You are on page 1of 1

SHUTDOWN JOBS ON 25.10.

2017 PP(SW)

1. M 2.1 : Strip guide pulley foundation loose. (mech).


2. M 2.1 : All the power pack and lucas pump oil level to made up. (mech).
3. M2.1 : Extra DA and Oxygen point to provide near f/s cross seam DA cyl. stand for
hand cutting. (mech) .
4. M2.2 : Extra DA and Oxygen point to provide near f/s cross seam DA cyl. stand for
hand cutting. (mech).
5. Conveyor c1 , c4, c6, c10 levelling to be done.(mech) (priority to be given for c1
cov.)
6. M3 : vertical roll having gap between top mounting bracket and roll, pipes stuck
up during cleaning. To be rectified. (mech).

You might also like