data

kolom = 300 x 500


Pu = 780 kN Aperlu = 2.84 m2 = 3 m2
Mu = 25 kN Ukuran pondasi = 3 m2 1x
σt = 275 kN/m2 tebal ditetapkan = 700 mm
Kedalaman tanah = 1.65 m tulangan (D) = 22
Fc' = 25 Mpa selimut beton = 70 mm
Fy = 400 MPa efektif (d) = 619 mm = 0.619 m
urukan tanah = 800 mm 0.8 m
tebal pondasi = 700 mm 0.7 m
lantai kerja = 50 mm 0.05 m beban - beban
urukan pasir = 100 mm 0.1 m beban kolom = 780 kN
bj tanah urug 1x3x0,7x = 31.2 kN
tanah urug = 13 pondasi 1x3x0,65x = 50.4 kN
pondasi = 24 lantai kerja 1x3x 0,05 = 3.6 kN
lantai kerja = 24 pasir urug 1x3x0,1 = 4.5 kN
pasir urug = 15 Q = 869.7 kN

kontrol tegangan tanah


σt = 289.9 ± 17
σmaks = 307 kNm2 > 275 kN/m2
σmin = 273 kNm3 > 275 kN/m2

kontrol kuat gesr beton


bc = 1.7
b0 = 3676 mm

øvc = 1659.3
vu = pu = 780 <

Penulanagan
arah memanjang
Mu = 425.8 kN.m
Mu/bd2 = 1111.25 p=
As = 2290.3
dipasang tulangan D22 - 200 = 2277 mm2

arah memendek
Mu = 425.79 kN.m
Mu/bd2 = 163.14 p=
As = 247.6 mm2
dipasang tulangan D16 - 250 = 379.5 mm2
3

1659.3 maka geser beton memenuhi

0.0037

0.0004
Data Hitung
b = 300 mm d' = 61 mm
h = 500 mm d'/h = 0.122 ≈ 0.1
Pu = 780 kN Agr = 150000 mm2
Mu = 25 kNm
Fc' = 25 Mpa Ordinat = 0.00037647 < 0.1
Fy = 400 Mpa et = 0.03205128 m ≈ 3.21
ø = 0.65
tul. Utama = 22 et/h = 0.00641026
sengkang = 10 Absis = 2.413E-06
tebal selimut beton = 40 mm
Tulangan dipasang secara simetris dua sisi, maka dari grafik
r = 0.15
B = 1

ρ = 0.15
Ast = 22500 mm2
As=As' = 11250 mm2
dipasang tulangan 3D 22 = 1138,5 mm2

Tulangan dipasang secara simetris semua sisinya, maka dari grafik


r = 0.24
B = 1

ρ = 0.24
Ast = 36000 mm2
As=As'=aska=aski = 9000 mm2
dipasang tulangan 3D 22 = 1139,82 mm2
mm

a dari grafik

a, maka dari grafik