You are on page 1of 14

Project:

ETAP Page: 1
12.5.0C
Location: Date: 05-05-2015
Contract: SN: KIEWIT-ENG
Engineer: Revision: Base
Study Case: MS
Filename: Alaska LNG Rev B Config.: MS - Normal

Electrical Transient Analyzer Program

Motor Starting Analysis

Static

Prestart Loading Category (1): Design

Prestart Generation Category (1) : Design

Load Diversity Factor: None

Swing V-Control Load Total


Number of Buses: 1 0 10 11

XFMR2 XFMR3 Reactor Line/Cable Impedance Tie PD Total


Number of Branches: 4 0 0 0 0 6 10

Synchronous Power Synchronous Induction


Generator Grid Motor Machines Total
Number of Machines: 2 0 0 1 3

Method of Solution: Adaptive Newton-Raphson

Max. No. of Iterations: 99

Precision of Solution: 0.001000 MW and Mvar

System Frequency: 60.00 Hz

Unit System: English

Project Filename: Alaska LNG Rev B

Output Filename: M:\2014043-NGSP_LNG\BD\Calcs\Elec_Controls\ETAP\North_Slope_L


NG_RevC (POWER ISLAND)\MS.MS1
Project:
ETAP Page: 2
12.5.0C
Location: Date: 05-05-2015
Contract: SN: KIEWIT-ENG
Engineer: Revision: Base
Study Case: MS
Filename: Alaska LNG Rev B Config.: MS - Normal

Adjustments

Apply Individual
Tolerance Adjustments /Global Percent
Transformer Impedance: Yes Individual

Reactor Impedance: Yes Individual

Overload Heater Resistance: No

Transmission Line Length: No

Cable Length: No

Apply Individual
Temperature Correction Adjustments /Global Degree C
Transmission Line Resistance: Yes Individual

Cable Resistance: Yes Individual


Project:
ETAP Page: 3
12.5.0C
Location: Date: 05-05-2015
Contract: SN: KIEWIT-ENG
Engineer: Revision: Base
Study Case: MS
Filename: Alaska LNG Rev B Config.: MS - Normal

Bus Input Data

Load @ T=0¯
Bus Initial Voltage Constant kVA Constant Z Constant I Generic

ID kV Sub-sys % Mag. Ang. MW Mvar MW Mvar MW Mvar MW Mvar

BOP MAIN A BUS 0.480 1 100.0 0.0

BOP MAIN B BUS 0.480 1 100.0 0.0

ESS-MCC 0.480 1 100.0 0.0 0.014 0.009 0.265 0.164

LIQUEFACTION MAIN A BUS 0.480 1 100.0 0.0

LIQUEFACTION MAIN B BUS 0.480 1 100.0 0.0

LIQUEFACTION-SWG-1A 0.480 1 11.5 0.0 0.380 0.236 0.012 0.007

LIQUEFACTION-SWG-1B 0.480 1 100.0 0.0 0.378 0.234 0.012 0.007

LVSG-1A 0.480 1 100.0 0.0 0.424 0.263 0.307 0.190

LVSG-1B 0.480 1 100.0 0.0 0.357 0.221 0.343 0.212

MTR BUS 4.160 1 100.0 0.0

MVSG-1A 4.160 1 100.0 0.0

Total Number of Buses: 11 1.553 0.962 0.938 0.582 0.000 0.000 0.000 0.000

Generation Bus Voltage Generation Mvar Limits

ID kV Type Sub-sys % Mag. Angle MW Mvar % PF Max Min

MVSG-1A 4.160 Swing 1 100.0 0.0

0.000 0.000
Project:
ETAP Page: 4
12.5.0C
Location: Date: 05-05-2015
Contract: SN: KIEWIT-ENG
Engineer: Revision: Base
Study Case: MS
Filename: Alaska LNG Rev B Config.: MS - Normal

