FOR SQUARE FOOTING


Fill up only the yellow box, do not save after using this estimate, if you want to erase just type "0" zero on the yellow

Thickness 0.25
Width 0.60
No. of bars 8.00 one way only
THICKNESS

No. of footing
on this size 5.00

Materials needed: WIDTH


Cement 4.66 bags
Sand 0.26 cu.m.
Gravel 0.52 cu.m.
bars 12.47 pcs. specify diameter
Tie wire 2.15 klg.

Footing total 0.45 cu.m.


st type "0" zero on the yellow box

0.09 0.93
0.05
0.85
13.6
2.49333
320.00
FOR CONCRETE COLUMN
Fill up only the yellow box, do not save after using this estimate, if you want to erase just type "0" zero

COLUMN FROM GROUND FLOOR TO FIRST FLOOR CEILING


###
vo
###
to Height col. 3.40 Number of column

SIDE 2
###
to Side 1 col. 0.20 this size 5
###
st Side 2 col. 0.20
###
s Thickness of footing (TF)
###
s Number of for this column 0.20
###
s vertical bars 4.00
###
r
Confinement of stirrups:

Height up to bottom of 2nd floor slab only


###
no
###
no No. of stirrups S1 8 S1 Spaced at 0.100
No. of stirrups S2 10 S2 Spaced at 0.150
No. of stirrups S3 16 S3 Spaced at 0.200
rest spaced at 0.200

Materials needed:
Cement 7.04 bags
Sand 0.39 cu.m.
Gravel 0.78 cu.m.
Vertical bars 13.93 pcs. specify diameter
Stirrups (1.33) pcs. specify diameter
Tie wire (0.27) klg.
rase just type "0" zero on the yellow box

SIDE 1

Stirrup - rest

NOTE:If stirrups spaced


uniformly, type "0" zero
on "no. of stirrups"
yellow box
Stirrup - S3

Stirrup - S2

Stirrup - S1

Thickness
Footing (TF)
FOR CONCRETE COLUMN
Fill up only the yellow box, do not save after using this estimate, if you want to erase just type "0" zero
COLUMN FROM SECOND FLOOR LINE TO PRECEEDING FLOOR CEILING

###
V Height col. 2.80 Number of column
###
###
T Side 1 col. 0.35 this size 11

SIDE 2
###
S Side 2 col. 0.35
###
S
###
S Number of
###RE vertical bars 6.00
###RE

Height from ground floor line to ceiling of preceeding floor


###
N Confinement of stirrups:
###
S No. of stirrups S1 8 S1 Spaced at 0.100
###
T No. of stirrups S2 10 S2 Spaced at 0.150
###
T No. of stirrups S3 18 S3 Spaced at 0.200
rest spaced at 0.200

Materials needed:
Cement 39.05 bags
Sand 2.17 cu.m.
Gravel 4.34 cu.m.
Vertical bars 35.91 pcs. specify diameter
Stirrups (25.41) pcs. specify diameter
Tie wire (4.00) klg.
o erase just type "0" zero on the yellow box
OR CEILING
SIDE 1

SLAB 2ND FLOOR

STIRRUP - REST

NOTE:If stirrups spaced


uniformly, type "0" zero
on "no. of stirrups"
yellow box

STIRRUP - S3

STIRRUP - S2

STIRRUP - S1

GROUND FLOOR SLAB


FOR CONCRETE COLUMN
### Fill up only the yellow box, do not save after using this estimate, if you want to erase just type "0" zero
###
r2
### COLUMN FROM GROUND FLOOR TO FIRST FLOOR CEILING
###
vo
###
to Height col. - Number of column
###
to Diameter - this size -
###
st
###
s Thickness of footing (TF)
###
s Number of for this column -
###
s vertical bars -
###
r
Confinement of stirrups:

Height up to bottom of 2nd floor slab only


###
no
###
no No. of stirrups S1 0 S1 Spaced at -
No. of stirrups S2 0 S2 Spaced at -
No. of stirrups S3 0 S3 Spaced at -
rest spaced at -

