Suplay 1.00 set 0.0175 % 0.00 - - - - - -
20 Kotak Kontak Biasa 80.00 bh 0.0309 % 0.00 - - - - - -
21 Kotak Kontak TV 20.00 bh 0.0175 % 0.00 - - - - - -
22 Kotak Kontak Power BED 14.00 bh 0.0054 % 0.00 - - - - - -
23 Kotak Kontak Bed Head 4 Gang 56.00 bh 0.0884 % 0.00 - - - - - -
24 Saklar Ganda lampu Bed Head 54.00 bh 0.0246 % 0.00 - - - - - -
25 Saklar Ganda 32.00 bh 0.0146 % 0.00 - - - - - -
26 Saklar Tunggal 80.00 bh 0.0252 % 0.00 - - - - - -
27 Saklar Hotel Tunggal 3.00 bh 0.0016 % 0.00 - - - - - -
28 Saklar Hotel Ganda 10.00 bh 0.0067 % 0.00 - - - - - -
II.A7 Ruang Server -
1 Instalasi Kotak kontak Biasa dg Kabel NYM 3 x 2.5 mm dlm Pipa Conduit dia. 20 mm2 8.00 titik 0.0133 % 0.00 - - - - - -
2 Kotak Kontak Biasa 8.00 bh 0.0031 % 0.00 - - - - - -
II.A8 Ruang Pos Satpam -
1 Instalasi Penerangan dg Kabel NYM 3 x 2.5 mm dlm Pipa Conduit dia. 20 mm2 1.00 titik 0.0017 % 0.00 - - - - - -
2 Instalasi Kotak kontak Biasa dg Kabel NYM 3 x 2.5 mm dlm Pipa Conduit dia. 20 mm2 2.00 titik 0.0033 % 0.00 - - - - - -
3 Downlight LED 7 W 1.00 bh 0.0009 % 0.00 - - - - - -
4 Kotak Kontak Biasa 2.00 bh 0.0008 % 0.00 - - - - - -
5 Saklar Tunggal 1.00 bh 0.0003 % 0.00 - - - - - -
II.A9 Penerangan Luar -
1 Instalasi Penerangan dg Kabel NYFGbY 3 x 4 mm2 260.00 m' 0.0729 % 0.00 - - - - - -
2 Bollard LED 7 W 4.00 bh 0.0168 % 0.00 - - - - - -
3 PJU HPL-N 1 x 250 W 6.00 set 0.2104 % 0.00 - - - - - -
- Tiang Octagonal Parabolic 7 meter singgle : 1 unit -
- Kabel NYY 3 x 2.5 mm2 : 7 m1 -
- Pondasi Tiang Oktagonal (K-100) + angkur : 1 set -
4 PJU HPL-N 2 x 250 W 1 set 0.0386 % 0.00 - - - - - -
- Tiang Octagonal Parabolic 7 meter double : 1 unit -
- Kabel NYY 3 x 2.5 mm2 : 12 m1 -
- Pondasi Tiang Oktagonal (K-100) + angkur : 1 set -
4.2143 % -
III PEKERJAAN INSTALASI KABEL TOUVUR DAN PANEL DAYA -
Pekerjaan Pengadaan dan pemasangan kabel touvur dan panel daya -
11
Volume Pekerjaan Prestasi Pekerjaan Total Total
Volume
Bobot % Volume Volume Komulatif Minggu Minggu Komulatif Presetase Rupiah Ket.
No. Uraian Pekerjaan Sat.
Kontrak Minggu Minggu Lalu Ini Sesuai Harga
Kontrak
lalu Ini % % % (%) Kontrak
lengkap dengan assesories sesuai gambar dan spek teknis -
1 Kabel FRC 4 x 240 mm2 dari LVMDP s/d SDP EMERGENCY 100.00 m' 2.3846 % 0.00 - - - - - -
2 Kabel FRC 4 x 10 mm2 dari SDP E. s/d manual COS. 40 A/ PP. OK 47.00 m' 0.0824 % 0.00 - - - - - -
3 Kabel NYY 4 x 10 mm2 dari Trafo Isolasi s/d PP.OK 6.00 m' 0.0040 % 0.00 - - - - - -
4 Kabel FRC 4 x 6 mm2 dari SDP E. s/d manual COS. 25 A/ PP. ICU 62.00 m' 0.0739 % 0.00 - - - - - -
5 Kabel NYY 4 x 6 mm2 dari Trafo Isolasi s/d PP. ICU 6.00 m' 0.0040 % 0.00 - - - - - -
6 Kabel FRC 4 x 6 mm2 dari SDP E. s/d PP. Elektronik 48.00 m' 0.0572 % 0.00 - - - - - -
7 Kabel FRC 4 x 16 mm2 dari SDP E. s/d PP. AC-OK 49.00 m' 0.1134 % 0.00 - - - - - -
8 Kabel FRC 4 x 6 mm2 dari SDP E. s/d PP. X-RAY 55.00 m' 0.0656 % 0.00 - - - - - -
9 Kabel FRC 4 x 6 mm2 dari SDP E. s/d PP. CT-SCAN 63.00 m' 0.0751 % 0.00 - - - - - -
10 Kabel NYFGbY 4 x 240 mm2 dari LVMDP s/d SDP 100.00 m' 1.1222 % 0.00 - - - - - -
11 Kabel NYY 4 x 10 mm2 dari SDP s/d LP.1 6.00 m' 0.0040 % 0.00 - - - - - -
12 Kabel NYY 4 x 10 mm2 dari SDP s/d R. IPRS 75.00 m' 0.0500 % 0.00 - - - - - -
13 Kabel NYY 4 x 25 mm2 dari SDP s/d LP.2 10.00 m' 0.0140 % 0.00 - - - - - -
14 Kabel NYY 4 x 16 mm2 dari SDP s/d PP.AC lantai 1 7.00 m' 0.0074 % 0.00 - - - - - -
15 Kabel NYY 4 x 16 mm2 dari SDP s/d PP.AC lantai 2 11.00 m' 0.0116 % 0.00 - - - - - -
16 Kabel NYY 4 x 6 mm2 dari SDP s/d PP.Boster Pump 85.00 m' 0.0560 % 0.00 - - - - - -
17 Kabel NYY 4 x 6 mm2 dari SDP s/d PP.transfer Pump 57.00 m' 0.0376 % 0.00 - - - - - -
18 Memasang Panel SDP Emergency 1.00 unit 0.1824 % 0.00 - - - - - -
19 Memasang Panel Penerangan R. Operasi 1.00 unit 0.0421 % 0.00 - - - - - -
20 Manual COS 40 A 1.00 unit 0.3787 % 0.00 - - - - - -
21 Trafo Isolasi 20 KVA, 380 V.3Φ.50 HZ 1.00 unit 0.2455 % 0.00 - - - - - -
22 Memasang Panel Penerangan R. ICU 1.00 unit 0.0316 % 0.00 - - - - - -
23 Manual COS 25 A 1.00 unit 0.0316 % 0.00 - - - - - -
24 Trafo Isolasi 20 KVA, 380 V.3Φ.50 HZ 1.00 unit 0.2455 % 0.00 - - - - - -
25 Memasang Panel Power CT-SCAN 1.00 unit 0.0351 % 0.00 - - - - - -
26 Memasang Panel Power X-RAY 1.00 unit 0.0351 % 0.00 - - - - - -
27 Memasang Panel Power Elektronik 1.00 unit 0.0351 % 0.00 - - - - - -
28 Memasang Panel Power AC-OK 1.00 unit 0.0386 % 0.00 - - - - - -
29 Memasang Panel SDP 1.00 unit 0.1753 % 0.00 - - - - - -
30 Memasang Panel Penerangan Lantai 1 1.00 unit 0.0561 % 0.00 - - - - - -
31 Memasang Panel Penerangan IPRS 1.00 unit 0.0281 % 0.00 - - - - - -
32 Memasang Panel Penerangan Lantai 2 1.00 unit 0.0631 % 0.00 - - - - - -
33 Memasang Panel AC Lantai 1 ( PPAC-1 ) 1.00 unit 0.0526 % 0.00 - - - - - -
34 Memasang Panel AC Lantai 2 ( PPAC-2 ) 1.00 unit 0.0561 % 0.00 - - - - - -
35 Memasang PP- Boster Pump 1.00 unit 0.0210 % 0.00 - - - - - -
36 Memasang PP- Transfer Pump 1.00 unit 0.0210 % 0.00 - - - - - -
Grounding System -
Pekerjaan Pengadaan dan pemasangan sistem Pembumian/ Grounding lengkap -
dengan elektroda, bak kontrol dan assesories sesuai gambar dan spek teknis -
37 Sumuran Grounding Arus Kuat tahanan max. 5 ohm c/w SDP s/d Panel sub distribusi 1.00 unit 0.0526 % 0.00 - - - - - -
38 Sumuran Grounding Arus Lemah tahanan max. 1 ohm c/w peralatan 1.00 unit 0.0526 % 0.00 - - - - - -
39 Kabel BC 120 mm2 85.00 m' 0.0745 % 0.00 - - - - - -
40 Kabel BC 35 mm2 45.00 m' 0.0126 % 0.00 - - - - - -
41 Kabel BC 25 mm2 48.00 m' 0.0118 % 0.00 - - - - - -
42 Kabel BC 16 mm2 58.00 m' 0.0089 % 0.00 - - - - - -
43 Kabel BC 10 mm2 40.00 m' 0.0042 % 0.00 - - - - - -
44 Kabel BC 6 mm2 63.00 m' 0.0040 % 0.00 - - - - - -
6.1587 % -
IV PEKERJAAN PENYALUR PETIR -
Pekerjaan Pengadaan dan pemasangan penyalur petir lengkap dengan -
assesories sesuai dengan gambar dan spek teknis -
1 Head terminal type KURN Radius proteksi 68 meter 1.00 Unit 0.0701 % 0.00 - - - - - -
2 Tiang penyangga penangkal petir 5 meter 1.00 unit 0.0032 % 0.00 - - - - - -
12
Volume Pekerjaan Prestasi Pekerjaan Total Total
Volume
Bobot % Volume Volume Komulatif Minggu Minggu Komulatif Presetase Rupiah Ket.
No. Uraian Pekerjaan Sat.
