Professional Documents
Culture Documents
1 UNITS TOGGLE This data sheet is designed to permit selection of Units of Measure by
selecting the desired choice from the list box located on this page.
2 TURNOVER TO OTHERS OUTSIDE OF TheCompany When these data sheets are turned
over to others in native format, the "Notes" and "Units" pages should be hidden (Format
/Sheet/Hide) and Password protection turned on for the workbook (Tools /Protection /Workbook/
Structure) It is suggested that the password be "TheCompanyunits" Use of common password
will enable other TheCompany engineers to unlock these functions but make the feature difficult
for others to find and use.
3 ISSUE OF DATA SHEETS Prior to issue of this data sheet, the non applicable sheets (pump
summary, unused pump pages 3 & 4 and either catagory 1&2 or Catagory 3seal page) should be
hidden as noted above.
4 MODIFIED UNITS To modify a preformatted Unit of Measure, select the "Units" worksheet tab
and enter the new Unit of Measure in the proper row and column. The unit will then be changed
everywhere it is used on the data sheets.
Should you need to deviate from the preformatted Units of Measure is it convenient to use the
"Hybrid" row. To do this, copy and paste the closest matching preformatted row into the "Hybrid"
row then make the changes accordingly. If needed, change the name of the Units of Measure
that appears in the title block of each page by updating the cell on the "Units" worksheet that
contains "Hybrid". For example, English, U.S. Customary (Atmospheres), Project Specific, SI
(N/m2), etc.
Note that any changes to the Units of Measure should be in agreement with those designated by
the Client and/or documented in the Project Coordination Procedures.
6 COLOR CODES Also note that the data sheets use a standardized convention for indicating
who is expected to input the data. Entries displayed in GREEN are "By Buyer/Purchaser", entries
in RED are "By Seller" and entries in BLUE are "By Either". For the sake of clarity, those Units of
Measure which are modifiable by the procedure listed above are designated in PURPLE.
7 PRINTING Wnen unnecessary sheetrs are hidden, the completed data sheet can be printed
by selecting "print workbook" option.
DOCUMENT NUMBER:
REVISION 0 1 2 3 4
DATE
BY
2 FOR UNIT
3 SITE SERVICE
6 ITEM NO. ATTACHED ITEM NO. ATTACHED ITEM NO. ATTACHED ATTACHED
7 PUMP Noise
8 MOTOR
9 GEAR
10 TURBINE
22 PARALLEL OPERATION REQ'D (5.1.13) H2S CONCENTRATION (6.5.2.4) (ml/m3) WET (5.2.1.12c)
26 ELECTRICAL AREA CLASSIFICATION (5.1.24 / 6.1.4) NON-HAZARDOUS MIN DESIGN METAL TEMP (5.12.4.1) (°C)
27 CLASS GR DIVISION
35 IMPELLER TYPE
53 LUBE STEAM MAX. PRESS. (kPaG) MAX. TEMP. (°C) MIN. PRESS. (kPaG) MIN. TEMP. (°C)
55 RADIAL / HEATING
57 VERTICAL THRUST CAPACITY SUPPLY TEMP. (°C) MAX. RETURN TEMP. (°C)
REVISION 0 1 2 3 4
DATE
BY 0
ISO 13709 (API 610 10TH) CENTRIFUGAL PUMP REV/APPR 0
1 REMARKS
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46
47
48
49
50
51
52
53
54
55
56
57
58
59
60
61
62
63
64
65
66
01/05 SHT 2 610 ISO.XLS REV 0 PROCESS DATA SHEET
DOCUMENT NUMBER:
CLIENT DOCUMENT NUMBER:
REVISION 0 1 2
DATE 30-Dec-99 30-Dec-99
BY 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99
ISO 13709 (API 610 10TH) CENTRIFUGAL PUMP REV/APPR 30-Dec-99 30-Dec-99 30-Dec-99 30-Dec-99
SINGLE STAGE OVERHUNG (TYPE OH)
CENTRIFUGAL PUMP DATA SHEET (ISO STANDARDS) JOB NO. - ITEM NO.
SI UNITS (kPa) PAGE 3 OF 8 REQ'N NO.
2 ROTATION: (VIEWED FROM COUPLING END) CW CCW MANUFACTURER'S STANDARD OTHER (SEE BELOW)
7 BASEPLATE: (6.3.17)
11 OH6 PUMP SUCTION REGION DESIGNED FOR MAWP (5.3.6) SHIPMENT: (7.4.1)
12 MAX ALLOWABLE WORKING PRESSURE (MPaG) DOMESTIC EXPORT EXPORT BOXING REQUIRED
17 RATING
20 COOLING REQ'D.
21 PRESSURE CASING AUX. CONNECTIONS: (5.4.3) COOLING WATER PIPING PLAN (6.5.3.1)
30 COMPONENT BALANCE TO ISO 1940 G1.0 (5.9.4.4) HEAT MEDIUM: STEAM OTHER
38 COUPLING PER ISO 10441(6.2.4) PURGE OIL MIST PURE OIL MIST
39 COUPLING PER API 671(6.2.4) ASME B15.1 CONSTANT LEVEL OILER PREFERENCE (5.10.2.2):
47 MECHANICAL SEAL:(5.8.1)
48 SEE ATTACHED ISO 21049/API 682 DATA SHEET
49 REMARKS:
50
51 WEIGHTS
56 REMARKS
57
58
59
60
61
01/05 SHT 3 610 ISO.XLS REV 0 OH PUMP DATA SHEET
DOCUMENT NUMBER:
CLIENT DOCUMENT NUMBER:
REVISION 0 1 2
DATE
BY 30-Dec-99
ISO 13709 (API 610 10TH) CENTRIFUGAL PUMP REV/APPR 30-Dec-99
SINGLE STAGE OVERHUNG (TYPE OH)
CENTRIFUGAL PUMP DATA SHEET (ISO STANDARDS) JOB NO. - ITEM NO.
SI UNITS (kPa) PAGE 4 OF 8 REQ'N NO.
