You are on page 1of 162

Proyeksi Produksi

Tahun Bulan
Existing Reparasi Re-opening Stimulasi

Jan-07
Feb-07
Mar-07
Apr-07
May-07
2007

Jun-07
Jul-07
Aug-07
Sep-07
Oct-07
Nov-07
Dec-07
Jan-08
Feb-08
Mar-08
Apr-08
May-08
2008

Jun-08
Jul-08
Aug-08
Sep-08
Oct-08
Nov-08
Dec-08
Jan-09
Feb-09
Mar-09
Apr-09
May-09
2009

Jun-09
Jul-09
Aug-09
Sep-09
Oct-09
Nov-09
Dec-09
Jan-10
0
Feb-10
Mar-10
Apr-10
May-10
2010

Jun-10
Jul-10
Aug-10
Sep-10
Oct-10
Nov-10
Dec-10
Jan-11
Feb-11
Mar-11
Apr-11
May-11
2011

Jun-11
Jul-11
Aug-11
Sep-11
Oct-11
Nov-11
Dec-11
Jan-12
Feb-12
Mar-12
Apr-12
May-12
2012

Jun-12
Jul-12
Aug-12
Sep-12
Oct-12
Nov-12
Dec-12
Jan-13 1451 30 15
Feb-13 1277 45 44
Mar-13 1223 56 69
Apr-13 1211 50 75
May-13 1021 65 98
2013

Jun-13 965 102 118


Jul-13 932 102 218
Aug-13 930 133 226
Sep-13 922 123 246 20
Oct-13 880 116 251 60
2
Nov-13 855 111 256 42
Dec-13 831 108 271 54
Realisasi Produksi

Proyeksi Realisasi
Existing Reparasi Re-opening
Produksi (bopd) Produksi (bopd)

2020
2026
2158
2308
2300
2162
2176
2280
2185
2091
2225
2369
2703
2787
2863
2736
2657
2604
2355
2335
2515
2709
3076
3412
2641 2470 101 0
2651 2274 592 1
3106 2394 642 0
3230 2607 633 28
2749 2261 397 22
2438 2038 397 16
2329 1846 409 4
2130 1548 510 3
2134 1411 614 112
2360 1403 671 217
2391 1422 804 176
2387 1427 737 225
2182 2083 26 4
2091 1955 291 0
2355 1997 282 8
2332 1945 306 12
2106 1824 271 11
1986 1664 312 11
1974 1549 346 11
1953 1480 394 11
1805 1339 388 11
1795 1234 458 11
1817 1261 460 11
1869 1338 403 8
1698 1660 20 18
1535 1385 38 21
1644 1325 123 47
1866 1402 186 123
1859 1345 191 167
1776 1272 221 143
1904 1191 215 151
1879 1188 323 117
1795 1198 308 107
2007 1179 266 117
1950 1071 239 132
1736 1027 238 144
2356 1,969 386 -
2576 2,003 570 0
2149 1,763 375 10
2111 1,689 376 47
2158 1,713 376 60
1750 1,444 248 54
1670 1,364 242 64
1622 1,318 245 58
1590 1,316 225 49
1555 1,304 214 38
1484 1,245 206 33
1403 1,210 163 30
1481 1451
1365.10
1347.67
1335.98
1183.71
1184.94
1251.91
1289.97
1310.63
1307.63
1264.63
1264.32
si Realisasi RK

Target Produksi
Bor Reparasi Reopening Stimulasi Water Injeksi Bor
(bopd)

4
5
5
5
2
4
5
6
7
4
3
9
4
11
4
3
11
1
4
5
7
10
12
4
0 2180 10
0 2231 18
0 2231 4
0 2273 11
0 2287 12
0 2316 10
0 2364 5
0 2360 6
0 2366 2
0 2358 4
0 2324 7
0 2306 6
0 2054 6
0 2023 11
0 2035 3
0 2105 7
0 2127 7
0 2223 10
0 2242 5
0 2243 6
32 2229 6
23 2268 11
17 2312 6
121 2364 7
0 1800 4 2 1
31 1930 6 5 1
77 2186 2 2
110 2169 1 9 1
152 2252 3 5
135 2380 2 3
334 2445 5 2
238 2586 4 3 2
174 2466 4 3
437 2395 6 5
496 2683 3 2
312 2920 0 0 2
- 1785 2 1
3 1758 2 3
0.4 1841 8 3
- 1773 4 6
9 1785 4 6
4 1715 3 4
- 1657 3 1
- 1597 2
- 1545 2 2
- 1480 0 1
- 1426 1 3
- 1379 1 4
1008
1056
1104
1145
1185
1219
1252
1281
1306
1332
1352
1373
PROGRAM PENINGKATAN EFISIENSI POMPA

1.00 Optimalisasi SPM PU sumur yang menggunakan elmot (pembelian VSD atau speed reducer)

Effisiensi Pompa
Rencana SPM Gross/Net Prime HP
Sumur % Qtest/Qmax SPM
sebelum sesudah Saat ini Mover eksisting HP desain delta HP
ST-118 3% 13% 99 12 2-4 15/8 Elmot 4 1 3
ST-170 4% 7% 83 5.5 2-4 10/3 Elmot 3 2 1
ST-071 4% 16% 99 11 2-4 9/3 Elmot 1 0 1
ST-008 5% 16% 94 10 2-4 15/3 Elmot 3 1 2
ST-178 5% 11% 100 6.5 2-4 12/9 Elmot 1 1 1
ST-176 6% 20% 98 9.5 2-4 44/11 Elmot 5 2 3
ST-145 7% 26% 89 11.5 2-4 25/14 Elmot 3 1 2
ST-069 8% 22% 88 8.5 2-4 15/7 Elmot 2 1 1
ST-169 8% 23% 100 9 2-4 11/4 Elmot 2 1 1
ST-125 8% 28% 94 10.5 2-4 16/10 Elmot 3 1 2
ST-023 11% 31% 100 8.5 2-4 21/7 Elmot 2 1 1
ST-112 12% 36% 100 9 2-4 25/10 Elmot 3 1 1
ST-157 13% 40% 98 9.5 2-4 45/8 Elmot 5 3 2

ST-080 14% 14% 90 2 2 9/4 Elmot 1 1 0

ST-026 14% 32% 90 7 2-4 49/7 Elmot 4 2 1


ST-116 14% 33% 100 7 2-4 30/5 Elmot 4 2 2
ST-134 16% 60% 87 11.5 2-4 30/4 Elmot 2 1 1
SD-001 18% 47% 100 8 2-4 17/10 Elmot 1 1 1
ST-183 18% 54% 95 9 2-4 37/22 Elmot 3 2 2
ST-002 18% 55% 100 9 2-4 32/7 Elmot 3 1 1
Total Penurunan HP 27
* Note : ST-080 saat ini menggunakan VSD,sehingga perlu di setting Speed reducer, agar VSD dapat dipakai di sumur lainnya
Keterangan

rencana pemasangan speed reducer, VSD di


pindahkan ke ST-134 (usulan)
a
TOTAL
40
SUMUR

Nama Status
NO. Gross (bpd) Nett (bpd)
Sumur Produksi

1 SD-001 produksi 17 10

2 SS-001 tidak produksi 0 0

3 SS-003 tidak produksi 0 0

4 SS-005 tidak produksi 0 0

5 SS-005 tidak produksi 0 0

6 ST-008 produksi 15 3

7 ST-010 tidak produksi 0 0


8 ST-013 tidak produksi 0 0

9 ST-019 tidak produksi 0 0

10 ST-022 produksi 62 2

11 ST-026 produksi 49 7

12 ST-030 tidak produksi 0 0

13 ST-042 produksi 51 3

14 ST-043 produksi 525 21

15 ST-045 tidak produksi 0 0

16 ST-046 tidak produksi 0 0

17 ST-051
18 ST-068 tidak produksi 0 0

19 ST-071 produksi 9 3

20 ST-083 tidak produksi 0 0

21 ST-084 produksi 98 1

22 ST-084 produksi 98 1

23 ST-084 produksi 98 1

24 ST-107 tidak produksi 0 0

25 ST-111 produksi 10 1

26 ST-112 produksi 25 10

27 ST-118 produksi 15 8

28 ST-120 tidak produksi 0 0


29 ST-122 tidak produksi 0 0

30 ST-124 tidak produksi 0 0

31 ST-127 tidak produksi 0 0

32 ST-138 tidak produksi 0 0

33 ST-145 produksi 25 14

34 ST-149 produksi 51 15

35 ST-157 produksi 53 11

36 ST-169 produksi 11 4

37 ST-173 produksi 70 35

38 ST-174 produksi 33 13

39 ST-176 produksi 47 19

40 ST-184
41 ST-191 tidak produksi 0 0

42 ST-191 tidak produksi 0 0

43 ST-193 tidak produksi 0 0

44 ST-193 tidak produksi 0 0

45
46
47
48
49
50 ST-063 tidak produksi 0 0

51 ST-067 tidak produksi 0 0

52 ST-077 tidak produksi 0 0

53 ST-119 tidak produksi 0 0

54 ST-131 tidak produksi 0 0

55 ST-141 tidak produksi 0 0

56 ST-148 tidak produksi 0 0

57 ST-150 tidak produksi 0 0


58 ST-151 tidak produksi 0 0
59 ST-162 tidak produksi 0 0

60 ST-166 tidak produksi 0 0

61 ST-095 tidak produksi 0 0


62 ST-096 tidak produksi 0 0
63 ST-070 tidak produksi 0 0
64 ST-125 produksi 12 7

65 ST-169 produksi 11 4

66 ST-155 produksi 395 4


Kategori
Group Lapisan Prospek (mtr)
Pekerjaan

REO-OIL p P-2 (1094.5-1097)

REP-GAS p p-6 (1215-1217)

REO-OIL p p-3 (1095-1096.5) m, p-4


(1103-1107) m
REO-GAS 962-964 m

REO-GAS 1416-1418 m

REP-GAS q q-74 (1246-1248.5)

REP-GAS q q-74 (1239.0-1241.0)


REO-OIL l l-6 (672-674)

REP-OIL q q-5 (1242-1252)

REO-OIL O-8 (1091-1092.5)

REO-OIL q q-5(1256-1270)

REO-OIL q q-3 (1301.5-1306)

REP-OIL q q-4 (1240-1242)

REP-OIL q q-3 group

REO-OIL l l-2, l-73, m-6, o-2

REP-OIL q Q-3 (1235.5-1238.5)

REO-OIL q q-74 (1265-1267)


REP-OIL u u-50 (1663-1666) dan u-5
(1666.5-1668.5)

REP-OIL l l-2 (676.0-679.0), (677.0-


680.5)

REO-OIL q group 1257-1272

REP-OIL h h-7a (366-369)

REP-OIL h h-7b (373.5-374.5)

REP-OIL h h-8 (383.5-384.5)

REP-OIL s s-1 (1506-1517)

REO-OIL r R-1 (1209,5-1214,5,0)

REP-OIL p p-4 (1104-1106) (bukan


1106.5 - 1108)??

REP-OIL p p-4 (1101-1103)

REP-OIL h h-3 (415-417)


REP-OIL r r-1(1275-1276)

REP-OIL q q-74 (1234.5-1235.5)

REP-GAS h h-2 (376-378)

REP-OIL j j-45 (489-490.5)

REP-GAS j h-95 (521-525),

REP-GAS h h-65 (502-503)

REP-GAS h h-45 (433-434)

REP-GAS f f-3 (347-349)

REP-OIL m M-12 (789-790)

REP-OIL h h-2 (431-432)

REP-GAS k k-31 (588.5-591)

REP-GAS g g-9(412-413)
REP-GAS k k-8 (782-783.5)

REP-OIL n (n-4)1029.5-1031

REP-OIL m m-2 (866-867)

REP-GAS k k-7 (755.5-757)

Stimulasi
Stimulasi
Stimulasi
Stimulasi
Stimulasi
WI o o-8

WI o o-8

WI m m-51

WI k k-31

WI p p-4

WI l l-73

WI p p-2

WI k dan m
WI m m-35
WI m m-2

WI k-31
k

WI n group n
WI l l-73
WI o o-4
WI p p-4

WI m-35

WI m m group
Detail Pekerjaan Stimulation Cost/Well (USD $)

Cabut RPP. Squeeze I k-7 (669-670.5) k-8


(678-680), squeeze II h-95 (471-472), j-
5(532-534) dan j-6 (537-539) m, squeeze III
g-9 (374-375) dan (442-445). Bor kurung
dan pancing CR di 684 m (kalau tidak
berhasil milling CR), dorong CR di 1048 m
spi 1153 m. Produksikan P-2 (1094.5-1097)

Cabut RPP. Squeeze nm-8. Bor semen.


