CHAPTER V – LOAD COMPUTATION AND ANALYSIS || 1

LIVE LOAD ANALYSIS


Tributary Area for Second Floor

Note: Values in the tributary area are equivalent uniform load dead load.
Live Load Pressure for:
Classroom = 3.0 kpa
Comfort Room = 2.5 kpa
Hallway = 2.5 kpa
Pathway = 2.5 kpa

Slab 1: (Classroom)
𝑊𝑠 3 (4.5)
Wtriangle = = = 4.5 kN/m
3 3

𝑊𝑠 𝑠 2 3 (4.5) 4.5 2
Wtrapezoid = [3 − ( ) ] = [3 − ( ) ] = 5.82 kN/m
6 𝐿 6 7

Slab 2: (Hallway)
𝑊𝑠 2.5 (2.5)
Wtriangle = = = 2.08 kN/m
3 3

𝑊𝑠 𝑠 2 2.5 (2.5) 2.5 2


Wtrapezoid = [3 − ( ) ] = [3 − ( ) ] = 2.80 kN/m
6 𝐿 6 4.5
CHAPTER V – LOAD COMPUTATION AND ANALYSIS || 2

Slab 3: (Hallway - Center)


𝑊𝑠 2.5 (2.5)
Wtriangle = = = 2.08 kN/m
3 3

𝑊𝑠 𝑠 2 2.5 (2.5) 2.5 2


Wtrapezoid = [3 − ( ) ] = [3 − ( ) ] = 2.86 kN/m
6 𝐿 6 5

Slab 4: (Comfort Room)


𝑊𝑠 2.5 (3.2)
Wtriangle = = = 2.67 kN/m
3 3

𝑊𝑠 𝑠 2 2.5 (3.2) 3.2 2


Wtrapezoid = [3 − ( ) ] = [3 − ( ) ] = 3.33 kN/m
6 𝐿 6 4.5

Slab 5: (Comfort Room Pathway)


𝑊𝑠 2.5 (1.5)
Wtriangle = = = 2.67 kN/m
3 3

𝑊𝑠 𝑠 2 2.5 (1.5) 1.5 2


Wtrapezoid = [3 − ( ) ] = [3 − ( ) ] = 3.33 kN/m
6 𝐿 6 3.8
CHAPTER V – LOAD COMPUTATION AND ANALYSIS || 3

Tributary Area for Roof Deck

Note: Values in the tributary area are equivalent uniform load dead load.

Live Load Pressure for:


Roof Deck = 3.0 kpa

Slab 1: (Main Open Area)


𝑊𝑠 3 (4.5)
Wtriangle = = = 4.5 kN/m
3 3

𝑊𝑠 𝑠 2 3 (4.5) 4.5 2
Wtrapezoid = [3 − ( ) ] = [3 − ( ) ] = 5.82 kN/m
6 𝐿 6 7

Slab 2: (Above the Comfort Room)


𝑊𝑠 3 (3.2)
Wtriangle = = = 3.2 kN/m
3 3

𝑊𝑠 𝑠 2 3 (3.2) 3.2 2
Wtrapezoid = [3 − ( ) ] = [3 − ( ) ] = 3.99kN/m
6 𝐿 6 4.5
CHAPTER V – LOAD COMPUTATION AND ANALYSIS || 4

Slab 3: (Above the Comfort Room Pathway)


𝑊𝑠 3 (1.5)
Wtriangle = = = 1.5 kN/m
3 3

𝑊𝑠 𝑠 2 3 (4.5) 1.5 2
Wtrapezoid = [3 − ( ) ] = [3 − ( ) ] = 2.13 kN/m
6 𝐿 6 3.8

Slab 4: (Above the Hallway)


𝑊𝑠 3 (2.5)
Wtriangle = = = 2.5 kN/m
3 3

𝑊𝑠 𝑠 2 3 (2.5) 2.5 2
Wtrapezoid = [3 − ( ) ] = [3 − ( ) ] = 3.36 kN/m
6 𝐿 6 4.5

Slab 5: (Above the Hallway - Center)