Materials needed:
Cement - bags
Sand - cu.m.
Gravel - cu.m.
Vertical bars - pcs. specify diameter
Stirrups #DIV/0! pcs. specify diameter
Tie wire #DIV/0! klg.
erase just type "0" zero on the yellow box

DIAMETER

Stirrup - rest

NOTE:If stirrups spaced


uniformly, type "0" zero on
"no. of stirrups" yellow box

Stirrup - S3

Stirrup - S2

Stirrup - S1

Thickness
Footing (TF)
FOR CONCRETE COLUMN
Fill up only the yellow box, do not save after using this estimate, if you want to erase just type "0" zero
###
ra COLUMN FROM SECOND FLOOR LINE TO PRECEEDING FLOOR CEILING
###
###
V Height col. - Number of column
###
###
T Diameter - this size -
###
S
###
S
###
S Number of
###
R vertical bars -
###
R
###
N Confinement of stirrups:
###
S No. of stirrups S1 0 S1 Spaced at -
###
T No. of stirrups S2 0 S2 Spaced at -
###
T No. of stirrups S3 0 S3 Spaced at -
rest spaced at -

Materials needed:
Cement - bags
Sand - cu.m.
Gravel - cu.m.
Vertical bars - pcs. specify diameter
Stirrups #DIV/0! pcs. specify diameter
Tie wire #DIV/0! klg.
COLUMN
want to erase just type "0" zero on the yellow box
NG FLOOR CEILING
DIAMETER

SLAB 2ND FLOOR


Height from ground floor line to ceiling of preceeding floor

STIRRUP - REST

NOTE:If stirrups spaced


uniformly, type "0" zero on
"no. of stirrups" yellow box

STIRRUP - S3

STIRRUP - S2

STIRRUP - S1

GROUND FLOOR SLAB


FOR ZOCALLO
Fill up only the yellow box, do not save after using this estimate, if you want to erase just type "0" zer

Width 0.50
Thickness 0.15
Length 40.00

No. of Longitudinal bars 4


Spacing of Transverse bars 0.30

Materials needed:
Cement 31.05 bags
Sand 1.73 cu.m.
Gravel 3.45 cu.m.
Def. Bars 41.65 pcs.
Tie wire 2.58 klg.
vol
###
long
###
trans
###
###

48
to erase just type "0" zero on the yellow box

Natural ground

CHB

Longitudinal bars

Transverse bars

Thickness

Width
FOR CONCRETE BEAM
Fill up only the yellow box, do not save after using this estimate, if you want to erase just type "0" zero
STIRRUPS - S1
STIRRUPS - S2
STIRRUPS - S3

###
vo
###
m
HEIGHT

###
L
###
s
###
s
###
s
###
r WIDTH L/2 L/4
###
s
###
to Height 0.15
###
to Width 0.20
LENGTH O.C. OF COLUMN
###
jo Length 4.50
###
ti
No. of beams Confinement of stirrups:
this size 2.00 No. of stirrups S1 10 S1 Spaced at 0.100
No. of stirrups S2 10 S2 Spaced at 0.150
Number of No. of stirrups S3 10 S3 Spaced at 0.200
main bars 4.00 rest spaced at 0.200
ant to erase just type "0" zero on the yellow box

STIRRUPS - S3
STIRRUPS - REST

L/4 L/2

TH O.C. OF COLUMN

Materials needed:
Cement 2.79 bags
Sand 0.16 cu.m.
Gravel 0.31 cu.m.
Main bars 6.66 pcs.
Stirrups 2.18 pcs.
Tie wire 0.46 klg.

Beam total 0.27 cu.m.


