INDUSTRIAL ATTACHMENT REPORT: A CASE STUDY OF POWERGEN RENEWABLE ENERGY EA

LIMITED

PREPARED BY:

OLOO MORINE AWINO

ADM NO. KIM/36055/16

NAIROBI BRANCH

A REPORT SUBMITTED IN PARTIAL FULFILMENT OF THE REQUIREMENT FOR THE AWARD OF A


DIPLOMA COURSE IN MANAGEMENT (BUSINESS MANAGEMENT OPTION) OF THE KENYA
INSTITUTE OF MANAGEMENT.

MONTH (FEBRUARY –APRIL) YEAR (2018)


DECLARATION PAGE

Declaration by the Student

This attachment is my original work and has not been presented to any other examination
body. No part of this industrial report should be produced without my consent or that of the
Kenya Institute of Management.

Name……………………………………………. Sign…………………………………………….. Date…………………….

KIM/DBM/36055/16

Declaration by the Supervisor

This attachment report has been submitted with my approval as the Kenya Institute of
Management Supervisor.

Name………………………………………. Sign…………………………………………………… Date………………………...

Lecturer Supervising

For and on behalf of the Kenya Institute of Management.

Name…………………………………… Sign……………………………………………………... Date………………………….

Branch Manager-Nairobi Branch


DEDICATION

I dedicate this attachment report to my beloved mother Mrs. Margaret Awuor for her
continued support, encouragement, passion and persistent prayers for my education and her
trust in me. To my sister Caren Anyango, special thanks for your support and encouragement
throughout my life.
ACKNOWLEDGEMENT

I would like to express my sincere gratitude to all who assisted me throughout my work. Special
gratitude and many thanks to my supervisor Mr. Vincent Ruttoh for his encouragement and
guidance. I would also like to acknowledge the Kenya Institute of Management for their training
and finally PowerGen Renewable Energy for accepting me to carry out my attachment with
them.
TABLE OF CONTENTS

DECLARATION……………………………………………………………………………………………………………………..ii

DEDICATION……………………………………………………………………………………………………………………….iii

ACKNOWLEDGEMENT…………………………………………………………………………………………………………IV

PREFACE……………………………………………………………………………………………………………………………..v

TABLE OF CONTENTS…………………………………………………………………………………………………………..VI

SECTION ONE

1.0 Introduction…………………………………………………………………………………………………………………..

SECTION TWO

2.1 General Activities Undertaken……………………………………………………………………………………….5

2.2 Specific Activities Undertaken………………………………………………………………………………………..5

SECTION THREE

3.1 Summary…………………………………………………………………………………………………………………………13

3.2 Conclusion……………………………………………………………………………………………………………………..13

3.3 Recommendations…………………………………………………………………………………………………………14
SECTION ONE

1.0 Introduction
2.0 PowerGen Procurement and Supply Chain Office