2-Winding Transformer Input Data

Transformer Rating Z Variation % Tap Setting Adjusted Phase Shift

ID MVA Prim. kV Sec. kV %Z X/R + 5% - 5% % Tol. Prim. Sec. %Z Type Angle

BOP-SUS-1A 2.500 4.160 0.480 5.75 10.67 0 0 7.5 0 0 6.1813 Dyn 0.000

BOP-SUS-1B 2.500 4.160 0.480 5.75 10.67 0 0 7.5 0 0 6.1813 Dyn 0.000

LIQUEFACTION-SUS-1A 1.000 4.160 0.480 5.75 5.79 0 0 7.5 0 0 6.1813 Dyn 0.000

LIQUEFACTION-SUS-1B 1.000 4.160 0.480 5.75 5.79 0 0 7.5 0 0 6.1813 Dyn 0.000

2-Winding Transformer Load Tap Changer (LTC) Settings

Transformer Load Tap Changer Setting


Transformer Connected Buses ("*" LTC Side)
% Min. % Max.
ID Primary Bus ID Secondary Bus ID Tap Tap % Step Regulated Bus ID %V kV
Project:
ETAP Page: 5
12.5.0C
Location: Date: 05-05-2015
Contract: SN: KIEWIT-ENG
Engineer: Revision: Base
Study Case: MS
Filename: Alaska LNG Rev B Config.: MS - Normal

Branch Connections

CKT/Branch Connected Bus ID % Impedance, Pos. Seq., 100 MVAb


ID Type From Bus To Bus R X Z Y

BOP-SUS-1A 2W XFMR MVSG-1A BOP MAIN A BUS 23.07 246.17 247.25

BOP-SUS-1B 2W XFMR MVSG-1A BOP MAIN B BUS 23.07 246.17 247.25

LIQUEFACTION-SUS-1A 2W XFMR MVSG-1A LIQUEFACTION MAIN A BUS 105.20 609.11 618.13

LIQUEFACTION-SUS-1B 2W XFMR MVSG-1A LIQUEFACTION MAIN B BUS 105.20 609.11 618.13

BOP MAIN A Tie Breakr BOP MAIN A BUS LVSG-1A

BOP MAIN B Tie Breakr BOP MAIN B BUS LVSG-1B

CB20 Tie Breakr LVSG-1B ESS-MCC

CB 25 Tie Breakr MVSG-1A MTR BUS

LIQUEFACTION MAIN A Tie Breakr LIQUEFACTION MAIN A BUS LIQUEFACTION-SWG-1A

LIQUEFCTION MAIN B Tie Breakr LIQUEFACTION MAIN B BUS LIQUEFACTION-SWG-1B


Project:
ETAP Page: 6
12.5.0C
Location: Date: 05-05-2015
Contract: SN: KIEWIT-ENG
Engineer: Revision: Base
Study Case: MS
Filename: Alaska LNG Rev B Config.: MS - Normal

Machine Input Data

% Impedance
Machine Connected Bus Rating (Machine Base)
ID Type ID MVA kV R X" X' *

Gen1 Gen MVSG-1A 2.059 4.160 1.00 19.00 28.00

Gen2 Gen MVSG-1A 2.059 4.160 1.00 19.00 28.00

Total Connected Machines ( = 2 ): 4.118 MVA

* Indicates the reactance used for machine representation


Project:
ETAP Page: 7
12.5.0C
Location: Date: 05-05-2015
Contract: SN: KIEWIT-ENG
Engineer: Revision: Base
Study Case: MS
Filename: Alaska LNG Rev B Config.: MS - Normal

Switching Motors

Motor Nameplate Locked-Rotor Accel. Time (Sec.)


ID Type Qty Connected Bus ID HP/kW kV RPM FLA % PF % Eff % LRC % PF No Load Full Load

Amine Circulation Pump1 Ind. 1 MTR BUS 500.0 4.160 1800 60.3 92.1 93.2 650.00 18.89 0.00 0.00
Project:
ETAP Page: 8
12.5.0C
Location: Date: 05-05-2015
Contract: SN: KIEWIT-ENG
Engineer: Revision: Base
Study Case: MS
Filename: Alaska LNG Rev B Config.: MS - Normal

Sequence of Events

Load Change
Time Event Switching Load % Loading Time Motor Load Static Load
Name Time ID Type Action Category Start Final Begin End MW Mvar MW Mvar

MS 0.200 Amine Circulation Pump1 Ind. Motor Start Normal 100.0 100.0 0.00 0.00
Project:
ETAP Page: 9
12.5.0C
Location: Date: 05-05-2015
Contract: SN: KIEWIT-ENG
Engineer: Revision: Base
Study Case: MS
Filename: Alaska LNG Rev B Config.: MS - Normal