1 SPARE PARTS (TABLE 18) QA INSPECTION AND TESTING (CONT.)
3 HYDROSTATIC (7.3.2)
16 ADDITIONAL DATA REQUIRING 20 YEARS RETENTION (7.2.2.1f) MOUNTING PAD SURFACES (6.3.3)
20 MOUNT SEAL RESERVOIR OFF BASEPLATE (6.5.1.4) OIL TEMP. STABLE (7.3.4.7.3)
21 FLANGES REQUIRED IN PLACE OF SOCKET WELD UNIONS (6.5.2.8) MECHANICAL RUN TEST(7.3.4.7.2)
33 CASTING REPAIR PROCEDURE APPROVAL REQ'D (5.12.2.5) VENDOR SUBMIT TEST PROCEDURES (7.3.1.2 / 9.2.5)
34 INSPECTION REQUIRED FOR CONNECTION WELDS (5.12.3.4e) VENDOR SUBMIT TEST DATA WITHIN 24 HOURS (7.3.3.3e)
39 RADIOGRAPHIC ULTRASONIC
42 FOR
43 METHOD
44 REMARKS
45
46
47
48
49
50
51
52
53
54
55
56
57
58
59
60
30-Dec-99 30-Dec-99
30-Dec-99 30-Dec-99
NT
(m³/h)
(m³/h)
(m³/h)
ON
3 4
OBSERVE
DOCUMENT NUMBER:
CLIENT DOCUMENT NUMBER:
REVISION 0 1 2 3
DATE
BY 0
ISO 13709 (API 610 10TH) CENTRIFUGAL PUMP REV/APPR 0
BETWEEN BEARINGS (TYPE BB)
CENTRIFUGAL PUMP DATA SHEET (ISO STANDARDS) JOB NO. - ITEM NO.
SI UNITS (kPa) PAGE 3 OF 8 REQ'N NO.