FOR CHB WALLING/PARTITION
Fill up only the yellow box, do not save after using this estimate, if you want to erase just type "0" zero
you may include height from zocallo to ceiling
Total length 25.30

HEIGHT just for a single floor


Height 3.40 1 floor

TO DESIGNATE WHAT SIZE OF CHB YOU'RE


USING, TYPE " 1" ONE ON THE YELLOW
BOX BELOW
Using 4"x8"x16" 1
Using 6"x8"x16" -

TOTAL LENGTH
FOR PLASTERING (class "B") METHOD,
CHOOSE BY TYPING " 1 " ONE ON Less: OPENNINGS on one floor only, CHB qu
YELLOW BOX BELOW Description Area
Plastering 1 side only - Door 1 1.89
Plastering 2 sides 1 Door 2 1.68
Door 3 -
Materials needed: Door 4 -
Cement 104.53 bags Door 5 -
Sand 10.29 cu.m. Door 6 -
Def. Bars 62.06 pcs. specify diameter
C.H.B. 1,028.17 pcs. specify size (thickness)
Tie wire 6.21 klg.
Note: Steel Reinforcement for CHB; Vertical bars - dist. @ 0.60m o.c., Horizontal bars - @ every 3 layers
t to erase just type "0" zero on the yellow box
###
D
CEILING LINE
###
W
###
To
LESS OPENNINGS OF
###
A
WINDOWS & DOORS
###
Ne
###
4"6"
###
ce
###
###
m
###
FLOOR LINE
###
ce
###
###
sa
###
TOTAL LENGTH ###
sa
###
NGS on one floor only, CHB quantity for another floor must be done separately.
No. of units Description Area No. of units ###
ce
###
1 Window 1 - - ### ######
sa ###
3 Window 2 - - 1 2###
###
fac
- Window 3 - - ### ######
ce ###
- Window 4 - - ###c#########
- Window 5 - - ###ve ### ###
- Window 6 - - ###ho ### ###
###
Total window opennings
for this floor only - sq.m.
every 3 layers
FOR TWO WAY CONCRETE SLAB
Fill up only the yellow box, do not save after using this estimate, if you want to erase just type "0" zero on the ye

### V For bar spacing, choose by tping "1"


on the yellow box below
### A
tie
bars
wireBar Spacing USE SPACING OF
MAIN
###
###
###
### 0.100 m. o.c. - REINFORCEMENT
###
###
###
### 0.125 m. o.c. -

WIDTH
###
###
###
### 0.150 m. o.c. -

(m)
###
###
###
### 0.175 m. o.c. -
###
###
###
### 0.200 m. o.c. -
###
###
###
### 0.225 m. o.c. -
###
###
###
### 0.250 m. o.c. -
###
###
###
### 0.275 m. o.c. -
###
###
###
### 0.300 m. o.c. 1
###
###
L/2 L / 4 Spaced at ___
Length 4.00
Width 3.00 LENGTH (m)
Thickness 0.15 Materials needed:
Cement 93.15 bags
No. of Slab this size 5.00 Sand 5.18 cu.m.
Gravel 10.35 cu.m.
Def. Bars 827.31 pcs.
Tie wire 51.98 klg.
erase just type "0" zero on the yellow box

4 Spaced at ___ L/2

specify diameter
FOR CONCRETE FLOORING
###
v Fill up only the yellow box, do not save after using this estimate, if you want to erase just type "0" zero
###
###
b
###
###
b For ground floor only: (REINFORCED CONCRETE FLOOR)
###
to
###
###
t Width 1.50 Reinforced bars
Length 4.00
Thickness 0.15
Note: If flooring is not reinforced,leave bar spacing blank
Bar Spacing
bothways 0.40
WIDTH
Note: If you are not using tiles, just leave tile size blank
Choose size of tiles you will use by
###
a typing one "1" on the box below Materials needed:
###
### 4" x 4" - Cement 9.32 bags
###
### 8" x 8" - Sand 0.52 cu.m.
###
### 12" x 12" 1 Gravel 1.04 cu.m.
###
### 16" x 16" - Def. Bars 6.51 pcs. specify diameter
### Tiles 70 pcs. specify size
Tie wire 0.25 klg.
ant to erase just type "0" zero on the yellow box

LENGTH

pecify diameter