LOAD FLOW REPORT @ T = 0.000-

Bus Voltage Generation Load Load Flow XFMR


ID kV % Mag. Ang. MW Mvar MW Mvar ID MW Mvar Amp % PF % Tap

BOP MAIN A BUS 0.480 98.697 -1.0 0 0 0 0 MVSG-1A -0.724 -0.449 1037.9 85.0

LVSG-1A 0.724 0.449 1037.9 85.0

BOP MAIN B BUS 0.480 98.263 -1.3 0 0 0 0 MVSG-1A -0.957 -0.593 1378.8 85.0

LVSG-1B 0.957 0.593 1378.8 85.0

ESS-MCC 0.480 98.263 -1.3 0 0 0.270 0.167 LVSG-1B -0.270 -0.167 388.4 85.0

LIQUEFACTION MAIN A 0.480 98.050 -1.2 0 0 0 0 MVSG-1A -0.391 -0.243 564.9 85.0
BUS
LIQUEFACTION-SWG-1A 0.391 0.243 564.9 85.0

LIQUEFACTION MAIN B 0.480 98.063 -1.2 0 0 0 0 MVSG-1A -0.389 -0.241 561.1 85.0
BUS
LIQUEFACTION-SWG-1B 0.389 0.241 561.1 85.0

LIQUEFACTION-SWG-1A 0.480 98.050 -1.2 0 0 0.391 0.243 LIQUEFACTION MAIN A -0.391 -0.243 564.9 85.0
BUS
LIQUEFACTION-SWG-1B 0.480 98.063 -1.2 0 0 0.389 0.241 LIQUEFACTION MAIN B -0.389 -0.241 561.1 85.0
BUS
LVSG-1A 0.480 98.697 -1.0 0 0 0.724 0.449 BOP MAIN A BUS -0.724 -0.449 1037.9 85.0

LVSG-1B 0.480 98.263 -1.3 0 0 0.688 0.426 BOP MAIN B BUS -0.957 -0.593 1378.8 85.0

ESS-MCC 0.270 0.167 388.4 85.0

MTR BUS 4.160 100.000 0.0 0 0 0 0 MVSG-1A 0.000 0.000 0.0 0.0

* MVSG-1A 4.160 100.000 0.0 0 0 0 0 BOP MAIN A BUS 0.726 0.467 119.8 84.1

BOP MAIN B BUS 0.960 0.626 159.1 83.8

LIQUEFACTION MAIN A 0.394 0.256 65.2 83.8


BUS
LIQUEFACTION MAIN B 0.391 0.254 64.7 83.8
BUS
MTR BUS 0.000 0.000 0.0 0.0

Gen1 -1.235 -0.801 204.4 83.9

Gen2 -1.235 -0.801 204.4 83.9

* Gen1 4.160 112.701 8.4 1.246 1.096 0 0 MVSG-1A 1.246 1.096 204.4 75.1

* Gen2 4.160 112.701 8.4 1.246 1.096 0 0 MVSG-1A 1.246 1.096 204.4 75.1

* Indicates a voltage regulated bus ( voltage controlled or swing type machine connected to it)
Project:
ETAP Page: 10
12.5.0C
Location: Date: 05-05-2015
Contract: SN: KIEWIT-ENG
Engineer: Revision: Base
Study Case: MS
Filename: Alaska LNG Rev B Config.: MS - Normal

LOAD FLOW REPORT @ T = 0.200+

Bus Voltage Generation Load Load Flow XFMR


ID kV % Mag. Ang. MW Mvar MW Mvar ID MW Mvar Amp % PF % Tap

BOP MAIN A BUS 0.480 81.402 -3.1 0 0 0 0 MVSG-1A -0.628 -0.389 1091.7 85.0

LVSG-1A 0.628 0.389 1091.7 85.0

BOP MAIN B BUS 0.480 81.079 -3.3 0 0 0 0 MVSG-1A -0.770 -0.477 1343.9 85.0

LVSG-1B 0.770 0.477 1343.9 85.0

ESS-MCC 0.480 81.079 -3.3 0 0 0.188 0.117 LVSG-1B -0.188 -0.117 328.2 85.0

LIQUEFACTION MAIN A 0.480 80.408 -3.6 0 0 0 0 MVSG-1A -0.388 -0.240 682.2 85.0
BUS
LIQUEFACTION-SWG-1A 0.388 0.240 682.2 85.0

LIQUEFACTION MAIN B 0.480 80.424 -3.6 0 0 0 0 MVSG-1A -0.385 -0.239 677.6 85.0
BUS
LIQUEFACTION-SWG-1B 0.385 0.239 677.6 85.0

LIQUEFACTION-SWG-1A 0.480 80.408 -3.6 0 0 0.388 0.240 LIQUEFACTION MAIN A -0.388 -0.240 682.2 85.0
BUS
LIQUEFACTION-SWG-1B 0.480 80.424 -3.6 0 0 0.385 0.239 LIQUEFACTION MAIN B -0.385 -0.239 677.6 85.0
BUS
LVSG-1A 0.480 81.402 -3.1 0 0 0.628 0.389 BOP MAIN A BUS -0.628 -0.389 1091.7 85.0