𝑊𝑠 3 (2.5)
Wtriangle = = = 2.5 kN/m
3 3

𝑊𝑠 𝑠 2 3 (2.5) 2.5 2
Wtrapezoid = [3 − ( ) ] = [3 − ( ) ] = 3.44 kN/m
6 𝐿 6 5

Slab 6: (Main Open Area - Center)


𝑊𝑠 3 (5)
Wtriangle = = = 5 kN/m
3 3

𝑊𝑠 𝑠 2 3 (5) 5 2
Wtrapezoid = [3 − ( ) ] = [3 − ( ) ] = 6.22 kN/m
6 𝐿 6 7
CHAPTER V – LOAD COMPUTATION AND ANALYSIS || 5

Computation of Live Load for Second Floor


FRAME 1: 𝐿𝐿2 = 2.08 KN/m
Along 2.5m length (2B-2)
Along 3.2m length (2B-2) FRAME 8: 𝐿𝐿2 = 2.08 KN/m
𝐿𝐿1 = 2.67 KN/m
Along 7m length (2B-2) FRAME 15:
Along 2.5m length (2B-2) 𝐿𝐿1 = 5.82 KN/m
𝐿𝐿2 = 2.08 KN/m Along 7m length (2B-2)
Along 2.5m length (2B-2) 𝐿𝐿1 = 2.67 + 1.78 + 5.82 = 10.27
FRAME 2: 𝐿𝐿2 = 2.08 KN/m KN/m

Along 7m length (2B-2) FRAME 9: Along 2.5m length (2B-2)


𝐿𝐿1 = 2.67 + 1.78 + 5.82 = 10.27 𝐿𝐿2 = 2.08 KN/m
KN/m Along 7m length (2B-2)
𝐿𝐿1 = 5.82 KN/m FRAME 16:
Along 2.5m length (2B-2)
𝐿𝐿2 = 2.08 KN/m Along 2.5m length (2B-2) Along 3.2m length (2B-2)
𝐿𝐿1 = 2.67 KN/m
FRAME 3: 𝐿𝐿2 = 2.08 KN/m
Along 2.5m length (2B-2)
Along 7m length (2B-2) FRAME 10: 𝐿𝐿2 = 2.08 KN/m
𝐿𝐿1 = 5.82 + 5.82 = 11.64 KN/m
Along 7m length (2B-2) FRAME A:
Along 2.5m length (2B-2) 𝐿𝐿1 = 5.82 + 5.82 = 11.64 KN/m
𝐿𝐿2 = 2.08 KN/m *Between 1-2: Along 4.5m length (2B-
Along 2.5m length (2B-2) 1)
FRAME 4: 𝐿𝐿2 = 2.08 KN/m 𝐿𝐿1 = 2.80 KN/m

Along 7m length (2B-2) FRAME 11: *Between 2-3: Along 4.5m length (2B-
𝐿𝐿1 = 5.82 + 5.82 = 11.64 KN/m 1)
Along 7m length (2B-2) 𝐿𝐿1 = 2.80 KN/m
Along 2.5m length (2B-2) 𝐿𝐿1 = 5.82 + 5.82 = 11.64 KN/m
𝐿𝐿2 = 2.08 KN/m *Between 3-4: Along 4.5m length (2B-
Along 2.5m length (2B-2) 1)
FRAME 5: 𝐿𝐿2 = 2.08 KN/m 𝐿𝐿1 = 2.80 KN/m

