Professional Documents
Culture Documents
Instrucción Especial
Installation Procedure for the 260-7854 Pilot Lines Gp {5057, 5059}
Número de medio -GEHS0440-00 Fecha de publicación -30/08/2012
Installation Procedure for the 2607854 Pilot Lines Gp {5057, 5059}
SMCS 5057; 5059
Excavator:
330D (S/N: RDA1UP; KAB1UP; PFC1UP; NBD1UP; NEF1UP; EAH1UP; LCJ1UP; PCK1UP; RDK1UP; LDR1UP; EDX1UP; MEY1UP)
336D (S/N: SKE1UP; PRF1UP; WRK1UP; JER1UP; NLS1UP; KKT1UP; M4T1UP; PGW1UP; EMX1UP)
Work Tool:
HYDRAULIC KIT (S/N: HKD1UP)
Introduction
This special instruction covers the installation procedure for 2607854 Pilot Lines Gp revision 13.
Safety Section
NOTICE
FORMATO PARA IMPRIMIR Care must be taken to ensure that fluids are contained during