1 CONSTRUCTION SURFACE PREPARATION AND PAINT
2 ROTATION: (VIEWED FROM COUPLING END) CW CCW MANUFACTURER'S STANDARD OTHER (SEE BELOW)
3 PUMP TYPE: (4.1) SPECIFICATION NO.
4 BB1 BB2 BB3 BB5 PUMP:
5 CASING MOUNTING: PUMP SURFACE PREPARATION
6 CENTERLINE NEAR CENTERLINE PRIMER
7 FOOT FINISH COAT
8 CASING SPLIT: BASEPLATE: (6.3.17)
9 AXIAL RADIAL BASEPLATE SURFACE PREPARATION
10 CASING TYPE: PRIMER
11 SINGLE VOLUTE MULTIPLE VOLUTE DIFFUSER FINISH COAT
12 BETWEEN BEARINGS BARREL DETAILS OF LIFTING DEVICES(6.3.20)
13 CASE PRESSURE RATING: SHIPMENT: (7.4.1)
14 MAX ALLOWABLE WORKING PRESSURE (MPaG) DOMESTIC EXPORT EXPORT BOXING REQUIRED
15 @ (°C) OUTDOOR STORAGE MORE THAN 6 MONTHS
16 HYDROTEST PRESSURE (MPaG) SPARE ROTOR ASSEMBLY PACKAGED FOR:
17 SUCTION PRESS. REGIONS MUST BE DESIGNED SHIPPING CONTAINER (8.2.8.3) VERTICAL STORAGE (8.2.8.2)
18 FOR MAWP (5.3.6) TYPE OF SHIPPING PREPARATION N2 PURGE (8.2.8.4)
19 NOZZLE CONNECTIONS: (5.4.2) HEATING AND COOLING
20 SIZE FLANGE FACING POSITION HEATING JACKET REQ'D. (5.8.9) COOLING REQ'D.
21 DN RATING COOLING WATER PIPING PLAN (6.5.3.1)
22 SUCTION C.W. PIPING:
23 DISCHARGE PIPE TUBING; FITTINGS
24 BALANCE DRUM C.W. PIPING MATERIALS:
25 PRESSURE CASING AUX. CONNECTIONS: (5.4.3) S. STEEL C. STEEL GALVANIZED
26 NO. SIZE (DN) TYPE COOLING WATER REQUIREMENTS:
27 DRAIN BEARING HOUSING (m³/h) @
28 VENT HEAT EXCHANGER (m³/h) @
29 PRESS. GAUGE STEAM PIPING: TUBING PIPE
30 TEMP GAUGE BEARINGS AND LUBRICATION
31 WARM-UP BEARING (TYPE/NUMBER) (5.10.1):
32 BALANCE / LEAK-OFF RADIAL /
33 MACHINED AND STUDDED CONNECTIONS (5.4.3.8) THRUST /
34 CYLINDRICAL THREADS REQUIRED (5.4.3.3) LUBRICATION (5.11.3, 5.11.4):
35 ROTOR: RING OIL HYDRODYNAMIC PURGE OIL MIST
36 COMPONENT BALANCE TO ISO 1940 G1.0 (5.9.4.4) CONSTANT LEVEL OILER PREFERENCE (5.10.2.2):
37 SHRINK FIT -LIMITED MOVEMENT IMPELLERS (8.2.2.3) PRESSURE LUBE SYS. ISO 10438-3 ISO 10438-2 (8.2.6.1/8.2.6.5)
38 COUPLINGS:(6.2.2) OIL VISC. ISO GRADE
39 MANUFACTURER MODEL OIL PRESS. TO BE GREATER THAN COOLANT PRESSURE
40 RATING (kW/100 RPM) REVIEW AND APPROVE THRUST BEARING SIZE(8.2.5.2.d)
41 SPACER LENGTH (mm) SERVICE FACTOR OIL HEATER REQUIRED: STEAM ELECTRIC
42 DRIVER HALF COUPLING MOUNTED BY: INSTRUMENTATION (6.4.2)
43 PUMP MFR. DRIVER MFR. PURCHASER SEE ATTACHED API-670 DATA SHEET
44 COUPLING WITH HYDRAULIC FIT (6.2.10) ACCELEROMETER(S) (6.4.2.1)
45 COUPLING BALANCED TO ISO 1940-1 G6.3 (6.2.3) NONCONTACTING TRANSDUCERS (6.4.2.2)
46 COUPLING PER ISO 14691(6.2.4) RADIAL PER BRG. AXIAL PER BRG.
47 COUPLING PER ISO 10441(6.2.4) PROVISION FOR MOUNTING ONLY (5.10.2.11)
48 COUPLING PER API 671(6.2.4) FLAT SURFACE REQ'D (5.10.2.12)
49 NON SPARK COUPLING GUARD (6.2.14c) RADIAL BEARING METAL TEMP. THRUST BRG METAL TEMP.
50 COUPLING GUARD STANDARD (6.2.14a) TEMP. GAUGES (WITH THERMOWELLS)
51 ASME B15.1 EN 953 ISO 14120 OTHER PRESSURE GAUGE TYPE
52 BASEPLATES: MONITORS AND CABLES SUPPLIED BY (6.4.2.4)
53 API BASEPLATE NUMBER (ANNEX D) REMARKS
54 NON-GROUT CONSTRUCTION (6.3.13)
55 OTHER
56 MECHANICAL SEAL:(5.8.1)
57 SEE ATTACHED ISO 21049/API 682 DATA SHEET
58 WEIGHTS (kg)