Kontrak Minggu Minggu Lalu Ini Sesuai Harga
Kontrak
lalu Ini % % % (%) Kontrak
3 Kabel NYY 1x70 mm2 Down Conductor 48.00 m' 0.1515 % 0.00 - - - - - -
4 Kabel BC 1x50 mm2 15.00 m' 0.0070 % 0.00 - - - - - -
5 Instalasi Pentanahan/ grounding lengkap dengan baut Coupling/Join Conector 1.00 unit 0.0351 % 0.50 0.50 0.02 - 0.0175 50.00 2,500,000.00
6 Bak Kontrol Uk. 40x40 Cm lengkap dengan elektroda tanah 1.00 unit 0.0028 % 0.00 - - - - - -
7 Fitting + Supporting 1.00 lot 0.0042 % 0.00 - - - - - -
0.2739 % -
V PEKERJAAN KABEL TRAY DAN LADDER -
Pekerjaan Pengadaan dan pemasangan kabel tray dan ladder -
lengkap dengan assesories/ alat bantu sesuai gambar dan spek teknis -
V.A Lantai 1 -
V.A.1 Arus kuat -
1 Kabel Ladder ukuran 300 mm x 100 mm 3.00 m' 0.0043 % 0.00 - - - - - -
2 Kabel Tray ukuran 300 mm x 100 mm 123.00 m' 0.1165 % 0.00 - - - - - -
3 Kabel Tray ukuran 200 mm x 100 mm 47.00 m' 0.0396 % 0.00 - - - - - -
4 Reduser Tray ukuran 300 mm x 200 mm x 100 mm 4.00 bh 0.0056 % 0.00 - - - - - -
5 Tee Tray ukuran 300 mm x 100 mm 7.00 bh 0.0101 % 0.00 - - - - - -
6 Tee Tray ukuran 200 mm x 100 mm 2.00 bh 0.0021 % 0.00 - - - - - -
7 Elbow ukuran 300 mm x 100 mm 6.00 bh 0.0072 % 0.00 - - - - - -
8 Elbow ukuran 200 mm x 100 mm 1.00 bh 0.0011 % 0.00 - - - - - -
V.A.2 Arus Lemah -
1 Kabel Ladder ukuran 300 mm x 100 mm 3.00 m' 0.0043 % 0.00 - - - - - -
2 Kabel Tray ukuran 300 mm x 100 mm 123.00 m' 0.1165 % 0.00 - - - - - -
3 Kabel Tray ukuran 200 mm x 100 mm 22.00 m' 0.0185 % 0.00 - - - - - -
4 Reduser Tray ukuran 300 mm x 200 mm x 100 mm 2.00 bh 0.0028 % 0.00 - - - - - -
5 Tee Tray ukuran 300 mm x 100 mm 6.00 bh 0.0086 % 0.00 - - - - - -
6 Elbow ukuran 300 mm x 100 mm 4.00 bh 0.0048 % 0.00 - - - - - -
V.B Lantai 2 -
V.B.1 Arus kuat -
1 Kabel Ladder ukuran 300 mm x 100 mm 4.00 m' 0.0058 % 0.00 - - - - - -
2 Kabel Tray ukuran 300 mm x 100 mm 147.00 m' 0.1392 % 0.00 - - - - - -
3 Tee Tray ukuran 300 mm x 100 mm 4.00 bh 0.0058 % 0.00 - - - - - -
4 Elbow ukuran 300 mm x 100 mm 6.00 bh 0.0072 % 0.00 - - - - - -
V.B.2 Arus Lemah -
1 Kabel Ladder ukuran 300 mm x 100 mm 4.00 m' 0.0058 % 0.00 - - - - - -
2 Kabel Tray ukuran 300 mm x 100 mm 144.00 m' 0.1363 % 0.00 - - - - - -
3 Tee Tray ukuran 300 mm x 100 mm 4.00 bh 0.0058 % 0.00 - - - - - -
4 Elbow ukuran 300 mm x 100 mm 5.00 bh 0.0060 % 0.00 - - - - - -
0.6535 % -
VI PEKERJAAN INSTALASI TELPON -
Pekerjaan Pengadaan dan pemasangan telepon lengkap dengan -
assesories/ alat bantu sesuai gambar dan spek teknis -
VI.A Lantai 1 -
1 Instalasi Telephone dg Kabel ITC 2x2x0.6 mm dlm Pipa Conduit 20 mm 21.00 titik 0.0516 % 0.00 - - - - - -
2 Direct Outlet 21.00 bh 0.0110 % 0.00 - - - - - -
3 Handset single Telephone 21.00 unit 0.0516 % 0.00 - - - - - -
4 Box telepon uk. 30x20x20 cm 1.00 unit 0.0032 % 0.00 - - - - - -
5 Kabel Feeder ITC 30 pairs dari MDF ke TTB 48.00 m' 0.0098 % 0.00 - - - - - -
VI.B Lantai 2 -
1 Instalasi Telephone dg Kabel ITC 2x2x0.6 mm dlm Pipa Conduit 20 mm 13.00 titik 0.0319 % 0.00 - - - - - -
2 Direct Outlet 13.00 bh 0.0068 % 0.00 - - - - - -
3 Handset single Telephone 13.00 unit 0.0319 % 0.00 - - - - - -
4 Operator console 1.00 unit 0.0281 % 0.00 - - - - - -
5 Handset single Telephone operator 1.00 unit 0.0039 % 0.00 - - - - - -
6 Main Distrubution Fram Telepon (MDF-TP) 50 Ext. 1.00 unit 0.0126 % 0.00 - - - - - -
13
Volume Pekerjaan Prestasi Pekerjaan Total Total
Volume
Bobot % Volume Volume Komulatif Minggu Minggu Komulatif Presetase Rupiah Ket.
No. Uraian Pekerjaan Sat.
Kontrak Minggu Minggu Lalu Ini Sesuai Harga
Kontrak
lalu Ini % % % (%) Kontrak
7 Private Automatic Branch eXchange (PABX),8 Co, 52 Ext. 1.00 unit 0.1438 % 0.00 - - - - - -
- Main Unit 7 Slot + Power + 4-port Digital Extension -
- 8-port Trunk Card Untuk 8 Line Telkom -
- 24-port Single Line Ext. untuk 24 Ext. Analog ; 2 unit -
- Key telp Operator 24 Co -
8 Power Surge Arester 15 KA 1.00 unit 0.0105 % 0.00 - - - - - -
9 Box telepon uk. 30x20x20 cm 1.00 unit 0.0032 % 0.00 - - - - - -
10 Kabel Feeder ITC 20 pairs dari MDF ke TTB 6.00 m1 0.0012 % 0.00 - - - - - -
11 Kabel Feeder ITC 40 pairs dari MDF ke PABX 10.00 m1 0.0020 % 0.00 - - - - - -
0.4030 % -
VII PEKERJAAN INSTALASI FIRE ALARM -
Pekerjaan Pengadaan dan pemasangan fire alarm lengkap dengan -
assesories/ alat bantu sesuai gambar dan spek teknis -
VII.A Lantai 1 -
1 Instalasi ROR Heat Detector & EORL dengan kabel NYA 2 (1x1.5) mm2 55.00 titik 0.0752 % 0.00 - - - - - -
2 Instalasi Smoke detector dengan kabel NYA 2 (1x1.5) mm2 29.00 titik 0.0397 % 0.00 - - - - - -
3 Instalasi Manual Push Button dengan kabel NYA 2 (1x1.5) mm2 3.00 titik 0.0046 % 0.00 - - - - - -
4 Instalasi Alarm Bell dengan kabel NYA 2 (1x1.5) mm2 3.00 titik 0.0058 % 0.00 - - - - - -
5 Instalasi Indicating lamp dengan kabel NYA 2 (1x1.5) mm2 3.00 titik 0.0021 % 0.00 - - - - - -
6 ROR Heat Detector 30.00 bh 0.0252 % 0.00 - - - - - -
7 Smoke Detector 18.00 bh 0.0410 % 0.00 - - - - - -
8 Manual Push Button 3.00 bh 0.0037 % 0.00 - - - - - -
9 Alarm Bell 3.00 bh 0.0058 % 0.00 - - - - - -
10 Indicating Lamp 3.00 bh 0.0020 % 0.00 - - - - - -
11 End of line resistor 3.00 bh 0.0007 % 0.00 - - - - - -
12 Terminal Box Fire Alarm (TB-FA) 1.00 bh 0.0084 % 0.00 - - - - - -
- Monitor Module -
- Input Module -
- Output Module -
- Short circuite Isolator Module -
- Manual Call Point -
13 Kabel Feeder fire alarm dari MCF-FA s/d JB-FA Lantai 1 32.00 m' 0.0157 % 0.00 - - - - - -
14 Announciator 10 zone 1.00 unit 0.0316 % 0.00 - - - - - -
15 MC-FA 10 Zone Semi Addressable 1.00 unit 0.4559 % 0.00 - - - - - -
MCFA type semi addresssable -
Master Intercome -
Intercome Grouping -
Lighting Arester -
Power Supply -
Lead Acid Battery Rechargeable -
Sirine -
Fireman Handset -
Control Module -
VII.B Lantai 2 -
1 Instalasi ROR Heat Detector & EORL dengan kabel NYA 2 (1x1.5) mm2 23.00 titik 0.0315 % 0.00 - - - - - -
2 Instalasi Smoke detector dengan kabel NYA 2 (1x1.5) mm2 41.00 titik 0.0561 % 0.00 - - - - - -
3 Instalasi Fix detector dengan kabel NYA 2 (1x1.5) mm2 3.00 titik 0.0041 % 0.00 - - - - - -
4 Instalasi Manual Push Button dengan kabel NYA 2 (1x1.5) mm2 2.00 titik 0.0027 % 0.00 - - - - - -
5 Instalasi Alarm Bell dengan kabel NYA 2 (1x1.5) mm2 2.00 titik 0.0027 % 0.00 - - - - - -
6 Instalasi Indicating lamp dengan kabel NYA 2 (1x1.5) mm2 2.00 titik 0.0027 % 0.00 - - - - - -
7 ROR Heat Detector 16.00 bh 0.0135 % 0.00 - - - - - -
8 Smoke Detector 26.00 bh 0.0593 % 0.00 - - - - - -
9 Fix Detector 3.00 bh 0.0063 % 0.00 - - - - - -
10 Manual Push Button 2.00 bh 0.0025 % 0.00 - - - - - -
14
Volume Pekerjaan Prestasi Pekerjaan Total Total
Volume
Bobot % Volume Volume Komulatif Minggu Minggu Komulatif Presetase Rupiah Ket.
No. Uraian Pekerjaan Sat.