Squeeze o-6 Bor semen. Dorong CR spi
1221. Masuk R/ pengerik spi 1221 m. Set
packer/ UR di (1190/ 1200) m. Buka p-6
dengan enerjet 2 1/8" -6 SPF.
Cabut RPP. Dorong CR di 1080 ke 1125 m).
Produksikan P-3 dan P-4
Cabut RPP. Squeeze h-8 (822.5-824.5) dan
h-5 (769.5-771). Pancing CR di 845 m. Bor
SS. Pancing CR di 900 m. Masuk pengerik
spi 960 m. Set packer di 940 m.
Produksikan k-8 (962-964) m
Release packer. Pancing BP. Squeeze o-8
(1379.5-1381.5). Pancing CR. Masuk R/
pengerik spi 1400 m. Set packer di 1390 m.
Produksikan p-3 (1416-1418)
Cabut RPP. Squeeze n-5, j-2, g2 dan g-6 (3
x). Bor semen. Masuk R/ pengerik spi 1250
m. Set packer/ UR di (1210/1230). Buka
ulang q-74 (1246-1248) dengan enerjet 2
1/8" -6 SPF.
Cabut RPP. Pancing CR 3 bh. Masuk R/
pengerik spi 1250 m. Set packer/ UR di
(1220/ 1230) m. Buka q-74 (1239-1241)
dengan enerjet 2 1/8" -6 SPF.
Release dan cabut packer. Squeeze I j-6
(478-479) & j-9 (527-529), squeeze II h-4
(355.5-357). Bor semen, dorong CR.
Produksikan l-6 (672-674) m.
Cabut RPP. Perfo ulang + tambah lapisan q-
5 (1242-1252) m dengan HSD 4.5" 51 BX -5
SPF, (selang existing saat ini (1241.5 -1245)
m)
Cabut RPP. squeeze I l-73 (789-792),
squeeze II k-5 (666.5-668), Squeeze III h-4
(433-436). Bor semen + pasir spi puncak
CR di 1029 m, dorong CR spi kedalaman
1100 m. Squeeze o-2 1036-1037.8). Reopen
o-8 (1091-1092.5) m
Cabut RPP. Set SS sbg bantalan, Squeeze
2 x (grup o dan grup m). Pancing CR di
1247 m. Produksikan q-5, q-5a, q-3 dan q-2
dengan ESP.
Release dan cabut packer. Squeeze m-8.
Bor semen + SS spi amblong. Squeeze q-
2a. Bor kurung dan pancing CR di 1306
(atau dorong). Produksikan q-3 (1310.5-
1314) m.
Cabut RPP. Squeeze I n-9 (998-1000.5),
squeeze II grup m dan n-91 (892-912.5). Bor
semen. Bor kurung dan pancing CR di
1012.5 m. Squeeze III p-4 (1134.3-1135.5) &
o-97 (1099-1102), Squeeze IV grup o (1018-
1049). Bor semen spi amblong. Bor kurung
dan pancing CR di 1200 m. Dorong CR di
1231 m spi 1270 m. Buka ulang q-4 (1240-
1242)

Cabut RPP. Buka ulang q-3 dengan HSD


4.5" -5 SPF. Produksikan kembali dengan
ESP
Cabut RPP. Squeeze ulang h-95. Bor
semen, produksikan lapisan eksisting
Masuk IB, lakukan cap permukaan ikan.
Pancing ikan berupa tubing 93 jts+ 2 DP
3.5"+Millbit. Squeeze grup q dan f-35 (2x).
Bor semen. Buka lapisan (Q-3 (1235.5-
1238.5) dengan HSD 4.5" -5 SPF.

Cabut RPP. Dorong CR spi 1350 m.


Produksikan dengan ESP
Cabut R/ ESP. Squeeze ulang semen bocor
di P-10 (1213.5-1215) & (1217.5-1219) m.
Buka ulang u-50 (1663-1666) dan u-5
(1666.5-1668.5). Produksikan dengan ESP.

Cabut RPP. Squeeze h-75 (417-418) m.


Buka ulang l-2 (676-680.5) dengan HSD
4.5" 51BX -5 SPF
squeeze m-8, dorong CR, Set ESP
produksikan Q group
Cabut RPP. Set SS di 400 m. Buka h-8
(383.5-384.5) m dengan HSD 4.5" -5 SPF.

Cabut RPP. Squeeze h-8 (383.5-384.5).


Buka h-7b (373.5-374.5) m dengan HSD
4.5" -5 SPF.
Cabut RPP. Squeeze h-7b (373.5-374.5).
Buka h-7a (366-369) dengan HSD 4.5" -5
SPF.
Masuk IB,cap permukaan ikan. Pancing ikan
berupa DHS. Bor SS. Squeeze j-4 (618 -
620) m. Bor semen + SS. Squeeze p-4
(1205-1206.5). Bor semen. Masuk IB, cap
permukaan ikan. Pancing ikan berupa
packer di 1365 m. Buka s-1.
Cabut RPP. Squeeze I q-3 (1116.5-1118),
squeeze II l-2 (836-838), Squeeze III f-3
(391.7-392.7) dan g-6 (503-505). Bor semen
+ pasir + SS. Squeeze q-6 (1168.5-1170).
Bor semen. Produksikan r-1 (1209.5-1214.5)

Cabut RPP. Masuk IB, cap permukaan ikan.


Pancing ikan. Squeeze bertahap grup 1: m-
6(832 - 838), m-7 (844-846), m-8 (857-859),
m-9 (875-876.5) m; grup 2. h-8 (428.5 -
431.5) m. Bor semen spi 1150 m. Buka
ulang p-4 (1101-1103) dengan HSD 4.5"
51BX - 5 SPF.

Cabut RPP. Masuk IB, cap permukaan ikan.


Pancing ikan. Squeeze bertahap grup 1: m-
6(832 - 838), m-7 (844-846), m-8 (857-859),
m-9 (875-876.5) m. 2. h-8 (428.5 - 431.5) m.
Bor semen spi 1150 m. Buka ulang p-4
(1101-1103) dengan HSD 4.5" 51BX - 5
SPF.

Cabut RPP. Squeeze q-74 (1190-1192).


Perfo h-3 (415-417) m dengan HSD 4.5" 51
BX -5 SPF.
Squeeze k-12. Bor semen. Dorong CR.
Buka r-1 dengan HSD 4.5", -5 SPF
Release dan cabut packer. Squeeze 1 m-6
n-8 (959-961), squeeze 2 (838 - 840). Bor
semen. Borong CR spi di bawah bottom
perfo (+/- 1245 m). Squeeze q-74 (1242,0-
1243,0) dan q-8 (1246,5-1249,0). Buka q-74
(1234.5-1235.5) dengan HSD 4.5" -5 SPF.

Cabut RPP. Set SS di 500 m. Masuk R/


pengerik spi 400 m. Set packer/ UR di
(350/360). Buka h-2 (375-377.5) dengan
enerjet 2 1/8" -6 SPF.
Cabut RPP. Set SS di 550 m. Buka j-45
(489-490.5)
Cabut RPP. Squeeze grup j dan k-12.
Masuk R/ pengerik spi 550 m. Set packer/
UR di (500/510). Buka h-95 dengan enerjet
2 1/8" -6 SPF.
Cabut RPP. Set SS di 500 m. Masuk R/
pengerik spi 450 m. Set packer/ UR di 380/
390 m. Buka h-65 dengan enerjet 2 1/8" -6
SPF.
Cabut RPP. Set SS di 550 m. Masuk R/
pengerik spi 450 m. Set packer/ UR di
(410/420). Buka h-45 (432.5-434.5) dengan
enerjet 2 1/8" -6 SPF.
Cabut RPP. Set SS di 500 m. Masuk R/
pengerik spi 400 m. Set packer/ UR di
(320/330). Bukaf-3 (347-350) dengan
enerjet 2 1/8" -6 SPF.
Cabut RPP. Squeeze I n-5 (915-917),
Squeeze II k-7 (662-664)m. Bor semen.
Buka m-12 (789-790) dengan HSD 4.5" 51
BX -5 SPF.
Cabur RPP. Set SS di 600 m. Buka h-2
(431-432) m dengan HSD-4.5-5 spf
Cabut RPP. Squeeze I l-2b (677-679) & l-3
(687-689.5), squeeze II (355-358) & (406-
407) m. Bor semen. Buka k-31 (589-591) m
dengan HSD 4.5" 51BX -5 SPF.
Cabut RPP. Squeeze n-6 (972 - 975.5).
Masuk TP + packer + RPP. Set packer/ UR
di 392/ 402 m. Swab RPP. Buka (412-
413)m.
Cabut RPP. Squeeze t-65 (1661-1664).
Masuk R/ pengerik spi 800 m. Set packer di
760 m. Buka 782-783.5 dengan enerjet 2
1/8"
Release dan cabut packer. Squeeze 782-
783.5. Buka 1029.5-1031 dengan HSD 4.5"
-5 SPF.
Set CR di 950 m. Buka m-2 dengan HSD
4.5" -5 SPF
Cabut RPP. Squeeze u-55 (1727.5-1729).
Masuk R/ pengerik spi 800 m. Set packer di
730 m. Buka k-7 (755.5-757) dengan enerjet
2 1/8".

Release dan cabut packer. Buka ulang o-8


(1193-1195) dengan HSD 4.5" 51BX -5 SPF.
Masuk bellshoe+TP + packer, set packer/
UR di (1170/ 1180)
squeeze f-8 (sekaligus perbaikan bonding
semen), bor semen, masuk R/ pengerik, set
packer di 1100 m, inj. Test. Jika tdp indikasi
plug lakukan re-perfo lap o-8.

Masuk R/ pengerik s.d 850 m. Set packer di


840 m
Squeeze k-1 (678-681). Masuk Pengerik spi
700 m. Reperfo k-31. Set packer/ UR di 670/
680

Squeeze layer terbuka 7x. Bor semen dan


dorong CR. Masuk R/ pengerik spi 1150 m.
Set packer/ UR di (1090/ 1100) m.
reperfo. Cumm 49000 bbl (set SS/CR, perfo
ulang), set packer
Squeeze k grup dan j-2. Masuk R/pengerik
spi 1160 m. Buka ulang p-2. Set Packer/ UR
di 1130/1140 m.
Injection rate test
Cabut Packer. Squeeze p-4 (1230.5 -
1239.5) m. Masuk R/ Pengerik. Reperfo m-
35 (896-899)m dengan HSD 4.5" -5 SPF.
Set packer/ UR di 870 m/ 880 m.
Set SS di 1000 m dan bantalan semen di
750 m. Squeeze j-group. Masuk pengerik
spi 900 m. Set packer/ UR di 850/ 870 m.
Squeeze m-2, j-4, g-4. Masuk Pengerik spi
750 m. Buka ulang k-31. Set packer/ UR di
(680/ 690) m.
Set packer di kedalaman 820 m
Squeeze k-2, set packer di 500 m.
Set packer di kedalaman 900 m.
Squeeze 4 x. Masuk R/ pengerik spi 1140
m. Buka p-4 91123-1129) m. Set packer/ UR
di (1100/ 1110) m.
Squeeze o-3 (1106.5 - 1108) m, l group
(821-865.5) m. Masuk R/ pengerik spi 880
m. Buka m-4 (891.5-893) m. Set packer/ UR
di (870/ 880) m.
Masuk R/ pengerik spi 880 m. Set packer/
UR di (870/ 880) m

Total

Total (Rp)
Cementing Perforation Total Cost/Well
Cost/Well (USD $) Cost/Well (USD $) (USD $)

39000 - 39000

26000 13816.1 39816.1

- - 0

12000 - 12000

12000 - 12000

39000 13920.05 52920.05

- 13895.3 13895.3
26000 - 26000

- 33544.28 33544.28

52000 - 52000

26000 - 26000

26000 - 26000

65000 - 65000

- 22312.925 22312.925

13000 - 13000

26000 15998.515 41998.515

- - 0
13000 21100.215 34100.215

13000 17856.895 30856.895

13000 - 13000

13000 8834 21834

13000 8834 21834

13000 13834 26834

26000 21942.63 47942.63

52000 - 52000

26000 13039.17 39039.17

13000 11334 24334


13000 11125.64 24125.64

39000 10988.345 49988.345

13000 11780 24780

13000 12584 25584

13000 13430 26430

13000 10130 23130

13000 11780 24780

13000 13430 26430

26000 9478.1 35478.1

13000 8834 21834

26000 11334 37334

13000 10130 23130


13000 11560.55 24560.55

13000 11545.09 24545.09

- 12991.63 12991.63

13000 - 13000
804,000.00 401,383.44 1,205,383.44

7,638,000,000.00 3,813,142,632.50 11,451,142,632.50


Lama Surface Facility
Kategori
Pekerjaan Hoist
Layer
(hari)
Flowline Pumping Unit