59 PUMP BASEPLATE
60 DRIVER TOTAL
61 GEAR
62
01/05 SHT 3 610 ISO.XLS REV 0 BB PUMP DATA SHEET
DOCUMENT NUMBER:
CLIENT DOCUMENT NUMBER:
REVISION 0 1 2 3
DATE
BY 0
ISO 13709 (API 610 10TH) CENTRIFUGAL PUMP REV/APPR 0
BETWEEN BEARINGS (TYPE BB)
CENTRIFUGAL PUMP DATA SHEET (ISO STANDARDS) JOB NO. - ITEM NO.
SI UNITS (kPa) PAGE 4 OF 8 REQ'N NO.
1 SPARE PARTS (TABLE 18) QA INSPECTION AND TESTING (CONT.)
2 START-UP NORMAL MAINTENANCE TEST NON-WIT WIT OBSERVE
3 SPECIFY HYDROSTATIC (7.3.2)
4 PERFORMANCE (7.3.3)
5 OTHER PURCHASER REQUIREMENTS NPSH (7.3.4.2)
6 COORDINATION MEETING REQUIRED (9.1.3) RETEST ON SEAL LEAKAGE (7.3.3.2d)
7 MAXIMUM DISCHARGE PRESSURE TO INCLUDE (5.3.2) RETEST REQUIRED AFTER FINAL
8 MAX RELATIVE DENSITY HEAD ADJUSTMENT (7.3.3.5b)
9 MAX DIA. IMPELLERS AND/OR NO OF STAGES COMPLETE UNIT TEST (7.3.4.3)
10 OPERATION TO TRIP SPEED SOUND LEVEL TEST (7.3.4.4)
11 CONNECTION DESIGN APPROVAL (5.12.3.4/8.2.1.4) CLEANLINESS PRIOR TO
12 INERT GAS INHIBITED STORAGE OF SPARE CARTRIDGE (8.2.8.4) FINAL ASSEMBLY (7.2.2.2)
13 TORSIONAL ANALYSIS REQUIRED (5.9.2.1) NOZZLE LOAD TEST (6.3.6)
14 TORSIONAL ANALYSIS REPORT (5.9.2.6) CHECK FOR CO-PLANAR
15 PROGRESS REPORTS (9.3.3) MOUNTING PAD SURFACES (6.3.3)
16 OUTLINE OF PROCEDURES FOR OPTIONAL TESTS (9.2.5) MECHANICAL RUN UNTIL OIL
17 ADDITIONAL DATA REQUIRING 20 YEARS RETENTION (7.2.2.1f) TEMP. STABLE (7.3.4.7.1)
18 LATERAL ANALYSIS REQUIRED (8.2.4.1 / 8.2.4.1.3) 4 HR. MECHANICAL RUN AFTER
19 DYNAMIC BALANCE ROTOR (8.2.4.2) OIL TEMP. STABLE (7.3.4.7.3)
20 MANIFOLD PIPING TO SINGLE CONNECTION (6.5.1.6) 4 HR. MECH. RUN TEST (7.3.4.7.2)
21 VENT DRAIN COOLING WATER TRUE PEAK VELOCITY
22 MOUNT SEAL RESERVOIR OFF BASEPLATE (6.5.1.4) DATA (7.3.3.4d)
23 FLANGES REQUIRED IN PLACE OF SOCKET WELD UNIONS (6.5.2.8) BRG HSG RESONANCE
24 CONNECTION BOLTING TEST (7.3.4.6)
25 PTFE COATING ASTM A153 GALVANIZED REMOVE / INSPECT
26 PAINTED SS HYDRODYNAMIC BEARINGS
27 INSTALLATION LIST IN PROPOSAL (9.2.3L) AFTER TEST (8.2.7.5)
28 QA INSPECTION AND TESTING AUXILIARY EQUIPMENT
29 SHOP INSPECTION (7.1.4) TEST (7.3.4.5)
30 PERFORMANCE CURVE APPR. CHARPY TEST (EN 13445/ASME VIII)
31 TEST WITH SUBSTITUTE SEAL (7.3.3.2)
32 MATERIAL CERTIFICATION REQUIRED (5.12.1.8)
33 CASING IMPELLER SHAFT
34 OTHER VENDOR KEEP REPAIR AND HT RECORDS (7.2.1.1c)
35 CASTING REPAIR PROCEDURE APPROVAL REQ'D (5.12.2.5) VENDOR SUBMIT TEST PROCEDURES (7.3.1.2 / 9.2.5)
36 INSPECTION REQUIRED FOR CONNECTION WELDS (5.12.3.4e) VENDOR SUBMIT TEST DATA WITHIN 24 HOURS (7.3.3.3e)
37 MAG PARTICLE LIQUID PENETRANT INCLUDE PLOTTED VIBRATION SPECTRA (5.9.3.3)
38 RADIOGRAPHIC ULTRASONIC RECORD FINAL ASSEMBLY RUNNING CLEARANCES
39 INSPECTION REQUIRED FOR CASTINGS (7.2.1.3)(5.12.1.5) COMPLETION OF INSPECTION CHECK LIST (7.1.6)
40 MAG PARTICLE LIQUID PENETRANT
41 RADIOGRAPHIC ULTRASONIC
42 HARDNESS TEST REQUIRED: (7.2.2.3)
43 ADDITIONAL SUBSURFACE EXAMINATION (7.2.1.3)
44 FOR
45 METHOD
46 REMARKS
47
48
49
50
51
52
53
54
55
56
57
58
59
60
61
62
63
64
01/05 SHT 4 610 ISO.XLS REV 0 BB PUMP DATA SHEET
4
(kPaG)
(kPaG)
ON
SO 10438-2 (8.2.6.1/8.2.6.5)
ELECTRIC
2)
PER BRG.