Kontrak Minggu Minggu Lalu Ini Sesuai Harga
Kontrak
lalu Ini % % % (%) Kontrak
11 Alarm Bell 2.00 bh 0.0039 % 0.00 - - - - - -
12 Indicating Lamp 2.00 bh 0.0013 % 0.00 - - - - - -
13 End of line resistor 2.00 bh 0.0005 % 0.00 - - - - - -
14 Terminal Box Fire Alarm (TB-FA) 1.00 bh 0.0084 % 0.00 - - - - - -
- Monitor Module -
- Input Module -
- Output Module -
- Short circuite Isolator Module -
- Manual Call Point -
15 Kabel Feeder fire alarm dari MCF-FA s/d JB-FA Lantai 2 36.00 m' 0.0177 % 0.00 - - - - - -
0.9306 % -
VIII PEKERJAAN INSTALASI TATA SUARA/ SOUND SYSTEM -
Pekerjaan Pengadaan dan pemasangan tata suara/ sound system -
lengkap dengan assesories/ alat bantu sesuai gambar dan spek teknis -
VIII.A Lantai 1 -
1 Instalasi Ceiling speaker dgn kabel NYMHY 3 x 1,5mm dlm pipa conduit PVC dia. 20 mm2 67.00 titik 0.1757 % 0.00 - - - - - -
2 Celling Speaker 3 W 40.00 bh 0.0561 % 0.00 - - - - - -
3 Volume Kontrol 26.00 bh 0.0638 % 0.00 - - - - - -
4 Sound Terminal Box uk. 30 x 20 x 20 cm 1.00 bh 0.0032 % 0.00 - - - - - -
5 Kabel Feeder sound system dari Sentral Sound System s/d STB Lt.1 46.00 m' 0.0145 % 0.00 - - - - - -
SUB TOTAL -
VIII.B Lantai 2 -
1 Instalasi Ceiling speaker dgn kabel NYMHY 3 x 1,5mm dlm pipa conduit PVC dia. 20 mm2 60.00 titik 0.1574 % 0.00 - - - - - -
2 Celling Speaker 3 W 40.00 bh 0.0561 % 0.00 - - - - - -
3 Volume Kontrol 41.00 bh 0.1006 % 0.00 - - - - - -
4 Sound Terminal Box uk. 30 x 20 x 20 cm 1.00 bh 0.0032 % 0.00 - - - - - -
Central System Sound Lengkap Terpasang : -
5 Amplifier 240 Watt 2.00 unit 0.0701 % 0.00 - - - - - -
6 Amplifier 120 Watt 1.00 unit 0.0245 % 0.00 - - - - - -
7 Emergency Amplifier 240 Watt 1.00 unit 0.0807 % 0.00 - - - - - -
8 Paging Microphone 1.00 unit 0.0070 % 0.00 - - - - - -
9 Selector Swicth 10 zone 1.00 unit 0.0316 % 0.00 - - - - - -
10 CD/VCD/DVD/MP3+ Radio tuner ZCD 2011R 1.00 unit 0.0421 % 0.00 - - - - - -
11 Mixer power amplifier 240 Watt 1.00 unit 0.0631 % 0.00 - - - - - -
12 Main Distrubution Fram (MDF) Sound System 1.00 unit 0.0365 % 0.00 - - - - - -
13 Power Surge Arester 15 KA 1.00 unit 0.0063 % 0.00 - - - - - -
14 Kabel Feeder sound system dari Sentral Sound System s/d STB Lt.1 42.00 m' 0.0127 % 0.00 - - - - - -
1.0052 % -
IX PEKERJAAN INSTALASI CCTV -
Pekerjaan Pengadaan dan pemasangan CCTV lengkap dengan -
assesories/ alat bantu sesuai gambar dan spek teknis -
IX.A Lantai 1 -
1 Instalasi CCTV dg kabel RG 59 + Power dlm pipa conduit PVC dia. 20 mm2 8.00 titik 0.0415 % 0.00 - - - - - -
2 In door Camera CCTV IR type Fixed 3.00 bh 0.0673 % 0.00 - - - - - -
3 Color Dome type camera 3.00 bh 0.0610 % 0.00 - - - - - -
4 Fitting & Supporting 1.00 ls 0.0105 % 0.00 - - - - - -
IX.B Lantai 2 -
1 Instalasi CCTV dg kabel RG 59 + Power dlm pipa conduit PVC dia. 20 mm2 8.00 titik 0.0415 % 0.00 - - - - - -
2 In door Camera CCTV IR type Fixed 1.00 bh 0.0224 % 0.00 - - - - - -
3 Color Dome type camera 3.00 bh 0.0610 % 0.00 - - - - - -
4 DVR kap 32 channel, hardisc 1 T 1.00 unit 0.1403 % 0.00 - - - - - -
5 Monitor LED 32" 1.00 unit 0.0351 % 0.00 - - - - - -
6 Power Surge Arester 15 KA 1.00 unit 0.0063 % 0.00 - - - - - -
7 Fitting & Supporting 1.00 ls 0.0105 % 0.00 - - - - - -
15
Volume Pekerjaan Prestasi Pekerjaan Total Total
Volume
Bobot % Volume Volume Komulatif Minggu Minggu Komulatif Presetase Rupiah Ket.
No. Uraian Pekerjaan Sat.
Kontrak Minggu Minggu Lalu Ini Sesuai Harga
Kontrak
lalu Ini % % % (%) Kontrak
0.4975 % -
X PEKERJAAN INSTALASI DATA INTERNET -
Pekerjaan Pengadaan dan pemasangan data komputer lengkap dengan -
assesories/ alat bantu sesuai gambar dan spek teknis -
X.A Lantai 1 -
1 Instalasi Data komputer dg kabel UTP Cath 6 dlm pipa conduit PVC dia. 20 mm2 15.00 titik 0.0505 % 0.00 - - - - - -
2 Outlet Data 15.00 bh 0.0132 % 0.00 - - - - - -
3 Switch hub 24 port 1.00 unit 0.0140 % 0.00 - - - - - -
4 Instalasi Fedeer Data komputer dari server s/d Switch Hub lantai 1 42 m' 0.0074 % 0.00 - - - - - -
5 Fitting & Supporting 1.00 ls 0.0105 % 0.00 - - - - - -
Lantai 2 -
1 Instalasi Data komputer dg kabel UTP Cath 6 dlm pipa conduit PVC dia. 20 mm2 12.00 titik 0.0404 % 0.00 - - - - - -
2 Outlet Data 12.00 bh 0.0105 % 0.00 - - - - - -
3 Switch hub 24 port 1.00 unit 0.0140 % 0.00 - - - - - -
4 Instalasi Fedeer Data komputer dari server s/d Switch Hub lantai 2 6.00 m' 0.0011 % 0.00 - - - - - -
5 Fitting & Supporting 1.00 ls 0.0105 % 0.00 - - - - - -
0.1721 % -
XI PEKERJAAN INSTALASI MATV -
Pekerjaan Pengadaan dan pemasangan MATV lengkap dengan -
assesories/ alat bantu sesuai gambar dan spek teknis -
XI.A Lantai 1 -
1 Instalasi MATV dg kabel Coaxial RG 6 dlm pipa conduit PVC dia. 20 mm2 3.00 titik 0.0042 % 0.00 - - - - - -
2 Outlet Antena TV 3.00 bh 0.0011 % 0.00 - - - - - -
3 Splitter 2 Way 1.00 bh 0.0008 % 0.00 - - - - - -
4 Indoortap 4 Way 1.00 bh 0.0014 % 0.00 - - - - - -
5 Kabel feeder coaxcial RG 11 dari Splitter s/d Indoortap 30.00 m' 0.0095 % 0.00 - - - - - -
XI.B Lantai 2 -
1 Instalasi MATV dg kabel Coaxial RG 6 dlm pipa conduit PVC dia. 20 mm2 2.00 titik 0.0063 % 0.00 - - - - - -
2 Outlet Antena TV 2.00 bh 0.0007 % 0.00 - - - - - -
3 Bracket MATV 2.00 bh 0.0070 % 0.00 - - - - - -
4 Splitter 2 Way 1.00 bh 0.0008 % 0.00 - - - - - -
5 Indoortap 4 Way 1.00 bh 0.0014 % 0.00 - - - - - -
6 Kabel feeder coaxcial RG 11 dari Splitter s/d Indoortap 36.00 m' 0.0114 % 0.00 - - - - - -
7 Kabel feeder coaxcial RG 11 dari Splitter Lt. 2 s/d Indoortap LT.1 10.00 m' 0.0032 % 0.00 - - - - - -
Peralatan utama System MATV -
8 Combiner 1.00 unit 0.0008 % 0.00 - - - - - -
9 Modulator 1.00 unit 0.0011 % 0.00 - - - - - -
10 Active Splitter 1.00 unit 0.0008 % 0.00 - - - - - -
11 Channel Amplifier 1.00 unit 0.0084 % 0.00 - - - - - -
12 VCD/ DVD Player 1.00 unit 0.0105 % 0.00 - - - - - -
13 Power Suplay 12 VDC 1.00 unit 0.0032 % 0.00 - - - - - -
14 Antenna UHF/VHF 1.00 unit 0.0042 % 0.00 - - - - - -
15 Antenna Parabola 6 Feet 1.00 unit 0.0175 % 0.00 - - - - - -
16 TV Monitor 1.00 unit 0.0351 % 0.00 - - - - - -
17 Rack Mounting 1.00 unit 0.0025 % 0.00 - - - - - -
18 Pengkabelan di Head End MATV 1.00 ls 0.0210 % 0.00 - - - - - -
0.1530 % -
XII PEKERJAAN INSTALASI NURSE CALL -
XII.A LANTAI 2 -
1 Instalasi Ceiling Sub Station cables Cath 6 dalam pipa Conduit dia. 20 mm2 23.00 titik 0.0403 % 0.00 - - - - - -
2 Instalasi Coorridor Call Light cables Cath 6 dalam pipa Conduit dia. 20 mm2 23.00 titik 0.0306 % 0.00 - - - - - -
3 Instalasi Bathroom Pullchord cables Cath 6 dalam pipa Conduit dia. 20 mm2 23.00 titik 0.0306 % 0.00 - - - - - -
4 Instalasi Call Reset Button cables Cath 6 dalam pipa Conduit dia. 20 mm2 58.00 titik 0.0773 % 0.00 - - - - - -
5 Instalasi Call Switch Bedside Jack cables Cath 6 dalam pipa Conduit dia. 20 mm2 58.00 titik 0.0773 % 0.00 - - - - - -
16
Volume Pekerjaan Prestasi Pekerjaan Total Total
Volume
Bobot % Volume Volume Komulatif Minggu Minggu Komulatif Presetase Rupiah Ket.
No. Uraian Pekerjaan Sat.