Along 7m length (2B-2) *Between 4-5: Along 4.5m length (2B-


FRAME 12:
𝐿𝐿1 = 5.82 + 5.82 = 11.64 KN/m 1)
𝐿𝐿1 = 2.80 KN/m
Along 7m length (2B-2)
Along 2.5m length (2B-2) 𝐿𝐿1 = 5.82 + 5.82 = 11.64 KN/m
𝐿𝐿2 = 2.08 KN/m *Between 5-6: Along 4.5m length (2B-
1)
Along 2.5m length (2B-2)
𝐿𝐿1 = 2.80 KN/m
FRAME 6: 𝐿𝐿2 = 2.08 KN/m
*Between 6-7: Along 4.5m length (2B-
Along 7m length (2B-2) FRAME 13: 1)
𝐿𝐿1 = 5.82 + 5.82 = 11.64 KN/m
𝐿𝐿1 = 2.80 KN/m
Along 7m length (2B-2)
Along 2.5m length (2B-2) 𝐿𝐿1 = 5.82 + 5.82 = 11.64 KN/m *Between 7-8: Along 4.5m length (2B-
𝐿𝐿2 = 2.08 KN/m
1)
Along 2.5m length (2B-2) 𝐿𝐿1 = 2.80 KN/m
FRAME 7: 𝐿𝐿2 = 2.08 KN/m
*Between 8-9: Along 5m length (2B-1)
Along 7m length (2B-2) FRAME 14: 𝐿𝐿1 = 2.86 KN/m
𝐿𝐿1 = 5.82 + 5.82 = 11.64 KN/m
Along 7m length (2B-2) *Between 9-10: Along 4.5m length
Along 2.5m length (2B-2) 𝐿𝐿1 = 5.82 + 5.82 = 11.64 KN/m (2B-1)
CHAPTER V – LOAD COMPUTATION AND ANALYSIS || 6

𝐿𝐿1 = 2.80 KN/m *Between 4-5: Along 4.5m length (2B-


*Between 10-11: Along 4.5m length *Between 7-8: Along 4.5m length (2B- 1)
(2B-1) 1) 𝐿𝐿1 = 4.5 KN/m
𝐿𝐿1 = 2.80 KN/m 𝐿𝐿1 = 4.50 + 2.80 = 4.05 KN/m
*Between 5-6: Along 4.5m length (2B-
*Between 11-12: Along 4.5m length *Between 8-9: Along 5m length (2B-1) 1)
(2B-1) 𝐿𝐿1 = 2.86 4.05 KN/m 𝐿𝐿1 = 4.5 KN/m
𝐿𝐿1 = 2.80 KN/m
*Between 9-10: Along 4.5m length *Between 6-7: Along 4.5m length (2B-
*Between 12-13: Along 4.5m length (2B-1) 1)
(2B-1) 𝐿𝐿1 = 4.50 + 2.80 = 4.05 KN/m 𝐿𝐿1 = 4.5 KN/m
𝐿𝐿1 = 2.80 KN/m
*Between 10-11: Along 4.5m length *Between 7-8: Along 4.5m length (2B-
*Between 13-14: Along 4.5m length (2B-1) 1)
(2B-1) 𝐿𝐿1 = 4.50 + 2.80 = 4.05 KN/m 𝐿𝐿1 = 4.5 KN/m
𝐿𝐿1 = 2.80 KN/m
*Between 11-12: Along 4.5m length *Between 8-9: Along 4.5m length (2B-
*Between 14-15: Along 4.5m length (2B-1) 1)
(2B-1) 𝐿𝐿1 = 4.50 + 2.80 = 4.05 KN/m 𝐿𝐿1 = 0 KN/m
𝐿𝐿1 = 2.80 KN/m
*Between 12-13: Along 4.5m length *Between 9-10: Along 4.5m length
*Between 15-16: Along 4.5m length (2B-1) (2B-1)
(2B-1) 𝐿𝐿1 = 4.50 + 2.80 = 4.05 KN/m 𝐿𝐿1 = 4.5 KN/m
𝐿𝐿1 = 2.80 KN/m
*Between 13-14: Along 4.5m length *Between 10-11: Along 4.5m length
FRAME B: (2B-1) (2B-1)
𝐿𝐿1 = 4.50 + 2.80 = 4.05 KN/m 𝐿𝐿1 = 4.5 KN/m
*Between 1-2: Along 4.5m length (2B-
1) *Between 14-15: Along 4.5m length *Between 11-12: Along 4.5m length
𝐿𝐿1 = 1.25 + 2.80 = 4.05 KN/m (2B-1) (2B-1)
𝐿𝐿1 = 4.50 + 2.80 = 4.05 KN/m 𝐿𝐿1 = 4.5 KN/m
*Between 2-3: Along 4.5m length (2B-
1) *Between 15-16: Along 4.5m length *Between 12-13: Along 4.5m length
𝐿𝐿1 = 4.50 + 2.80 = 4.05 KN/m (2B-1) (2B-1)
𝐿𝐿1 = 1.25 + 2.80 = 4.05 KN/m 𝐿𝐿1 = 4.5 KN/m
*Between 3-4: Along 4.5m length (2B-
1) FRAME C: *Between 13-14: Along 4.5m length
𝐿𝐿1 = 4.50 + 2.80 = 4.05 KN/m (2B-1)
*Between 1-2: Along 4.5m length (2B- 𝐿𝐿1 = 4.5 KN/m
*Between 4-5: Along 4.5m length (2B- 1)
1) 𝐿𝐿1 = 3.33 KN/m *Between 14-15: Along 4.5m length
𝐿𝐿1 = 4.50 + 2.80 = 4.05 KN/m (2B-1)
*Between 2-3: Along 4.5m length (2B- 𝐿𝐿1 = 4.5 KN/m
*Between 5-6: Along 4.5m length (2B- 1)
1) 𝐿𝐿1 = 4.5 KN/m *Between 15-16: Along 4.5m length
𝐿𝐿1 = 4.50 + 2.80 = 4.05 KN/m (2B-1)
*Between 3-4: Along 4.5m length (2B- 𝐿𝐿1 = 3.33 KN/m
*Between 6-7: Along 4.5m length (2B- 1)
1) 𝐿𝐿1 = 4.5 KN/m
𝐿𝐿1 = 4.50 + 2.80 = 4.05 KN/m
CHAPTER V – LOAD COMPUTATION AND ANALYSIS || 7