8 L-350 lap lama

Ada 79 LUF

8 lap lama

TOS Tidak Ada

4 L-350 lap lama


TOS Tidak Ada
lap lama

6 L-350 TOS Tidak Ada

lap lama

6 L-350 Tidak Ada Tidak Ada

5 L-350 lap lama

Ada 13 BKK

7 L-350 lap lama

Ada 47 LUF
6 L-350 lap lama

Tidak Ada

4 AB-100 lap lama

TOS 21 BKK

7 L-350 lap lama

Ada 10 BKK

lap lama

7 L-350 Ada 92 BKK

7 L-350 lap lama

Ada Tidak Ada

10 L-350 lap lama

Ada 101 IME

4 L-350 lap lama


Ada 110 BKK

3 L-350 lap lama


Ada Tidak Ada
6 L-350 lap baru

Ada Tidak Ada

4 lap lama
AB-100 Ada Tidak Ada
5 L-350 lap lama

Ada Tidak Ada

4 AB-100 lap lama


Ada 53 LUF

6 L-350 lap lama


Ada Tidak Ada
lap baru
4 AB-100 Ada 69 RES

lap baru
4 AB-100 Ada 69 RES

lap baru
4 AB-100 Ada 69 RES

8 L-350 lap lama

Tidak Ada Tidak Ada

8 L-350 lap lama

Ada 66 LUF

10 L-350 lap lama

Ada 36 LEG

7 L-350 lap lama

Ada 39 LEG

5 L-350 lap baru


Ada Tidak Ada
6 L-350 lap baru
Ada Tidak Ada
5 L-350 lap baru

Ada Tidak Ada

5 AB-100 lap baru


Ada Tidak Ada

lap baru
4 AB-100 Ada 50 LUF
6 AB-100 lap baru
Ada 50 LUF

4 AB-100 lap baru


Ada 59 LUF

4 AB-100 lap baru


Ada 29 CHC

4 AB-100 lap baru


Ada 56 LUF

6 AB-100 lap lama


Ada 60 LUF

4 AB-100 lap baru


Ada 54 LUF
5 AB-100 lap baru
Ada 103 IME

5 AB-100 lap baru


Ada 27 BKK
lap baru
5 L-350 Ada Tidak Ada

lap baru
5 AB-100 Ada Tidak Ada

4 AB-100 lap baru


Ada 75 BKK
lap baru
5 L-350 Ada 75 BKK

Crane ADA

L-350 ADA

AB-100 Tidak ada

AB-100 Tidak ada

L-350 Tidak ada

AB-100 Tidak ada

L-350 ADA

AB-100 ADA
AB-100 ADA

AB-100 ADA

L-350 ADA
AB-100 Tidak ada
L-350 On Progress

L-350 Tidak ada

AB-100 Tidak ada

AB-100 Tidak ada

244.00
Surface Facility
Barchart
Jalur
Pumping Unit Gasline
Listrik

C.160D-169-54 Ada Ada

Tidak Ada Tidak Ada Tidak Ada

v
Tidak Ada Tidak Ada Tidak Ada

Tidak Ada Tidak Ada Tidak Ada

Tidak Ada Tidak Ada Tidak Ada

C. 160-173-64 Ada Ada

M.114 D-173-74 Ada Ada


v
Tidak Ada

v
M. 228-246-86 Ada Ada

C. 160-173-64 Ada Ada

v
M. 228-246-86 Ada Ada

Tidak Ada Ada Tidak Ada

C.456-305-168 Ada Ada

v
C.456-305-168 Ada Ada

v
Tidak Ada Ada Ada

Tidak Ada Tidak Ada Tidak Ada

Tidak Ada Ada Ada


v

Tidak Ada Ada Tidak Ada

C.160 D-169-54 Ada Ada

v
Tidak Ada Ada Ada
v
C. 114-143-64 Ada Ada

v
C. 114-143-64 Ada Ada

v
C. 114-143-64 Ada Ada

Tidak Ada Tidak Ada Tidak Ada

M.228 D-213-86 Ada Ada

C. 114-143-64 Ada Ada

C. 160-143-64 Ada Ada

v
Tidak Ada Ada Tidak Ada
v
Tidak Ada Ada Ada

Tidak Ada Ada Ada

Tidak Ada Ada Ada

v
C.160 D-169-54

C.160 D-169-54 Ada Ada

M.228 D-200-74 Ada Ada

C.160-143-64 Ada Ada

C.160 D-169-54 Ada Ada

M.228 D-200-74 Ada Ada

C.160 D-169-54 Ada Ada

C.456-305-168 Ada Ada

M. 228-246-86 Ada Ada


v
Tidak Ada Ada Ada

v
Tidak Ada Ada Ada

Ada (drop v
M. 228-246-86 Tidak Ada
voltage)
v
Ada (drop
M. 228-246-86 Tidak Ada
voltage)
Realisasi RK Tahun 2010-2012 dan Rencana RK Tahun 2013-2014

Water
Tahun Perawatan (Job) Workover Reparasi Reopening Stimulasi Injeksi Bor (sumur)
(sumur) (sumur) (sumur) (sumur) (sumur)

2010 110 5 85 31 2 3

2011 108 1 37 38 6 9

2012 138 34 24 3 12 1

2013 72 43 38 5 22

2014 72 20 24 7 36 2

Untuk water injeksi ada pekerjaan perforasi/reparasi.

Rencana
No Sumur
Kerja
ST-019 ST-042 ST-043 ST-046 ST-068 ST-071 ST-084 ST-107 ST-112 ST-118 ST-
120 ST-122 ST-124 ST-138 ST-173 ST-174 ST-191 ST-193 ST-167 ST-091 ST-
1 Reparasi 005 ST-109 ST-099 ST-060 ST-072 ST-137 ST-175 SS-005 ST-004 ST-133 ST-
074

SS-001 ST-008 ST-010 ST-127 ST-145 ST-149 ST-157 ST-169 ST-176 ST-184 ST-
Reparasi Gas 191 ST-193

SD-001 SS-003 ST-013 ST-022 ST-026 ST-030 ST-045 ST-051 ST-083 ST-111 ST-
067 ST-014 ST-061 ST-031 ST-018 ST-038 ST-011 ST-065 ST-121 ST-177 ST-
2 Reopening 123 ST-086 ST-029 ST-002 ST-127 ST-141 ST-024 ST-037 ST-044 ST-085 ST-
101 SS-002 ST-053 ST-093 ST-073 ST-069 ST-102

3 Reopening Gas SS-005


4 Stimulasi ST-043 ST-181 ST-019 ST-047 ST-064
ST-063 ST-077 ST-119 ST-131 ST-141 ST-148 ST-150 ST-151 ST-162 ST-166 ST-
Water Injeksi 095 ST-096 ST-070 ST-125 ST-169 ST-155 ST-028 ST-056 ST-040 ST-057 ST-
5 186 ST-066
Total
Realisasi
Sumur

31 ST-120, ST-138

12

37

1
5

ST-166,ST-96, ST-
22 70
ST-019 ST-042 ST-043 ST-046 ST-068 ST-071 ST-084 ST-084 ST-084

SS-001 ST-008 ST-010 ST-127 ST-145 ST-149 ST-157 ST-169 ST-176

SD-001 SS-003 ST-013 ST-022 ST-026 ST-030 ST-045 ST-051 ST-083

ST-043 ST-181 ST-019 ST-047 ST-064

ST-063 ST-077 ST-119 ST-131 ST-141 ST-148 ST-150 ST-151 ST-162

ST-019
ST-042 ST-019 ST-042 ST-043
ST-043 ST-042
ST-046 ST-043
ST-068 ST-046
ST-071 ST-068
ST-084 ST-071
ST-107 ST-084
ST-112 ST-107
ST-118 ST-112
ST-120 ST-118
ST-122 ST-120
ST-124 ST-122
ST-138 ST-124
ST-173 ST-138
ST-174 ST-173
ST-191 ST-174
ST-193 ST-191
ST-167 ST-193
ST-091 ST-167
ST-005 ST-091
ST-109 ST-005
ST-099 ST-109
ST-060 ST-099
ST-072 ST-060
ST-137 ST-072
ST-175 ST-137
SS-005 ST-175
ST-004 SS-005
ST-133 ST-004
ST-074 ST-133
ST-074

ST-063 SD-001 SS-003 ST-013 ST-022 ST-026 ST-030 ST-045 ST-051

ST-077 SS-003
ST-119 ST-013
ST-131 ST-022
ST-141 ST-026
ST-148 ST-030 ST-063

ST-150 ST-045 ST-077


ST-151 ST-051 ST-119
ST-162 ST-083 ST-131
ST-166 ST-111 ST-141
ST-095 ST-067 ST-148
ST-096 ST-014 ST-150
ST-070 ST-061 ST-151
ST-125 ST-031 ST-162
ST-169 ST-018 ST-166
ST-155 ST-038 ST-095
ST-028 ST-011 ST-096
ST-056 ST-065 ST-070
ST-040 ST-121 ST-125
ST-057 ST-177 ST-169
ST-186 ST-123 ST-155
ST-066 ST-086 ST-028
ST-029 ST-056
ST-002 ST-040
ST-127 ST-057
ST-141 ST-186
ST-024 ST-066
ST-037
ST-044
ST-085
ST-101
SS-002
ST-053
ST-093
ST-073
ST-069
ST-102
ST-063

ST-077
ST-119
ST-131
ST-141
ST-148
ST-150
ST-151
ST-162
ST-166
ST-095
ST-096
ST-070
ST-125
ST-169
ST-155
ST-028
ST-056
ST-040
ST-057
ST-186
ST-066
ST-107 ST-112 ST-118 ST-120 ST-122 ST-124 ST-138 ST-173 ST-174 ST-191

ST-184 ST-191 ST-193

ST-111 ST-067 ST-030 ST-014 ST-061 ST-031 ST-018 ST-038 ST-011 ST-065

ST-166 ST-095 ST-096 ST-070 ST-125 ST-169 ST-155 ST-028 ST-056 ST-040

ST-046 ST-068 ST-071 ST-084 ST-107 ST-112 ST-118 ST-120 ST-122 ST-124
ST-083 ST-111 ST-067 ST-014 ST-061 ST-031 ST-018 ST-038 ST-011 ST-065
ST-193 ST-167 ST-091 ST-005 ST-109 ST-099 ST-060 ST-072 ST-137 ST-175

ST-121 ST-177 ST-123 ST-086 ST-029 ST-002 ST-127 ST-141 ST-024 ST-037

ST-057 ST-186 ST-066

ST-138 ST-173 ST-174 ST-191 ST-193 ST-167 ST-091 ST-005 ST-109 ST-099
ST-121 ST-177 ST-123 ST-086 ST-029 ST-002 ST-127 ST-141 ST-024 ST-037
SS-005 ST-004 ST-133 ST-074

ST-044 ST-085 ST-101 SS-002 ST-053 ST-093 ST-073 ST-069 ST-102

ST-060 ST-072 ST-137 ST-175 SS-005 ST-004 ST-133 ST-074


ST-044 ST-085 ST-101 SS-002 ST-053 ST-093 ST-073 ST-069 ST-102
RENCANA KERJA (HASIL KONSIN

Nama Status
NO. Sumur Produksi Gross (bpd) Nett (bpd)

3 SS-003 produksi 140 40

9 ST-019 produksi 320 21

10 ST-022 produksi 62 30

14 ST-043 produksi 525 21

21 ST-084 produksi 98 21

22 ST-084 produksi 98 24

23 ST-084 produksi 98 24

29 ST-122 produksi 78 25
78 ST-043 produksi 835 60
80 ST-019 produksi 780 30
RJA (HASIL KONSINYERING + WELL BY WELL REVIEW JA

Kategori
Pekerjaan Group Lapisan Prospek (mtr)

REO-OIL p p-3 (1095-1096.5) m, p-4 (1103-1107) m

REP-OIL q q-5 (1242-1252)

REO-OIL O-8 (1091-1092.5)

REP-OIL q q-3 group

REP-OIL h h-7a (366-369)

REP-OIL h h-7b (373.5-374.5)

REP-OIL h h-8 (383.5-384.5)

REP-OIL r r-1(1275-1276)
STIMULASI q q-3
STIMULASI q q-74

TOTAL SUMUR :
TOTAL PEKERJAAN DENGAN RIG SEWA :
TOTAL PEKERJAAN DENGAN RIG EXISTING :
TOTAL PEKERJAAN :
ELL REVIEW JANUARI 2013)

Lama
Pekerjaan
Detail Pekerjaan (hari) Hoist

Pancing RPP. Tutup lap o-3 dan o-4. Dorong 7 RIG EXISTING
CR di 1080 ke 1125 m). Produksikan P-3
dan P-4
Cabut RPP. Perfo ulang + tambah lapisan q- 4 RIG EXISTING
5 (1242-1252) m dengan HSD 4.5" 51 BX -5
SPF, (selang existing saat ini (1241.5 -1245)
m)
Cabut RPP. squeeze I l-73 (789-792), 7 RIG EXISTING
squeeze II k-5 (666.5-668), Squeeze III h-4
(433-436). Bor semen + pasir spi puncak
CR di 1029 m, dorong CR spi kedalaman
1100 m. Squeeze o-2 1036-1037.8). Reopen
o-8 (1091-1092.5) m
Cabut RPP. Buka ulang q-3 dengan HSD 4 RIG EXISTING
4.5" -5 SPF. Produksikan kembali dengan
ESP
Cabut RPP. Set SS di 400 m. Buka h-8 RIG EXISTING
(383.5-384.5) m dengan HSD 4.5" -5 SPF. 4

Cabut RPP. Squeeze h-8 (383.5-384.5). RIG EXISTING


Buka h-7b (373.5-374.5) m dengan HSD 4
4.5" -5 SPF.
Cabut RPP. Squeeze h-7b (373.5-374.5). RIG EXISTING
Buka h-7a (366-369) dengan HSD 4.5" -5 4
SPF.
Squeeze k-12. Bor semen. Dorong CR.
6 RIG EXISTING
Buka r-1 dengan HSD 4.5", -5 SPF
set packer stimulasi q-3 7 RIG EXISTING
set packer stimulasi q-3 7 RIG EXISTING

108
AN RIG SEWA : 22
RIG EXISTING : 90
112
TAHUN
JANUARI
RIG
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25

H-25

Gross

Net

AB-100 St-34 ST-106 ST-120 ST-017 ST-068 ST-120 ST-048

Gross 67

Net 64

L-350 ST-66 ST-147 ST-096 Maintenance program


Gross

Net

Rig Sewa

(250 hp)

Gross

Net

GROSS 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 67 0 0 0 0 0 0
NET 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 64 0 0 0 0 0 0
AIR 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 3 0 0 0 0 0 0
TAHUN
FEBRUARI
RIG
26 27 28 29 30 31 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19

H-25

Gross

Net

AB-100
ST-048 ST- ST-148 ST-138 ST-188 ST-081 ST-138 ST-03
ST-108
034

Gross 212

Net 4

m L-350 ST-66 ST-070 ST-068 ST-122


Gross 78

Net 25

Rig Sewa

(250 hp)

Gross

Net

GROSS 0 0 212 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 78 0 0
NET 0 0 4 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 25 0 0
AIR 0 0 208 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 53 0 0
TAHUN 2013
FEBRUARI
RIG
20 21 22 23 24 25 26 27 28 29 30 24 25 26 27 28

H-25

Gross

Net

AB-100 ST-030 ST-084 ST-167

Gross 120 98 45

Net 5 24 20

ST-122L-350 ST-66 ST-013 ST-022


Gross 130 62

Net 30 30

Rig Sewa

(250 hp)