Kontrak Minggu Minggu Lalu Ini Sesuai Harga
Kontrak
lalu Ini % % % (%) Kontrak
6 Ceiling Sub Station (NBL) 23.00 bh 0.1452 % 0.00 - - - - - -
7 Coorridor Call Light 23.00 bh 0.0436 % 0.00 - - - - - -
8 Bathroom Pullchord 23.00 bh 0.1371 % 0.00 - - - - - -
9 Call Reset Button 58.00 bh 0.0895 % 0.00 - - - - - -
10 Call Switch Bedside Jack c/w Metal Jack 58.00 bh 0.2441 % 0.00 - - - - - -
11 Master Nurse Call 10 Channel 1.00 unit 0.1192 % 0.00 - - - - - -
12 Master Nurse Call 20 Channel 1.00 unit 0.1403 % 0.00 - - - - - -
13 Fitting & Supporting 1.00 ls 0.0351 % 0.00 - - - - - -
1.2102 % -
D PEKERJAAN MEKANIKAL & PLUMBING -
I PEKERJAAN RUANG POMPA -
I.A SISTEM AIR BERSIH -
Peralatan Utama Air Bersih sudah lengkap terpasang dengan Accessories -
dan material bantu sesuai dengan gambar perencanaan dan spesifikasi teknis -
1 Ground Water Tank uk. 1.00 unit 0.00 - - - - - -
2 Sumur bor kedalaman 120 meter Lengkap dengan pompa Deep weel, pemipaan 1.00 unit 0.5260 % 1.00 1.00 0.53 - 0.5260 100.00 75,000,000.00
Gip medium A 2" dari Pompa s/d Ground water tank, valve-valve, panel kontrol, -
pengkabelan WLC , accecories, Perijinan dan material bantu. -
Spesifikasi Pompa Deep Weel -
-Flow : 14 m3/ Hari -
-Head : 100 meter -
-Power (KW) : 5.5 KW -
-pengkabelan dari panel kontrol s/d unit pompa -
-
3 Pompa Transfer 2.00 unit 0.2385 % 0.00 - - - - - -
-Flow : 200 lite / menit -
-Head : 60 meter -
-Material Pump : CI, Cassing bronze -
-pengkabelan dari panel kontrol s/d unit pompa -
-
4 Centrifugal pump 2.00 unit 0.2525 % 0.00 - - - - - -
-1 Set terdiri dari 2 Pompa c/w Acessories, automatic alternate running system -
-Kapasitas : 2 x (16m3/jam/pompa) -
-Total Head : 60 m -
-Putaran : 1500 rpm - 2.900 rpm -
-Daya Motor : 2 x 5 KW -
-Data Listrik : 380 V/3 Ph/50 Hz -
-Operasi : Automatic Alternate, up and bottom WLC -
-Jenis : Vertical Multistage pump -
-Kelengkapan : Valve, WLC, Panel Control -
-Lokasi : Pump Room -
-pengkabelan dari panel kontrol s/d unit pompa -
-
5 Dosing Pump 1.00 unit 0.0526 % 0.00 - - - - - -
-1 Set c/w Acessories dan panel kontrol -
-Kapasitas : 75 liter per menit -
-Total Head : 20 m -
-Putaran : 1500 rpm - 2.900 rpm -
-Daya Motor : 0,48 KW -
-Data Listrik : 380 V/3 Ph/50 Hz -
-Operasi : Water Level Control -
-Kelengkapan : Valve, Panel Control -
-Lokasi : Pump Room -
-pengkabelan dari panel kontrol s/d unit pompa -
17
Volume Pekerjaan Prestasi Pekerjaan Total Total
Volume
Bobot % Volume Volume Komulatif Minggu Minggu Komulatif Presetase Rupiah Ket.
No. Uraian Pekerjaan Sat.
Kontrak Minggu Minggu Lalu Ini Sesuai Harga
Kontrak
lalu Ini % % % (%) Kontrak
-
6 Sand Filter 1.00 unit 0.0175 % 0.00 - - - - - -
-Material Of Contruction : FRP Line Mild Steel -
-Dimensi : 1370 mm x 1500mm -
-Filter Media : Silica Sand -
-Silica Gravel : Silica Gravel -
-Operating Pressure : 6 Bar Max -
-Kapacity : 15 m³/jam -
-Pipa Connection : 2.5 " -
-Backwash system : Manual -
-Standart Accessories : 1 handhole -
1 manhole -
1 air vent -
2 Pressure Guages -
5 Ball valve -
-
7 CARBON FILTER 1.00 unit 0.0175 % 0.00 - - - - - -
-Merk : SETARA AQUAPURE -
-Type : ACF 54 -
-Material Of Contruction : FRP Line Mild Steel -
-Dimensi : 1370 mm x 1800mm -
-Filter Media : Activated Carbon Glanular -
-Silica Gravel : Silica Gravel -
-Operating Pressure : 4 Bar Max -
-Kapacity : 30 m³/jam -
-Pipa Connection : 2.5 " -
-Backwash system : Manual -
-Standart Accessories : 1 handhole -
1 mandhole -
1 air vent -
2 Pressure Guages -
5 Ball valve -
8 Memasang Gate Valve 10 K Drat dia. 1 1/4" 2.00 bh 0.0351 % 0.00 - - - - - -
9 Memasang Gate Valve dia. 2" 4.00 bh 0.0140 % 0.00 - - - - - -
10 Memasang Check Valve dia. 11/4" 2.00 bh 0.0042 % 0.00 - - - - - -
11 Memasang Foot Valve dia. 11/4" 2.00 bh 0.0070 % 0.00 - - - - - -
12 Memasang Flexible Joint dia. 11/4" 4.00 bh 0.0056 % 0.00 - - - - - -
13 Memasang Pipa PPR PN 10 dia. 1" 14.00 m' 0.0029 % 0.00 - - - - - -
14 Memasang Pipa PPR PN 10 dia. 1 1/4" 12.00 m' 0.0042 % 0.00 - - - - - -
15 Memasang Pipa PPR PN 10 dia. 1 1/4" Supplay dari Pump Room s/d Rofftank 92.00 m' 0.0323 % 0.00 - - - - - -
16 Memasang Header 4" 1.00 unit 0.0161 % 0.00 - - - - - -
17 Memasang Pressure Gauge 4.00 bh 0.0140 % 0.00 - - - - - -
18 Memasang Pressure Switch 2.00 bh 0.0168 % 0.00 - - - - - -
19 Memasang Automatic Air Vant 25 GV 1.00 bh 0.0025 % 0.00 - - - - - -
20 Fitting + Supporting 1.00 ls 0.0105 % 0.00 - - - - - -
21 Perijinan, Testing dan Commissioning 1.00 ls 0.0351 % 0.00 - - - - - -
1.3050 % -
II PEKERJAAN INSTALASI AIR KOTOR/ BEKAS DAN VENT CUP -
Pekerjaan Pengadaan dan pemasangan Instalasi air kotor/bekas dan vent -
lengkap dengan assesories/ alat bantu sesuai gambar dan spek teknis -
II.A Lantai 1 -
1 Memasang Pipa PVC dia. 6" kelas AW 178.00 m' 0.2310 % 0.00 - - - - - -
2 Memasang Pipa PVC dia. 4'' kelas AW 203.00 m' 0.1281 % 0.00 - - - - - -
3 Memasang Pipa PVC dia. 3'' kelas AW 12.00 m' 0.0050 % 0.00 - - - - - -
18
Volume Pekerjaan Prestasi Pekerjaan Total Total
Volume
Bobot % Volume Volume Komulatif Minggu Minggu Komulatif Presetase Rupiah Ket.
No. Uraian Pekerjaan Sat.
Kontrak Minggu Minggu Lalu Ini Sesuai Harga
Kontrak
lalu Ini % % % (%) Kontrak
4 Memasang Pipa PVC dia. 2'' kelas AW 112.00 m' 0.0275 % 0.00 - - - - - -
5 Memasang Pipa PVC dia. 1 1/4'' kelas AW 62.00 m' 0.0104 % 0.00 - - - - - -
6 Memasang Clean Out dia. 6'' 4.00 m' 0.0056 % 0.00 - - - - - -
7 Resapan 2.00 Unit 0.0701 % 0.00 - - - - - -
8 IPAL BIOSERIES Kap. 40 m3 / hari 1.00 Unit 2.4548 % 0.00 - - - - - -
Lengkap dengan : -
- Bak Screening & and Screnn type Raill Saff & Finne Bascrin/ Stainlees steel -
- Air Blow dan Accessories -
- Air Seal Diffuser type Coarse Bubble -
- Media Aeration, 100 % Udara Constant -
- Air Lift Pump Sistem Kap. 12.5 m3/ hours Slude Active -
- Skum Skimmer -
- Equalizink Pump& Effluent Pump -
- Control Panel -
- Basket Screen -
- Material Bantu dan Assesories -
9 Fitting + Supporting termasuk hanger dan u-trap 1.00 ls 0.0245 % 0.00 - - - - - -
II.B Lantai 2 -
1 Memasang Pipa PVC dia. 4'' kelas AW 92.00 m' 0.0581 % 0.00 - - - - - -
2 Memasang Pipa PVC dia. 3'' kelas AW 32.00 m' 0.0135 % 0.00 - - - - - -
3 Memasang Pipa PVC dia. 2'' kelas AW 100.00 m' 0.0245 % 0.00 - - - - - -
4 Memasang Pipa PVC dia. 1 1/4'' kelas AW 151.00 m' 0.0254 % 0.00 - - - - - -
5 Memasang Clean Out dia. 4'' 18.00 m' 0.0252 % 0.00 - - - - - -
6 Memasang Clean Out dia. 3'' 1.00 m' 0.0013 % 0.00 - - - - - -
7 Memasang Clean Out dia. 2'' 14.00 m' 0.0157 % 0.00 - - - - - -
8 Fitting + Supporting termasuk hanger dan u-trap 1.00 ls 0.0105 % 0.00 - - - - - -
II.C Pipa Riser -
1 Memasang Pipa PVC dia. 4'' kelas AW 205.00 m' 0.1294 % 0.00 - - - - - -
2 Memasang Pipa PVC dia. 2'' kelas AW 105.00 m' 0.0258 % 0.00 - - - - - -
3 Fitting + Supporting termasuk hanger dan u-trap 1.00 ls 0.0105 % 0.00 - - - - - -
III PEKERJAAN INSTALASI AIR BERSIH DINGIN 3.2971 % -
Pekerjaan Pengadaan dan pemasangan instalasi air bersih lengkap dengan -
assesories/ alat bantu sesuai gambar dan spek teknis -
III.A Lantai 1 -
1 Memasang Pipa PPR PN 10 dia. 1 1/4" 85.00 m' 0.0388 % 0.00 - - - - - -
2 Memasang Pipa PPR PN 10 dia. 1" 55.00 m' 0.0162 % 0.00 - - - - - -
3 Memasang Pipa PPR PN 10 dia. 3/4" 263.00 m' 0.0461 % 0.00 - - - - - -
4 Memasang Gate Valve dia. 1 1/4" 2.00 bh 0.0045 % 0.00 - - - - - -
5 Memasang Gate Valve dia. 1" 3.00 bh 0.0059 % 0.00 - - - - - -
6 Memasang Gate Valve dia. 3/4" 10.00 bh 0.0088 % 0.00 - - - - - -
7 Fitting + Supporting termasuk hanger 1.00 ls 0.0105 % 0.00 - - - - - -
III.B Lantai 2 -
1 Memasang Pipa PPR PN 10 dia. 1" 67.00 m' 0.0305 % 0.00 - - - - - -
2 Memasang Pipa PPR PN 10 dia. 3/4" 415.00 m' 0.1222 % 0.00 - - - - - -
3 Memasang Gate Valve dia. 1" 2.00 bh 0.0004 % 0.00 - - - - - -
4 Memasang Gate Valve dia. 3/4" 27.00 bh 0.0237 % 0.00 - - - - - -
5 Fitting + Supporting termasuk hanger 1.00 ls 0.0105 % 0.00 - - - - - -
III.C Lantai Atap -
1 Memasang Rooftank FRP kap 8 m3 1.00 unit 0.1052 % 0.00 - - - - - -
2 Memasang AAV 2.00 bh 0.0063 % 0.00 - - - - - -
3 Memasang Paket Pompa Booster Kap. 5 m3/ hari lengkap dg Panel Inverter 1.00 unit 0.0842 % 0.00 - - - - - -
Spesifikasi Pompa Boster -
Flow : 100 lite / menit -
Head : 40 meter -
19
Volume Pekerjaan Prestasi Pekerjaan Total Total
Volume
Bobot % Volume Volume Komulatif Minggu Minggu Komulatif Presetase Rupiah Ket.