Computation of Live Load for Roof Deck

FRAME 1:
Along 2.5m length (2B-2) FRAME 14:
Along 7m length (2B-2) 𝐿𝐿2 = 2.5 + 2.5 = 5 KN/m
𝐿𝐿1 = 2.4 + 3.99 = 6.39 KN/m Along 7m length (2B-2)
FRAME 8: 𝐿𝐿1 = 5.82 + 5.82 = 11.64 KN/m
Along 2.5m length (2B-2) Along 2.5m length (2B-2)
𝐿𝐿2 = 2.4 + 2.5 = 4.9 KN/m Along 7m length (2B-2) 𝐿𝐿2 = 2.08 KN/m
𝐿𝐿1 = 5.82 + 6.82 = 12.04 KN/m
FRAME 2: FRAME 15:
Along 2.5m length (2B-2)
Along 7m length (2B-2) 𝐿𝐿2 = 2.5 + 2.5 = 5 KN/m Along 7m length (2B-2)
𝐿𝐿1 = 3.99 + 2.13 + 5.82 = 11.94 𝐿𝐿1 = 3.99 + 2.13 + 5.82 = 11.94
KN/m FRAME 9: KN/m

Along 2.5m length (2B-2) Along 7m length (2B-2) Along 2.5m length (2B-2)
𝐿𝐿2 = 2.5 + 2.5 = 5 KN/m 𝐿𝐿1 = 5.82 + 6.82 = 12.04 KN/m 𝐿𝐿2 = 2.5 + 2.5 = 5 KN/m

FRAME 3: Along 2.5m length (2B-2) FRAME 16:


𝐿𝐿2 = 2.5 + 2.5 = 5 KN/m
Along 7m length (2B-2) Along 7m length (2B-2)
𝐿𝐿1 = 5.82 + 5.82 = 11.64 KN/m FRAME 10: 𝐿𝐿1 = 2.4 + 3.99 = 6.39 KN/m

Along 2.5m length (2B-2) Along 7m length (2B-2) Along 2.5m length (2B-2)
𝐿𝐿2 = 2.08 KN/m 𝐿𝐿1 = 5.82 + 5.82 = 11.64 KN/m 𝐿𝐿2 = 2.4 + 2.5 = 4.9 KN/m

FRAME 4: Along 2.5m length (2B-2) FRAME A:


