Tahun Bulan
Existing Reparasi Re-opening Stimulasi
Jan-07
Feb-07
Mar-07
Apr-07
May-07
2007
Jun-07
Jul-07
Aug-07
Sep-07
Oct-07
Nov-07
Dec-07
Jan-08
Feb-08
Mar-08
Apr-08
May-08
2008
Jun-08
Jul-08
Aug-08
Sep-08
Oct-08
Nov-08
Dec-08
Jan-09
Feb-09
Mar-09
Apr-09
May-09
2009
Jun-09
Jul-09
Aug-09
Sep-09
Oct-09
Nov-09
Dec-09
Jan-10
0
Feb-10
Mar-10
Apr-10
May-10
2010
Jun-10
Jul-10
Aug-10
Sep-10
Oct-10
Nov-10
Dec-10
Jan-11
Feb-11
Mar-11
Apr-11
May-11
2011
Jun-11
Jul-11
Aug-11
Sep-11
Oct-11
Nov-11
Dec-11
Jan-12
Feb-12
Mar-12
Apr-12
May-12
2012
Jun-12
Jul-12
Aug-12
Sep-12
Oct-12
Nov-12
Dec-12
Jan-13 1451 30 15
Feb-13 1277 45 44
Mar-13 1223 56 69
Apr-13 1211 50 75
May-13 1021 65 98
2013
Proyeksi Realisasi
Existing Reparasi Re-opening
Produksi (bopd) Produksi (bopd)
2020
2026
2158
2308
2300
2162
2176
2280
2185
2091
2225
2369
2703
2787
2863
2736
2657
2604
2355
2335
2515
2709
3076
3412
2641 2470 101 0
2651 2274 592 1
3106 2394 642 0
3230 2607 633 28
2749 2261 397 22
2438 2038 397 16
2329 1846 409 4
2130 1548 510 3
2134 1411 614 112
2360 1403 671 217
2391 1422 804 176
2387 1427 737 225
2182 2083 26 4
2091 1955 291 0
2355 1997 282 8
2332 1945 306 12
2106 1824 271 11
1986 1664 312 11
1974 1549 346 11
1953 1480 394 11
1805 1339 388 11
1795 1234 458 11
1817 1261 460 11
1869 1338 403 8
1698 1660 20 18
1535 1385 38 21
1644 1325 123 47
1866 1402 186 123
1859 1345 191 167
1776 1272 221 143
1904 1191 215 151
1879 1188 323 117
1795 1198 308 107
2007 1179 266 117
1950 1071 239 132
1736 1027 238 144
2356 1,969 386 -
2576 2,003 570 0
2149 1,763 375 10
2111 1,689 376 47
2158 1,713 376 60
1750 1,444 248 54
1670 1,364 242 64
1622 1,318 245 58
1590 1,316 225 49
1555 1,304 214 38
1484 1,245 206 33
1403 1,210 163 30
1481 1451
1365.10
1347.67
1335.98
1183.71
1184.94
1251.91
1289.97
1310.63
1307.63
1264.63
1264.32
si Realisasi RK
Target Produksi
Bor Reparasi Reopening Stimulasi Water Injeksi Bor
(bopd)
4
5
5
5
2
4
5
6
7
4
3
9
4
11
4
3
11
1
4
5
7
10
12
4
0 2180 10
0 2231 18
0 2231 4
0 2273 11
0 2287 12
0 2316 10
0 2364 5
0 2360 6
0 2366 2
0 2358 4
0 2324 7
0 2306 6
0 2054 6
0 2023 11
0 2035 3
0 2105 7
0 2127 7
0 2223 10
0 2242 5
0 2243 6
32 2229 6
23 2268 11
17 2312 6
121 2364 7
0 1800 4 2 1
31 1930 6 5 1
77 2186 2 2
110 2169 1 9 1
152 2252 3 5
135 2380 2 3
334 2445 5 2
238 2586 4 3 2
174 2466 4 3
437 2395 6 5
496 2683 3 2
312 2920 0 0 2
- 1785 2 1
3 1758 2 3
0.4 1841 8 3
- 1773 4 6
9 1785 4 6
4 1715 3 4
- 1657 3 1
- 1597 2
- 1545 2 2
- 1480 0 1
- 1426 1 3
- 1379 1 4
1008
1056
1104
1145
1185
1219
1252
1281
1306
1332
1352
1373
PROGRAM PENINGKATAN EFISIENSI POMPA