No. Uraian Pekerjaan Sat.
Kontrak Minggu Minggu Lalu Ini Sesuai Harga
Kontrak
lalu Ini % % % (%) Kontrak
Material Pump : CI, Cassing bronze-impeler, SS 403-shaft -
operation ; Pararel alternativ (2 Pump running in 2 pump system) -
Elektrikal power : 2 x 1.1 KW/ 380/ 3PH/ 50 HZ/ 3000 rpm, Mfr : WEG or TECO -
C/W : Baseframe, Coupling Guard, Control Panel + VSD, -
Pressure Switch, Pressure Tank -
Pengkabelan dari panel kontrol s/d unit pompa -
-
4 Memasang Gate Valve dia. 4" 4.00 bh 0.0982 % 0.00 - - - - - -
5 Memasang Gate Valve dia. 2" 6.00 unit 0.0210 % 0.00 - - - - - -
6 Memasang Header 4" 2.00 unit 0.0603 % 0.00 - - - - - -
7 Fitting + Supporting termasuk hanger 1.00 ls 0.0105 % 0.00 - - - -
III.D Riser
1 Memasang Pipa PPR PN 10 dia. 2" 51.00 m' 0.0125 % 0.00 - - - - - -
2 Fitting + Supporting termasuk hanger 1.00 ls 0.0105 % 0.00 - - - - - -
0.7269 % -
IV PEKERJAAN INSTALASI AIR HUJAN -
Pekerjaan Pengadaan dan pemasangan instalasi air hujan lengkap dengan -
assesories/ alat bantu sesuai gambar dan spek teknis -
1 Memasang Roofdrain dia. 4" 37.00 bh 0.0324 % 0.00 - - - - - -
2 Memasang Pipa PVC dia. 4'' kelas AW 728.00 m' 0.4595 % 0.00 - - - - - -
3 Bak Kontrol Air Hujan 29.00 unit 0.0814 % 0.00 - - - - - -
4 Sumur Peresapan Air Hujan (SPAH) 15.00 unit 0.3156 % 0.00 - - - - - -
5 Aquacell system uk. 4 x 4 m2 3.00 unit 0.0631 % 0.00 - - - - - -
6 Fitting dan assesories termasuk hanger 1.00 ls 0.0175 % 0.00 - - - - - -
0.9696 % -
V PEKERJAAN FIRE EXTINGUISHER -
Pekerjaan Pengadaan dan pemasangan Portable Fire Extinguisher lengkap dengan -
assesories/ alat bantu sesuai gambar dan spek teknis -
V.A Lantai 1 -
1 Memasang Portable Fire Extinguisher type ABC 3.5 kg 7.00 unit 0.0736 % 0.00 - - - - - -
terpasang dengan bracket -
V.B Lantai 2 -
1 Memasang Portable Fire Extinguisher type ABC 3.5 kg 6.00 unit 0.0631 % 0.00 - - - - - -
terpasang dengan bracket -
0.1368 % -
VI PEKERJAAN INSTALASI PENGKONDISIAN UDARA -
Pekerjaan Pengadaan dan pemasangan instalasi pengkondisian udara lengkap -
dengan assesories/ alat bantu sesuai gambar dan spek teknis -
VI.A Lantai 1 -
1 Instalasi Power AC 3 phase dg Kabel NYM 4 x 4 mm dlm Pipa Conduit dia. 20 mm2 1.00 titik 0.0063 % 0.00 - - - - - -
2 Instalasi Power AC 1 phase dg Kabel NYM 3 x 2.5 mm dlm Pipa Conduit dia. 20 mm2 27.00 titik 0.0947 % 0.00 - - - - - -
3 Kabel Power Kontrol NYM 4 x 2.5 mm2 dari Indoor s/d Outdoor unit 1.00 m' 0.0002 % 0.00 - - - - - -
4 Kabel Power Kontrol NYM 3 x 2.5 mm2 dari Indoor s/d Outdoor unit 128.00 m' 0.0135 % 0.00 - - - - - -
5 Air Conditioner Ceiling Casette 36.000 Btu/h - Unit - % 0.00 - - -
6 Air Conditioner Split Wall 18.000 Btu/h 1.00 Unit 0.0456 % 0.00 - - - - - -
7 Air Conditioner Split Wall 12.000 Btu/h 4.00 Unit 0.1403 % 0.00 - - - - - -
8 Air Conditioner Split Wall 9.000 Btu/h 2.00 Unit 0.0631 % 0.00 - - - - - -
9 Air Conditioner Split Wall 7.000 Btu/h 4.00 Unit 0.1122 % 0.00 - - - - - -
10 Air Conditioner Split Wall 5.000 Btu/h 4.00 Unit 0.0982 % 0.00 - - - - - -
11 Pipa Refrigerant uk. 5/8" dan 3/8" lengkap terpasang dgn armaplek 10.00 m' 0.0088 % 0.00 - - - - - -
12 Pipa Refrigerant uk. 1/2" dan 1/4" lengkap terpasang dgn armaplek 82.00 m' 0.0518 % 0.00 - - - - - -
13 Pipa Refrigerant uk. 3/8" dan 1/4" lengkap terpasang dgn armaplek 163.00 m' 0.0857 % 0.00 - - - - - -
14 Memasang Pipa PVC dia. 3/4'' kelas AW 177.00 m' 0.0348 % 0.00 - - - - - -
15 Fitting + Supporting dan material bantu 1.00 ls 0.0105 % 0.00 - - - - - -
20
Volume Pekerjaan Prestasi Pekerjaan Total Total
Volume
Bobot % Volume Volume Komulatif Minggu Minggu Komulatif Presetase Rupiah Ket.
No. Uraian Pekerjaan Sat.
Kontrak Minggu Minggu Lalu Ini Sesuai Harga
Kontrak
lalu Ini % % % (%) Kontrak
VI.B IPRS -
1 Instalasi Power AC 1 phase dg Kabel NYM 3 x 2.5 mm dlm Pipa Conduit dia. 20 mm2 3.00 titik 0.0082 % 0.00 - - - - - -
2 Kabel Power Kontrol NYM 3 x 2.5 mm2 dari Indoor s/d Outdoor unit 12.00 m1 0.0328 % 0.00 - - - - - -
3 Air Conditioner Split Wall 12.000 Btu/h 2.00 Unit 0.0701 % 0.00 - - - - - -
4 Air Conditioner Split Wall 7.000 Btu/h 1.00 Unit 0.0281 % 0.00 - - - - - -
5 Pipa Refrigerant uk. 1/2" dan 1/4" lengkap terpasang dgn armaplek 8.00 m1 0.0050 % 0.00 - - - - - -
6 Pipa Refrigerant uk. 3/8" dan 1/4" lengkap terpasang dgn armaplek 3.00 m1 0.0016 % 0.00 - - - - - -
7 Memasang Pipa PVC dia. 3/4'' kelas AW U/ Drain 15.00 m1 0.0029 % 0.00 - - - - - -
8 Fitting + Supporting dan material bantu 1.00 ls 0.0105 % 0.00 - - - - - -
VI.C Ruang Operasi -
1 Instalasi Power AC 1 phase dg Kabel NYM 3 x 2.5 mm dlm Pipa Conduit dia. 20 mm2 6.00 titik 0.0164 % 0.00 - - - - - -
2 Kabel Power Kontrol NYM 3 x 2.5 mm2 dari Indoor s/d Outdoor unit 42.00 m' 0.1149 % 0.00 - - - - - -
3 Air Conditioner Split Wall 18.000 Btu/h 1.00 Unit 0.0456 % 0.00 - - - - - -
4 Air Conditioner Split Wall 12.000 Btu/h 1.00 Unit 0.0351 % 0.00 - - - - - -
5 Air Conditioner Split Wall 9.000 Btu/h - Unit - % 0.00 - - - -
6 Air Conditioner Split Wall 5.000 Btu/h 1.00 Unit 0.0245 % 0.00 - - - - - -
7 Pipa Refrigerant uk. 1/2" dan 1/4" lengkap terpasang dgn armaplek 22.00 m' 0.0139 % 0.00 - - - - - -
8 Pipa Refrigerant uk. 3/8" dan 1/4" lengkap terpasang dgn armaplek 21.00 m' 0.0110 % 0.00 - - - - - -
9 Fitting + Supporting dan material bantu 1.00 ls 0.0105 % 0.00 - - - - - -
10 Air Conditioner 90.000 Btuh R.Operasi 2.00 unit 0.6312 % 0.00 - - - - - -
Lengkap dengan :
Equipment
1. Unit AC
Kapasitas : 90.000 Btu/h
2. Boster Fan 4550 cfm static pressure 3,5
Instalasi lengkap dengan
Pemipaan
- Pipa Refrigerant c/w isolasi & fittings
- Pipa Drain c/w isolasi
- Filter Driyer & Sigh glass
Pekerjaan Ducting bahan Pre insulated duct
aluminium tebal 20 mm dencity 50 - 55 kg/m3
Diffuser 750 CFM
RAG 1250 CFM
EAG 600 CFM
FAG 600 CFM
Volume Damper
Exhaust fan 500 cfm
Pekerjaan Filter
- Pre FILTER
- Medium FILTER
- HEPA FILTER klas 10.000
- Housing FILTER
Pekerjaan Electrical
- Kabel Power NYY
- Kabel Kontrol NYYHY
- Pekerjaan Lain - Lain
- Hanger & Support Unit
VI.D Ruang Isolasi
1 Instalasi Power AC 1 phase dg Kabel NYM 3 x 2.5 mm dlm Pipa Conduit dia. 20 mm2 2.00 titik 0.0055 % 0.00 - - - - - -
2 Kabel Power Kontrol NYM 3 x 2.5 mm2 dari Indoor s/d Outdoor unit 12.00 m' 0.0328 % 0.00 - - - - - -
3 Air Conditioner Ceiling Duct 9.000 Btu/h 2.00 Unit 0.0631 % 0.00 - - - - - -
4 Exshaust Fan 320 CFM 1.00 set 0.0032 % 0.00 - - - - - -
5 Pipa Refrigerant uk. 3/8" dan 1/4" lengkap terpasang dgn armaplek 15.00 m' 0.0079 % 0.00 - - - - - -
21
Volume Pekerjaan Prestasi Pekerjaan Total Total
Volume
Bobot % Volume Volume Komulatif Minggu Minggu Komulatif Presetase Rupiah Ket.
No. Uraian Pekerjaan Sat.