𝐿𝐿2 = 2.5 + 2.5 = 5 KN/m
Along 7m length (2B-2) *Between 1-2: Along 4.5m length (2B-
𝐿𝐿1 = 5.82 + 5.82 = 11.64 KN/m FRAME 11: 1)
𝐿𝐿1 = 3.36 + 2.4 = 5.76 KN/m
Along 2.5m length (2B-2) Along 7m length (2B-2)
𝐿𝐿2 = 2.5 + 2.5 = 5 KN/m 𝐿𝐿1 = 5.82 + 5.82 = 11.64 KN/m *Between 2-3: Along 4.5m length (2B-
1)
FRAME 5: Along 2.5m length (2B-2) 𝐿𝐿1 = 3.36 + 2.4 = 5.76 KN/m
𝐿𝐿2 = 2.5 + 2.5 = 5 KN/m
Along 7m length (2B-2) *Between 3-4: Along 4.5m length (2B-
𝐿𝐿1 = 5.82 + 5.82 = 11.64 KN/m FRAME 12: 1)
𝐿𝐿1 = 3.36 + 2.4 = 5.76 KN/m
Along 7m length (2B-2)
Along 2.5m length (2B-2) 𝐿𝐿1 = 5.82 + 5.82 = 11.64 KN/m *Between 4-5: Along 4.5m length (2B-
𝐿𝐿2 = 2.5 + 2.5 = 5 KN/m 1)
Along 2.5m length (2B-2) 𝐿𝐿1 = 3.36 + 2.4 = 5.76 KN/m
FRAME 6: 𝐿𝐿2 = 2.5 + 2.5 = 5 KN/m
*Between 5-6: Along 4.5m length (2B-
Along 7m length (2B-2) 1)
FRAME 13:
𝐿𝐿1 = 5.82 + 5.82 = 11.64 KN/m 𝐿𝐿1 = 3.36 + 2.4 = 5.76 KN/m
*Between 6-7: Along 4.5m length (2B-
Along 7m length (2B-2)
Along 2.5m length (2B-2) 1)
𝐿𝐿1 = 5.82 + 5.82 = 11.64 KN/m
𝐿𝐿2 = 2.5 + 2.5 = 5 KN/m 𝐿𝐿1 = 3.36 + 2.4 = 5.76 KN/m
Along 2.5m length (2B-2)
*Between 7-8: Along 4.5m length (2B-
FRAME 7: 𝐿𝐿2 = 2.5 + 2.5 = 5 KN/m
1)
𝐿𝐿1 = 3.36 + 2.4 = 5.76 KN/m
Along 7m length (2B-2)
𝐿𝐿1 = 5.82 + 5.82 = 11.64 KN/m
CHAPTER V – LOAD COMPUTATION AND ANALYSIS || 8
*Between 8-9: Along 4.5m length (2B- *Between 3-4: Along 4.5m length (2B-
1) *Between 6-7: Along 4.5m length (2B- 1)
𝐿𝐿1 = 3.44 + 2.4 = 5.84 KN/m 1) 𝐿𝐿1 = 2.4 + 4.5 = 6.9 KN/m
𝐿𝐿1 = 4.50 + 3.36 = 7.86 KN/m
*Between 9-10: Along 4.5m length *Between 4-5: Along 4.5m length (2B-
(2B-1) *Between 7-8: Along 4.5m length (2B- 1)
𝐿𝐿1 = 3.36 + 2.4 = 5.76 KN/m 1) 𝐿𝐿1 = 2.4 + 4.5 = 6.9 KN/m
𝐿𝐿1 = 4.50 + 3.36 = 7.86 KN/m
*Between 10-11: Along 4.5m length *Between 5-6: Along 4.5m length (2B-
(2B-1) *Between 8-9: Along 5m length (2B-1) 1)
𝐿𝐿1 = 3.36 + 2.4 = 5.76 KN/m 𝐿𝐿1 = 5 + 3.44 = 8.44 KN/m 𝐿𝐿1 = 2.4 + 4.5 = 6.9 KN/m

*Between 11-12: Along 4.5m length *Between 9-10: Along 4.5m length *Between 6-7: Along 4.5m length (2B-
(2B-1) (2B-1) 1)
𝐿𝐿1 = 3.36 + 2.4 = 5.76 KN/m 𝐿𝐿1 = 4.50 + 3.36 = 7.86 KN/m 𝐿𝐿1 = 2.4 + 4.5 = 6.9 KN/m

