 Simpler geometry costing at fraction of geo-technical investigation,


3.9 Structural Placement Methods; yes, there comes geo-physical investigation, where
in, we can see beneath the earth by 100-200 m,
a) Self propelled Modular Transporters also
for various strata’s, presence of water and many
called SPMT’s
stratigraphies.
These vehicles play major role in transportation
of heavy loads to the extent of carrying 1000MT 4.2 Knowledge of unforeseen, highly variable
from casting yard to bridge location. Large sub-surface ground conditions reduces project risk,
transport corridors either road or rail can be cost, time period of completion with improved
completed ahead of schedule by planning and safety. Geophysical methods are pre-diagnosis for
using these vehicles. These vehicles are large bridge site even before geotechnical investigations.
multi-axle platforms, they are computer operated, Geophysical methods are all non-invasive. These
can turn 360º, it can lift, lower, can move methods provide an expeditious and economical
around walking speed, each axle of transporter means of supplementing information obtained by
moves independently. Fig. 2 shows the loaded
direct exploratory methods, such as boring, test
SPMT.

Fig. 2 Complete Superstructure of Self Propelled pits and in-situ testing. These methods can identify
Modular Transporter
local anomalies that might not be identified by
Time and cost advantages; other methods of exploration; these methods also
 Time period; Projects can be completed in define strata boundaries between widely spaced
40% or less than stipulated time period borings for more realistic prediction of sub surface
 Costing; Savings to the extent of 20% or more profiles. Advances in processing and imaging
can be achieved software have made it possible to detect, display
4. Introduction of Geo-physical and interpret small geological features with great
methods for precise and accuracy. These geophysical investigations in
accelerated planning of conjunction with geotechnical investigation will
projects provide accurate sub-strata profile. A well designed
Delhi signature bridge – well foundation sat geophysical investigation helps in optimising
precariously on sloped hard strata, an under the location and depth of boring for geotechnical
construction bridge pier in back water‘s of investigations, resulting in savings in terms of cost
Sharavathi river Linganamakki dam–Karnataka, and time of project.
collapsed, reason, variable soil strata at micro level
not investigated and not possible to investigate Fig. 3 shows stratigraphy in clay environment,
by our present geo-technical methods. Both the Fig. 4 shows section across river with shear zone
projects delayed years for completion and common indicated in blue.
man landed in trouble.
4.1 A system is required which is superfast,

74 Journal of the indian Roads Congress, July - September, 2017