Gross

Net

GROSS 120 0 0 0 0 130 0 0 98 0 0 0 0 62 0 45


NET 5 0 0 0 0 30 0 0 24 0 0 0 0 30 0 20
AIR 115 0 0 0 0 100 0 0 74 0 0 0 0 32 0 25
TAHUN
MARET
RIG
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27

H-25

Gross

Net

AB-100 ST-167 ST-169 ST-018

Gross 113

Net 7

L-350 ST-022ST-66 ST-002 SS-003 ST-111


Gross 412 140 60

Net 35 40 21

Rig Sewa

(250 hp)

Gross

Net

GROSS 0 0 0 0 0 0 412 0 0 0 0 0 0 0 0 0 140 0 0 0 113 0 0 60 0 0 0


NET 0 0 0 0 0 0 35 0 0 0 0 0 0 0 0 0 40 0 0 0 7 0 0 21 0 0 0
AIR 0 0 0 0 0 0 377 0 0 0 0 0 0 0 0 0 100 0 0 0 106 0 0 39 0 0 0
TAHUN
APRIL
RIG
28 29 30 31 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22

H-25

Gross

Net

AB-100 ST-031 ST-014 ST-038 ST-121

Gross 110 112 112 120

Net 5 4 6 5

L-350
ST-111 ST-66 ST-051 ST-083 ST-026
Gross 1700 1100 49

Net 40 34 17

Rig Sewa

(250 hp)

Gross

Net

GROSS 0 110 0 0 0 0 1700 0 112 0 0 0 1100 0 0 0 112 0 0 0 0 49 0 120 0 0


NET 0 5 0 0 0 0 40 0 4 0 0 0 34 0 0 0 6 0 0 0 0 17 0 5 0 0
AIR 0 105 0 0 0 0 1660 0 108 0 0 0 1066 0 0 0 106 0 0 0 0 32 0 115 0 0
TAHUN
APRIL
RIG
23 24 25 26 27 28 29 30

H-25

Gross

Net

AB-100 ST-028

Gross

Net

ST-026 L-350 ST-66 ST-107


Gross 130

Net 40

Rig Sewa

(250 hp)

Gross

Net

GROSS 0 0 0 0 0 130 0 0
NET 0 0 0 0 0 40 0 0
AIR 0 0 0 0 0 90 0 0
TAHUN
MEI
RIG
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27

H-25

Gross

Net

ST-028
AB-100 ST-077 ST-066 ST-091

Gross 76

Net 25

L-350
ST-107 ST-66 ST-046 ST-118
Gross 800 250

Net 35 42

Rig Sewa ST-072 ST-137 ST-109

(250 hp)

Gross 97 251 80

Net 26 33 25

GROSS 0 0 0 0 0 97 0 0 0 0 0 800 0 0 0 0 251 0 0 0 0 0 0 250 0 76 80


NET 0 0 0 0 0 26 0 0 0 0 0 35 0 0 0 0 33 0 0 0 0 0 0 42 0 25 25
AIR 0 0 0 0 0 71 0 0 0 0 0 765 0 0 0 0 218 0 0 0 0 0 0 208 0 51 55
TAHUN
JUNI
RIG
28 29 30 31 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22

H-25

Gross

Net

AB-100
ST-091 ST-043 ST-019

Gross 835 780

Net 60 30

L-350 ST-66 ST-131 ST-065


Gross 80

Net 12

ST-109
Rig Sewa ST-175 SS-002

(250 hp)

Gross 70 32

Net 30 24

GROSS 0 0 0 0 0 0 0 0 835 70 0 0 0 0 0 0 0 0 0 32 0 0 0 80 780 0


NET 0 0 0 0 0 0 0 0 60 30 0 0 0 0 0 0 0 0 0 24 0 0 0 12 30 0
AIR 0 0 0 0 0 0 0 0 775 40 0 0 0 0 0 0 0 0 0 8 0 0 0 68 750 0
TAHUN
JUNI
RIG
23 24 25 26 27 28 29 30

H-25

Gross

Net

ST-019
AB-100

Gross

Net

ST-065 L-350 ST-66 ST-042


Gross

Net

Rig Sewa ST-004

(250 hp)

Gross 32

Net 24

GROSS 0 0 32 0 0 0 0 0
NET 0 0 24 0 0 0 0 0
AIR 0 0 8 0 0 0 0 0
TAHUN
JULY
RIG
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27

H-25

Gross

Net

AB-100 ST-047 ST-064

Gross 625 987

Net 42 80

L-350 ST-66 ST-042 ST-112 ST-029


Gross 51 250 432

Net 20 40 15

Rig Sewa ST-133 ST-053 ST-074

(250 hp)

Gross 41 312 76

Net 23 14 21

GROSS 0 0 0 51 0 41 625 0 0 0 0 0 0 0 0 562 0 0 0 0 987 0 0 0 0 508 0


NET 0 0 0 20 0 23 42 0 0 0 0 0 0 0 0 54 0 0 0 0 80 0 0 0 0 36 0
AIR 0 0 0 31 0 18 583 0 0 0 0 0 0 0 0 508 0 0 0 0 907 0 0 0 0 472 0
TAHUN
AGUSTUS
RIG
28 29 30 31 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22

H-25

Gross

Net

AB-100 ST-149 ST-174

Gross 83

Net 23

T-029 L-350 ST-66 ST-030 ST-124 ST-125


Gross 212 110

Net 26 21

ST-074
Rig Sewa ST-093 ST-073 ST-12

(250 hp)

Gross 420 320

Net 13 26

GROSS 0 0 0 0 0 0 0 212 420 0 0 0 0 0 0 0 430 0 0 0 83 0 0 0 0 0


NET 0 0 0 0 0 0 0 26 13 0 0 0 0 0 0 0 47 0 0 0 23 0 0 0 0 0
AIR 0 0 0 0 0 0 0 186 407 0 0 0 0 0 0 0 383 0 0 0 60 0 0 0 0 0
TAHUN
AGUSTUS
RIG
23 24 25 26 27 28 29 30 31

H-25

Gross

Net

AB-100 ST-191

Gross 76

Net 31

ST-125
L-350 ST-66 ST-067
Gross

Net

Rig Sewa ST-123

(250 hp)

Gross 50

Net 30

GROSS 0 50 0 0 0 76 0 0 0
NET 0 30 0 0 0 31 0 0 0
AIR 0 20 0 0 0 45 0 0 0
TAHUN
SEPTEMBER
RIG
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27

H-25

Gross

Net

AB-100 ST-193 ST-151 ST-099

Gross 91 202

Net 32 23

ST-067
L-350 ST-66 ST-005 SD-001
Gross 215 110 117

Net 25 35 32

Rig Sewa ST-085 ST-037

(250 hp)

Gross 420 62

Net 12 28

GROSS 0 215 0 420 0 91 0 0 0 0 0 0 110 0 0 62 0 0 0 0 0 0 0 117 0 0 202


NET 0 25 0 12 0 32 0 0 0 0 0 0 35 0 0 28 0 0 0 0 0 0 0 32 0 0 23
AIR 0 190 0 408 0 59 0 0 0 0 0 0 75 0 0 34 0 0 0 0 0 0 0 85 0 0 179
TAHUN
OKTOBER
RIG
28 29 30 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23

H-25

Gross

Net

ST-099
AB-100 ST-162 ST-127

Gross 52

Net 18

L-350 ST-66 ST-148 ST-181


Gross 412

Net 34

Rig Sewa ST-141 ST-060 ST-056

(250 hp)

Gross 220 120

Net 22 24

GROSS 0 220 0 0 0 0 0 0 0 0 0 0 120 0 0 0 0 0 0 0 0 412 52 0 0 0


NET 0 22 0 0 0 0 0 0 0 0 0 0 24 0 0 0 0 0 0 0 0 34 18 0 0 0
AIR 0 198 0 0 0 0 0 0 0 0 0 0 96 0 0 0 0 0 0 0 0 378 34 0 0 0
TAHUN
OKTOBER
RIG
24 25 26 27 28 29 30 31

H-25

Gross

Net

AB-100 ST-086

Gross 67

Net 21

ST-181 L-350 ST-66 ST-011


Gross

Net

Rig Sewa
ST-056 ST-008

(250 hp)

Gross

Net

GROSS 0 0 0 0 0 67 0 0
NET 0 0 0 0 0 21 0 0
AIR 0 0 0 0 0 46 0 0
TAHUN
NOVEMBER
RIG
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27

H-25

Perawatan Sumur

Gross

Net

AB-100 ST-057 ST-024

Gross 87

Net 12

L-350 ST-011
ST-66 ST-069 ST-102
Gross 111 140

Net 14 31

ST-008
Rig Sewa ST-044 ST-057

(250 hp)

Gross 120

Net 24

GROSS 111 0 0 0 0 0 0 0 0 0 0 0 260 0 0 0 0 87 0 0 0 0 0 0 0 0 0


NET 14 0 0 0 0 0 0 0 0 0 0 0 55 0 0 0 0 12 0 0 0 0 0 0 0 0 0
AIR 97 0 0 0 0 0 0 0 0 0 0 0 205 0 0 0 0 75 0 0 0 0 0 0 0 0 0
TAHUN
DESEMBER
RIG
28 29 30 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24

H-25

Perawatan Sumur

Gross

Net

AB-100 ST-186 ST-145

Gross

Net

ST-102
L-350 ST-66 ST-101 ST-040
Gross 210 320

Net 34 24

ST-057
Rig Sewa ST-176

(250 hp)

Gross

Net

GROSS 210 0 0 0 0 0 0 0 0 0 0 320 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0


NET 34 0 0 0 0 0 0 0 0 0 0 24 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
AIR 176 0 0 0 0 0 0 0 0 0 0 296 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
TAHUN
DESEMBER
RIG
25 26 27 28 29 30 31

H-25

Gross

Net

AB-100

Gross

Net

L-350 ST-66
Gross

Net

Rig Sewa

(250 hp)

Gross

Net

GROSS 0 0 0 0 0 0 0
NET 0 0 0 0 0 0 0
AIR 0 0 0 0 0 0 0
TARGET, REALISASI DAN PROYEKSI P

31 28

KEGIATAN SATUAN Jan Feb

TARGET, BOPD 981 978


EXISTING REALISASI, BOPD 1,430 -
% 146 -
TARGET, BOPD - -
REOPENING REALISASI, BOPD - -
%
TARGET, BOPD 28 78
REPARASI REALISASI, BOPD 10 -
% 36 -
TARGET, BOPD - -
STIMULASI REALISASI, BOPD - -
% - -
TARGET, BOPD 1,008 1,056
SASARAN RENDAH REALISASI, BOPD 1,440 -
% 143 -
TARGET, BOPD - -
KUPL REALISASI, BOPD -
% - -
TARGET, BOPD 1,008 1,056
SASARAN MENENGAH REALISASI, BOPD 1,440 -
% 143 -
BOR BARU TARGET, BOPD - -
REALISASI, BOPD - -
% - -
TARGET, BOPD 1,008 1,056
SASARAN TINGGI REALISASI, BOPD 1,440 -
% 143 0.0

SATUAN Jan Feb


TARGET NET, BOPD 1008 1056
REALISASI NET, BOPD 1440 0
Gross (bpd) 10039
Air (bpd) 8599
Tanpa tambahan Rig Sewa Proyeksi Gross (bpd) 10039 9568
Proyeksi Net (Tanpa Rig Sewa) 1440 1430
Proyeksi Air (bpd) 8599 8138
Total (existin+Rig Sewa) Proyeksi Gross (bpd) 10039 9568
Proyeksi Net (Tambah Rig Sewa) 1440 1430
Proyeksi Air (bpd) 8599 8138

bbl Gain
(Kumulatif
Justifikasi $ Gain (bbl x ICP)
Perolehan
Minyak)
Nilai 58517 5,266,512
DAN PROYEKSI PRODUKSI MINYAK - SANGATTA REGION KTI (BOPD)
TAHUN 2013

31 30 31 30 31 31 30 31

Mar Apr May Jun Jul Aug Sep Oct

975 972 969 966 963 960 957 954


- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -

129 173 216 253 289 321 349 377


- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
1,104 1,145 1,185 1,219 1,252 1,281 1,306 1,332
- - - - - - - -
- - - - - - - -
- - - - - - - -

- - - - - - - -
1,104 1,145 1,185 1,219 1,252 1,281 1,306 1,332
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
1,104 1,145 1,185 1,219 1,252 1,281 1,306 1,332
- - - - - - - -
- - - - - - - -

Mar Apr May Jun Jul Aug Sep Oct


1104 1145 1185 1219 1252 1281 1306 1332
0 0 0 0 0 0 0 0

9446 11825 11768 12286 13403 12543 12024 11353


1395 1402 1363 1329 1393 1355 1366 1303
8051 10423 10405 10957 12010 11189 10658 10050
9446 11825 12196 12806 14299 14140 14163 13398
1395 1402 1447 1483 1589 1600 1649 1581
8051 10423 10749 11323 12710 12540 12514 11816

$ Net = $ Gain -
Sewa Rig Biaya Sewa rig
($4200) (4200$/day)

1,041,600 4,224,912
D)

30 31 31 365

Nov Dec AVG Total


bbl

952 949 967 352,995


- - - -
- - - -
- - - -
- - - -

401 424 254 92,873


- - - -
- - - -
- - - -
- - - -
- - - -
1,352 1,373 1,222 445,867
- - - -
- - - -
- - - -
- -
- - -
1,352 1,373 1,222 445,867
- - - -
- - - -
- - - -
- - - -
- - - -
1,352 1,373 1,218 445,867
- - - -
- - - -