1.00 Optimalisasi SPM PU sumur yang menggunakan elmot (pembelian VSD atau speed reducer)
Effisiensi Pompa
Rencana SPM Gross/Net Prime HP
Sumur % Qtest/Qmax SPM
sebelum sesudah Saat ini Mover eksisting HP desain delta HP
ST-118 3% 13% 99 12 2-4 15/8 Elmot 4 1 3
ST-170 4% 7% 83 5.5 2-4 10/3 Elmot 3 2 1
ST-071 4% 16% 99 11 2-4 9/3 Elmot 1 0 1
ST-008 5% 16% 94 10 2-4 15/3 Elmot 3 1 2
ST-178 5% 11% 100 6.5 2-4 12/9 Elmot 1 1 1
ST-176 6% 20% 98 9.5 2-4 44/11 Elmot 5 2 3
ST-145 7% 26% 89 11.5 2-4 25/14 Elmot 3 1 2
ST-069 8% 22% 88 8.5 2-4 15/7 Elmot 2 1 1
ST-169 8% 23% 100 9 2-4 11/4 Elmot 2 1 1
ST-125 8% 28% 94 10.5 2-4 16/10 Elmot 3 1 2
ST-023 11% 31% 100 8.5 2-4 21/7 Elmot 2 1 1
ST-112 12% 36% 100 9 2-4 25/10 Elmot 3 1 1
ST-157 13% 40% 98 9.5 2-4 45/8 Elmot 5 3 2
Nama Status
NO. Gross (bpd) Nett (bpd)
Sumur Produksi
1 SD-001 produksi 17 10
6 ST-008 produksi 15 3
10 ST-022 produksi 62 2
11 ST-026 produksi 49 7
13 ST-042 produksi 51 3
17 ST-051
18 ST-068 tidak produksi 0 0
19 ST-071 produksi 9 3
21 ST-084 produksi 98 1
22 ST-084 produksi 98 1
23 ST-084 produksi 98 1
25 ST-111 produksi 10 1
26 ST-112 produksi 25 10
27 ST-118 produksi 15 8
33 ST-145 produksi 25 14
34 ST-149 produksi 51 15
35 ST-157 produksi 53 11
36 ST-169 produksi 11 4
37 ST-173 produksi 70 35
38 ST-174 produksi 33 13
39 ST-176 produksi 47 19
40 ST-184
41 ST-191 tidak produksi 0 0
45
46
47
48
49
50 ST-063 tidak produksi 0 0
65 ST-169 produksi 11 4
REO-GAS 1416-1418 m
REO-OIL q q-5(1256-1270)
REP-GAS g g-9(412-413)
REP-GAS k k-8 (782-783.5)
REP-OIL n (n-4)1029.5-1031
Stimulasi
Stimulasi
Stimulasi
Stimulasi
Stimulasi
WI o o-8
WI o o-8
WI m m-51
WI k k-31
WI p p-4
WI l l-73
WI p p-2
WI k dan m
WI m m-35
WI m m-2
WI k-31
k
WI n group n
WI l l-73
WI o o-4
WI p p-4
WI m-35
WI m m group
Detail Pekerjaan Stimulation Cost/Well (USD $)
Total
Total (Rp)
Cementing Perforation Total Cost/Well
Cost/Well (USD $) Cost/Well (USD $) (USD $)
39000 - 39000
- - 0
12000 - 12000
12000 - 12000
- 13895.3 13895.3
26000 - 26000
- 33544.28 33544.28
52000 - 52000
26000 - 26000
26000 - 26000
65000 - 65000
- 22312.925 22312.925
13000 - 13000
- - 0
13000 21100.215 34100.215
13000 - 13000
52000 - 52000
- 12991.63 12991.63
13000 - 13000
804,000.00 401,383.44 1,205,383.44
Ada 79 LUF
8 lap lama
lap lama
Ada 13 BKK
Ada 47 LUF
6 L-350 lap lama
Tidak Ada
TOS 21 BKK
Ada 10 BKK
lap lama
4 lap lama
AB-100 Ada Tidak Ada
5 L-350 lap lama
lap baru
4 AB-100 Ada 69 RES
lap baru
4 AB-100 Ada 69 RES
Ada 66 LUF
Ada 36 LEG
Ada 39 LEG
lap baru
4 AB-100 Ada 50 LUF
6 AB-100 lap baru
Ada 50 LUF
lap baru
5 AB-100 Ada Tidak Ada
Crane ADA
L-350 ADA
L-350 ADA
AB-100 ADA
AB-100 ADA
AB-100 ADA