(CONT.)
OBSERVE
DOCUMENT NUMBER:
CLIENT DOCUMENT NUMBER:
REVISION 0 1 2
DATE
BY 0
ISO 13709 (API 610 10TH) CENTRIFUGAL PUMP REV/APPR 0
VERTICALLY SUSPENDED (TYPE VS)
CENTRIFUGAL PUMP DATA SHEET (ISO STANDARDS) JOB NO. - ITEM NO.
SI UNITS (kPa) PAGE 3 OF 8 REQ'N NO.
1 CONSTRUCTION SURFACE PREPARATION AND PAINT
2 ROTATION: (VIEWED FROM COUPLING END) CW CCW MANUFACTURER'S STANDARD OTHER (SEE BELOW)
3 PUMP TYPE: (4.1) PUMP:
4 VS1 VS2 VS3 VS4 VS5 VS6 VS7
5 CASING MOUNTING: SUMP COVER PLATE PUMP SURFACE PREPARATION
6 INLINE SEPARATE MOUNTING PLATE (8.3.8.3.1) PRIMER
7 SEPARATE SOLE PLATE (8.3.8.3.3) FINISH COAT
8 CASING SPLIT: BASEPLATE / COLUMN:(6.3.17)
9 AXIAL RADIAL BASEPLATE SURFACE PREPARATION
10 CASING TYPE: PRIMER
11 SINGLE VOLUTE MULTIPLE VOLUTE DIFFUSER FINISH COAT
12 CASE PRESSURE RATING: SHIPMENT: (7.4.1)
13 MAX ALLOWABLE WORKING PRESSURE (kPaG) DOMESTIC EXPORT EXPORT BOXING REQUIRED
14 @ (°C) OUTDOOR STORAGE MORE THAN 6 MONTHS
15 HYDROTEST PRESSURE (kPaG) SPARE ROTOR ASSEMBLY PACKAGED FOR:
16 SUCTION PRESS. REGIONS MUST BE DESIGNED FOR MAWP (5.3.6) HORIZONTAL STORAGE VERTICAL STORAGE
17 NOZZLE CONNECTIONS: (5.4.2) TYPE OF SHIPPING PREPARATION
18 SIZE FLANGE FACING POSITION
19 DN RATING HEATING AND COOLING
20 SUCTION HEATING JACKET REQ'D. (5.8.9) COOLING REQ'D.
21 DISCHARGE COOLING WATER PIPING PLAN (6.5.3.1)
22 BALANCE DRUM C.W. PIPING:
23 PIPE TUBING; FITTINGS
24 PRESSURE CASING AUX. CONNECTIONS: (5.4.3) C.W. PIPING MATERIALS:
25 NO. SIZE (DN) TYPE S. STEEL C. STEEL GALVANIZED
26 DRAIN COOLING WATER REQUIREMENTS:
27 VENT BEARING HOUSING (m³/h) @
28 WARM-UP HEAT EXCHANGER (m³/h) @
29 BALANCE / LEAK-OFF STEAM PIPING: TUBING PIPE
30 MACHINED AND STUDDED CONNECTIONS (5.4.3.8) BEARINGS AND LUBRICATION
31 CYLINDRICAL THREADS REQUIRED (5.4.3.3) BEARING (TYPE/NUMBER):
32 ROTOR: RADIAL /
33 COMPONENT BALANCE TO ISO 1940 G1.0 (5.9.4.4) THRUST /
34 SHRINK FIT -LIMITED MOVEMENT IMPELLERS (8.2.2.3) LUBRICATION (5.11.3, 5.11.4):
35 COUPLINGS: GREASE FLOOD PURGE OIL MIST
36 MANUFACTURER MODEL FLINGER PURE OIL MIST
37 RATING (kW/100 RPM) CONSTANT LEVEL OILER PREFERENCE (5.10.2.2): x
38 SPACER LENGTH (mm) SERVICE FACTOR OIL VISC. ISO GRADE
39 RIGID REVIEW AND APPROVE THRUST BEARING SIZE
40 THROUGH COUPLINGS: OIL HEATER REQUIRED: STEAM ELECTRIC
41 MANUFACTURER MODEL
42 RATING (kW/100 RPM) LUBE INSTRUMENTATION (6.4.2)
43 SPACER LENGTH (mm) SERVICE FACTOR ACCELEROMETER (6.4.2.1)
44 RIGID PROVISION FOR MOUNTING ONLY (5.10.2.11)
45 DRIVER HALF COUPLING MOUNTED BY: FLAT SURFACE REQ'D (5.10.2.12)
46 PUMP MFR. DRIVER MFR. PURCHASER PRESSURE GAUGE TYPE
47 COUPLING BALANCED TO ISO 1940-1 G.6.3 (6.2.3)
48 COUPLING PER ISO 14691(6.2.4)
49 COUPLING PER ISO 10441(6.2.4) REMARKS:
50 COUPLING PER API 671(6.2.4)
51 NON SPARK COUPLING GUARD (6.2.14c)
52 COUPLING GUARD STANDARD PER (6.2.14a) WEIGHTS
ASME B15.1 EN 953 ISO 14120 OTHER
53 MECHANICAL SEAL: WEIGHT OF PUMP (kg)
54 SEE ATTACHED ISO 21049/API 682 DATA SHEET WEIGHT OF DRIVER (kg)
55 WEIGHT OF GEAR (kg)
56 WEIGHT OF BASEPLATE (kg)
57 TOTAL WEIGHT (kg)
58
59
60 REMARKS
61
62
63
64
65
66
67
68
06/03 SHT 3 610 ISO.XLS REV 0 VS PUMP DATA SHEET
DOCUMENT NUMBER:
CLIENT DOCUMENT NUMBER:
REVISION 0 1 2
DATE
BY 0
ISO 13709 (API 610 10TH) CENTRIFUGAL PUMP REV/APPR 0
VERTICALLY SUSPENDED (TYPE VS)
CENTRIFUGAL PUMP DATA SHEET (ISO STANDARDS) JOB NO. - ITEM NO.