Pencapaian
Nov Dec AVG Total (% YTD)
1352 1373 1218 444649
0 0 0 0

10765 10009 11363 4147428


1263 1161 1342 489773 110%
9502 8848 10021 3657654
12726 11773 12395 4524018
1538 1408 1502 548290 123%
11188 10365 10892 3975728
Perbandingan Produksi
Rig Existing dan Penambahan Rig Sewa
1800

1600

1400

1200

TARGET NET, BOPD


1000 Proyeksi Net (Tanpa Rig Sewa)
Proyeksi Net (Tambah Rig Sewa)
Axis Title
800

600

400

200

0
Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec
Perawatan (Job) Workover (sumur) Reparasi (sumur)
Reopening (sumur) Stimulasi (sumur) Water Injeksi (sumur)
Bor (sumur)
3
2
31 1
12
9 3
6 24
38 22
85 34 5
38
37
5 1
43

138
110 108
72

2010 2011 2012 2013


Success Ratio Reparasi

Tahun Frekwensi Job for gas berhasil tak berhasil Success Ratio
2007 38 4 7 27 20.59%
2008 77 2 16 59 21.33%
2009 93 10 26 57 31.33%
2010 78 15 34 29 53.97%
2011 37 11 17 9 65.38%
2012 31 9 12 10 54.55%

Tahun Jenis Job Prod Sblm Prod Ssdh

Perforasi (new) 314 27 1453 124


2011 Reperfo 1459 43 3483 462
GAS
Perforasi (new) 122 23 1913 722
2012 Reperfo 412 21 1420 69
GAS
Jumlah
Gain Prod
Job
succes no succes
Succes ratio

1139 97 8 5 3 63%
1698 419 18 12 6 67%
11
1791 699 14 4 10 29%
1008 48 8 5 3 63%
9 3 6 33%
31
100 70.00%

90
60.00%
80

70 50.00%

60
40.00%
50
30.00%
40

30 20.00%
20
10.00%
10

0 0.00%
2007 2008 2009 2010 2011 2012
Frekwensi Job Success Ratio
Realisasi Produksi 2007 s.d Jan 2013
4000

3500

3000

2500
Produksi (bopd)

2000

1500

1000

500

0
Jan-07 May-07 Sep-07 Jan-08 May-08 Sep-08 Jan-09 May-09 Sep-09 Jan-10 May-10 Sep-10 Jan-11 May-11 Sep-11 Jan-12 May-12 Sep-12 Jan-13
Target Realisasi Produksi 2007 s.d Jan 2013 dan Proyeksi s.d akhir 2013
3500

3000

2500

2000
Produksi (bopd)

1500

1000

500

0
Jan-11 Mar-11 May-11 Jul-11 Sep-11 Nov-11 Jan-12 Mar-12 May-12 Jul-12 Sep-12 Nov-12 Jan-13 Mar-13 May-13 Jul-13 Sep-13 Nov-13
Bor Re-opening Reparasi Existing
3000

2500

2000

1500

1000

500

0
Dec-99 Dec-12 Dec-25 Dec-38 Dec-51 Dec-64 Dec-77 Dec-90 Dec-03
Stimulasi Re-opening Reparasi
Existing Target Produksi (bopd)
2000
1800
YTD : 110 %
1600
1400
1200
1000
800
600
400
200
0
Jan-13 Mar-13 May-13 Jul-13 Sep-13 Nov-13
DATA WATER INJEKSI HARIAN LAPANGAN SANGATTA TAHUN 2010-2013

Date Rate Injeksi (bbl/d) Tekanan (psia)