L-350 ADA
AB-100 Tidak ada
L-350 On Progress
244.00
Surface Facility
Barchart
Jalur
Pumping Unit Gasline
Listrik
v
Tidak Ada Tidak Ada Tidak Ada
v
M. 228-246-86 Ada Ada
v
M. 228-246-86 Ada Ada
v
C.456-305-168 Ada Ada
v
Tidak Ada Ada Ada
v
Tidak Ada Ada Ada
v
C. 114-143-64 Ada Ada
v
C. 114-143-64 Ada Ada
v
C. 114-143-64 Ada Ada
v
Tidak Ada Ada Tidak Ada
v
Tidak Ada Ada Ada
v
C.160 D-169-54
v
Tidak Ada Ada Ada
Ada (drop v
M. 228-246-86 Tidak Ada
voltage)
v
Ada (drop
M. 228-246-86 Tidak Ada
voltage)
Realisasi RK Tahun 2010-2012 dan Rencana RK Tahun 2013-2014
Water
Tahun Perawatan (Job) Workover Reparasi Reopening Stimulasi Injeksi Bor (sumur)
(sumur) (sumur) (sumur) (sumur) (sumur)
2010 110 5 85 31 2 3
2011 108 1 37 38 6 9
2012 138 34 24 3 12 1
2013 72 43 38 5 22
2014 72 20 24 7 36 2
Rencana
No Sumur
Kerja
ST-019 ST-042 ST-043 ST-046 ST-068 ST-071 ST-084 ST-107 ST-112 ST-118 ST-
120 ST-122 ST-124 ST-138 ST-173 ST-174 ST-191 ST-193 ST-167 ST-091 ST-
1 Reparasi 005 ST-109 ST-099 ST-060 ST-072 ST-137 ST-175 SS-005 ST-004 ST-133 ST-
074
SS-001 ST-008 ST-010 ST-127 ST-145 ST-149 ST-157 ST-169 ST-176 ST-184 ST-
Reparasi Gas 191 ST-193
SD-001 SS-003 ST-013 ST-022 ST-026 ST-030 ST-045 ST-051 ST-083 ST-111 ST-
067 ST-014 ST-061 ST-031 ST-018 ST-038 ST-011 ST-065 ST-121 ST-177 ST-
2 Reopening 123 ST-086 ST-029 ST-002 ST-127 ST-141 ST-024 ST-037 ST-044 ST-085 ST-
101 SS-002 ST-053 ST-093 ST-073 ST-069 ST-102
31 ST-120, ST-138
12
37
1
5
ST-166,ST-96, ST-
22 70
ST-019 ST-042 ST-043 ST-046 ST-068 ST-071 ST-084 ST-084 ST-084
ST-019
ST-042 ST-019 ST-042 ST-043
ST-043 ST-042
ST-046 ST-043
ST-068 ST-046
ST-071 ST-068
ST-084 ST-071
ST-107 ST-084
ST-112 ST-107
ST-118 ST-112
ST-120 ST-118
ST-122 ST-120
ST-124 ST-122
ST-138 ST-124
ST-173 ST-138
ST-174 ST-173
ST-191 ST-174
ST-193 ST-191
ST-167 ST-193
ST-091 ST-167
ST-005 ST-091
ST-109 ST-005
ST-099 ST-109
ST-060 ST-099
ST-072 ST-060
ST-137 ST-072
ST-175 ST-137
SS-005 ST-175
ST-004 SS-005
ST-133 ST-004
ST-074 ST-133
ST-074
ST-077 SS-003
ST-119 ST-013
ST-131 ST-022
ST-141 ST-026
ST-148 ST-030 ST-063
ST-077
ST-119
ST-131
ST-141
ST-148
ST-150
ST-151
ST-162
ST-166
ST-095
ST-096
ST-070
ST-125
ST-169
ST-155
ST-028
ST-056
ST-040
ST-057
ST-186
ST-066
ST-107 ST-112 ST-118 ST-120 ST-122 ST-124 ST-138 ST-173 ST-174 ST-191
ST-111 ST-067 ST-030 ST-014 ST-061 ST-031 ST-018 ST-038 ST-011 ST-065
ST-166 ST-095 ST-096 ST-070 ST-125 ST-169 ST-155 ST-028 ST-056 ST-040
ST-046 ST-068 ST-071 ST-084 ST-107 ST-112 ST-118 ST-120 ST-122 ST-124
ST-083 ST-111 ST-067 ST-014 ST-061 ST-031 ST-018 ST-038 ST-011 ST-065
ST-193 ST-167 ST-091 ST-005 ST-109 ST-099 ST-060 ST-072 ST-137 ST-175
