Procedures:
1. Perform the general start-up procedures as described in Section 4.1.
2. Start the experiment for Membrane 1. Open valves V2, V5, V7, V11 and V15.
3. To set the maximum working pressure at 20 bars, switch on the plunger pump (P1) and slowly
close valve V5. Observe pressure value at pressure gauge and adjust the pressure regulator to 20
bars.
Note: Use a proper wrench to turn the adjusting screw at the pressure regulator (PR1) by
turning clockwise to increase pressure and counter-clockwise to reduce pressure.
Warning: Do not operate pump in dry condition. Make sure V2 is opened.
4. Open valve V5. Then, set membrane maximum inlet pressure to 18 bars for Membrane 1 by
adjusting the retentate control valve (V15).
5. Allow the system to run for 5 minutes. Start collecting sample from permeate sampling port and
weigh the sample using digital weighing balance. Record the weight of permeates every 1 minute
for 10 minutes.
Note: To collect sample, open valve V19 and simultaneously close valve V11.
6. Repeat the step 1 to 5 for Membrane 2, 3 and 4. Open and close the respective sets of valves
and adjust the membrane maximum inlet pressure for every membrane.
Open Valves Sampling Retentate Membrane
Membrane control maximum inlet
(Step 2) Valves valve pressure (bar)
1 V2, V5, V7, Open V19 and V15 18
V11 and V15. close V11
2 V2, V5, V8, Open V20 and V16 12
V12 and V16. close V12
3 V2, V5, V9, Open V21 and V17 10
V13 and V17. close V13
4 V2, V5, V10, Open V22 and V18 8.5
V14 and V18. close V14