Professional Documents
Culture Documents
Gas Eng PartI PDF
Gas Eng PartI PDF
Putu Suarsana
• Lecturer Info
• Syllabus
Lapangan Offshore
? Gas
Water
GWC
Gas
GWC
Water
Lapangan Onshore
?
WHERE WE FIND OIL & GAS?
Reservoir
Rock Fluid
Reservoir Gas Development
2
Tahap 1-4
1 3
7
6 Tahap 5
5
Tahap 6-7
5 6
1-4 7
4Fasa Dalam Konsep Pengembangan Lapangan Gas
Fasa IV
Fasa II
Fasa III
Fasa I
Type of Rocks
4 Sections in Petroleum Industry
Section III
Section IV
Section II
Section I
4 Sections in Petroleum Industry
RESERVOIR PRODUCTION
ENGINEERIN ENGINEERING
G
GEOLOGY SURFACE
AND FACILITIES
GEOPHYSIC ENGINEERING
S
RESERVOIR
DESIGN AND
(PETROLEUM ENVIRONMENTA
CONSTRUCTIO
ASSET) L AND LEGAL
N
MANAGEMEN ASPECTS
ENGINEERING
T
ECONOMICS
GAS
DRILLING MARKETING,
MANAGEMENT
RESEARCH
PRODUCTION
AND
OPERATIONS
SERVICE
LABS
Section III
Section IV
Section II
Section I
Mencari Reservoir Gas??
2
1 3
1-5 - Exploration
5 - Primary Production
6-7 - EOR
4
7
6
5
5 6
1-4 7
4Fasa Dalam Konsep Pengembangan Lapangan Gas
Fasa IV
Fasa II
Fasa III
1 3
Fasa I
7
6
5
Petroleum Reservoir System
Gas: PLN
LNG
Rumah
P1
P2
Gas
P3
Sealing
GOC
FWL Water
Reservoir minyak dan gas
7
6 Tahap 5
5
Tahap 6-7
5 6
1-4 7
MULTIDISCIPLINARY NATURE OF RESERVOIR MANAGEMENT
RESERVOIR PRODUCTION
ENGINEERING ENGINEERING
GEOLOGY SURFACE
AND FACILITIES
GEOPHYSICS ENGINEERING
RESERVOIR
DESIGN AND
(PETROLEUM ENVIRONMENTA
CONSTRUCTIO
ASSET) L AND LEGAL
N
MANAGEMEN ASPECTS
ENGINEERING
T
ECONOMICS
GAS
DRILLING MARKETING,
MANAGEMENT
RESEARCH
PRODUCTION
AND
OPERATIONS
SERVICE
LABS
Tools
• Seismic Interpretation
People • Tomography
•Management • Data Acquisitions
•Geoscientists • Logging/Coring
•Engineers
•Land/Legal
Integration • Completion and Facilities
• Geologic Modeling
•Field • Pressure Transient
•Financial • Fracturing
• Reservoir simulators
• EOR
• Computer Software and
Technology • Hardware
• Seismic
•Geologic
•Geostatistics
•Engineering
•Drilling and Completions
•Enhanced Oil Recover y
• Environmental
•Computer
Technology
Geophysics: Geology:
•2D Seismic •Core Description Reservoir Engineering:
•Thin Sections •Portfolio
•3D Seismic •Management
•Microscopes
•Cross-Hole •Image Analysis •Log Analysis
•Tomography •X-Ray •Transient Well Tests
•Stable Isotope •Conventional Core anlysis
•Vertical Seismic •CT Scan, NMR
•Profile •Analysis
•Fluid Analysis
•Depositional Models •Decline Curve Analysiss
•Multicomponent
•Diagenetic Models •Material Balance
•Seismic
•Maps, Cross sections •Waterflood
•Shear Wave •Remote Sensing •Streamtube Models
•Logging
•Reservoir Simulation
Production Engineering: •Geostatistics
•Economics •EOR Screening
•Data Acquisition •EOR Technology
•& Mangement •Expert Systems
•Well Stimulation •Neural Networks
•Pipeflow Simulation
•Wellbore Simulation
•Nodal Analysis
INDONESIA : PERKIRAAN
INDONESIA: PRODUKSI
Oil production forecast to SAMPAI
2050 2050
Second Peak
2000 EOR: water flood Minas &
First Peak: Thermal (Duri)
Thousands of barrels of oil per day
1800
Primary Production
1600
1400
1200 No New Field
NO EOR
1000
800
600
400
200
0
1930 1940 1950 1960 1970 1980 1990 2000 2010 2020 2030 2040 2050
Start
Import
Oil
POSISI PERTAMINA DIANTARA
PRODUSEN MIGAS DI INDONESIA
• DELINEATION
2nd
• DEVELOPMENT DEVELOPMENT
3rd &
PRODUCTION
PHASE
• PRODUCTION
4th
45
WHERE WE FIND OIL & GAS?
REAL WORLD
SEISMIC vs REAL WORLD
EXPLORATION DISCOVERIES IN THE 2001’s
Alu-Alu-1990 Lokan-1997
Sembilang-1990 Gajah Putri-1997
Buntal-1990
Belut-1998
Jangkar-1998 N
LSS - 1991
K Langsa - 1992 Bunyu Seipaya-1990 0 500
A Rambong-1993 Kerisi-1991 Bunyu Seibesar-1992
SLS - 1993 Kilometers
Kakap-1991 Bunyu Seigundah-1993
Pase - 1999 KR-1995 Sei Utara-2000
Tegar-1991
Jambon-1992 Semanlu-1990
MSDC & Lereng-1993
Ronda-1992 Gelam-1990 Peciko-1991
MSBQ-1991 Merah Besar-1996
Asih-1993 Puyuh-1993 Janu-1992
OKI-1995 Sumpal-1994 Hijau Besar-1997
West Peciko-1995
Bungsu West-1997 Kaji-1996 West Seno-1998 Roabiba-1990
Stupa-1998
0° Doral North-1998 Semoga-1996 Seo-1991 Wiriagar-1994
N.Geragai-1995 Lampake-1992
Bungin Batu-1997 Amuk-1998 Vorwata-1997
NE.Betara-1995 Tetangga-1997 Sisi-1990 Ubadari-1997
Bungin-1998 Rayun-1997 Serang-1991
Gemah-1999 Senoro-1999 SWO-1996
Nubi-1992 Donggi-2001
P.Gading-1996
N.Betara-1998 Seguni-1995
Ambar-1992APN & FSN -1991
R.Condong C-2000 Retno-1992 GQS, BZN & SSX -1992
Oseil-1994
Aida-1995 ER-1993
Harimau-1990
LU & KKN-1995
Air Serdang-1990
JJW, FXE & KMS -1997
Siamang-1991 Keladi-1993
Tangai-1992 Mudi-1994 Sirasun-1993
Pandan-1993 Terang-1994
Dayung-1994
Batur & Kubu-1995
Sambar-1994
Rengasdengklok-1991
Bungkal-1996
Tambun-1992 Wunut-1994
Singa-1997
Pasircatang-1992 Rembang-1999
Tepus-1997
Tanjung Sari-1995 Kedung Tuban-2000
Sopa-1997
Subang-1995 Suci - 2000
Suban-1998
Bojong raong-1995
Petanang-1999
Melandong-2000
Bernai-2000
Tambun Barat-2001
Lintang-2001
110° 130°
Di Daerah Mana Kita Harus Drilling I ?
Seismic Framework
Structural Interpretation
Trap Models
Seismic Framework