ST-121 ST-177 ST-123 ST-086 ST-029 ST-002 ST-127 ST-141 ST-024 ST-037
ST-138 ST-173 ST-174 ST-191 ST-193 ST-167 ST-091 ST-005 ST-109 ST-099
ST-121 ST-177 ST-123 ST-086 ST-029 ST-002 ST-127 ST-141 ST-024 ST-037
SS-005 ST-004 ST-133 ST-074
Nama Status
NO. Sumur Produksi Gross (bpd) Nett (bpd)
10 ST-022 produksi 62 30
21 ST-084 produksi 98 21
22 ST-084 produksi 98 24
23 ST-084 produksi 98 24
29 ST-122 produksi 78 25
78 ST-043 produksi 835 60
80 ST-019 produksi 780 30
RJA (HASIL KONSINYERING + WELL BY WELL REVIEW JA
Kategori
Pekerjaan Group Lapisan Prospek (mtr)
REP-OIL r r-1(1275-1276)
STIMULASI q q-3
STIMULASI q q-74
TOTAL SUMUR :
TOTAL PEKERJAAN DENGAN RIG SEWA :
TOTAL PEKERJAAN DENGAN RIG EXISTING :
TOTAL PEKERJAAN :
ELL REVIEW JANUARI 2013)
Lama
Pekerjaan
Detail Pekerjaan (hari) Hoist
Pancing RPP. Tutup lap o-3 dan o-4. Dorong 7 RIG EXISTING
CR di 1080 ke 1125 m). Produksikan P-3
dan P-4
Cabut RPP. Perfo ulang + tambah lapisan q- 4 RIG EXISTING
5 (1242-1252) m dengan HSD 4.5" 51 BX -5
SPF, (selang existing saat ini (1241.5 -1245)
m)
Cabut RPP. squeeze I l-73 (789-792), 7 RIG EXISTING
squeeze II k-5 (666.5-668), Squeeze III h-4
(433-436). Bor semen + pasir spi puncak
CR di 1029 m, dorong CR spi kedalaman
1100 m. Squeeze o-2 1036-1037.8). Reopen
o-8 (1091-1092.5) m
Cabut RPP. Buka ulang q-3 dengan HSD 4 RIG EXISTING
4.5" -5 SPF. Produksikan kembali dengan
ESP
Cabut RPP. Set SS di 400 m. Buka h-8 RIG EXISTING
(383.5-384.5) m dengan HSD 4.5" -5 SPF. 4
108
AN RIG SEWA : 22
RIG EXISTING : 90
112
TAHUN
JANUARI
RIG
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25
H-25
Gross
Net
Gross 67
Net 64
Net
Rig Sewa
(250 hp)
Gross
Net
GROSS 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 67 0 0 0 0 0 0
NET 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 64 0 0 0 0 0 0
AIR 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 3 0 0 0 0 0 0
TAHUN
FEBRUARI
RIG
26 27 28 29 30 31 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19
H-25
Gross
Net
AB-100
ST-048 ST- ST-148 ST-138 ST-188 ST-081 ST-138 ST-03
ST-108
034
Gross 212
Net 4
Net 25
Rig Sewa
(250 hp)
Gross
Net
GROSS 0 0 212 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 78 0 0
NET 0 0 4 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 25 0 0
AIR 0 0 208 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 53 0 0
TAHUN 2013
FEBRUARI
RIG
20 21 22 23 24 25 26 27 28 29 30 24 25 26 27 28
H-25
Gross
Net
Gross 120 98 45
Net 5 24 20
Net 30 30
Rig Sewa
(250 hp)
Gross
Net
H-25
Gross
Net
Gross 113
Net 7
Net 35 40 21
Rig Sewa
(250 hp)
Gross
Net
H-25
Gross
Net
Net 5 4 6 5
L-350
