91.75 % i) COORDINATION WITH HSM & PPC TO ENSURE THAT COILS
(for 12 3/4" ARE ROLLED IN CLOSE TOLERANCE OF + 0.1 / - 0 MM IN
SECTIONAL I/C (OPN.)
THICKNESS & + 10 / - 0 MM WIDTH. FEEDBACK TO BE GIVEN CONT.
to 18" O.D) AND MILL INCHARGE
TO HSM FOR ANY DEVIATION IN THICKNESS & WIDTH THAN
DESIRED.
vi) CUT-OFF PIPES TO BE SENT TO RFC AFTER PROPER PAINT
SHIFT I/C
MARKING IN WORKS INSPECTION SKID TO ENSURE CUTTING AT CONT.
(OPERATIONS)
THE RIGHT LOCATION.
III. Co-ordination with HSM & PPC for rolling of input H.R coils strictly SECTIONAL I/C (OPN.)
REG.
adhering to the requirements of the API specifications. AND MILL INCHARGE
V. To Ensure the validation of the mill & NDT process for the first day
production is being done and adherence to the frozen parameters is SECTIONAL I/C (OPN.)
REG.
being followed for meeting the quality requirements and also minimizing AND MILL INCHARGE
generation of non conformance products.
SECTIONAL I/C (OPN.),
MILL & NDT NCHARGE
VI. Maintaining the health of the equipments for avoiding reduction of
And SECTIONAL REG.
quality due to equipment malfunctioning.
INCHARGE (MECH. &
ELEC.)
VII. Regular review of the performance and to carry out necessary HOD,SECTIONAL
REG.
CAPA. INCHARGES &RCL