Kontrak Minggu Minggu Lalu Ini Sesuai Harga
Kontrak
lalu Ini % % % (%) Kontrak
6 Memasang Pipa PVC dia. 3/4'' kelas AW U/ Drain 15.00 m' 0.0029 % 0.00 - - - - - -
7 Round ducting Bjls 5" 15.00 m' 0.0158 % 0.00 - - - - - -
8 Round ducting Bjls 6" 13.00 m' 0.0146 % 0.00 - - - - - -
9 SAG 300 x 200 mm / 250 cfm 1.00 bh 0.0046 % 0.00 - - - - - -
10 SAD 250 x 250 mm / 250 cfm 1.00 bh 0.0039 % 0.00 - - - - - -
11 EAG 300 x 300 mm / 320 cfm 1.00 bh 0.0053 % 0.00 - - - - - -
12 Plenum Box uk. 300 x 300 mm 1.00 bh 0.0042 % 0.00 - - - - - -
13 Plenum Box uk. 250 x 250 mm 1.00 bh 0.0035 % 0.00 - - - - - -
14 Plenum Box uk. 300 x 200 mm 1.00 bh 0.0032 % 0.00 - - - - - -
15 Volume Damper 5" 2.00 bh 0.0056 % 0.00 - - - - - -
16 Volume Damper 6" 1.00 bh 0.0035 % 0.00 - - - - - -
17 Housing Medium Filter 1.00 m2 0.0053 % 0.00 - - - - - -
18 Housing Pre filter 1.00 m2 0.0018 % 0.00 - - - - - -
19 Housing Hepa Filter 1.00 m2 0.0025 % 0.00 - - - - - -
20 Pre Filter 35% Arrestance Efficiency 1.00 unit 0.0025 % 0.00 - - - - - -
21 Medium Filter 95% Arrestance Efficiency 1.00 unit 0.0032 % 0.00 - - - - - -
22 Housing Hepa Filter 99.97 %, 0.3 µm 1.00 unit 0.0105 % 0.00 - - - - - -
23 Fitting + Supporting dan material bantu 1.00 ls % 0.00 - - - - - -
VI.E Lantai 2 -
1 Instalasi Power AC 3 phase dg Kabel NYM 4 x 4 mm dlm Pipa Conduit dia. 20 mm2 1.00 titik 0.0046 % 0.00 - - - - - -
2 Instalasi Power AC 1 phase dg Kabel NYM 3 x 2.5 mm dlm Pipa Conduit dia. 20 mm2 30.00 titik 0.1052 % 0.00 - - - - - -
3 Kabel Power Kontrol NYM 4 x 2.5 mm2 dari Indoor s/d Outdoor unit 9.00 m1 0.0410 % 0.00 - - - - - -
4 Kabel Power Kontrol NYM 3 x 2.5 mm2 dari Indoor s/d Outdoor unit 120.00 m1 0.4208 % 0.00 - - - - - -
5 Air Conditioner Ceiling Casette 27.000 Btu/h - Unit % 0.00 - - -
6 Air Conditioner Split Wall 12.000 Btu/h 6.00 Unit 0.2104 % 0.00 - - - - - -
7 Air Conditioner Split Wall 9.000 Btu/h 3.00 Unit 0.0947 % 0.00 - - - - - -
8 Air Conditioner Split Wall 7.000 Btu/h 2.00 Unit 0.0561 % 0.00 - - - - - -
9 Air Conditioner Split Wall 5.000 Btu/h 3.00 Unit 0.0736 % 0.00 - - - - - -
10 Pipa Refrigerant uk. 5/8" dan 3/8" lengkap terpasang dgn armaplek 10.00 m1 0.0088 % 0.00 - - - - - -
11 Pipa Refrigerant uk. 1/2" dan 1/4" lengkap terpasang dgn armaplek 99.00 m1 0.0625 % 0.00 - - - - - -
12 Pipa Refrigerant uk. 3/8" dan 1/4" lengkap terpasang dgn armaplek 99.00 m1 0.0521 % 0.00 - - - - - -
13 Memasang Pipa PVC dia. 3/4'' kelas AW U/ Drain 160.00 m1 0.0314 % 0.00 - - - - - -
14 Fitting + Supporting dan material bantu 1.00 ls 0.0105 % 0.00 - - - - - -
VI.F Exshaust FAN -
Lantai 1 + IPRS -
1 Instalasi Exshaust FAN 14 W dg kabel NYM 2 x 2.5 mm2 dlm Pipa Conduit dia. 20 mm2 9.00 titik 0.0158 % 0.00 - - - - - -
2 Memasang Exshaust FAN 14 W 9.00 bh 0.0221 % 0.00 - - - - - -
VI.G Ruang Operasi -
1 Instalasi Exshaust FAN 14 W dg kabel NYM 2 x 2.5 mm2 dlm Pipa Conduit dia. 20 mm2 2.00 titik 0.0035 % 0.00 - - - - - -
2 Memasang Exshaust FAN 14 W 2.00 bh 0.0049 % 0.00 - - - - - -
VI.H R. ICU -
1 Instalasi Exshaust FAN 14 W dg kabel NYM 2 x 2.5 mm2 dlm Pipa Conduit dia. 20 mm2 1.00 titik 0.0018 % 0.00 - - - - - -
2 Memasang Exshaust FAN 14 W 1.00 bh 0.0025 % 0.00 - - - - - -
VI.I Lantai 2 -
1 Instalasi Exshaust FAN 14 W dg kabel NYM 2 x 2.5 mm2 dlm Pipa Conduit dia. 20 mm2 29.00 titik 0.0508 % 0.00 - - - - - -
2 Memasang Exshaust FAN 14 W 15.00 bh 0.0368 % 0.00 - - - - - -
3.3430 % -
VII PEKERJAAN INSTALASI GAS MEDIS -
Pekerjaan Pengadaan dan pemasangan instalasi gas medis lengkap -
dengan assesories/ alat bantu sesuai gambar dan spek teknis -
VII.A SENTRAL GAS MEDIS -
1 Sentral Oksigen ( O2 ) 1.00 unit 0.0351 % 0.00 - - - - - -
Type : Digital Automatic System, tanpa Cylinder kap. 2 x 5 -
terdiri dari : -
22
Volume Pekerjaan Prestasi Pekerjaan Total Total
Volume
Bobot % Volume Volume Komulatif Minggu Minggu Komulatif Presetase Rupiah Ket.
No. Uraian Pekerjaan Sat.
Kontrak Minggu Minggu Lalu Ini Sesuai Harga
Kontrak
lalu Ini % % % (%) Kontrak
- Digital Automatic Change Over TRI-TECH -
- Header Manifold -
- Stand Bracket untuk manifold dan silinder -
- Lead Cooper -
- Main valve -
2 Sentral Nitrous Oxyde 1.00 unit 0.0351 % 0.00 - - - - - -
Type : Digital Automatic System -
terdiri dari : -
- Digital Automatic Change Over TRI-TECH -
- Header Manifold -
- Stand Bracket untuk manifold dan silinder -
- Lead Cooper -
- Main valve -
3 Central Vacuum Pump " Duplex System " 1.00 unit 0.0631 % 0.00 - - - - - -
Type : Oil Lubricated Vacuum pump BECKER-Germany : 1 unit -
- Motor 1,5 KW 3 Phase, 380 V, 50 Hz -
- Capacity 41 m3 / jam -
- Vacuum 3 mbar abs -
- Vacuum filter -
- Model FM 110 -
- Control panel Automatic & manual Operation -
- Fitting , supporting dan asesoris lainya -
4 Central Compressor Air " Simplex " 1.00 unit 0.0842 % 0.00 - - - - - -
- Oil Free Reciprocating Compressor kap. 240 lpm -
2,2 KW / 3 Phase / 380 V / 50 Hz -
- Air Driyer c/w after cooler -
- Pre Filter : FTS - 008, 1 micron -
- After Filter : FTX - 008, 0,01 micron -
- Carbon Filter : FTZ - 008, 0,01 micron -
- Air regulator -
- Automatic Control panel -
- Fitting , supporting dan asesoris lainya -
5 Medical Gas Alarm 4.00 unit 0.0421 % 0.00 - - - - - -
VII.B LANTAI 1 -
1 Memasang Pipa cooper tube dia. 5/8" 386.00 m' 0.2707 % 0.00 - - - - - -
2 Memasang Pipa cooper tube dia. 3/8" 245.00 m' 0.0945 % 0.00 - - - - - -
3 Memasang Outlet Oxygent 14.00 bh 0.1473 % 0.00 - - - - - -
4 Memasang Outlet Vacum (suction) 14.00 bh 0.1473 % 0.00 - - - - - -
5 Memasang Outlet Compressede Air 2.00 bh 0.0210 % 0.00 - - - - - -
6 Memasang Outlet Nitrous Oxide 2.00 bh 0.0210 % 0.00 - - - - - -
7 Memasang Zone Valve (2 line gas) 1.00 Unit 0.0105 % 0.00 - - - - - -
8 Memasang Box Alarm (2 line gas) 1.00 Unit 0.0245 % 0.00 - - - - - -
9 Memasang Zone Valve (4 line gas) 1.00 Unit 0.0245 % 0.00 - - - - - -
10 Memasang Box Alarm (4 line gas) 1.00 Unit 0.0316 % 0.00 - - - - - -
11 Fitting dan assesories 1.00 ls 0.0245 % 0.00 - - - - - -
VII.C LANTAI 2 -
1 Memasang Pipa cooper tube dia. 7/8" 121.00 m' 0.1018 % 0.00 - - - - - -
2 Memasang Pipa cooper tube dia. 5/8" 498.00 m' 0.3493 % 0.00 - - - - - -
3 Memasang Pipa cooper tube dia. 3/8" 669.00 m' 0.2581 % 0.00 - - - - - -
4 Memasang Outlet Oxygent 60.00 bh 0.6312 % 0.00 - - - - - -
5 Memasang Outlet Vacum (suction) 60.00 bh 0.6312 % 0.00 - - - - - -
6 Memasang Zone Valve (2 line gas) 2.00 Unit 0.0210 % 0.00 - - - - - -
7 Memasang Box Alarm (2 line gas) 2.00 Unit 0.0491 % 0.00 - - - - - -
8 Fitting dan assesories 1.00 ls 0.0245 % 0.00 - - - - - -
23
Volume Pekerjaan Prestasi Pekerjaan Total Total
Volume
Bobot % Volume Volume Komulatif Minggu Minggu Komulatif Presetase Rupiah Ket.
No. Uraian Pekerjaan Sat.
