HARGA JUMLAH
NO. URAIAN PEKERJAAN Q'TY SAT SATUAN HARGA
(Rp) (Rp.)
1 2 3 4 5 6
I PEKERJAAN PERSIAPAN
1. Bouwplank 1.00 Ls 500,000 500,000.00
500,000.00
II PEKERJAAN TANAH
1. Pek. Galian 11.33 m³ 70,000 792,750.00
2. Urugan pondasi + pemadatan 12.00 m³ 80,000 960,000.00
1,752,750.00
Page 1 of 2
HARGA JUMLAH
NO. URAIAN PEKERJAAN Q'TY SAT SATUAN HARGA
(Rp) (Rp.)
1 2 3 4 5 6
VI PEKERJAAN SANITAIR
1 Pas. Pipa air kotor PVC 'D' 3"+ass 1.00 Set 200,000 200,000.00
2 Pas. Pipa air kotor PVC 'D' 2½"+ass 1.00 Set 300,000 300,000.00
3 Pas. Pipa Air Bersih PVC AW 1/2"+ass 1.00 Set 200,000 200,000.00
4 Pas. Kran air 1/2" 2.00 bh 30,000 60,000.00
5 Pas. Shower 1.00 bh 200,000 200,000.00
6 Pas. Zet Shower Kloset 1.00 bh 150,000 150,000.00
7 Pas. Kloset Duduk (Volk) 1.00 bh 1,500,000 1,500,000.00
8 Pek. Sumur Bor + Pipa 'D' 4" 1.00 ls 5,000,000 5,000,000.00
9 Mesin Pompo air 1.00 bh 650,000 650,000.00
10 Tandon Air 750 Liter 1.00 bh 1,250,000 1,250,000.00
9,510,000.00
VII PEKERJAAN INSTALASI LISTRIK
1 Titik Stop Kontak 7.00 Ttk 150,000 1,050,000.00
2 Titik Lampu 6.00 Ttk 200,000 1,200,000.00
3 Titik Lampu Downlight 3.00 Ttk 350,000 1,050,000.00
4 MCB 2 (1 Group) 1.00 Set 300,000 300,000.00
5 Biaya Pemasangan 2200 VA 1.00 Set 2,200,000 2,200,000.00
6 SLO 1.00 Unit 150,000 150,000.00
5,950,000.00