1/1/2010 3400 398.16 Realisasi dan Proyeksi Water Injeksi Tahun 2010-2015
1/2/2010 3400 398.16
1/3/2010 3400 398.16 Tahun Rate Air Injeksi Tekanan (psia)
1/4/2010 3400 398.16 2010 6195 338
1/5/2010 3400 398.16 2011 10245 315
1/6/2010 3400 398.16 2012 9353 397
1/7/2010 3400 398.16 2013 10996 571
1/8/2010 3400 398.16 2014 12196 640
1/9/2010 3400 398.16 2015 13696 672
1/10/2010 3400 398.16
1/11/2010 3400 398.16
1/12/2010 3400 398.16
1/13/2010 3400 398.16
1/14/2010 3400 398.16
1/15/2010 3400 398.16
1/16/2010 3400 398.16
1/17/2010 3400 398.16
1/18/2010 3400 398.16
1/19/2010 3400 398.16
1/20/2010 3400 398.16
1/21/2010 3400 398.16
1/22/2010 3400 398.16
1/23/2010 3400 398.16
1/24/2010 3400 398.16
1/25/2010 3400 398.16
1/26/2010 3400 398.16
1/27/2010 3400 398.16
1/28/2010 3400 398.16
1/29/2010 3400 398.16
1/30/2010 3400 398.16
1/31/2010 3400 398.16
2/1/2010 3400 398.16
2/2/2010 3400 398.16
2/3/2010 3400 398.16
2/4/2010 3400 398.16
2/5/2010 3400 398.16
2/6/2010 3400 398.16
2/7/2010 3400 398.16
2/8/2010 3400 398.16
2/9/2010 3400 398.16
2/10/2010 3400 398.16
2/11/2010 3400 398.16
2/12/2010 3400 398.16
2/13/2010 3400 398.16
2/14/2010 3400 398.16
2/15/2010 3400 398.16
2/16/2010 3400 398.16
2/17/2010 3400 398.16
2/18/2010 3400 398.16
2/19/2010 3400 398.16
2/20/2010 3400 398.16
2/21/2010 3400 398.16
2/22/2010 3400 398.16
2/23/2010 3400 398.16
2/24/2010 3400 398.16
2/25/2010 3400 398.16
2/26/2010 3400 398.16
2/27/2010 3400 398.16
2/28/2010 3400 398.16
3/1/2010 3400 398.16
3/2/2010 3400 398.16
3/3/2010 3400 398.16
3/4/2010 3400 398.16
3/5/2010 3400 398.16
3/6/2010 8822 398.16
3/7/2010 9019 426.6
3/8/2010 9133 476.37
3/9/2010 9073 369.72
3/10/2010 8849 398.16
3/11/2010 8767 362.61
3/12/2010 8524 355.5
3/13/2010 9242 362.61
3/14/2010 9293 383.94
3/15/2010 9324 362.61
3/16/2010 9495 355.5
3/17/2010 8694 355.5
3/18/2010 8351 362.61
3/19/2010 8827 369.72
3/20/2010 9693 319.95
3/21/2010 10455 405.27
3/22/2010 10788 405.27
3/23/2010 10999 412.38
3/24/2010 11027 412.38
3/25/2010 10782 405.27
3/26/2010 10791 405.27
3/27/2010 10968 405.27
3/28/2010 11187 405.27
3/29/2010 9718 405.27
3/30/2010 9918 405.27
3/31/2010 9266 405.27
4/1/2010 8878 383.94
4/2/2010 8746 383.94
4/3/2010 8855 383.94
4/4/2010 8961 412.38
4/5/2010 8977 426.6
4/6/2010 8931 447.93
4/7/2010 3952 433.71
4/8/2010 8698 426.6
4/9/2010 8881 511.92
4/10/2010 9103 469.26
4/11/2010 9006 469.26
4/12/2010 8171 455.04
4/13/2010 8109 462.15
4/14/2010 8267 462.15
4/15/2010 8275 497.7
4/16/2010 7896 469.26
4/17/2010 8199 483.48
4/18/2010 6800 483.48
4/19/2010 0 0
4/20/2010 2161 199.08
4/21/2010 4298 284.4
4/22/2010 2231 355.5
4/23/2010 7385 455.04
4/24/2010 8138 433.71
4/25/2010 4338 319.95
4/26/2010 4395 319.95
4/27/2010 4480 440.82
4/28/2010 4294 440.82
4/29/2010 3986 440.82
4/30/2010 3994 447.93
5/1/2010 0 0
5/2/2010 3528 227.52
5/3/2010 6109 376.83
5/4/2010 1568 383.94
5/5/2010 1575 248.85
5/6/2010 4123 305.73
5/7/2010 4123 312.84
5/8/2010 4123 312.84
5/9/2010 4123 412.38
5/10/2010 4123 412.38
5/11/2010 4123 383.94
5/12/2010 4123 405.27
5/13/2010 4123 405.27
5/14/2010 4101 405.27
5/15/2010 3888 362.61
5/16/2010 3915 341.28
5/17/2010 3934 376.83
5/18/2010 3937 305.73
5/19/2010 3991 284.4
5/20/2010 3979 284.4
5/21/2010 4151 284.4
5/22/2010 4317 284.4
5/23/2010 4340 270.18
5/24/2010 6851 327.06
5/25/2010 6869 355.5
5/26/2010 6738 327.06
5/27/2010 6687 341.28
5/28/2010 6679 327.06
5/29/2010 6915 341.28
5/30/2010 6460 341.28
5/31/2010 6492 341.28
6/1/2010 6490 341.28
6/2/2010 6222 341.28
6/3/2010 6269 341.28
6/4/2010 6335 341.28
6/5/2010 6522 341.28
6/6/2010 6985 341.28
6/7/2010 6985 341.28
6/8/2010 6985 341.28
6/9/2010 6985 341.28
6/10/2010 6985 341.28
6/11/2010 6985 341.28
6/12/2010 6985 341.28
6/13/2010 6985 341.28
6/14/2010 6985 341.28
6/15/2010 6985 341.28
6/16/2010 3493 341.28
6/17/2010 6985 341.28
6/18/2010 5647 341.28
6/19/2010 5781 341.28
6/20/2010 6257 341.28
6/21/2010 6357 341.28
6/22/2010 6362 341.28
6/23/2010 6321 341.28
6/24/2010 6338 341.28
6/25/2010 6415 369.72
6/26/2010 6415 369.72
6/27/2010 6415 369.72
6/28/2010 6415 369.72
6/29/2010 6415 369.72
6/30/2010 6415 369.72
7/1/2010 6415 369.72
7/2/2010 6306 369.72
7/3/2010 6116 369.72
7/4/2010 6139 369.72
7/5/2010 6161 334.17
7/6/2010 6258 369.72
7/7/2010 7109 348.39
7/8/2010 7729 376.83
7/9/2010 7677 355.5
7/10/2010 7691 376.83
7/11/2010 7681 376.83
7/12/2010 7802 334.17
7/13/2010 7872 355.5
7/14/2010 7735 369.72
7/15/2010 7824 398.16
7/16/2010 3895.5 263.07
7/17/2010 3915.5 191.97
7/18/2010 4096 220.41
7/19/2010 3938 341.28
7/20/2010 3861 341.28
7/21/2010 3865.5 284.4
7/22/2010 3875 206.19
7/23/2010 3883 241.74
7/24/2010 3878 305.73
7/25/2010 3931.5 149.31
7/26/2010 3899.5 149.31
7/27/2010 3889.5 156.42
7/28/2010 3969.5 149.31
7/29/2010 4037.5 149.31
7/30/2010 4038 149.31
7/31/2010 4500 113.76
8/1/2010 4500 113.76
8/2/2010 4500 142.2
8/3/2010 6300 305.73
8/4/2010 8054 156.42
8/5/2010 8138 362.61
8/6/2010 8172 291.51
8/7/2010 8108 369.72
8/8/2010 8049 383.94
8/9/2010 8012 383.94
8/10/2010 5997.75 383.94
8/11/2010 5812.5 383.94
8/12/2010 5853 383.94
8/13/2010 5862 383.94
8/14/2010 5781 383.94
8/15/2010 5805.75 383.94
8/16/2010 5565.75 291.51
8/17/2010 6244.95 291.51
8/18/2010 6582 319.95
8/19/2010 7384 319.95
8/20/2010 6846.3 298.62
8/21/2010 6968.7 298.62
8/22/2010 6911.1 298.62
8/23/2010 6951.6 376.83
8/24/2010 6855.3 92.43
8/25/2010 6216.3 248.85
8/26/2010 6215.4 248.85
8/27/2010 6185.7 248.85
8/28/2010 6191.1 248.85
8/29/2010 6199.2 248.85
8/30/2010 4115.4 248.85
8/31/2010 4162.2 248.85
9/1/2010 4107.6 248.85
9/2/2010 4088.4 255.96
9/3/2010 3951 255.96
9/4/2010 3988.8 220.41
9/5/2010 4021.2 220.41
9/6/2010 4009.2 220.41
9/7/2010 6723 241.74
9/8/2010 6717 241.74
9/9/2010 6779 206.19
9/10/2010 6764 241.74
9/11/2010 6788 248.85
9/12/2010 7054 199.08
9/13/2010 6938 263.07
9/14/2010 7001 213.3
9/15/2010 7137 248.85
9/16/2010 7099 213.3
9/17/2010 7042 255.96
9/18/2010 6918 255.96
9/19/2010 7079 213.3
9/20/2010 7298 213.3
9/21/2010 8094 213.3
9/22/2010 8119 284.4
9/23/2010 7793 234.63
9/24/2010 7897 234.63
9/25/2010 8151 234.63
9/26/2010 8119 234.63
9/27/2010 8021 234.63
9/28/2010 7966 234.63
9/29/2010 7766 234.63
9/30/2010 7745 234.63
10/1/2010 7614 270.18
10/2/2010 7480 206.19
10/3/2010 7784 234.63
10/4/2010 7979 234.63
10/5/2010 8010 298.62
10/6/2010 8200 355.5
10/7/2010 7527 355.5
10/8/2010 7036 291.51
10/9/2010 7042 355.5
10/10/2010 6994 284.4
10/11/2010 6863 284.4
10/12/2010 6822 291.51
10/13/2010 7016 319.95
10/14/2010 6573 312.84
10/15/2010 6367 319.95
10/16/2010 6475 419.49
10/17/2010 6351 341.28
10/18/2010 6357 362.61
10/19/2010 6299 284.4
10/20/2010 6593 298.62
10/21/2010 6828 305.73
10/22/2010 6612 213.3
10/23/2010 6729 305.73
10/24/2010 6883 270.18
10/25/2010 6855 291.51
10/26/2010 8009 291.51
10/27/2010 8205 0
10/28/2010 8230 0
10/29/2010 8029 334.17
10/30/2010 8261 348.39
10/31/2010 8297 241.74
11/1/2010 8229 341.28
11/2/2010 8257 305.73
11/3/2010 8279 305.73
11/4/2010 8295 376.83
11/5/2010 8358 348.39
11/6/2010 8213 348.39
11/7/2010 8564 327.06
11/8/2010 8404 348.39
11/9/2010 8277 348.39
11/10/2010 8107 348.39
11/11/2010 7977 312.84
11/12/2010 7722 312.84
11/13/2010 7900 291.51
11/14/2010 7945 327.06
11/15/2010 8081 334.17
11/16/2010 7701 334.17
11/17/2010 7787 362.61
11/18/2010 7759 362.61
11/19/2010 7750 362.61
11/20/2010 7892 362.61
11/21/2010 7759 362.61
11/22/2010 7968 362.61
11/23/2010 7983 362.61
11/24/2010 6835 362.61
11/25/2010 7074 362.61
11/26/2010 7118 362.61
11/27/2010 7078 362.61
11/28/2010 7173 362.61
11/29/2010 7096 327.06
11/30/2010 7068 312.84
12/1/2010 7167 391.05
12/2/2010 7126 398.16
12/3/2010 7035 398.16
12/4/2010 7292 319.95
12/5/2010 7218 284.4
12/6/2010 7132 376.83
12/7/2010 7129 263.07
12/8/2010 7277 298.62
12/9/2010 7238 341.28
12/10/2010 7086 405.27
12/11/2010 6955 319.95
12/12/2010 6879 383.94
12/13/2010 7307 383.94
12/14/2010 7475 312.84
12/15/2010 7577 369.72
12/16/2010 7828 376.83
12/17/2010 7901 398.16
12/18/2010 7940 398.16
12/19/2010 7967 412.38
12/20/2010 7989 369.72
12/21/2010 7317 355.5
12/22/2010 7584 412.38
12/23/2010 7608 426.6
12/24/2010 7716 334.17
12/25/2010 7761 334.17
12/26/2010 7834 369.72
12/27/2010 7857 334.17
12/28/2010 7721 334.17
12/29/2010 7617 362.61
12/30/2010 7871 327.06
12/31/2010 7387 298.62
1/1/2011 7307 298.62
1/2/2011 7212 298.62
1/3/2011 7082 298.62
1/4/2011 7288 298.62
1/5/2011 7396 298.62
1/6/2011 7409 298.62
1/7/2011 7540 334.17
1/8/2011 7636 341.28
1/9/2011 7958 341.28
1/10/2011 7993 341.28
1/11/2011 8151 355.5
1/12/2011 8284 334.17
1/13/2011 8249 348.39
1/14/2011 8274 348.39
1/15/2011 8241 348.39
1/16/2011 8286 348.39
1/17/2011 8281 376.83
1/18/2011 8152 376.83
1/19/2011 8125 383.94
1/20/2011 7991 341.28
1/21/2011 7929 355.5
1/22/2011 8068 355.5
1/23/2011 8188 341.28
1/24/2011 8254 355.5
1/25/2011 8280 305.73
1/26/2011 8234 376.83
1/27/2011 8133 305.73
1/28/2011 8284 348.39
1/29/2011 8631 184.86
1/30/2011 9049 263.07
1/31/2011 9067 248.85
2/1/2011 8955 348.39
2/2/2011 8532 355.5
2/3/2011 8701 355.5
2/4/2011 8512 191.97
2/5/2011 8445 199.08
2/6/2011 8296 170.64
2/7/2011 8453 305.73
2/8/2011 8080 255.96
2/9/2011 7778 255.96
2/10/2011 7569 327.06
2/11/2011 7391 312.84
2/12/2011 7717 312.84
2/13/2011 8686 312.84
2/14/2011 8951 334.17
2/15/2011 8902 369.72
2/16/2011 8697 291.51
2/17/2011 8779 355.5
2/18/2011 8837 327.06
2/19/2011 8827 369.72
2/20/2011 8769 298.62
2/21/2011 8881 312.84
2/22/2011 9000 248.85
2/23/2011 8958 369.72
2/24/2011 8866 341.28
2/25/2011 8841 334.17
2/26/2011 8789 362.61
2/27/2011 8734 369.72
2/28/2011 8797 305.73
3/1/2011 8810 305.73
3/2/2011 9138 305.73
3/3/2011 8767 305.73
3/4/2011 9027 305.73
3/5/2011 9300 305.73
3/6/2011 9372 305.73
3/7/2011 9430 305.73
3/8/2011 9594 362.61
3/9/2011 9430 362.61
3/10/2011 9640 362.61
3/11/2011 9593 369.72
3/12/2011 9528 376.83
3/13/2011 9410 383.94
3/14/2011 9422 348.39
3/15/2011 9542 362.61
3/16/2011 9559 391.05
3/17/2011 9496 263.07
3/18/2011 9316 270.18
3/19/2011 9553 227.52
3/20/2011 9879 291.51
3/21/2011 9949 263.07
3/22/2011 9995 263.07
3/23/2011 10313 291.51
3/24/2011 10311 284.4
3/25/2011 10384 284.4
3/26/2011 10546 305.73
3/27/2011 10645 305.73
3/28/2011 10675 305.73
3/29/2011 10640 334.17
3/30/2011 10786 312.84
3/31/2011 10784 277.29
4/1/2011 10450 298.62
4/2/2011 10431 241.74
4/3/2011 10508 298.62
4/4/2011 10521 305.73
4/5/2011 10879 305.73
4/6/2011 10609 305.73
4/7/2011 10255 305.73
4/8/2011 10143 305.73
4/9/2011 10080 305.73
4/10/2011 10061 305.73
4/11/2011 10159 305.73
4/12/2011 10455 327.06
4/13/2011 10671 327.06
4/14/2011 10457 376.83
4/15/2011 10110 383.94
4/16/2011 10346 277.29
4/17/2011 10544 341.28
4/18/2011 10855 362.61
4/19/2011 10621 270.18
4/20/2011 10906 284.4
4/21/2011 10732 383.94
4/22/2011 11070 362.61
4/23/2011 11039 383.94
4/24/2011 11161 383.94
4/25/2011 11298 362.61
4/26/2011 11226 305.73
4/27/2011 11313 369.72
4/28/2011 10707 405.27
4/29/2011 10710 383.94
4/30/2011 10673 440.82
5/1/2011 10557 369.72
5/2/2011 10792 369.72
5/3/2011 10632 405.27
5/4/2011 10715 405.27
5/5/2011 10671 405.27
5/6/2011 10926 398.16
5/7/2011 11279 426.6
5/8/2011 11253 398.16
5/9/2011 11375 369.72
5/10/2011 11388 405.27
5/11/2011 10998 398.16
5/12/2011 10562 369.72
5/13/2011 10485 369.72
5/14/2011 10598 369.72
5/15/2011 10950 369.72
5/16/2011 10605 383.94
5/17/2011 10337 369.72
5/18/2011 10234 376.83
5/19/2011 10196 362.61
5/20/2011 10044 355.5
5/21/2011 10151 369.72
5/22/2011 10159 355.5
5/23/2011 10283 355.5
5/24/2011 10444 376.83
5/25/2011 10461 383.94
5/26/2011 10525 383.94
5/27/2011 10617 383.94
5/28/2011 10616 369.72
5/29/2011 10668 334.17
5/30/2011 10691 334.17
5/31/2011 10679 334.17
6/1/2011 10525 334.17
6/2/2011 10438 334.17
6/3/2011 10428 369.72
6/4/2011 10466 369.72
6/5/2011 10500 312.84
6/6/2011 10380 312.84
6/7/2011 10128 284.4
6/8/2011 10087 376.83
6/9/2011 10150 376.83
6/10/2011 10449 355.5
6/11/2011 10496 355.5
6/12/2011 10555 362.61
6/13/2011 10442 476.37
6/14/2011 10336 433.71
6/15/2011 10427 412.38
6/16/2011 10315 327.06
6/17/2011 10360 255.96
6/18/2011 10097 327.06
6/19/2011 10294 334.17
6/20/2011 10171 334.17
6/21/2011 10070 319.95
6/22/2011 9857 319.95
6/23/2011 10045 341.28
6/24/2011 10203 341.28