LVSG-1B 0.480 81.079 -3.3 0 0 0.582 0.361 BOP MAIN B BUS -0.770 -0.477 1343.9 85.0

ESS-MCC 0.188 0.117 328.2 85.0

MTR BUS 4.160 82.776 -1.8 0 0 0.365 1.900 MVSG-1A -0.365 -1.900 324.4 18.9

* MVSG-1A 4.160 82.776 -1.8 0 0 0 0 BOP MAIN A BUS 0.630 0.409 126.0 83.8

BOP MAIN B BUS 0.773 0.508 155.1 83.6

LIQUEFACTION MAIN A 0.391 0.260 78.7 83.3


BUS
LIQUEFACTION MAIN B 0.388 0.258 78.2 83.3
BUS
MTR BUS 0.365 1.900 324.4 18.9

Gen1 -1.274 -1.668 351.8 60.7

Gen2 -1.274 -1.668 351.8 60.7

* Gen1 4.160 112.701 8.4 1.305 2.542 0 0 MVSG-1A 1.305 2.542 351.8 45.7

* Gen2 4.160 112.701 8.4 1.305 2.542 0 0 MVSG-1A 1.305 2.542 351.8 45.7

* Indicates a voltage regulated bus ( voltage controlled or swing type machine connected to it)
Project:
ETAP Page: 11
12.5.0C
Location: Date: 05-05-2015
Contract: SN: KIEWIT-ENG
Engineer: Revision: Base
Study Case: MS
Filename: Alaska LNG Rev B Config.: MS - Normal

LOAD FLOW REPORT @ T = 3.000+

Bus Voltage Generation Load Load Flow XFMR


ID kV % Mag. Ang. MW Mvar MW Mvar ID MW Mvar Amp % PF % Tap

BOP MAIN A BUS 0.480 96.905 -2.4 0 0 0 0 MVSG-1A -0.713 -0.442 1041.3 85.0

LVSG-1A 0.713 0.442 1041.3 85.0

BOP MAIN B BUS 0.480 96.482 -2.8 0 0 0 0 MVSG-1A -0.936 -0.580 1373.3 85.0

LVSG-1B 0.936 0.580 1373.3 85.0

ESS-MCC 0.480 96.482 -2.8 0 0 0.260 0.161 LVSG-1B -0.260 -0.161 382.1 85.0

LIQUEFACTION MAIN A 0.480 96.226 -2.7 0 0 0 0 MVSG-1A -0.391 -0.242 575.0 85.0
BUS
LIQUEFACTION-SWG-1A 0.391 0.242 575.0 85.0

LIQUEFACTION MAIN B 0.480 96.239 -2.7 0 0 0 0 MVSG-1A -0.388 -0.241 571.1 85.0
BUS
LIQUEFACTION-SWG-1B 0.388 0.241 571.1 85.0

LIQUEFACTION-SWG-1A 0.480 96.226 -2.7 0 0 0.391 0.242 LIQUEFACTION MAIN A -0.391 -0.242 575.0 85.0
BUS
LIQUEFACTION-SWG-1B 0.480 96.239 -2.7 0 0 0.388 0.241 LIQUEFACTION MAIN B -0.388 -0.241 571.1 85.0
BUS
LVSG-1A 0.480 96.905 -2.4 0 0 0.713 0.442 BOP MAIN A BUS -0.713 -0.442 1041.3 85.0

LVSG-1B 0.480 96.482 -2.8 0 0 0.676 0.419 BOP MAIN B BUS -0.936 -0.580 1373.3 85.0

ESS-MCC 0.260 0.161 382.1 85.0

MTR BUS 4.160 98.212 -1.4 0 0 0.400 0.169 MVSG-1A -0.400 -0.169 61.4 92.1

* MVSG-1A 4.160 98.212 -1.4 0 0 0 0 BOP MAIN A BUS 0.715 0.460 120.2 84.1

BOP MAIN B BUS 0.939 0.612 158.5 83.8

LIQUEFACTION MAIN A 0.393 0.256 66.3 83.8


BUS
LIQUEFACTION MAIN B 0.391 0.254 65.9 83.8
BUS
MTR BUS 0.400 0.169 61.4 92.1

Gen1 -1.419 -0.876 235.7 85.1

Gen2 -1.419 -0.876 235.7 85.1

* Gen1 4.160 112.701 8.4 1.433 1.269 0 0 MVSG-1A 1.433 1.269 235.7 74.9

* Gen2 4.160 112.701 8.4 1.433 1.269 0 0 MVSG-1A 1.433 1.269 235.7 74.9

* Indicates a voltage regulated bus ( voltage controlled or swing type machine connected to it)
Project:
ETAP Page: 12
12.5.0C
Location: Date: 05-05-2015
Contract: SN: KIEWIT-ENG
Engineer: Revision: Base
Study Case: MS
Filename: Alaska LNG Rev B Config.: MS - Normal