ST-111 ST-66 ST-051 ST-083 ST-026
Gross 1700 1100 49
Net 40 34 17
Rig Sewa
(250 hp)
Gross
Net
H-25
Gross
Net
AB-100 ST-028
Gross
Net
Net 40
Rig Sewa
(250 hp)
Gross
Net
GROSS 0 0 0 0 0 130 0 0
NET 0 0 0 0 0 40 0 0
AIR 0 0 0 0 0 90 0 0
TAHUN
MEI
RIG
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27
H-25
Gross
Net
ST-028
AB-100 ST-077 ST-066 ST-091
Gross 76
Net 25
L-350
ST-107 ST-66 ST-046 ST-118
Gross 800 250
Net 35 42
(250 hp)
Gross 97 251 80
Net 26 33 25
H-25
Gross
Net
AB-100
ST-091 ST-043 ST-019
Net 60 30
Net 12
ST-109
Rig Sewa ST-175 SS-002
(250 hp)
Gross 70 32
Net 30 24
H-25
Gross
Net
ST-019
AB-100
Gross
Net
Net
(250 hp)
Gross 32
Net 24
GROSS 0 0 32 0 0 0 0 0
NET 0 0 24 0 0 0 0 0
AIR 0 0 8 0 0 0 0 0
TAHUN
JULY
RIG
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27
H-25
Gross
Net
Net 42 80
Net 20 40 15
(250 hp)
Gross 41 312 76
Net 23 14 21
H-25
Gross
Net
Gross 83
Net 23
Net 26 21
ST-074
Rig Sewa ST-093 ST-073 ST-12
(250 hp)
Net 13 26
H-25
Gross
Net
AB-100 ST-191
Gross 76
Net 31
ST-125
L-350 ST-66 ST-067
Gross
Net
(250 hp)
Gross 50
Net 30
GROSS 0 50 0 0 0 76 0 0 0
NET 0 30 0 0 0 31 0 0 0
AIR 0 20 0 0 0 45 0 0 0
TAHUN
SEPTEMBER
RIG
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27
H-25
Gross
Net
Gross 91 202
Net 32 23
ST-067
L-350 ST-66 ST-005 SD-001
Gross 215 110 117
Net 25 35 32
(250 hp)
Gross 420 62
Net 12 28
H-25
Gross
Net
ST-099
AB-100 ST-162 ST-127
Gross 52
Net 18
Net 34
(250 hp)
Net 22 24
H-25
Gross
Net
AB-100 ST-086
Gross 67
Net 21
Net
Rig Sewa
ST-056 ST-008
(250 hp)
Gross
Net
GROSS 0 0 0 0 0 67 0 0
NET 0 0 0 0 0 21 0 0
AIR 0 0 0 0 0 46 0 0
TAHUN
NOVEMBER
RIG
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27
H-25
Perawatan Sumur
Gross
Net
Gross 87
Net 12
L-350 ST-011
ST-66 ST-069 ST-102
Gross 111 140
Net 14 31
ST-008
Rig Sewa ST-044 ST-057
(250 hp)
Gross 120
Net 24
H-25
Perawatan Sumur
Gross
Net
Gross
Net
ST-102
L-350 ST-66 ST-101 ST-040
Gross 210 320
Net 34 24
ST-057
Rig Sewa ST-176
(250 hp)
Gross
Net
H-25
Gross
Net
AB-100
Gross
Net
L-350 ST-66
Gross
Net
Rig Sewa
(250 hp)
Gross
Net
GROSS 0 0 0 0 0 0 0
NET 0 0 0 0 0 0 0
AIR 0 0 0 0 0 0 0
TARGET, REALISASI DAN PROYEKSI P
31 28
bbl Gain
(Kumulatif
Justifikasi $ Gain (bbl x ICP)
Perolehan
Minyak)
Nilai 58517 5,266,512
DAN PROYEKSI PRODUKSI MINYAK - SANGATTA REGION KTI (BOPD)
TAHUN 2013
31 30 31 30 31 31 30 31
- - - - - - - -
1,104 1,145 1,185 1,219 1,252 1,281 1,306 1,332
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
- - - - - - - -
1,104 1,145 1,185 1,219 1,252 1,281 1,306 1,332
- - - - - - - -
- - - - - - - -
$ Net = $ Gain -
Sewa Rig Biaya Sewa rig
($4200) (4200$/day)
1,041,600 4,224,912