SI UNITS (kPa) PAGE 4 OF 8 REQ'N NO.
1 SPARE PARTS (TABLE 18) VERTICAL PUMPS (CONT.)
2 START-UP NORMAL MAINTENANCE PUMP AND STRUCTURE DYNAMIC ANALYSIS (8.3.5)
3 SPECIFY DRAIN PIPED TO SURFACE (8.3.13.5)
4
5 OTHER PURCHASER REQUIREMENTS QA INSPECTION AND TESTING
6 COORDINATION MEETING REQUIRED (9.1.3) SHOP INSPECTION (7.1.4) PERFORMANCE CURVE APPROVAL
7 MAXIMUM DISCHARGE PRESSURE TO INCLUDE (5.3.2) TEST WITH SUBSTITUTE SEAL (7.3.3.2b)
8 MAX RELATIVE DENSITY TEST NON-WIT WIT
9 MAX DIA. IMPELLERS AND/OR NO OF STAGES HYDROSTATIC TEST OF BOWLS
10 OPERATION TO TRIP SPEED AND COLUMN (8.3.13.2)
11 CONNECTION DESIGN APPROVAL (5.12.3.4) HYDROSTATIC (7.3.2)
12 TORSIONAL ANALYSIS REQUIRED (5.9.2.1) PERFORMANCE (7.3.3)
13 TORSIONAL ANALYSIS REPORT (5.9.2.6) RETEST ON SEAL LEAKAGE (7.3.3.2d)
14 PROGRESS REPORTS (9.3.3) NPSH (7.3.4.2)
15 OUTLINE OF PROCEDURES FOR OPTIONAL TESTS (9.2.5) COMPLETE UNIT TEST (7.3.4.3)
16 ADDITIONAL DATA REQUIRING 20 YEARS RETENTION (7.2.2.1f) SOUND LEVEL TEST (7.3.4.4)
17 MANIFOLD PIPING TO SINGLE CONNECTION (6.5.1.6) CLEANLINESS PRIOR TO
18 VENT VENT COOLING WATER FINAL ASSEMBLY (7.2.2.2)
19 MOUNT SEAL RESERVOIR OFF BASEPLATE (6.5.1.4) NOZZLE LOAD TEST (6.3.6)
20 FLANGES REQUIRED IN PLACE OF SOCKET WELD UNIONS (6.5.2.8) 4 HR. MECHANICAL RUN TEST(7.3.4.7.2)
21 CONNECTION BOLTING PTFE COATING SS MECHANICAL RUN UNTIL OIL
22 PAINTED ASTM A153 GALVANIZED TEMP. STABLE (7.3.4.7.1)
23 INSTALLATION LIST IN PROPOSAL (9.2.3L) 4 HR. MECHANICAL RUN AFTER
24 VERTICAL PUMPS OIL TEMP. STABLE (7.3.4.7.3)
25 PUMP THRUST: (+) UP (-) DOWN TRUE PEAK VELOCITY
26 AT MIN. FLOW (N) (N) DATA (7.3.3.4.d)
27 AT RATED FLOW (N) (N) RESONANCE TEST (8.3.9.2)
AT MAX. FLOW (N) (N)
28 MAX THRUST (N) (N) AUXILIARY EQUIPMENT
29 SOLEPLATE REQ'D. (8.3.8.3.3) (m) X (m) TEST (7.3.4.5)
30 MOUNTING PLATE REQUIRED (8.3.9.3.1) IMPACT TEST (/)
31 SOLEPLATE THICKNESS (mm) PER EN 13445
32 COLUMN PIPE: FLANGED THREADED PER ASME VIII
33 DIAMETER (mm) LENGTH (m) VENDOR KEEP REPAIR AND HT RECORDS (7.2.1.1c)
34 GUIDE BUSHINGS VENDOR SUBMIT TEST PROCEDURES (7.3.1.2 / 9.2.5)
35 NUMBER VENDOR SUBMIT TEST DATA WITHIN 24 HOURS (7.3.3.3e)
36 LINE SHAFT BEARING SPACING (mm) INCLUDE PLOTTED VIBRATION SPECTRA (5.9.3.3)
37 GUIDE BUSHINGS LUBE: RECORD FINAL ASSEMBLY RUNNING CLEARANCES
38 WATER OIL COMPLETION OF INSPECTION CHECK LIST (7.1.6)
39 GREASE PUMPAGE MATERIAL CERTIFICATION REQUIRED (5.12.1.8)
40 LINESHAFT: OPEN ENCLOSED CASING IMPELLER SHAFT
41 LINE SHAFT DIAMETER: (mm) OTHER
42 TUBE DIAMETER: (mm) CASTING REPAIR PROCEDURE APPROVAL REQ'D (5.12.2.5)
43 LINESHAFT COUPLING: INSPECTION REQUIRED FOR CONNECTION
44 LINE SHAFT DIAMETER: SLEEVE & KEY THREADED WELDS (5.12.3.4)
45 SUCTION CAN THICKNESS (mm) MAG PARTICLE LIQUID PENETRANT
46 LENGTH (m) RADIOGRAPHIC ULTRASONIC
47 DIAMETER (m) INSPECTION REQUIRED FOR CASTINGS (7.2.1.3) (5.12.1.5)
48 SUCTION STRAINER TYPE MAG PARTICLE LIQUID PENETRANT
49 FLOAT & ROD FLOAT SWITCH RADIOGRAPHIC ULTRASONIC
50 IMPELLER COLLETS ACCEPTABLE (5.6.3) HARDNESS TEST REQUIRED (7.2.2.3)
51 HARDENED SLEEVES UNDER BEARINGS (8.3.10.5) ADDITIONAL SUBSURFACE EXAMINATION (7.2.1.3)
52 FOR
53 METHOD
54
55 Sump Arrangement 3 2
56 Key
57 1 grade
58 2 low liquid level
59 3 centerline of discharge
60 l1 sump depth
61 l2 pump length
l5
l2
NG
COOLING REQ'D.