Kontrak Minggu Minggu Lalu Ini Sesuai Harga
Kontrak
lalu Ini % % % (%) Kontrak
VII.D RISER -
1 Memasang Pipa cooper tube dia. 1" 34.00 m' 0.0417 % 0.00 - - - - - -
2 Fitting dan assesories termasuk hanger 1.00 ls 0.0025 % 0.00 - - - - - -
3.1876 % -
E UNIT PENUNJANG -
E.1 UNIT POWER HOUSE -
I PEKERJAAN SIPIL POWER HOUSE -
I.A PEKERJAAN STRUKTUR BAWAH -
1 Galian Tanah 37.38 m3 0.0157 % 15.52 15.52 0.01 - 0.0065 41.52 931,200.00
2 Urugan Tanah Kembali 13.08 m3 0.0018 % 54.44 54.44 0.01 - 0.0076 416.22 1,088,818.50
3 Urugan Pasir Bawah Lantai Tb = 7 Cm 10.08 m3 0.0177 % 10.08 10.08 0.02 - 0.0177 100.00 2,520,000.00
4 Urugan Pasir Bawah Sloof, Footplat, Pondasi Batu Kali Tb = 5 Cm 3.92 m3 0.0069 % 0.00 - - - - - -
5 Lantai Kerja Bawah Footplate Tb = 10 cm 0.71 m3 0.0025 % 0.25 0.25 0.00 - 0.0009 35.49 126,000.00
6 Pekerjaan Pondasi Beton Footplate -
- Footplate 60 x 60 x 30 Cm 0.97 m3 0.0238 % 2.10 2.10 0.05 - 0.0515 216.49 7,350,000.00
- Footplate 170 x 50 x 35 Cm 0.30 m3 0.0074 % 0.00 - - - - - -
- Pondasi Ganset 4.05 m3 0.0994 % 1.87 1.87 0.05 - 0.0460 46.22 6,552,000.00
7 Pekerjaan Pengeboran Stouss Dia. 25 35.00 m' 0.0368 % 0.00 - - - - - -
8 Pekerjaan Beton Strous Dia. 25 1.72 m3 0.0422 % 0.00 - - - - - -
9 Pas. Batu Kali 1 Pc : 6 Ps 29.21 m3 0.1537 % 23.28 23.28 0.12 - 0.1225 79.70 17,460,000.00
10 Pas. Aanstampeng 12.30 m3 0.0388 % 0.00 - - - - - -
I.B PEKERJAAN STRUKTUR ATAS -
1 Rabat Beton Tb = 10 cm 14.40 m3 0.0505 % 5.46 5.46 0.02 - 0.0192 37.94 2,732,000.00
2 Beton Sloof -
- TOC. - 0.10 -
- Sloof 15/30 cm ( S2 ) 3.80 m3 0.1199 % 2.91 2.91 0.09 - 0.0918 76.58 13,095,000.00
3 Beton Kolom -
- BOC. - 0.10 -
- Kolom 20x30 Cm (K3) 2.70 m3 0.0852 % 1.89 1.89 0.06 - 0.0597 70.00 8,505,000.00
- Kolom 10x15 Cm (Kp) 1.45 m3 0.0458 % 1.19 1.19 0.04 - 0.0377 82.41 5,377,050.00
4 Beton Balok -
- TOC +2.50 -
- Balok Latai 11/15 cm ( B5 ) 0.56 m3 0.0177 % 0.00 - - - - - -
5 Beton Plat -
- TOC +3.00 -
- Beton Plat Atap T=8 cm 1.65 m3 0.0521 % 1.14 1.14 0.04 - 0.0360 69.05 5,127,300.00
6 Waterprofing Coating 17.33 m2 0.0134 % 14.85 14.85 0.01 - 0.0115 85.69 1,633,500.00
I.C PEKERJAAN ATAP -
1 Pasang Penutup Atap Galvalum 162.50 m2 0.0969 % 164.75 164.75 0.10 - 0.0982 101.38 14,003,750.00
2 Pas. Kuda2 + Reng Usuk Baja Ringan Tb = 0,75 mm 162.50 m2 0.1254 % 164.75 164.75 0.13 - 0.1271 101.38 18,122,500.00
3 Pas. Alumunium Foil (Double Side) 162.50 m2 0.0285 % 139.75 139.75 0.02 - 0.0245 86.00 3,493,750.00
4 Pasang Listplang Grc T = 9 mm, Lebar 20 Cm (Rangkap) 51.00 m2 0.0089 % 51.36 51.36 0.01 - 0.0090 100.71 1,284,000.00
5 Cat Listplank 30.60 m2 0.0075 % 0.00 - - - - - -
1.0984 % -
II PEKERJAAN ARSITEKTUR -
II.A PEKERJAAN PASANGAN -
1 Pasangan dinding 1/2 bata ad. 1 : 3 15.53 m2 0.0087 % 0.00 - - - - - -
2 Pasangan dinding 1/2 bata ad. 1 : 4 134.35 m2 0.0754 % 220.62 220.62 0.12 - 0.1238 164.21 17,649,440.00
II.B PEKERJAAN KUSEN PINTU DAN JENDELA -
1 Pekerjaan Kusen Pintu -
- Pasang Pintu Type 1 (P1) 3.00 unit 0.0526 % 0.00 - - - - - -
- Pasang Pintu Type 2 (P2) 1.00 unit 0.0175 % 0.00 - - - - - -
-
2 Pekerjaan Kusen Jendela -
24
Volume Pekerjaan Prestasi Pekerjaan Total Total
Volume
Bobot % Volume Volume Komulatif Minggu Minggu Komulatif Presetase Rupiah Ket.
No. Uraian Pekerjaan Sat.
Kontrak Minggu Minggu Lalu Ini Sesuai Harga
Kontrak
lalu Ini % % % (%) Kontrak
- Pasang Jendela Type 1 (J1) 12.00 unit 0.0547 % 0.00 - - - - - -
II.C PEKERJAAN PLESTERAN -
1 Plesteran dinding ad. 1 : 3 31.06 m2 0.0131 % 0.00 - - - - - -
2 Plesteran dinding ad. 1 : 4 268.70 m2 0.1131 % 340.55 340.55 0.14 - 0.1433 126.74 20,432,820.00
3 Plesteran beton ad. 1 : 3 22.50 m2 0.0103 % 31.84 31.84 0.01 - 0.0145 141.49 2,069,275.00
4 Acian 322.26 m2 0.0565 % 340.55 340.55 0.06 - 0.0597 105.67 8,513,675.00
II.D PEKERJAAN PLAFOND -
1 Plafond gypsum 9 mm + rangka Metal Furing 98.96 m2 0.0659 % 0.00 - - - - - -
2 Expose plat beton 28.66 m2 0.0131 % 0.00 - - - - - -
3 List Plafond 77.89 m' 0.0082 % 0.00 - - - - - -
II.E PEKERJAAN PENUTUP LANTAI -
1 Granite Tile 60x60 cm Type 1 (Polish) 99.65 m2 0.0874 % 0.00 - - - - - -
2 Granite Tile 60x60 cm Type 2 (Polish) 29.70 m2 0.0260 % 0.00 - - - - - -
II.F PEKERJAAN PENGECATAN -
1 Cat dinding luar watershield ICI 134.89 m2 0.0331 % 0.00 - - - - - -
2 Cat dinding dalam - emulsion Setara Vinilex 164.87 m2 0.0289 % 0.00 - - - - - -
3 Cat plafond emulsion Setara Vinilex 127.62 m2 0.0224 % 0.00 - - - - - -
0.6868 % -
E.2 UNIT POS JAGA -
I PEKERJAAN SIPIL -
I.A PEKERJAAN TANAH DAN URUGAN -
1 Galian Tanah 5.12 m3 0.0022 % 0.00 - - - - - -
2 Urugan Tanah Kembali 1.79 m3 0.0003 % 0.00 - - - - - -
3 Urugan Pasir -
- Bawah Pondasi 0.64 m3 0.0001 % 0.00 - - - - - -
4 Urugan Tanah Peninggian Elevasi 2.33 m3 0.0010 % 0.00 - - - - - -
I.B PEKERJAAN BETON -
1 Rabat Lantai Tebal 10 cm 0.47 m3 0.0020 % 0.00 - - - - - -
2 Beton Sloof -
- Sloof 15x30 cm (S1) 0.36 m3 0.0088 % 0.00 - - - - - -
3 Beton Kolom -
- Kolom 15x15 Cm (Kp) 0.27 m3 0.0066 % 0.00 - - - - - -
4 Beton Balok -
- Balok 15/30 cm (B1) 0.45 m3 0.0110 % 0.00 - - - - - -
5 Plat Canopy t : 10 cm 0.30 m3 0.0095 % 0.00 - - - - - -
I.C PEKERJAAN ATAP -
1 Pasang Penutup Atap Selulosa Bitumen Tb = 0,3 cm 6.14 m2 0.0037 % 0.00 - - - - - -
2 Pas. Kuda2 + Reng Usuk Baja Ringan Tb = 0,75 mm 6.14 m2 0.0047 % 0.00 - - - - - -
3 Pasang Listplang Grc T = 9 mm, Lebar 30 Cm 2.00 m' 0.0004 % 0.00 - - - - - -
4 Cat Listplank 0.80 m2 0.0001 % 0.00 - - - - - -
0.0503 % -
II PEKERJAAN ARSITEK -
II.A PEKERJAAN PASANGAN -
1 Pas. Aanstampeng 1.28 m3 0.0040 % 0.00 - - - - - -
2 Pas. Batu Kali 1pc : 5Ps 3.96 m3 0.0222 % 0.00 - - - - - -
3 Pasangan 1/2 Batu Bata 1 Pc : 3PS 3.36 m2 0.0020 % 0.00 - - - - - -
4 Pasangan 1/2 Batu Bata 1 Pc : 4 PS 41.04 m2 0.0230 % 0.00 - - - - - -
II.B PEKERJAAN PLESTERAN -
1 Plesteran Dinding 128.92 m2 0.0543 % 0.00 - - - - - -
2 Acian 128.92 m2 0.0226 % 0.00 - - - - - -
II.C PEKERJAAN KUSEN -
1 Pekerjaan Pasang Pintu Type 1 (P1) 1.00 unit 0.0105 % 0.00 - - - - - -
2 Pekerjaan Pasang Jendela Type 1 (J1) 1.00 unit 0.0053 % 0.00 - - - - - -
3 Pekerjaan Pasang Jendela Type 2 (J2) 1.00 unit 0.0046 % 0.00 - - - - - -
25
Volume Pekerjaan Prestasi Pekerjaan Total Total
Volume
Bobot % Volume Volume Komulatif Minggu Minggu Komulatif Presetase Rupiah Ket.
No. Uraian Pekerjaan Sat.