D)
30 31 31 365
Pencapaian
Nov Dec AVG Total (% YTD)
1352 1373 1218 444649
0 0 0 0
1600
1400
1200
600
400
200
0
Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec
Perawatan (Job) Workover (sumur) Reparasi (sumur)
Reopening (sumur) Stimulasi (sumur) Water Injeksi (sumur)
Bor (sumur)
3
2
31 1
12
9 3
6 24
38 22
85 34 5
38
37
5 1
43
138
110 108
72
Tahun Frekwensi Job for gas berhasil tak berhasil Success Ratio
2007 38 4 7 27 20.59%
2008 77 2 16 59 21.33%
2009 93 10 26 57 31.33%
2010 78 15 34 29 53.97%
2011 37 11 17 9 65.38%
2012 31 9 12 10 54.55%
1139 97 8 5 3 63%
1698 419 18 12 6 67%
11
1791 699 14 4 10 29%
1008 48 8 5 3 63%
9 3 6 33%
31
100 70.00%
90
60.00%
80
70 50.00%
60
40.00%
50
30.00%
40
30 20.00%
20
10.00%
10
0 0.00%
2007 2008 2009 2010 2011 2012
Frekwensi Job Success Ratio
Realisasi Produksi 2007 s.d Jan 2013
4000
3500
3000
2500
Produksi (bopd)
2000
1500
1000
500
0
Jan-07 May-07 Sep-07 Jan-08 May-08 Sep-08 Jan-09 May-09 Sep-09 Jan-10 May-10 Sep-10 Jan-11 May-11 Sep-11 Jan-12 May-12 Sep-12 Jan-13
Target Realisasi Produksi 2007 s.d Jan 2013 dan Proyeksi s.d akhir 2013
3500
3000
2500
2000
Produksi (bopd)
1500
1000
500
0
Jan-11 Mar-11 May-11 Jul-11 Sep-11 Nov-11 Jan-12 Mar-12 May-12 Jul-12 Sep-12 Nov-12 Jan-13 Mar-13 May-13 Jul-13 Sep-13 Nov-13
Bor Re-opening Reparasi Existing
3000
2500
2000
1500
1000
500
0
Dec-99 Dec-12 Dec-25 Dec-38 Dec-51 Dec-64 Dec-77 Dec-90 Dec-03
Stimulasi Re-opening Reparasi
Existing Target Produksi (bopd)
2000
1800
YTD : 110 %
1600
1400
1200
1000
800
600
400
200
0
Jan-13 Mar-13 May-13 Jul-13 Sep-13 Nov-13
DATA WATER INJEKSI HARIAN LAPANGAN SANGATTA TAHUN 2010-2013
Keterangan
Proyeksi
Proyeksi
Proyeksi
Rate Injeksi (bbl/d) Tekanan (psia)
13696
672
640
12196
10996
571
10245
9353
397
338
6195
315
1
a
b
c
d
e
2
a
b
c
d
e
3
a
b
c
d
e
4
a
b
c
d
5
a
b
c
d
6
a
b
c
d
7
a
b
c
d
8
a
b
c
d
9
9.1
a
b
c
d
e
9.2
a
b
c
d
e
9.3
a
b
c
d
e
9.4
a
b
c
d
e
10
a
b
c
d
11
a
b
c
d
e
12
a
b
c
d
13
a
b
c
d
14
a
b
c
d
15
15.1
a
b
c
d
15.2
a
b
c
d
16
16.1
a
b
c
d
e
16.2
a
b
c
d
16.3
a
b
c
d
17
17.1
a
b
c
d
e
17.2
a
b
c
d
17.3
a
b
c
d
18
a
b
c
d
19
a
b
c
d
e
TATA WAKTU D
Keterangan
Masa Pemeliharaan
Pembangunan 1 Unit di SP II Kap. 80 M3 Field Sangata
Pengajuan & Persetujuan AFE
Penyiapan PR, RKS & OE
Proses Lelang/Pengadaan
Waktu Konstruksi + Masa Pemeliharaan
Masa Pemeliharaan
Pembuatan Workshop Pumping Unit dan Workshop Piping & Konstruksi
Pengajuan & Persetujuan AFE
Penyiapan PR, RKS & OE
Proses Lelang/Pengadaan
Waktu Konstruksi
Masa Pemeliharaan
Pengadaan Dump Truck Kap. 20 Ton Field Sangata
Pengajuan & Persetujuan AFE
Penyiapan PR & Spesifikasi