(kPaG)
(kPaG)
ATION
ELECTRIC
4.2)
3 4
S (CONT.)
TING
MANCE CURVE APPROVAL
OBSERVE
SHAFT
1
l3
l4
l6
DOCUMENT NUMBER:
CLIENT DOCUMENT NUMBER:
REVISION 0 1 2
DATE
BY 0
ISO 13709 (API 610 10TH) CENTRIFUGAL PUMP REV/APPR 0
PRESSURE DESIGN CODES / WELDING REQUIREMENTS /
PURCHASER DEFINED MATERIAL INSPECTIONS JOB NO. - ITEM NO.
SI UNITS (kPa) PAGE 5 OF 8 REQ'N NO.
1
2 FOR 0 UNIT 0
3 SITE 0 SERVICE 0
4 NOTES: INFORMATION BELOW TO BE COMPLETED: BY PURCHASER BY MANUFACTURER BY MANUFACTURER OR PURCHASER
REVISION 0 1 2
1
2
3
4
5
6
7
8
9
10 CENTRIFUGAL PUMP PERFORMANCE CURVES
11
12
13
14
15
16
17 When this requisition is issued for purchase, the supplier’s proposed curves for
18 the selected pump will be inserted here as a substitute for this sheet.
19
20 The pump performance and characteristics as given on this performance curve will be
21 a part of the supplier’s contractual obligation within the tolerances agreed upon.
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46
47
48
49
50
51
52
53
54
55
56
57
58
59
60
61
62
63
64
65
66
67
68
3 4
30-Dec-99 30-Dec-99
30-Dec-99 30-Dec-99
DOCUMENT NUMBER:
CLIENT DOCUMENT NUMBER:
REVISION 0 1 2 3
REVISION 0 1 2 3
DATE
BY
CATEGORY 1 & 2 MECHANICAL SEALS REV/APR
FOR CENTRIFUGAL AND ROTARY PUMPS
DATA SHEET (API 682 - 3rd) JOB NO. - ITEM NO.
SI UNITS (kPa) PAGE 7 OF 8 REQ'N NO.
(FLUID DATA, UTILITIES, ACCESSORIES & INSP./TEST.)
1 INDICATES DATA COMPLETED BY PURCHASER BY SEAL VENDOR BY SEAL VENDOR OR PURCHASER
2 DEFAULT SELECTION
3 FLUID DATA - (QUENCH, BUFFER AND BARRIER FLUID DATA, LIQUID AND GAS)
4 QUENCH MEDIUM (PLAN 51, 61) SUPPLY TEMPERATURE MAX/MIN /
5 TYPE OR NAME FLOW RATE REQ'D MAX/MIN /
6 BUFFER/BARRIER MEDIUM
7 TYPE OR NAME SPECIFIC GRAVITY AT TEMPERATURE INDICATED (LIQUID)
8 PURCHASER SELECTION SEAL VENDOR SELECTION @ NORMAL TEMP @ MAXIMUM TEMP
9 SEAL VENDOR REVIEW PURCHASER REVIEW VAPOR PRESSURE AT TEMPERATURE INDICATED (LIQUID)
10 FLOW RATE REQ'D MAX/MIN / (m³/h) @ NORMAL TEMP (kPaA) @ MAXIMUM TEMP
11 COOLING/HEATING REQUIRED (+ or -) (kW) ATMOSPHERIC BOILING POINT (LIQUID)
12 SUPPLY PRESSURE MAX/MIN / (kPaG) VISCOSITY @ NORMAL TEMP. (LIQUID)
13 FLUID OPERATING TEMPERATURE SPECIFIC HEAT @ NORMAL TEMP
14 MIN (°C) NORMAL (°C) MAX (°C)
15 SITE AND UTILITIES)
16 CONTROL VOLTAGE VOLTS PHASE HERTZ COOLING H20 SUPPLY TEMP. 0 (°C) Cl2
17 ELECTRICAL AREA CL 0 GR 0 DIV 0 COOLING H20 PRESSURE NORM/DES 0 / 0
ZONE 0 GR 0 TEMP 0 ATEX (EC DIRECTIVE 94/9/EC) GR CAT. T CLASS
18 DESIGN AMBIENT MIN/MAX 0 / 0 (°C)
19 ACCESSORIES (CLAUSES 8 AND 9)
20 GENERAL PLAN 52 AND 53 SYSTEMS CONTINUED
21 JOINT USER/VENDOR LAYOUT OF EQUIPMENT (8.1.4) EQUIPMENT SUPPORT SUPPLIER
22 PIPE TAPER THREADS (8.1.9) ISO 7 ASME B1.20.1 FILLING SYSTEMS SUPPLIER
23 SPECIAL REQUIREMENTS FOR HAZARDOUS SERVICE ASME CODE STAMP REQUIRED
24 EN 13445 OR OTHER CODE APPLICABLE
25 SPECIAL CLEANING AND DECONTAMINATION REQ'TS RESERVOIR CAPACITY (8.5.4.3)
26 UTILITY MANIFOLD CONNECTIONS REQUIRED (8.4.4) NLL TO GLAND PLATE HEIGHT (8.5.4.2)
27 TYPE AND SPEC. OF HEAT TRACING (8.6.5.8) RESERVOIR MAWP (3.41) (kPaG) @
28 SET PRESSURE RANGE, MAX/MIN /
29 THERMAL RELIEF VALVES REQUIRED (9.8.3) SYSTEM HOLD-UP PERIOD (PLAN 53B & 53C)
30 COOLING SYSTEM (PLAN 21, 22, 23, 41, 53B, 53C) TEMPERATURE INDICATOR (PLAN 53B &53C)
31 HEAT EXCHANGER SUPPLIER PRESSURE SWITCH (8.5.4.2.h) TO ACTIVATE ON;
32 WATER COOLED AIR COOLED ISO 15649 ASME B31.3 RISING PRESSURE (ARR 2) SET @
33 EQUIPMENT REFERENCE/CODE FALLING PRESSURE (ARR 3) SET @
34 COOLING WATER LINES SUPPLIER HIGH LEVEL ALARM REQUIRED (8.5.4.2.1)
35 TUBING GALVANIZED PIPING (8.4.2) TEST BASED H/Q CURVE FOR INTERNAL CIRC. DEVICE
36 COOLING WATER FLOW RATE (L/min) EXTERNAL CIRCULATING PUMP (8.6.3.1)
37 SIGHT FLOW INDICATORS (8.4.3) OPEN CLOSED PLAN 72 AND 74 SYSTEMS
38 PLAN 11, 12, 13, 31, 14, 21, 23, 31, 32 AND 41 SYSTEMS EQUIPMENT SUPPLIER
39 CONNECTING LINES SUPPLIER HIGH FLOW ALARM SWITCH (8.6.6.5)
40 TUBING PIPING (8.5.2.2) PLAN 75 AND 76 SYSTEMS
41 RESTRICTION ORIFICE NIPPLE IN FLUSH LINE (8.5.2.4) EQUIPMENT SUPPLIER
42 CYCLONE SEPARATOR SUPPLIER HIGH LEVEL ALARM SWITCH FOR PLAN 75 (8.6.5.3)
43 PLAN 32 EQUIPMENT SUPPLIER TEST CONNECTION (8.6.5.4)
44 PLAN 32 FLOW IND'R PLAN 32 TEMPERATURE IND'R INSTRUMENTATION
45 PLAN 52 AND 53 SYSTEMS USER SPECIFICATION REFERENCE FOR
46 STANDARD (FIG. G.27) ALTERNATE (FIG. G.28) INSTRUMENTATION / CONTROLS
47 DIMENSIONAL VARIATIONS TO STANDARD (FIG. G.27) PRESSURE GAUGES (9.4)
48 OIL FILLED PRESSURE GAUGES (9.4.3)
49 DIMENSIONAL VARIATIONS TO ALTERNATE ( FIG. G.28) PRESSURE SWITCHES (9.5.2) TRANSMITTERS (9.5.2.3)
50 LEVEL SWITCHES (9.5.3) TRANSMITTERS (9.5.3.2)
51 ALTERNATE FABRICATION STANDARD HYDROSTATIC CAPACITANCE ULTRASONIC
52 PRIMARY EQUIPMENT SUPPLIER LEVEL INDICATORS (9.6)
53 SUPPLIER REFERENCE/CODE WELD PAD EXTERNAL, REMOVABLE (9.6.2)
54 CONNECTING LINES SUPPLIER FLOW INDICATORS (9.7) TRANSMITTER (9.7.3)
55 TUBING SCH 80 PIPING (8.5.4.4.9)
56 INSPECTION AND TESTING
57 PURCHASER PARTICIPATION IN INSPECTION AND TEST 100% INSPECTION OF ALL WELDS (6.1.6.10.5.1) USING:
58 SPECIFY: MAGNETIC PARTICLE LIQUID PENETRANT
59 INSPECTION CHECKLIST (10.1.7 & ANNEX H) RADIOGRAPHIC ULTRASONIC
60 PURCHASER APPROVAL REQUIRED FOR WELDED OPTIONAL QUALIFICATION TESTING REQ'D (10.3.1.1.2)
61 CONNECTIONS DESIGNS (6.1.6.10.5) MODIFIED FACES FOR PUMP TEST (10.3.5.2.1) (SEE PAGE 1, LINE 30)
62 HARDNESS TEST (10.2.3 k) REQUIRED FOR: ALTERNATE SEAL PUMP TEST (10.3.5.2.2) (SEE PAGE 1, LINE 25)
63
4
30-Dec-99
30-Dec-99
30-Dec-99
SI UNITS
METAL PARTS
(kPaG)
(kPaG)
(°C)
(°C)
0
0 (kPaG)
(kPaG)
(rpm)
(°C)
(°C)
(ml/m3)
(kPaA)
(°C)
(mPa-s)
(L/min)
(kPaG)
4
(°C)
(L/min)
(kPaA)
(°C)
(mPa-s)
(kJ/kg °K)
(ml/m3)
0 (kPaG)
T CLASS
(l)
(m)
(°C)
(kPaG)
(days)
(kPaG)
(kPaG)
RANSMITTERS (9.5.2.3)
RANSMITTERS (9.5.3.2)
DOCUMENT NUMBER:
CLIENT DOCUMENT NUMBER:
REVISION 0 1 2 3
REVISION 0 1 2 3
DATE
BY
CATEGORY 3 MECHANICAL SEALS REV/APR
FOR CENTRIFUGAL AND ROTARY PUMPS
DATA SHEET (API 682 - 3rd) JOB NO. - ITEM NO. 0
SI UNITS (kPa) PAGE 8 OF 8 REQ'N NO. 0
(FLUID DATA, UTILITIES, ACCESSORIES & INSP./TEST.)