6/25/2011 10249 312.84
6/26/2011 10303 334.17
6/27/2011 10272 319.95
6/28/2011 10294 270.18
6/29/2011 10255 142.2
6/30/2011 9762 362.61
7/1/2011 9765 561.69
7/2/2011 9720 376.83
7/3/2011 9862 369.72
7/4/2011 9621 369.72
7/5/2011 9548 447.93
7/6/2011 9321 383.94
7/7/2011 9334 376.83
7/8/2011 9379 298.62
7/9/2011 9598 369.72
7/10/2011 10631 348.39
7/11/2011 10796 348.39
7/12/2011 10759 383.94
7/13/2011 10662 348.39
7/14/2011 10584 348.39
7/15/2011 10629 334.17
7/16/2011 10495 348.39
7/17/2011 10213 319.95
7/18/2011 10545 184.86
7/19/2011 10477 305.73
7/20/2011 10664 391.05
7/21/2011 10644 263.07
7/22/2011 10511 412.38
7/23/2011 10254 440.82
7/24/2011 10525 447.93
7/25/2011 10820 362.61
7/26/2011 10905 447.93
7/27/2011 11219 163.53
7/28/2011 11523 284.4
7/29/2011 11583 327.06
7/30/2011 11452 327.06
7/31/2011 11417 319.95
8/1/2011 11697 312.84
8/2/2011 11220 312.84
8/3/2011 10515 405.27
8/4/2011 10952 348.39
8/5/2011 11127 391.05
8/6/2011 10926 348.39
8/7/2011 11004 362.61
8/8/2011 11080 362.61
8/9/2011 11130 355.5
8/10/2011 11057 369.72
8/11/2011 11210 362.61
8/12/2011 11450 341.28
8/13/2011 11463 327.06
8/14/2011 11479 319.95
8/15/2011 11742 334.17
8/16/2011 11857 348.39
8/17/2011 11838 305.73
8/18/2011 11860 319.95
8/19/2011 11760 248.85
8/20/2011 11721 191.97
8/21/2011 11643 163.53
8/22/2011 11526 106.65
8/23/2011 11654 199.08
8/24/2011 11429 199.08
8/25/2011 11140 241.74
8/26/2011 11225 227.52
8/27/2011 11255 206.19
8/28/2011 11415 213.3
8/29/2011 11425 213.3
8/30/2011 11426 234.63
8/31/2011 11443 206.19
9/1/2011 11315 220.41
9/2/2011 11312 220.41
9/3/2011 11268 227.52
9/4/2011 11267 227.52
9/5/2011 11401 227.52
9/6/2011 11496 241.74
9/7/2011 11383 255.96
9/8/2011 11358 234.63
9/9/2011 11335 248.85
9/10/2011 11057 248.85
9/11/2011 11137 241.74
9/12/2011 11316 241.74
9/13/2011 11919 241.74
9/14/2011 12141 263.07
9/15/2011 11819 270.18
9/16/2011 11860 255.96
9/17/2011 11655 255.96
9/18/2011 11653 255.96
9/19/2011 11815 255.96
9/20/2011 11732 255.96
9/21/2011 11922 227.52
9/22/2011 11991 227.52
9/23/2011 12040 277.29
9/24/2011 11815 248.85
9/25/2011 11951 255.96
9/26/2011 11954 291.51
9/27/2011 12342 270.18
9/28/2011 12409 291.51
9/29/2011 12433 291.51
9/30/2011 12333 284.4
10/1/2011 12521 334.17
10/2/2011 12599 334.17
10/3/2011 12619 298.62
10/4/2011 12769 291.51
10/5/2011 12987 263.07
10/6/2011 12691 227.52
10/7/2011 12102 305.73
10/8/2011 11574 369.72
10/9/2011 11070 284.4
10/10/2011 11551 263.07
10/11/2011 10959 263.07
10/12/2011 10636 263.07
10/13/2011 10548 263.07
10/14/2011 10321 263.07
10/15/2011 10459 248.85
10/16/2011 10510 263.07
10/17/2011 10548 305.73
10/18/2011 10375 270.18
10/19/2011 0 0
10/20/2011 10706 270.18
10/21/2011 11321 270.18
10/22/2011 11362 270.18
10/23/2011 11103 291.51
10/24/2011 11143 255.96
10/25/2011 11133 305.73
10/26/2011 11102 319.95
10/27/2011 11283 312.84
10/28/2011 11602 298.62
10/29/2011 11283 298.62
10/30/2011 11320 298.62
10/31/2011 11122 298.62
11/1/2011 10884 298.62
11/2/2011 10853 298.62
11/3/2011 10794 298.62
11/4/2011 10719 298.62
11/5/2011 10435 305.73
11/6/2011 10449 305.73
11/7/2011 10596 312.84
11/8/2011 10407 305.73
11/9/2011 10515 305.73
11/10/2011 10573 305.73
11/11/2011 10851 284.4
11/12/2011 11246 284.4
11/13/2011 11217 327.06
11/14/2011 11070 298.62
11/15/2011 11298 298.62
11/16/2011 10965 319.95
11/17/2011 10803 319.95
11/18/2011 10728 319.95
11/19/2011 10683 298.62
11/20/2011 10694 298.62
11/21/2011 10495 298.62
11/22/2011 10259 284.4
11/23/2011 10067 305.73
11/24/2011 9894 305.73
11/25/2011 10222 305.73
11/26/2011 10529 305.73
11/27/2011 10301 305.73
11/28/2011 10135 298.62
11/29/2011 9956 298.62
11/30/2011 9833 298.62
12/1/2011 9801 298.62
12/2/2011 9941 298.62
12/3/2011 9984 298.62
12/4/2011 10027 298.62
12/5/2011 10024 298.62
12/6/2011 9905 291.51
12/7/2011 9888 298.62
12/8/2011 9915 298.62
12/9/2011 9918 298.62
12/10/2011 9772 291.51
12/11/2011 10115 291.51
12/12/2011 10118 305.73
12/13/2011 10155 305.73
12/14/2011 10015 319.95
12/15/2011 10125 305.73
12/16/2011 9996 305.73
12/17/2011 9722 305.73
12/18/2011 10192 305.73
12/19/2011 10123 305.73
12/20/2011 10015 298.62
12/21/2011 9921 298.62
12/22/2011 9905 298.62
12/23/2011 9876 312.84
12/24/2011 9982 312.84
12/25/2011 9950 312.84
12/26/2011 9815 305.73
12/27/2011 9750 319.95
12/28/2011 9487 319.95
12/29/2011 8634 319.95
12/30/2011 8569 298.62
12/31/2011 8568 291.51
1/1/2012 8677 291.51
1/2/2012 9109 298.62
1/3/2012 8725 298.62
1/4/2012 8544 298.62
1/5/2012 8698 291.51
1/6/2012 8560 291.51
1/7/2012 8516 291.51
1/8/2012 8899 298.62
1/9/2012 8990 298.62
1/10/2012 8881 298.62
1/11/2012 8761 298.62
1/12/2012 8669 291.51
1/13/2012 8562 291.51
1/14/2012 8803 291.51
1/15/2012 8951 319.95
1/16/2012 8813 284
1/17/2012 9024 284
1/18/2012 9062 298
1/19/2012 9064 298
1/20/2012 9498 298
1/21/2012 9643 298
1/22/2012 9551 269.5
1/23/2012 9570 266.5
1/24/2012 9729 270
1/25/2012 9530 272.5
1/26/2012 9302 272.5
1/27/2012 9058 376.5
1/28/2012 8991 376.5
1/29/2012 8873 333
1/30/2012 8811 305.5
1/31/2012 8150 305.5
2/1/2012 8039 319
2/2/2012 7950 305
2/3/2012 7707 319.5
2/4/2012 7685 291
2/5/2012 7601 362
2/6/2012 7725 319.5
2/7/2012 7716 335
2/8/2012 7488 320
2/9/2012 7637 325
2/10/2012 7589 312
2/11/2012 7683 297.5
2/12/2012 7996 310
2/13/2012 7970 355
2/14/2012 7934 355
2/15/2012 7958 369
2/16/2012 7753 335
2/17/2012 7962 369.5
2/18/2012 8266 369.5
2/19/2012 8567 334
2/20/2012 8509 376
2/21/2012 8655 376
2/22/2012 8920 376
2/23/2012 9071 355
2/24/2012 8885 319.5
2/25/2012 8875 338.5
2/26/2012 8948 383.5
2/27/2012 8882 406
2/28/2012 8847 390.5
2/29/2012 8763 390.5
3/1/2012 8515 390.5
3/2/2012 8818 390.5
3/3/2012 9027 390.5
3/4/2012 8524 390.5
3/5/2012 8235 333.5
3/6/2012 8974 333.5
3/7/2012 9226 390.5
3/8/2012 9078 390.5
3/9/2012 9633 390.5
3/10/2012 9285 377.5
3/11/2012 9151 390.5
3/12/2012 9121 333.5
3/13/2012 9327 336
3/14/2012 9171 426
3/15/2012 9214 411.5
3/16/2012 9202 426
3/17/2012 9660 390.5
3/18/2012 9626 425.5
3/19/2012 9711 425.5
3/20/2012 9679 425.5
3/21/2012 9585 425.5
3/22/2012 9520 425.5
3/23/2012 9428 425.5
3/24/2012 9512 425.5
3/25/2012 9494 354.5
3/26/2012 9609 354.5
3/27/2012 9624 319.5
3/28/2012 9170 290.5
3/29/2012 8802 315
3/30/2012 8716 309.5
3/31/2012 9124 333.5
4/1/2012 9328 340.5
4/2/2012 9871 340
4/3/2012 9739 340
4/4/2012 9505 341
4/5/2012 9215 376
4/6/2012 9168 383.5
4/7/2012 9099 377.5
4/8/2012 9068 370
4/9/2012 9519 370
4/10/2012 10059 361.5
4/11/2012 9996 361.5
4/12/2012 10210 361.5
4/13/2012 10217 315
4/14/2012 10404 315
4/15/2012 10394 315
4/16/2012 10156 315
4/17/2012 10146 341
4/18/2012 10132 312.5
4/19/2012 10201 296
4/20/2012 10258 296
4/21/2012 10324 362
4/22/2012 10966 362
4/23/2012 11032 375.5
4/24/2012 11279 375.5
4/25/2012 11532 377.5
4/26/2012 11244 382.5
4/27/2012 11037 387.5
4/28/2012 10141 390.5
4/29/2012 9742 390.5
4/30/2012 9861 390.5
5/1/2012 9675 390.5
5/2/2012 9416 390.5
5/3/2012 9183 397.5
5/4/2012 9165 281.5
5/5/2012 9423 397.5
5/6/2012 9390 362
5/7/2012 9751 362
5/8/2012 9994 362
5/9/2012 9759 362
5/10/2012 9521 404.5
5/11/2012 9448 404.5
5/12/2012 9223 404.5
5/13/2012 9438 404.5
5/14/2012 9587 404.5
5/15/2012 9879 404.5
5/16/2012 9972 404.5
5/17/2012 10131 404.5
5/18/2012 10107 383.5
5/19/2012 10181 404.5
5/20/2012 10144 376.5
5/21/2012 10104 369
5/22/2012 10083 369
5/23/2012 9654 390.5
5/24/2012 9352 383.5
5/25/2012 9309 383.5
5/26/2012 9306 383.5
5/27/2012 9631 383.5
5/28/2012 9897 383.5
5/29/2012 9188 383.5
5/30/2012 9657 383.5
5/31/2012 10323 383.5
6/1/2012 10931 383.5
6/2/2012 10591 333.5
6/3/2012 10927 305.5
6/4/2012 10868 277
6/5/2012 9747 270
6/6/2012 10157 270
6/7/2012 10197 319.5
6/8/2012 10048 319.5
6/9/2012 10305 319.5
6/10/2012 9752 319.5
6/11/2012 9715 319.5
6/12/2012 9653 319.5
6/13/2012 9502 333.5
6/14/2012 9302 333.5
6/15/2012 9519 226
6/16/2012 9448 226
6/17/2012 9476 226
6/18/2012 9479 226
6/19/2012 9429 385
6/20/2012 9433 420
6/21/2012 9523 360
6/22/2012 9629 420
6/23/2012 9704 450
6/24/2012 9682 400
6/25/2012 9610 400
6/26/2012 9434 340
6/27/2012 8851 360
6/28/2012 8494 320
6/29/2012 8241 350
6/30/2012 8098 400
7/1/2012 8205 420
7/2/2012 8136 360
7/3/2012 8311 360
7/4/2012 8376 360
7/5/2012 8318 360
7/6/2012 8125 360
7/7/2012 8200 360
7/8/2012 8294 360
7/9/2012 8389 400
7/10/2012 8580 400
7/11/2012 8598 400
7/12/2012 8608 400
7/13/2012 8938 400
7/14/2012 8935 440
7/15/2012 8862 440
7/16/2012 8655 440
7/17/2012 8352 440
7/18/2012 8375 440
7/19/2012 8452 380
7/20/2012 8311 380
7/21/2012 8318 320
7/22/2012 8525 320
7/23/2012 8693 260
7/24/2012 8698 280
7/25/2012 8389 280
7/26/2012 8272 320
7/27/2012 8229 300
7/28/2012 8430 300
7/29/2012 8632 320
7/30/2012 8353 320
7/31/2012 8344 320
8/1/2012 8452 320
8/2/2012 8515 320
8/3/2012 8682 320
8/4/2012 8694 320
8/5/2012 8735 320
8/6/2012 8758 380
8/7/2012 8662 380
8/8/2012 8447 380
8/9/2012 8507 340
8/10/2012 7678 360
8/11/2012 7695 360
8/12/2012 7614 360
8/13/2012 7744 300
8/14/2012 8027 380
8/15/2012 7925 380
8/16/2012 7951 400
8/17/2012 7926 400
8/18/2012 7687 400
8/19/2012 7618 400
8/20/2012 7703 440
8/21/2012 7714 430
8/22/2012 7776 440
8/23/2012 7782 430
8/24/2012 7915 430
8/25/2012 7843 470
8/26/2012 7836 440
8/27/2012 7893 450
8/28/2012 7978 360
8/29/2012 7962 380
8/30/2012 7900 380
8/31/2012 8169 380
9/1/2012 8493 300
9/2/2012 8571 380
9/3/2012 8385 380
9/4/2012 8418 423
9/5/2012 8473 380
9/6/2012 8425 400
9/7/2012 8431 350
9/8/2012 8517 340
9/9/2012 9230 380
9/10/2012 10007 440
9/11/2012 10385 460
9/12/2012 10264 480
9/13/2012 10238 460
9/14/2012 9940 460
9/15/2012 10214 460
9/16/2012 10175 460
9/17/2012 10150 460
9/18/2012 10197 460
9/19/2012 9664 460
9/20/2012 9425 460
9/21/2012 9450 460
9/22/2012 9416 460
9/23/2012 9582 450
9/24/2012 9458 440
9/25/2012 9019 380
9/26/2012 9379 400
9/27/2012 9794 400
9/28/2012 10509 380
9/29/2012 10377 440
9/30/2012 9846 420
10/1/2012 9042 460
10/2/2012 8627 480
10/3/2012 9226 480
10/4/2012 9568 460
10/5/2012 10394 480
10/6/2012 10288 460
10/7/2012 10194 440
10/8/2012 10132 480
10/9/2012 10564 460
10/10/2012 10754 460
10/11/2012 12110 420
10/12/2012 12020 500
10/13/2012 12024 500
10/14/2012 11713 500
10/15/2012 11645 480
10/16/2012 11378 480
10/17/2012 11647 480
10/18/2012 11751 470
10/19/2012 11293 490
10/20/2012 11811 480
10/21/2012 12185 480
10/22/2012 12802 580
10/23/2012 12664 580
10/24/2012 12842 500
10/25/2012 12706 500
10/26/2012 12717 500
10/27/2012 12757 480
10/28/2012 12862 480
10/29/2012 12737 480
10/30/2012 12595 480
10/31/2012 12577 480
11/1/2012 12696 480
11/2/2012 12510 480
11/3/2012 12975 480
11/4/2012 13094 480
11/5/2012 12285 460
11/6/2012 12281 460
11/7/2012 12403 460
11/8/2012 12555 460
11/9/2012 12516 320
11/10/2012 12544 320
11/11/2012 12394 340
11/12/2012 12490 340
11/13/2012 12557 300
11/14/2012 12592 300
11/15/2012 12592 300
11/16/2012 12825 520
11/17/2012 13000 400
11/18/2012 13039 400
11/19/2012 12186 400
11/20/2012 9680 400
11/21/2012 9442 400
11/22/2012 9437 400
11/23/2012 9463 400
11/24/2012 9455 700
11/25/2012 9448 680
11/26/2012 9344 500
11/27/2012 9306 500
11/28/2012 9089 560
11/29/2012 8656 560
11/30/2012 7579 560
12/1/2012 7157 560
12/2/2012 7040 560
12/3/2012 7063 560
12/4/2012 7148 540
12/5/2012 7157 540
12/6/2012 7171 540
12/7/2012 7198 500
12/8/2012 7119 540
12/9/2012 7110 540
12/10/2012 7575 540
12/11/2012 8073 480
12/12/2012 8076 560
12/13/2012 8126 520
12/14/2012 8108 520
12/15/2012 8134 560
12/16/2012 8158 560
12/17/2012 8134 580
12/18/2012 8064 770
12/19/2012 7609 770
12/20/2012 6928 770
12/21/2012 6633 580
12/22/2012 7876 440
12/23/2012 7739 500
12/24/2012 7846 580
12/25/2012 7845 580
12/26/2012 7829 750
12/27/2012 7829 500
12/28/2012 7819 540
12/29/2012 7839 540
12/30/2012 7841 540
12/31/2012 7828 580
1/1/2013 7855 580
1/2/2013 7908 580
1/3/2013 8212 580
1/4/2013 8251 800
1/5/2013 8195 800
1/6/2013 7996 800
1/7/2013 7999 800
1/8/2013 7961 800
1/9/2013 7942 800
1/10/2013 8021 800
1/11/2013 8058 800
1/12/2013 8064 800
1/13/2013 8023 800
1/14/2013 8014 800
1/15/2013 7984 800
1/16/2013 7987 800
1/17/2013 7937 800
1/18/2013 7913 800
1/19/2013 7915 500
1/20/2013 7940 550
1/21/2013 7928 700
1/22/2013 7924 800
1/23/2013 7951 700
1/24/2013 7931 700
Tahun 2010-2015

