A quick and easy pair of mitts using Mitts (make 2):
only one hank of Worsted Hand Dyes. CO 32 sts, arranging 12 sts on ndl 1 and 10 sts across ndls 2 and 3. Join for experience level working in rnd, being careful not to Advanced Beginner twist sts. Work k2, p2 rib for 10 rnds.
Materials: Next Rnd: Begin working chart across
• Blue Sky Worsted (100g/100yds): ndl 1, cont rib pat across ndls 2 and 3. 1 hank Rep chart 3 times. Work thumb gusset • Size 9 (5.5 mm) double pointed on row 6 of 2nd chart rep as follows: needles, or size needed to obtain gauge Left mitt: work even in patt to last 2 sts • 2 stitch markers of ndl 3 and work Thumb Gusset. • Cable needle Right mitt: work across ndl 1, k2 from • Waste Yarn ndl 2 and work Thumb Gusset, k2, p2 • Yarn Needle to end.
SIZE Thumb Gusset:
One size Rnd 1: P1, pm, M1L, pm, P1. Rnd 2: P1, sm, k to next marker, sm, p1. GAUGE Rnd 3: P1, sm, M1L, k to next marker, In Rib Pattern, unstretched, 8 sts = 1" M1R, sm, p1. Rep last 2 rounds 3 more times until Abbreviations there are 9 sts between markers. Rep BO: Bind off rnd 2 once more, sl sts between markers C6B: Sl 3 sts to cn, hold in back of to waste yarn and remove markers. work, k3, k3 from cn C6F: Sl 3 sts to cn, hold in front of After third rep of chart, rep row 1 of work, k3, k3 from cn chart once more, then work 5 rows k2, CN: Cable needle p2 rib. BO loosely in patt. CO: Cast on Cont: Continu(e)(ing) Thumb: Move thumb sts from waste DPN(s): Double pointed needles yarn onto ndls and rejoin yarn. Pick up Est: Established and knit 2 sts across body of mitt. K: Knit [11 sts] Knit 5 rnds even, then BO very M1L: Insert ndl under bar between 2 sts loosely (or use sewn BO). from front to back, k into the back of the loop. Weave in ends and block lightly. M1R: Insert ndl under bar between 2 sts from back to front, k into the front of the loop. Ndl(s): Needle(s) 12 12 P: Purl 11 11 Patt: Pattern 10 10 PM: Place Marker 9 9 Rep: Repeat(ing) 8 8 Rnd(s): Round(s) 7 7 Sl: Slip 6 6 SM: Slip Marker 5 5 4 4 Pattern Notes 3 3 Chart is worked across ndl 1 with k2, 2 2 p2 ribbing worked across ndls 2 and 3, 1 1 inserting the thumb gusset as indicated. 12 11 10 9 8 7 6 5 4 3 2 1 12 11 10 9 8 7 6 5 4 3 2 1 Left Right Knit C6F Purl C6B
P.O. Box 88, Cedar, MN 55011. blueskyalpacas.com
This knit pattern is copyrighted material and under the copyright laws of the United States. You may use this pattern for your own personal use or enjoyment, but may not edit, publish, copy or commercially exploit this pattern in any way. 121010