1 INDICATES DATA COMPLETED BY PURCHASER BY SEAL VENDOR BY SEAL VENDOR OR PURCHASER
2 DEFAULT SELECTION
3 FLUID DATA - (QUENCH, BUFFER AND BARRIER FLUID DATA - LIQUID AND GAS)
4 QUENCH MEDIUM (PLAN 51, 62) SUPPLY TEMPERATURE MAX/MIN /
5 TYPE OR NAME FLOW RATE REQ'D MAX/MIN /
6 BUFFER/BARRIER MEDIUM
7 TYPE OR NAME SPECIFIC GRAVITY AT TEMPERATURE INDICATED (LIQUID)
8 PURCHASER SELECTED SEAL VENDOR SELECTED @ NORMAL TEMP @ MAXIMUM TEMP
9 SEAL VENDOR REVIEW PURCHASER REVIEW VAPOR PRESSURE AT TEMPERATURE INDICATED (LIQUID)
10 FLOW RATE REQ'D MAX/MIN / (L/min) @ NORMAL TEMP (kPaA) @ MAXIMUM TEMP
11 COOLING/HEATING REQUIRED (+ OR -) (kW) ATMOSPHERIC BOILING POINT (LIQUID)
12 SUPPLY PRESSURE MAX/MIN / (kPaG) VISCOSITY @ NORMAL TEMP. (LIQUID)
13 FLUID OPERATING TEMPERATURE SPECIFIC HEAT @ NORMAL TEMP
14 MIN (°C) NORMAL (°C) MAX (°C)
15 SITE AND UTILITIES
16 CONTROL VOLTAGE VOLTS PHASE HERTZ COOLING H20 SUPPLY TEMP. 0 (°C) Cl2
12/30/1899
30-Dec-99
30-Dec-99
SI UNITS
62
65
74
METAL PARTS
(kPaG)
(kPaG)
(°C)
0 (°C)
(kW)
(kW)
(N)
0
(kPaG)
(kPaG)
(rpm)
(°C)
(°C)
(ml/m3)
(kPaA)
(°C)
(mPa-s)
(L/min)
(kPaG)
4
(°C)
(m³/h)
(kPaA)
(°C)
(mPa-s)
(kJ/kg °K)
(ml/m3)
0 (kPaG)
T CLASS
(l)
(m)
(°C)
(kPaG)
(days)
(kPaG)
(kPaG)
RANSMITTERS (9.5.2.3)
RANSMITTERS (9.5.3.2)
Document Number Revision Date Service Liquid Item Capacity Suction Pressure Dischage Differential Differential NPSHA Temp. P Vap SG Viscosity Type Material Min Design Driver Hydraulic Suction Specific Speed Area Classification IEC
Type Number Normal Max Max Normal Pressure Pressure Head Normal Normal Normal Normal Metal Temp Voltage Power Max Actual Zone Group Temp. Code
(m³/h) (m³/h) (kPaG) (kPaG) (kPaG) (kPa) (m) (m) (°C) (kPaA) (mPa-s) (°C) (kW)
0 0 30-Dec-99 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0.00 0.00 0.00 0 0 0
Area Classification NEC Seal Code
Class Group Div.
0 0 0 0
Gas Volume Flow
(psig) (psig) (psi) (ft) (lb/ft²) (14.7 psia & 60°F DRY)
(barG) (barG) (bar) (m) (kg/m²) (1.013 barA & 0°C DRY)
(kPaG) (MPaG) (kPa) (m) (kg/m²) (101.3 kPaA & 0°C DRY)
(kg/cm²G) (kg/cm²G) (kg/cm²) (m) (kg/m²) (1.033 kg/cm²A & 0°C DRY)
ref.press.5000 press.wc.abs press.wc.diff press.hg.abs sound.press
5000 psi (in H2O abs) (in H2O) (in Hg abs) (dBA)
345 kg/cm² (mm H2O abs) (mm H2O) (mm Hg abs) (dBA)
34470 kPa (mm H2O abs) (mm H2O) (mm Hg abs) (dBA)
353 kg/cm² (mm H2O abs) (mm H2O) (mm Hg abs) (dBA)
(µPa)
Temperature
(ft-lb/lb) (°F) (@ 60 °F) (@ 100 °F) (@ 150 °F) (@ 212 °F) (lb)
(BTU/HP-hr) (BTU/hr ft² °F) (HP/100 rpm) (BHP/100 CFM) (lb/hp-hr) (W/in²)
(kJ/kW-hr) (kJ/hr m² °C) (kW/100 rpm) (BkW/ 100 m³/h) (kg/kW-hr) (W/in²)
(kJ/kW-hr) (kJ/hr m² °C) (kW/100 rpm) (BkW/ 100 m³/h) (kg/kW-hr) (W/in²)
(kJ/kW-hr) (kJ/hr m² °C) (kW/100 rpm) (BkW/ 100 m³/h) (kg/kW-hr) (W/in²)
power.heat power.heat.lg energy.heat energy energy.work torque unbalance moment.inertia
stiffness stress ampere volt ohm cond.electric control.signal time.sec time.min time.hr
(lb-in/rad) (psi) (A) (V) (ohm) (Mho) (psig/mA) (sec) (min) (hr)
(kg-m/rad) (MPa) (A) (V) (ohm) (Mho) (barG/mA) (sec) (min) (hr)
(kg-m/rad) (MPa) (A) (V) (ohm) (Mho) (kPaG/mA) (sec) (min) (hr)
(kg-m/rad) (MPa) (A) (V) (ohm) (Mho) (kg/cm²G/mA) (sec) (min) (hr)
S
Velocity / Acceleration Length / Area
SSU
kin.visc.at.ref.temp kin.visc.at.ref.temp.212 mass.density gas.density mass.mol mol.weight
(Btu/ft h °F) (Btu/lb mol) (lbf/ft³) (BTU/lb °F) (Btu/lb) (BTU/ft³) (hr ft²°F/BTU)
(kJ/m h °C) (kJ/kg mol) (kN/m³) (kJ/kg °K) (kJ/kg) (kJ/Nm³) (hr m² °C/kJ)
(kJ/m h °C) (kJ/kg mol) (kN/m³) (kJ/kg °K) (kJ/kg) (kJ/Nm³) (hr m² °C/kJ)
(kJ/m h °C) (kJ/kg mol) (kN/m³) (kJ/kg °K) (kJ/kg) (kJ/Nm³) (hr m² °C/kJ)