*Between 12-13: Along 4.5m length *Between 10-11: Along 4.5m length *Between 7-8: Along 4.5m length (2B-
(2B-1) (2B-1) 1)
𝐿𝐿1 = 3.36 + 2.4 = 5.76 KN/m 𝐿𝐿1 = 4.50 + 3.36 = 7.86 KN/m 𝐿𝐿1 = 2.4 + 4.5 = 6.9 KN/m

*Between 13-14: Along 4.5m length *Between 11-12: Along 4.5m length
(2B-1) (2B-1)
𝐿𝐿1 = 3.36 + 2.4 = 5.76 KN/m 𝐿𝐿1 = 4.50 + 3.36 = 7.86 KN/m *Between 8-9: Along 5m length (2B-1)
𝐿𝐿1 = 2.4 + 5 = 7.4 KN/m
*Between 14-15: Along 4.5m length *Between 12-13: Along 4.5m length
(2B-1) (2B-1) *Between 9-10: Along 4.5m length
𝐿𝐿1 = 3.36 + 2.4 = 5.76 KN/m 𝐿𝐿1 = 4.50 + 3.36 = 7.86 KN/m (2B-1)
𝐿𝐿1 = 2.4 + 4.5 = 6.9 KN/m
*Between 15-16: Along 4.5m length
(2B-1) *Between 13-14: Along 4.5m length *Between 10-11: Along 4.5m length
𝐿𝐿1 = 3.36 + 2.4 = 5.76 KN/m (2B-1) (2B-1)
𝐿𝐿1 = 4.50 + 3.36 = 7.86 KN/m 𝐿𝐿1 = 2.4 + 4.5 = 6.9 KN/m
FRAME B:
*Between 14-15: Along 4.5m length *Between 11-12: Along 4.5m length
*Between 1-2: Along 4.5m length (2B- (2B-1) (2B-1)
1) 𝐿𝐿1 = 4.50 + 3.36 = 7.86 KN/m 𝐿𝐿1 = 2.4 + 4.5 = 6.9 KN/m
𝐿𝐿1 = 1.5 + 3.36 = 4.86 KN/m
*Between 2-3: Along 4.5m length (2B- *Between 15-16: Along 4.5m length *Between 12-13: Along 4.5m length
1) (2B-1) (2B-1)
𝐿𝐿1 = 4.50 + 3.36 = 7.86 KN/m 𝐿𝐿1 = 1.5 + 3.36 = 4.86 KN/m 𝐿𝐿1 = 2.4 + 4.5 = 6.9 KN/m

*Between 3-4: Along 4.5m length (2B- FRAME C: *Between 13-14: Along 4.5m length
1) (2B-1)
𝐿𝐿1 = 4.50 + 3.36 = 7.86 KN/m *Between 1-2: Along 4.5m length (2B- 𝐿𝐿1 = 2.4 + 4.5 = 6.9 KN/m
1)
*Between 4-5: Along 4.5m length (2B- 𝐿𝐿1 = 2.4 + 3.2 = 5.6 KN/m *Between 14-15: Along 4.5m length
1) (2B-1)
𝐿𝐿1 = 4.50 + 3.36 = 7.86 KN/m *Between 2-3: Along 4.5m length (2B- 𝐿𝐿1 = 2.4 + 4.5 = 6.9 KN/m
1)
*Between 5-6: Along 4.5m length (2B- 𝐿𝐿1 = 2.4 + 4.5 = 6.9 KN/m *Between 15-16: Along 4.5m length
1) (2B-1)
𝐿𝐿1 = 4.50 + 3.36 = 7.86 KN/m 𝐿𝐿1 = 2.4 + 3.2 = 5.6 KN/m
CHAPTER V – LOAD COMPUTATION AND ANALYSIS || 9