Proses Lelang/Pengadaan
Delivery Time Barang
Commissioning
Penggantian Trafo Las Listrik 450 A dan Penggantian Mesin Las Listrik Engine Driven 500 A Field Sangata
Pengajuan & Persetujuan AFE
Penyiapan PR & Spesifikasi
Proses Lelang/Pengadaan
Delivery Time Barang
Commissioning
Commissioning
Commissioning
Commissioning
Pembangunan Laboratorium lengkap dengan peralatan Pour Point, Viscometer dan Gas Chromatograph
Pembangunan Laboratorium
Pengajuan & Persetujuan AFE
Penyiapan PR, RKS & OE
Proses Lelang/Pengadaan
Waktu Konstruksi
Masa Pemeliharaan
Pour Point
Pengajuan & Persetujuan AFE
Penyiapan PR & Spesifikasi
Proses Lelang/Pengadaan
Delivery time &
Commissioning
Viscometer
Pengajuan & Persetujuan AFE
Penyiapan PR & Spesifikasi
Proses Lelang/Pengadaan
Delivery time
Commissioning
Gas Chromatograph
Pengajuan & Persetujuan AFE
Penyiapan PR & Spesifikasi
Proses Lelang/Pengadaan
Delivery time
Commissioning
Pembelian Cable N3XSEFGby 6/10 (12) kV, 50 mm2 sepanjang 7200 meter untuk interkoneksi Power Plant - SP VI Field Sanga
Pengajuan & Persetujuan AFE
Penyiapan PR & Spesifikasi
Proses Lelang/Pengadaan
Delivery Time Barang
Commissioning
Masa Pemeliharaan
Penggantian Wire Line Unit
Pengajuan & Persetujuan AFE
Penyiapan PR & Spesifikasi
Proses Lelang/Pengadaan
Delivery Time Barang
Commissioning
Commissioning
Penggantian Prime Mover kap. 300 HP Field Sangata C/With Low Bad
Pengajuan & Persetujuan AFE
Penyiapan PR & Spesifikasi
Proses Lelang/Pengadaan
Delivery Time Barang
Commissioning
Commissioning
Masa Pemeliharaan
Pengadaan 2 Unit Fire Pump C/W Jockey Pump Kap. 300 GPM
Pengajuan & Persetujuan AFE
Penyiapan PR & Spesifikasi
Proses Lelang/Pengadaan
Delivery Time Barang
Commissioning
Commissioning
Pembangunan Surface Facilities Fire Protection Gudang Teluk Lombok Field Sangata
Pembangunan Fire System
Pengajuan & Persetujuan AFE
Penyiapan PR, RKS & OE
Proses Lelang/Pengadaan
Waktu Konstruksi
Masa Pemeliharaan
Pengadaan Fire Pump C/W Jockey Pump Kap. 500 GPM
Pengajuan & Persetujuan AFE
Penyiapan PR & Spesifikasi
Proses Lelang/Pengadaan
Delivery Time Barang
Commissioning
Commissioning
Commissioning
Upgrading Fire Protection Loading terminal Pertamina EP Region KTI Field Sangata
Pengajuan & Persetujuan AFE
Penyiapan PR & Spesifikasi
Proses Lelang/Pengadaan
Delivery Time Barang
Commissioning
Field Sangatta
Ren-Field Sangatta
SCM Region KTI
SCM Region KTI & Field
Sangatta
Field Sangatta
Field Sangatta
Ren-Field Sangatta
SCM Field Sangatta
SCM Field Sangatta
Field Sangatta
Ren-Field Sangatta
SCM Field Sangatta
SCM Field Sangatta
Field Sangatta
Ren-Field Sangatta
SCM Field Sangatta