Keterangan

Proyeksi
Proyeksi
Proyeksi
Rate Injeksi (bbl/d) Tekanan (psia)

13696
672
640
12196
10996
571
10245
9353

397
338
6195
315

2010 2011 2012 2013 2014 2015


TATA
No

1
a
b
c
d

e
2
a
b
c
d

e
3
a
b
c
d

e
4
a
b
c
d

5
a
b
c
d

6
a
b
c
d

7
a
b
c
d

8
a
b
c
d

9
9.1
a
b
c
d

e
9.2
a
b
c
d
e
9.3
a
b
c
d
e
9.4
a
b
c
d
e
10
a
b
c
d

11
a
b
c
d

e
12
a
b
c
d

13
a
b
c
d

14
a
b
c
d

15
15.1
a
b
c
d

15.2
a
b
c
d

16
16.1
a
b
c
d

e
16.2
a
b
c
d

16.3
a
b
c
d

17
17.1
a
b
c
d

e
17.2
a
b
c
d

17.3
a
b
c
d

18
a
b
c
d

19
a
b
c
d

e
TATA WAKTU D
Keterangan

Pembangunan 2 Unit di SP I Kap. 80 M3 Field Sangata


Pengajuan & Persetujuan AFE
Penyiapan PR, RKS & OE
Proses Lelang/Pengadaan
Waktu Konstruksi

Masa Pemeliharaan
Pembangunan 1 Unit di SP II Kap. 80 M3 Field Sangata
Pengajuan & Persetujuan AFE
Penyiapan PR, RKS & OE
Proses Lelang/Pengadaan
Waktu Konstruksi + Masa Pemeliharaan

Masa Pemeliharaan
Pembuatan Workshop Pumping Unit dan Workshop Piping & Konstruksi
Pengajuan & Persetujuan AFE
Penyiapan PR, RKS & OE
Proses Lelang/Pengadaan
Waktu Konstruksi

Masa Pemeliharaan
Pengadaan Dump Truck Kap. 20 Ton Field Sangata
Pengajuan & Persetujuan AFE
Penyiapan PR & Spesifikasi
Proses Lelang/Pengadaan
Delivery Time Barang

Commissioning

Penggantian Trafo Las Listrik 450 A dan Penggantian Mesin Las Listrik Engine Driven 500 A Field Sangata
Pengajuan & Persetujuan AFE
Penyiapan PR & Spesifikasi
Proses Lelang/Pengadaan
Delivery Time Barang

Commissioning

Pembelian 2 unit Genset 350 KVA


Pengajuan & Persetujuan AFE
Penyiapan PR & Spesifikasi
Proses Lelang/Pengadaan
Delivery Time Barang

Commissioning

Pembelian 1 unit Cable Fault Locator Field Sangata


Pengajuan & Persetujuan AFE
Penyiapan PR & Spesifikasi
Proses Lelang/Pengadaan
Delivery Time Barang

Commissioning

Pembelian Truck Crane Kap. 10 Ton Field Sangata


Pengajuan & Persetujuan AFE
Penyiapan PR & Spesifikasi
Proses Lelang/Pengadaan
Delivery Time Barang

Commissioning

Pembangunan Laboratorium lengkap dengan peralatan Pour Point, Viscometer dan Gas Chromatograph
Pembangunan Laboratorium
Pengajuan & Persetujuan AFE
Penyiapan PR, RKS & OE
Proses Lelang/Pengadaan
Waktu Konstruksi

Masa Pemeliharaan
Pour Point
Pengajuan & Persetujuan AFE
Penyiapan PR & Spesifikasi
Proses Lelang/Pengadaan
Delivery time &
Commissioning
Viscometer
Pengajuan & Persetujuan AFE
Penyiapan PR & Spesifikasi
Proses Lelang/Pengadaan
Delivery time
Commissioning
Gas Chromatograph
Pengajuan & Persetujuan AFE
Penyiapan PR & Spesifikasi
Proses Lelang/Pengadaan
Delivery time
Commissioning
Pembelian Cable N3XSEFGby 6/10 (12) kV, 50 mm2 sepanjang 7200 meter untuk interkoneksi Power Plant - SP VI Field Sanga
Pengajuan & Persetujuan AFE
Penyiapan PR & Spesifikasi
Proses Lelang/Pengadaan
Delivery Time Barang

Commissioning

Relokasi Ruang Server dan Telekomunikasi Field Sangata


Pengajuan & Persetujuan AFE
Penyiapan PR, RKS & OE
Proses Lelang/Pengadaan
Waktu Konstruksi

Masa Pemeliharaan
Penggantian Wire Line Unit
Pengajuan & Persetujuan AFE
Penyiapan PR & Spesifikasi
Proses Lelang/Pengadaan
Delivery Time Barang

Commissioning

Refurbistment Hoist H-25


Pengajuan & Persetujuan AFE
Penyiapan PR & Spesifikasi
Proses Lelang/Pengadaan
Delivery Time Barang

Commissioning

Penggantian Prime Mover kap. 300 HP Field Sangata C/With Low Bad
Pengajuan & Persetujuan AFE
Penyiapan PR & Spesifikasi
Proses Lelang/Pengadaan
Delivery Time Barang

Commissioning

Pembangunan Surface Facilities Fire Protection Area Perkantoran Field Sangata


Pembangunan Fire System
Pengajuan & Persetujuan AFE
Penyiapan PR, RKS & OE
Proses Lelang/Pengadaan
Waktu Konstruksi + Masa Pemeliharaan

Pengadaan Fire Pump C/W Jockey Pump Kap. 300 GPM


Pengajuan & Persetujuan AFE
Penyiapan PR & Spesifikasi
Proses Lelang/Pengadaan
Delivery Time Barang

Commissioning

Pembangunan Surface Facilities Fire Protection RDP Field Sangata


Pembangunan Fire System
Pengajuan & Persetujuan AFE
Penyiapan PR, RKS & OE
Proses Lelang/Pengadaan
Waktu Konstruksi + Masa Pemeliharaan

Masa Pemeliharaan
Pengadaan 2 Unit Fire Pump C/W Jockey Pump Kap. 300 GPM
Pengajuan & Persetujuan AFE
Penyiapan PR & Spesifikasi
Proses Lelang/Pengadaan
Delivery Time Barang

Commissioning

Pengadaan 1 Unit Pompa Suply Fire Pum Package


Pengajuan & Persetujuan AFE
Penyiapan PR & Spesifikasi
Proses Lelang/Pengadaan
Delivery Time Barang

Commissioning

Pembangunan Surface Facilities Fire Protection Gudang Teluk Lombok Field Sangata
Pembangunan Fire System
Pengajuan & Persetujuan AFE
Penyiapan PR, RKS & OE
Proses Lelang/Pengadaan
Waktu Konstruksi

Masa Pemeliharaan
Pengadaan Fire Pump C/W Jockey Pump Kap. 500 GPM
Pengajuan & Persetujuan AFE
Penyiapan PR & Spesifikasi
Proses Lelang/Pengadaan
Delivery Time Barang

Commissioning

Pengadaan 1 Unit Pompa Suply Fire Pum Package


Pengajuan & Persetujuan AFE
Penyiapan PR & Spesifikasi
Proses Lelang/Pengadaan
Delivery Time Barang

Commissioning

Upgrading Fire Protection SP II & SP V Pertamina EP Region KTI Field Sangata


Pengajuan & Persetujuan AFE
Penyiapan PR & Spesifikasi
Proses Lelang/Pengadaan
Delivery Time Barang

Commissioning

Upgrading Fire Protection Loading terminal Pertamina EP Region KTI Field Sangata
Pengajuan & Persetujuan AFE
Penyiapan PR & Spesifikasi
Proses Lelang/Pengadaan
Delivery Time Barang

Commissioning

Pengajuan & Persetujuan AFE & Non AFE


Penyiapan RKS/Spesifikasi, OE & PR
Delivery Time/Masa Konstruksi
Masa Pemeliharaan/Commissioning
DAN PROGRES STATUS PEKERJAAN ABI 2013
2012 2013
PIC Nilai AFE/Non AFE
Mei-Okt Nov Des Jan Feb Mar Apr Mei
158,083.00 13-6673
Field Sangatta
Ren-Field Sangatta
SCM Region KTI
SCM Region KTI & Field
Sangatta
Field Sangatta
79,042.00 13-6674
Field Sangatta
Ren-Field Sangatta
SCM Region KTI
SCM Region KTI & Field
Sangatta
Field Sangatta
187,087.00 Non AFE
Field Sangatta
Ren-Field Sangatta
SCM Region KTI
SCM Region KTI & Field
Sangatta
Field Sangatta
105,850.00 Non AFE
Field Sangatta
Ren Field Sangatta
SCM Reg KTI
SCM Region KTI & Field
Sangatta
SCM Region KTI & Field
Sangatta
27,000.00 Non AFE
Field Sangatta
Ren Field Sangatta
SCM Reg KTI
SCM Region KTI & Field
Sangatta
SCM Region KTI & Field
Sangatta
182,000.00 Non AFE
Field Sangatta
Ren Field Sangatta
SCM Reg KTI
SCM Region KTI & Field
Sangatta
SCM Region KTI & Field
Sangatta
97,000.00 Non AFE
Field Sangatta
Ren Field Sangatta
SCM Reg KTI
SCM Region KTI & Field
Sangatta
SCM Region KTI & Field
Sangatta
250,000.00 Non AFE
Field Sangatta
Ren Field Sangatta
SCM Reg KTI
SCM Region KTI & Field
Sangatta
SCM Region KTI & Field
Sangatta
204,000.00 Non AFE

Field Sangatta
Ren-Field Sangatta
SCM Region KTI
SCM Region KTI & Field
Sangatta
Field Sangatta

Field Sangatta
Ren-Field Sangatta
SCM Field Sangatta
SCM Field Sangatta

Field Sangatta
Ren-Field Sangatta
SCM Field Sangatta
SCM Field Sangatta

Field Sangatta
Ren-Field Sangatta
SCM Field Sangatta
SCM Field Sangatta
363,111.00 Non AFE
Field Sangatta
Ren Field Sangatta
SCM Reg KTI
SCM Region KTI & Field
Sangatta
SCM Region KTI & Field
Sangatta
112,000.00 Non AFE
Field Sangatta
Ren-Field Sangatta
SCM Region KTI
SCM Region KTI & Field
Sangatta
Field Sangatta
320,000.00 Non AFE
Field Sangatta
Ren Field Sangatta
SCM Reg KTI
SCM Region KTI & Field
Sangatta
SCM Region KTI & Field
Sangatta
525,000.00 13-9675
Field Sangatta
Ren Field Sangatta
SCM Reg KTI
SCM Region KTI & Field
Sangatta
SCM Region KTI & Field
Sangatta
331,200.00 Non AFE
Field Sangatta
Ren Field Sangatta
SCM Reg KTI
SCM Region KTI & Field
Sangatta
SCM Region KTI & Field
Sangatta
344,589.00 Non AFE

Field Sangatta
Ren-Field Sangatta
SCM Region KTI
SCM Region KTI & Field
Sangatta

Field Sangatta
Ren Field Sangatta
SCM Reg KTI
SCM Region KTI & Field
Sangatta
SCM Region KTI & Field
Sangatta
595,389.00 Non AFE

Field Sangatta
Ren-Field Sangatta
SCM Region KTI
SCM Region KTI & Field
Sangatta
Field Sangatta

Field Sangatta
Ren Field Sangatta
SCM Reg KTI
SCM Region KTI & Field
Sangatta
SCM Region KTI & Field
Sangatta

Field Sangatta
Ren Field Sangatta
SCM Field Sangatta
SCM Field Sangatta &
Field Sangatta
SCM Field Sangatta &
Field Sangatta
500,028.00 Non AFE

Field Sangatta
Ren-Field Sangatta
SCM Region KTI
SCM Region KTI & Field
Sangatta
Field Sangatta

Field Sangatta
Ren Field Sangatta
SCM Reg KTI
SCM Region KTI & Field
Sangatta
SCM Region KTI & Field
Sangatta

Field Sangatta
Ren Field Sangatta
SCM Field Sangatta
SCM Field Sangatta &
Field Sangatta
SCM Field Sangatta &
Field Sangatta
201,624.00 Non AFE
Field Sangatta
Ren Field Sangatta
SCM Reg KTI
SCM Region KTI & Field
Sangatta
SCM Region KTI & Field
Sangatta
1,268,866.00 Non AFE
Field Sangatta
Ren Field Sangatta
SCM Reg KTI
SCM Region KTI & Field
Sangatta
SCM Region KTI & Field
Sangatta
5,851,869.00
2013 2014 Keterangan
Jun Jul Ags Sep Okt Nov Des Jan Feb tgl 8 Jan 2013

Penyiapan Drawing,
RKS & OE

Penyiapan Drawing,
RKS & OE

Penyiapan Drawing,
RKS & OE

Penyiapan Spesifikasi

Penyiapan Spesifikasi

Penyiapan Spesifikasi
Penyiapan Spesifikasi

Penyiapan Spesifikasi

Penyiapan Spesifikasi

Penyiapan Drawing,
RKS & OE

Proses Approval PR
dan Spesifikasi

Proses Tender di SCM


Field Sangatta

Penyiapan Spesifikasi
Penyiapan Spesifikasi

Penyiapan Spesifikasi

Penyiapan Drawing,
RKS & OE

Penyiapan Spesifikasi

Penyiapan Drawing,
RKS & OE

Penyiapan Spesifikasi

Penyiapan Drawing,
RKS & OE
Penyiapan Drawing,
RKS & OE

Penyiapan Spesifikasi

Penyiapan Drawing,
RKS & OE

Penyiapan Spesifikasi

Penyiapan Spesifikasi

Penyiapan Drawing,
RKS & OE

Penyiapan Spesifikasi
Penyiapan Spesifikasi

Penyiapan Spesifikasi

Penyiapan Spesifikasi

Proses aanwijzing tgl 8


Jan 13