Approximate Analysis for Live Load

FRAME A FRAME B
BEAM MAXIMUM MOMENTS MAXIMUM BEAM MAXIMUM MOMENTS MAXIMUM
NO. NEGATIVE POSITIVE SHEAR NO. NEGATIVE POSITIVE SHEAR
1 -5.25 9.33 12.96 1 -4.43 7.87 10.94
2 -5.25 9.33 12.96 2 -7.16 12.73 17.69
3 -5.25 9.33 12.96 3 -7.16 12.73 17.69
4 -5.25 9.33 12.96 4 -7.16 12.73 17.69
5 -5.25 9.33 12.96 5 -7.16 12.73 17.69
6 -5.25 9.33 12.96 6 -7.16 12.73 17.69
7 -5.25 9.33 12.96 7 -7.16 12.73 17.69
8 -6.57 11.68 14.60 8 -9.50 16.88 21.10
9 -5.25 9.33 12.96 9 -7.16 12.73 17.69
10 -5.25 9.33 12.96 10 -7.16 12.73 17.69
11 -5.25 9.33 12.96 11 -7.16 12.73 17.69
12 -5.25 9.33 12.96 12 -7.16 12.73 17.69
13 -5.25 9.33 12.96 13 -7.16 12.73 17.69
14 -5.25 9.33 12.96 14 -7.16 12.73 17.69
15 -5.25 9.33 12.96 15 -7.16 12.73 17.69
16 -2.55 4.54 6.30 16 -6.65 11.83 16.43
17 -2.55 4.54 6.30 17 -6.65 11.83 16.43
18 -2.55 4.54 6.30 18 -6.65 11.83 16.43
19 -2.55 4.54 6.30 19 -6.65 11.83 16.43
20 -2.55 4.54 6.30 20 -6.65 11.83 16.43
21 -2.55 4.54 6.30 21 -6.65 11.83 16.43
22 -2.55 4.54 6.30 22 -6.65 11.83 16.43
23 -3.22 5.72 7.15 23 -3.22 5.72 7.15
24 -2.55 4.54 6.30 24 -6.65 11.83 16.43
25 -2.55 4.54 6.30 25 -6.65 11.83 16.43
26 -2.55 4.54 6.30 26 -6.65 11.83 16.43
27 -2.55 4.54 6.30 27 -6.65 11.83 16.43
28 -2.55 4.54 6.30 28 -6.65 11.83 16.43
29 -2.55 4.54 6.30 29 -6.65 11.83 16.43
30 -2.55 4.54 6.30 30 -6.65 11.83 16.43
CHAPTER V – LOAD COMPUTATION AND ANALYSIS || 10

FRAME C FRAME 1
BEAM MAXIMUM MOMENTS MAXIMUM BEAM MAXIMUM MOMENTS MAXIMUM
NO. NEGATIVE POSITIVE SHEAR NO. NEGATIVE POSITIVE SHEAR
1 -5.10 9.07 12.60 1 -18.79 33.40 29.82
2 -6.29 11.18 15.53 2 -1.38 2.45 6.13
3 -6.29 11.18 15.53 3 -9.81 17.44 15.58
4 -6.29 11.18 15.53 4 -0.59 1.04 2.60
5 -6.29 11.18 15.53
6 -6.29 11.18 15.53 FRAME 2
7 -6.29 11.18 15.53 BEAM MAXIMUM MOMENTS MAXIMUM
8 -7.76 13.80 17.25 NO. NEGATIVE POSITIVE SHEAR
9 -6.29 11.18 15.53 1 -26.33 46.80 41.79
10 -6.29 11.18 15.53 2 -1.41 2.50 6.25
11 -6.29 11.18 15.53 3 -22.65 40.26 35.95
12 -6.29 11.18 15.53 4 -1.17 2.08 5.20
13 -6.29 11.18 15.53
14 -6.29 11.18 15.53 FRAME 3
15 -5.10 9.07 12.60 BEAM MAXIMUM MOMENTS MAXIMUM
16 -4.10 7.29 10.13 NO. NEGATIVE POSITIVE SHEAR
17 -4.10 7.29 10.13 1 -26.33 46.80 41.79
18 -4.10 7.29 10.13 2 -1.41 2.50 6.25
19 -4.10 7.29 10.13 3 -25.67 45.63 40.74
20 -4.10 7.29 10.13 4 -1.17 2.08 5.20
21 -4.10 7.29 10.13
22 -4.10 7.29 10.13 FRAME 4
23 -3.22 5.72 7.15 BEAM MAXIMUM MOMENTS MAXIMUM
24 -4.10 7.29 10.13 NO. NEGATIVE POSITIVE SHEAR
25 -4.10 7.29 10.13 1 -26.33 46.80 41.79
26 -4.10 7.29 10.13 2 -1.41 2.50 6.25
27 -4.10 7.29 10.13 3 -25.67 45.63 40.74
28 -4.10 7.29 10.13 4 -1.17 2.08 5.20
29 -4.10 7.29 10.13
30 -4.10 7.29 10.13 FRAME 5
BEAM MAXIMUM MOMENTS MAXIMUM
NO. NEGATIVE POSITIVE SHEAR
1 -26.33 46.80 41.79
2 -1.41 2.50 6.25
3 -25.67 45.63 40.74
4 -1.17 2.08 5.20
CHAPTER V – LOAD COMPUTATION AND ANALYSIS || 11

