1.

All project documents as built documentation indicating as-built information – stamped

by Al AALI at least.

2. Schematic drawing for Fresh air handling units distribution.

3. Photo of Garbage chute extraction roof fan.

4. Traverse AHUS testing results

5. BMS system different elements approved material submittals with attachments.

6. Stamped Ashghal Approval.

7. Stamped and Approved As built dwg for the 3 filtration stage system before sump pit.

8. Stamped and Approved As built drawing for the kitchen drain showing the grease

intercept.

9. Project manhole to Ashghal Manhole connection detail.

10. Stamped and Approved As built Fire Alarm drawing information for BMS

11. Stamped and Approved As built site plan drawing

12. Waterproofing approved report and inspection for the roof.

13. Approved material submittal for diffusers and grills with attachments.

14. Indoor Carpet Adhesive Approved material Submittal and attachments.

15. Different wall paints approved material submittal with attachments.

16. Different Ceiling paint approved material submittal with attachments.

17. BMS building specific Panel Module (Photo from inside the panel, to show the module)

18. Stamped and Approved As built MEP package and ensure all drawings has the reference

number; corresponding to the final architectural drawing.

19. Lift station – Oil interceptor, Silt collection, break chamber photos