Kontrak Minggu Minggu Lalu Ini Sesuai Harga
Kontrak
lalu Ini % % % (%) Kontrak
II.D PEKERJAAN PLAFOND -
1 Pas. Plafond Gypsumboard rangka Metal Furing 3.43 m2 0.0023 % 0.00 - - - - - -
2 List Plafond Cornice 7.40 m' 0.0013 % 0.00 - - - - - -
II.E PEKERJAAN PENUTUP LANTAI -
1 Pas. Keramik Lantai 30x30 cm (A) 4.66 m2 0.0028 % 0.00 - - - - - -
2 Pas. Keramik Plint 30x10 cm 8.05 m' 0.0014 % 0.00 - - - - - -
II.F PEKERJAAN PENGECETAN -
1 Pengecatan Dinding -
Exterior 58.02 m2 0.0142 % 0.00 - - - - - -
Interior 70.91 m2 0.0124 % 0.00 - - - - - -
0.1829 % -
F PEKERJAAN LANDSCAPE ,PERKERASAN DAN VEGETASI -
I PEKERJAAN PENINGGIAN LOKASI DAN PERKERASAN -
1 Urugan Tanah humus Tb=20 cm 31.68 m3 0.0133 % 0.00 - - - - - -
2 Urugan tanah kembali 3.96 m3 0.0006 % 0.00 - - - - - -
3 Urugan Pasir Bawah kanstin 7.92 m3 0.0139 % 0.00 - - - - - -
4 Urugan Pasir Bawah Paving Tb = 7 cm 76.80 m3 0.1347 % 0.00 - - - - - -
5 Perkerasan Paving Stone Tb = 8 cm -
- Paving Block Motif Beda Warna ( B1 ) 76.86 m2 0.0647 % 0.00 - - - - - -
- Paving Block 20x10 cm ( B2 ) -
a. Paving Polos 700.00 m2 0.4910 % 0.00 - - - - - -
b. Paving Warna 60.00 m2 0.0505 % 0.00 - - - - - -
- Paving Grass Block ( GB ) 100.00 m2 0.0842 % 0.00 - - - - - -
6 Pasang Kanstin 200.00 m' 0.1052 % 0.00 - - - - - -
7 Pengecatan Kanstin 200.00 m2 0.0491 % 0.00 - - - - - -
1.0070 % -
II PEKERJAAN VEGETASI -
1 Urugan Tanah Humus Tb = 20 cm 80.00 m3 0.0337 % 0.00 - - - - - -
2 Ketapang Kencana 8.00 bh 0.0028 % 0.00 - - - - - -
3 Palm Raja 20.00 bh 0.0175 % 0.00 - - - - - -
4 Pucuk Merah 20.00 bh 0.0210 % 0.00 - - - - - -
5 Sikas 7.00 bh 0.0123 % 0.00 - - - - - -
6 Bambu Jepang 60.00 bh 0.0105 % 0.00 - - - - - -
7 Honie Merah 40.00 bh 0.0098 % 0.00 - - - - - -
8 Aster 400.00 bh 0.0210 % 0.00 - - - - - -
9 Sirih Gading 20.00 m2 0.0011 % 0.00 - - - - - -
10 Bunga Bawang Bawangan 6.00 m2 0.0003 % 0.00 - - - - - -
11 Rumput Manila 400.00 m2 0.0701 % 0.00 - - - - - -
0.2002 % -
G PEKERJAAN PAGAR -
I PEKERJAAN PAGAR DAN DINDING PENAHAN -
1 Uitzet dan Bowplank 300.00 m' 0.0032 % 37.50 37.50 0.00 - 0.0004 12.50 56,250.00
2 Galian Tanah Pondasi 140.00 m3 0.0491 % 24.02 24.02 0.01 - 0.0084 17.16 1,200,900.00
3 Bor Strous Dia 30 cm 120.00 m' 0.1262 % 0.00 - - - - - -
4 Urugan Tanah Kembali 120.00 m3 0.0168 % 104.42 104.42 0.01 - 0.0146 87.02 2,088,360.00
5 Urugan Pasir Tb= 10 cm 15.00 m3 0.0158 % 0.00 - - - - - -
6 Pas. Aanstampeng 50.00 m3 0.0526 % 0.00 - - - - - -
7 Pas. Pondasi Batu Kali 200.00 m3 0.8346 % 72.97 72.97 0.30 - 0.3045 36.49 43,419,173.00
8 Beton Strous dia 30 cm 9.00 m3 0.1894 % 0.00 - - - - - -
9 Kolom Beton 15 x 15 cm 9.00 m3 0.1894 % 0.00 - - - - - -
10 Sloof 15 x 30 cm 10.00 m3 0.2104 % 2.48 2.48 0.05 - 0.0523 24.84 7,452,000.00
11 Balok Ring 15 x 30 cm 10.00 m3 0.2104 % 0.00 - - - - - -
12 Pas. Dinding 1/2 Bata 1 Pc : 5 Ps 380.00 m2 0.1999 % 0.00 - - - - - -
13 Plesteran Dinding 1/2 Bata 1 Pc : 5 Ps 760.00 m2 0.0267 % 0.00 - - - - - -
26
Volume Pekerjaan Prestasi Pekerjaan Total Total
Volume
Bobot % Volume Volume Komulatif Minggu Minggu Komulatif Presetase Rupiah Ket.
No. Uraian Pekerjaan Sat.
Kontrak Minggu Minggu Lalu Ini Sesuai Harga
Kontrak
lalu Ini % % % (%) Kontrak
14 Acian 380.00 m2 0.0666 % 0.00 - - - - - -
2.1911 % -
H PENINGKATAN KMR JENAZAH MJD 2 LT -
1 Galian tanah 8.13 m3 0.0034 % 16.46 16.46 0.01 - 0.0069 202.46 987,525.00
2 Urug Tanah kembali 2.44 m3 0.0003 % 12.17 12.17 0.00 - 0.0017 498.96 243,375.00
3 Urugan Pasir 0.29 m3 0.0005 % 0.58 0.58 0.00 - 0.0010 196.43 144,375.00
4 Lantai Kerja 0.29 m3 0.0010 % 0.41 0.41 0.00 - 0.0014 140.31 206,250.00
5 Pile Cap uk 1.4 x 0.7x0.4 m 1.18 m3 0.0330 % 0.00 - - - - - -
6 kolom pedestal 0.4x0.4 0.72 m3 0.0202 % 0.00 - - - - - -
7 Boor pille diameter 30 cm 2.54 m' 0.0714 % 0.00 - - - - - -
8 Beam 20x40 cm 3.15 m3 0.0884 % 3.30 3.30 0.09 - 0.0926 104.76 13,200,000.00
9 Kolom K2 3.36 m3 0.1013 % 0.00 - - - - - -
10 Balok B2 30/50 6.30 m3 0.1900 % 0.00 - - - - - -
11 Beton Plat t 12 cm 4.68 m3 0.1411 % 0.00 - - - - - -
lt 2 -
12 Pas Bata Ringan 86.15 m2 0.0544 % 0.00 - - - - - -
13 Plester 172.30 m2 0.0544 % 0.00 - - - - - -
14 Aci 172.30 m2 0.0302 % 0.00 - - - - - -
15 Cat Dinding 172.30 m2 0.0242 % 0.00 - - - - - -
16 kusen dan jendela j9 4.00 bh 0.0334 % 0.00 - - - - - -
17 kusen dan pintu p5 2.00 bh 0.0351 % 0.00 - - - - - -
18 Plafon gypsum 39.00 m2 0.0260 % 0.00 - - - - - -
19 Cat Gypsum 39.00 m2 0.0055 % 0.00 - - - - - -
20 Lampu 4.00 bh 0.0070 % 0.00 - - - - - -
21 Kontak 4.00 bh 0.0070 % 0.00 - - - - - -
22 Granit lantai 2 39.00 m2 0.0369 % 0.00 - - - - - -
0.9647 %
27
BACK UP VOLUME STRUKTUR BANGUNAN UTAMA
A. Pekerjaan Sipil
I. Pekerjaan Persiapan
1 Pembersihan Lapangan / Peralatan
117,6 m
Lahan yang sudah Dibersihkan
20 m 56,4 m 32,6 m 28,6 m Luas A = 4775 m2
(Dihitung dengan AutoCAD)
Luas B = 500 m2
(Dihitung dengan AutoCAD)
47,8 m
A A+B = 5275 m2
37,5 m
39,8 m
34 m
C
Pembersihan Lahan Minggu 41
Luas C = 680,85 m2
19,5 m
16,2 m
28,6 m
680.85 m2
6 Pagar Keliling 20 m 117,6 m
47,8 m
26,7 m
32.6 m
34 m
37.5
13,1 m
50 m
- 2.0 m
4m
- 3.0 m
11 m
168.00 m3
No. Uraian Pekerjaan Volume
B. Pekerjaan Arsitektur
I. Pekerjaan Pasangan
2 Pasangan dinding 1/2 bata ad. 1 : 4 Lantai 1
AX AZ A' B' C' D' E' F' G' H' I' J' K' L' M'
8 2.7 m 1.63 m
BANGUNAN B
5.5 m
2.5 m 2.75 m
2m 1.63 m 2 m 2 m 3 m 2.5 m 1.45 m 2.38 m 2.48 m
7
6 3.26 m 1.61 m
1.63 m h = 0.2 m
h = 0.6 m
5 h = 0.8 m
h = 1.2 m
4 h = 1.8 m
BANGUNAN A
3
2
1
A B C D E F G H I J K L M N
𝑇𝑒bal dinding = 10 cm
2 × 0.8 + 2 + 2 + 3 + 2 × 2.5 + 1.45 + 2.75 + 2.38 + 2.48 × 1.2 + 0.6 × 5.5
𝑉= × 0.1
+ 2.7 + 1.63 × 0.2 + 1.63 + 1.63 + 1.61 × 1.8 + 3.25 + 1.63 + 1.63 × 2
= 52.77 𝑚
52.77 m2
bal dinding = 10 cm
KEGIATAN
PEKERJAAN
01 SPOEL MENGETAHUI
R. ALAT
HOEK DIREKTUR UTAMA RS CEPOKO
±0.00
-0.05
SELASAR
±0.00 PICU Dr. Ivo Devi Kristiyani, Sp.B, M.Si
Med, FINACS, FAACT
KETERANGAN
NURSE
STATION
R. MANDI ±0.00 PICU
JENAZAH PEMULASARAN
-0.05 JENAZAH
±0.00 02 03
NICU
±0.00
HYDRANT
86m³ R.ADM TOILET
±0.00 -0.05 ICU
KONSULTAN PERENCANA
±0.00
R. DOKTER
R. POMPA & SELASAR ±0.00 PT. SURYA GLOBAL PRIMA
PRAPTA SUHARYANA, ST
AHLI MEKANIKAL ELEKTRIKAL
LOBBY LIFT
TOILET TOILET R. X-RAY
DETAIL DENAH LANTAI 01
(PARTIAL 02)
1 : 100
DETAIL DENAH LANTAI 01 (PARTIAL 02) KODE GAMBAR NO. LEMBAR JML. LEMBAR
SKALA 1 : 100
ARS 01.1 - 0002 -
KEGIATAN
PEKERJAAN
LOKASI PEKERJAAN
SIRKULASI KHUSUS PETUGAS TOILET
±0.00 -0.05 CEPOKO, GUNUNGPATI
UNGARAN, JAWA TENGAH
MENGETAHUI
RESUSTASI
TOILET
BAYI
-0.05
PRAPTA SUHARYANA, ST
AHLI MEKANIKAL ELEKTRIKAL
TOILET
-0.05
LOBBY LIFT R. OPERATOR JUDUL GAMBAR SKALA
DETAIL DENAH LANTAI 01 (PARTIAL 03) KODE GAMBAR NO. LEMBAR JML. LEMBAR
SKALA 1 : 100
ARS 01.1 - 0003 -
DD. Minggu ke-41
4. Galian Ipal