Version 1.7
Change Management Roles
Table of Contents
1. About This Document .................................................................................................................... 4
1.1 Document Objective .................................................................................................................. 4
1.2 Assumptions .............................................................................................................................. 4
1.3 Scope ........................................................................................................................................ 4
1.4 References ................................................................................................................................ 4
2. Roles Process Flow Chart ................................................................................................................. 5
3. Change Requester Role .................................................................................................................... 6
4. Change Coordinator Role ................................................................................................................. 6
5. Change Implementer Role ................................................................................................................ 6
6. Change Manager Role ...................................................................................................................... 6
7. Service Owner Role .......................................................................................................................... 7
7.1 Current Service Owners ............................................................................................................ 7
8. ICT Change Management Role ........................................................................................................ 7
9. Authorized Sender Role .................................................................................................................... 8
10. Communication Approver Role ..................................................................................................... 8
10.1 Communication Approvers ........................................................................................................ 8
11. Change Board Role ....................................................................................................................... 8
11.1 Change Board Members ........................................................................................................... 8
12. Inquiries ......................................................................................................................................... 8
2
Change Management Roles
Revision History
Author Version Description Date
Steve Lane 1.0 Initial draft June 5, 2013
Gemma Tungul
Candace Dechant
Sandy Stout
Steve Lane 1.1 Aligned Change Board Role with TOR. October 7, 2013
Gemma Tungul
Steve Lane 1.2 Aligned Change Managers Role with TOR. October 10, 2013
Gemma Tungul
Steve Lane 1.3 ICT Change Facilitator Role includes facilitating November 29, 2013
Gemma Tungul Change Communication Distribution
Change Management Process Flowchart updated
with Emergency change (out of scope) and a new
ICT Change Facilitator Swimlane
Gemma Tungul 1.4 Update reference to ITSM 7.6 to ITSM 8.1. June 5, 2014
Update links to Sharepoint Site 2010.
Gemma Tungul 1.5 Add Authorized Sender and Communication January 27, 2015
Approver Roles. Updated the Service Owner
Information.
Ken Merkel 1.6 Updated and verified all role definitions September 1, 2015
Sandy Stout
Gemma Tungul
Caroline Schulte
Gemma Tungul 1.6 Updated CM Roles Process Diagram September 21, 2015
Sandy Stout 1.7 Updated Communication Approver. Updated Feb. 4, 2016
Service Owner information
3
Change Management Roles
1.2 Assumptions
Change Management Roles is written on two key assumptions:
You are familiar with the overall Service Alberta Change Management process as detailed in the
Change Management Process Guide .
You are familiar with the use of BMC Remedy Change Management 8.1 (herein referred to as
ITSM). For further instructions on using ITSM to create and work with Requests for Change
(RFCs) and Changes (CRQs):
o refer to the BMC Remedy Change Management 8.1 User's Guide
o Or view the BMC Remedy Change Management computer-based training (CBT)
1.3 Scope
Change Management Roles is not intended to replace any of the change management processes and
procedures or the BMC Remedy Change Management 8.1 User's Guide, but rather to serve as a
supplement to these guides. This document identifies only the roles and responsibilities expected of each
position involved in the Change Management process.
1.4 References
Change Management Roles refers directly to information found in the change process and procedures
documents found in the Change Management Processes and Procedures Documents Site. For a more
thorough breakdown of each position, please refer to the original documents.
4
Change Management Roles
5
Change Management Roles
Documenting the Change Request (CRQ) to the best of their ability and understanding (ie
description, risk, requested implementation dates) based on organizational requirements
Working with other people in the Change Management Process to identify needs, as required
Submitting Requests for Change (RFCs) in ITSM
May present the proposed change to the Change Board
6
Change Management Roles
Where required, reviews communication plan for accuracy, requests communication approval and
schedules communication for distribution
Reviews the change for its validity and completeness and determines the Change Board
requirements.
Ensures change is submitted for review by its submission deadline. (refer to Lead Time in Terms
of Reference (TOR) Document)
Requests approval from appropriate Service Owner
Ensures changes go through the correct Change Board (Operational or Business)
Performs the Post Implementation Review to ensure the change met the schedule and objectives
Updates Change Records as required
Closes CRQs
Monitors and reports on the performance of the process
Approving all changes (with the exception of “no impact” changes) before they are moved into a
scheduled state
Reviewing all relevant information about the Change Request (eg. Service Impact Assessment,
Risk Assessment, Backout Plan, Implementation Plan, Schedule, Communication Plans and
scheduled dates)
Making a decision about the Change (Approve, Reject, Defer)
Updating the Change Request with their decision (approval within ITSM or through an email
attached to the ticket)
7
Change Management Roles
On October 31, 2013, Ministry IT Representatives became a part of the Change Board.
12. Inquiries
Refer your inquiries to ict.change@gov.ab.ca.