% Alert Settings
Critical Marginal
Starting Motors/MOV

MOV Terminal Voltage 80.00 90.00(Vmtr, rate)

Motor Terminal Voltage 80.00 90.00(Vmtr, rate)

Failed to Start, Slip Kept 5.00

Generator/Engine/Exciter Rating Min. Span (Sec.)


Generator Rating 100.00 95.00 0.00

Engine Continuous Rating 100.00 95.00 0.00

Engine Peak Rating 100.00 95.00 0.00

Exciter Peak Rating 100.00 95.00 0.00

Bus Voltage Group Min. Dip Width (Sec.)


Starting Motor Bus VBus 80.00 90.00 0.00

Grid/Generator Bus VBus 92.00 95.00 0.00

HV Bus, kV 10.00 VBus 90.00 95.00 0.00


MV Bus, 10.00 kV 1.00 VBus 90.00 95.00 0.00

LV Bus, kV 1.00 VBus 90.00 95.00 0.00

Critical Report

DeviceID Type Alert Condition Rating/Limit Unit Operating % Operating T Begin Duration

Gen1 Generator Generator Rating Over Rating 2.059 MVA 2.098 101.9 0.200 0.000

Gen2 Generator Generator Rating Over Rating 2.059 MVA 2.098 101.9 0.200 0.000

BOP MAIN A BUS LV Bus Bus Voltage Under Voltage 0.480 kV 0.391 81.4 0.200 0.000

BOP MAIN B BUS LV Bus Bus Voltage Under Voltage 0.480 kV 0.389 81.1 0.200 0.000

ESS-MCC LV Bus Bus Voltage Under Voltage 0.480 kV 0.389 81.1 0.200 0.000

LIQUEFACTION MAIN A BUS LV Bus Bus Voltage Under Voltage 0.480 kV 0.386 80.4 0.200 0.000

LIQUEFACTION MAIN B BUS LV Bus Bus Voltage Under Voltage 0.480 kV 0.386 80.4 0.200 0.000

LIQUEFACTION-SWG-1A LV Bus Bus Voltage Under Voltage 0.480 kV 0.386 80.4 0.200 0.000

LIQUEFACTION-SWG-1B LV Bus Bus Voltage Under Voltage 0.480 kV 0.386 80.4 0.200 0.000

LVSG-1A LV Bus Bus Voltage Under Voltage 0.480 kV 0.391 81.4 0.200 0.000

LVSG-1B LV Bus Bus Voltage Under Voltage 0.480 kV 0.389 81.1 0.200 0.000

MTR BUS MV Bus Bus Voltage Under Voltage 4.160 kV 3.443 82.8 0.200 0.000

MVSG-1A Generator Bus Bus Voltage Under Voltage 4.160 kV 3.443 82.8 0.200 0.000

MVSG-1A MV Bus Bus Voltage Under Voltage 4.160 kV 3.443 82.8 0.200 0.000
Project:
ETAP Page: 13
12.5.0C
Location: Date: 05-05-2015
Contract: SN: KIEWIT-ENG
Engineer: Revision: Base
Study Case: MS
Filename: Alaska LNG Rev B Config.: MS - Normal

Marginal Report

DeviceID Type Alert Condition Rating/Limit Unit Operating % Operating T Begin Duration

Amine Circulation Pump1 Motor Motor Voltage Under Voltage 4.160 kV 3.443 82.8 0.200 0.000

MTR BUS Motor Bus Bus Voltage Under Voltage 4.160 kV 3.443 82.8 0.200 0.000
Project:
ETAP Page: 14
12.5.0C
Location: Date: 05-05-2015
Contract: SN: KIEWIT-ENG
Engineer: Revision: Base
Study Case: MS
Filename: Alaska LNG Rev B Config.: MS - Normal

The tabulated plots were not generated because the option of 'Skip Tabulated Plots' in the study case was checked.
To generate tabulated plots, you need to uncheck this option in the Info page of Motor Starting Study Case.