FRAME 6 FRAME 11
BEAM MAXIMUM MOMENTS MAXIMUM BEAM MAXIMUM MOMENTS MAXIMUM
NO. NEGATIVE POSITIVE SHEAR NO. NEGATIVE POSITIVE SHEAR
1 -26.33 46.80 41.79 1 -26.33 46.80 41.79
2 -1.41 2.50 6.25 2 -1.41 2.50 6.25
3 -25.67 45.63 40.74 3 -25.67 45.63 40.74
4 -1.17 2.08 5.20 4 -1.17 2.08 5.20

FRAME 7 FRAME 12
BEAM MAXIMUM MOMENTS MAXIMUM BEAM MAXIMUM MOMENTS MAXIMUM
NO. NEGATIVE POSITIVE SHEAR NO. NEGATIVE POSITIVE SHEAR
1 -26.33 46.80 41.79 1 -26.33 46.80 41.79
2 -1.41 2.50 6.25 2 -1.41 2.50 6.25
3 -25.67 45.63 40.74 3 -25.67 45.63 40.74
4 -1.17 2.08 5.20 4 -1.17 2.08 5.20

FRAME 8 FRAME 13
BEAM MAXIMUM MOMENTS MAXIMUM BEAM MAXIMUM MOMENTS MAXIMUM
NO. NEGATIVE POSITIVE SHEAR NO. NEGATIVE POSITIVE SHEAR
1 -26.55 47.20 42.14 1 -26.33 46.80 41.79
2 -1.41 2.50 6.25 2 -1.41 2.50 6.25
3 -12.83 22.81 20.37 3 -25.67 45.63 40.74
4 -1.17 2.08 5.20 4 -1.17 2.08 5.20

FRAME 9 FRAME 14
BEAM MAXIMUM MOMENTS MAXIMUM BEAM MAXIMUM MOMENTS MAXIMUM
NO. NEGATIVE POSITIVE SHEAR NO. NEGATIVE POSITIVE SHEAR
1 -26.55 47.20 42.14 1 -26.33 46.80 41.79
2 -1.41 2.50 6.25 2 -1.41 2.50 6.25
3 -12.83 22.81 20.37 3 -25.67 45.63 40.74
4 -1.17 2.08 5.20 4 -1.17 2.08 5.20

FRAME 10 FRAME 15
BEAM MAXIMUM MOMENTS MAXIMUM BEAM MAXIMUM MOMENTS MAXIMUM
NO. NEGATIVE POSITIVE SHEAR NO. NEGATIVE POSITIVE SHEAR
1 -26.33 46.80 41.79 1 -26.33 46.80 41.79
2 -1.41 2.50 6.25 2 -1.41 2.50 6.25
3 -25.67 45.63 40.74 3 -25.67 45.63 40.74
4 -1.17 2.08 5.20 4 -1.17 2.08 5.20
CHAPTER V – LOAD COMPUTATION AND ANALYSIS || 12

FRAME 16
BEAM MAXIMUM MOMENTS MAXIMUM
NO. NEGATIVE POSITIVE SHEAR
1 -18.79 33.40 29.82
2 -1.38 2.45 6.13
3 -9.81 17.44 15.58
4 -0.59 1.04 2.60
CHAPTER V – LOAD COMPUTATION AND ANALYSIS || 13

Structural Analysis Software - Aided Computation for Live Load