Professional Documents
Culture Documents
MSR4b Tenant is responsible for completing "Data Supplied" and "Not Applicable" columns of form. Page 1 of 16
Mechanical Checklist for Minimum Submittal Requirements
MSR4b Tenant is responsible for completing "Data Supplied" and "Not Applicable" columns of form. Page 2 of 16
Mechanical Checklist for Minimum Submittal Requirements
Additional Comments
MSR4b Tenant is responsible for completing "Data Supplied" and "Not Applicable" columns of form. Page 3 of 16
Load Calculation Summary
Project: Date: Revision:
Tenant Name: Space: Calculation: Cooling
Zone Name: Sq. Ft.: Heat Occ.
Unit Designation: Level: Heat Un.
(Complete separate form for each zone or terminal device)
Design Conditions Outside: Inside: Supply Air Temp: Time:
DB DB DB
WB WB WB
Floor
Partition
Roof
Subtotal Skin Loads
Outside Air No. of Occupants:
CFM per Occupant:
Total CFM:
Subtotal External Loads (Skin, Outside Air)
Subtotal Internal Loads (Occupant, Lights, Misc., Ex. Credit)
TOTAL
TOTAL
TOTAL
1. VAV -
2. VAV -
3. VAV -
4. VAV -
5. Kitchen Hood-
6. Makeup Air Unit-
7 Kitchen Hood-
8. Makeup Air Unit-
9. Dishwasher Hood
10. Toilet Exhaust
11. Trash Exhaust
TOTAL
1. VAV -
2. VAV -
3. VAV -
4. VAV -
5. Kitchen Hood-
6. Makeup Air Unit-
7 Kitchen Hood-
8. Makeup Air Unit-
9. Dishwasher Hood
10. Toilet Exhaust
11. Trash Exhaust
TOTAL
Water Closet
Urinal
Lavatory
Service Sink
Water Cooler
Floor Drain
Floor Sink
TOTAL
TOTAL
Sizing Method:
Line Size:
Regulator: Location:
Line Size:
Service Service
BTU/HR CFH Pressure Line Size
Total Gas
Requirements
TOTAL
TOTAL
ESR 10/94 Tenant is responsible for checking "Data Supplied" and "Not Applicable" columns of form. Page 14 of 2
Electrical Checklist for Minimum Submittal Requirements
Additional Comments
ESR 10/94 Tenant is responsible for checking "Data Supplied" and "Not Applicable" columns of form. Page 15 of 2
ELECTRICAL LOAD SUMMARY CHECKLIST
Project: Date:
Tenant Name: Space:
Zone Name: Sq. Ft.:
Lighting
Receptacles
Air Handlers