SCM Field Sangatta
363,111.00 Non AFE
Field Sangatta
Ren Field Sangatta
SCM Reg KTI
SCM Region KTI & Field
Sangatta
SCM Region KTI & Field
Sangatta
112,000.00 Non AFE
Field Sangatta
Ren-Field Sangatta
SCM Region KTI
SCM Region KTI & Field
Sangatta
Field Sangatta
320,000.00 Non AFE
Field Sangatta
Ren Field Sangatta
SCM Reg KTI
SCM Region KTI & Field
Sangatta
SCM Region KTI & Field
Sangatta
525,000.00 13-9675
Field Sangatta
Ren Field Sangatta
SCM Reg KTI
SCM Region KTI & Field
Sangatta
SCM Region KTI & Field
Sangatta
331,200.00 Non AFE
Field Sangatta
Ren Field Sangatta
SCM Reg KTI
SCM Region KTI & Field
Sangatta
SCM Region KTI & Field
Sangatta
344,589.00 Non AFE
Field Sangatta
Ren-Field Sangatta
SCM Region KTI
SCM Region KTI & Field
Sangatta
Field Sangatta
Ren Field Sangatta
SCM Reg KTI
SCM Region KTI & Field
Sangatta
SCM Region KTI & Field
Sangatta
595,389.00 Non AFE
Field Sangatta
Ren-Field Sangatta
SCM Region KTI
SCM Region KTI & Field
Sangatta
Field Sangatta
Field Sangatta
Ren Field Sangatta
SCM Reg KTI
SCM Region KTI & Field
Sangatta
SCM Region KTI & Field
Sangatta
Field Sangatta
Ren Field Sangatta
SCM Field Sangatta
SCM Field Sangatta &
Field Sangatta
SCM Field Sangatta &
Field Sangatta
500,028.00 Non AFE
Field Sangatta
Ren-Field Sangatta
SCM Region KTI
SCM Region KTI & Field
Sangatta
Field Sangatta
Field Sangatta
Ren Field Sangatta
SCM Reg KTI
SCM Region KTI & Field
Sangatta
SCM Region KTI & Field
Sangatta
Field Sangatta
Ren Field Sangatta
SCM Field Sangatta
SCM Field Sangatta &
Field Sangatta
SCM Field Sangatta &
Field Sangatta
201,624.00 Non AFE
Field Sangatta
Ren Field Sangatta
SCM Reg KTI
SCM Region KTI & Field
Sangatta
SCM Region KTI & Field
Sangatta
1,268,866.00 Non AFE
Field Sangatta
Ren Field Sangatta
SCM Reg KTI
SCM Region KTI & Field
Sangatta
SCM Region KTI & Field
Sangatta
5,851,869.00
2013 2014 Keterangan
Jun Jul Ags Sep Okt Nov Des Jan Feb tgl 8 Jan 2013
Penyiapan Drawing,
RKS & OE
Penyiapan Drawing,
RKS & OE
Penyiapan Drawing,
RKS & OE
Penyiapan Spesifikasi
Penyiapan Spesifikasi
Penyiapan Spesifikasi
Penyiapan Spesifikasi
Penyiapan Spesifikasi
Penyiapan Spesifikasi
Penyiapan Drawing,
RKS & OE
Proses Approval PR
dan Spesifikasi
Penyiapan Spesifikasi
Penyiapan Spesifikasi
Penyiapan Spesifikasi
Penyiapan Drawing,
RKS & OE
Penyiapan Spesifikasi
Penyiapan Drawing,
RKS & OE
Penyiapan Spesifikasi
Penyiapan Drawing,
RKS & OE
Penyiapan Drawing,
RKS & OE
Penyiapan Spesifikasi
Penyiapan Drawing,
RKS & OE
Penyiapan Spesifikasi
Penyiapan Spesifikasi
Penyiapan Drawing,
RKS & OE
Penyiapan Spesifikasi
Penyiapan Spesifikasi
Penyiapan Spesifikasi
Penyiapan Spesifikasi