1. 1210079 VALVE,DBB&C,1.13/16IN,10000LB,DBCODJ10AB = 2 PC
2. 1148882 FLANGE,RTJ,8IN,BLIND,2500LB,F65,BLACK = 1 PC
3. 1123416 GASKET,RTJ,1.13/16IN,10000LB,OCT,SS,316,BX151 = 8 PC è Meindo stock (282 ea)
4. 1183880 GASKET,RTJ,8IN,2500LB,OCT,ZINC,R51D = 6 PC
5. 1153560 GASKET,RTJ,8IN,2500LB,OCT,SS,316L,R51 = 2 PC
6. 1106016 GASKET,FLAT,2IN,150LB,RF,2MMTHK,NONASB = 1 PC
7. 1117155 BOLT,STUD,5/8X90MM,ZNBIC,B7&2H = 16 PC
8. 1132540 NIPPLE,PIPE,1.5X6IN,XXS,SMLS,PBE,X65, = 2 PC
9. 1130173 ELBOW,90D,0.75IN,6000LB,SW,A105,BLACK = 1 PC
10. 1132607 NIPPLE,CONC,0.75X0.5IN,XXS,PBE,A105,BLACK = 1 PC
11. COUPLING,FULL,3/4IN,6000LB,SW,A105,CS = 2 PC à Meindo stock (3 ea) è actual
dipakai N/A dipakai HDL
12. 1132204 PLUG,HEX,0.75IN,6000LB,THR,A105,BLACK = 2 PC
13. FITTING,ACC,8-10IN,HOLLOW,SS,0.5,TEE,NUT = 2 PC
14. BOLT,MACHINE, M12 X 50MM,ZNBIC,NUT&WASH = 8 PC
15. BOLT,MACHINE, M12 X 75MM,ZNBIC,NUT&WASH = 6 PC
16. BOLT,MACHINE, M16 X 75MM,ZNBIC,NUT&WASH = 18 PC
17. BOLT,MACHINE, M12 X 100MM,ZNBIC,NUT&WASH = 16 PC
18. 1117170 BOLT,STUD,3/4X4.1/2IN,ZNBIC,B7&2H = 32 PC
19. 1117153 BOLT,STUD,1/2X2.1/2IN,ZNBIC,B7&2H = 8 PC à Meindo Stock (148 ea)
20. 1160169 PLATE,STEEL,19MMTHK,1.2X2.4M,S355 = 1 SHEET
21. PLATE,STEEL,16MMTHK,1.2X2.4MM,S235 = 1 SHEET
22. 1130109 PLATE,STEEL,12MMTHK,1.2X2.4MM,S235 = 1 SHEET
http://mail1.kaliraya.co.id:3000/WorldClient.dll?Session=EKHPRNH...
WBS No.
Regards,
Son Ha
3916
Mas Wahyu,
Terima kasih
slamet
Pak Son,
Terima Kasih,
WPS
CST/OPT
Pak Wahyu,
M Anwar Septiadi
WAREHOUSE DIVISION
Office 0541 691751 Ext 143
On Mon, Apr 23, 2018 at 10:07 AM, Wahyu PRIYO <wahyu.priyo@mitrakerja.pertamina.com> wrote:
Pak Anwar,
Mohon bisa dicantumkan Reservasinya pula untuk Material yg masih N/A (zero), biar kita tahu mana yang sudah direservasikan tp belum datang dan mana yang belum
direservasikan
Salam
WPS
CST/OPT
Pak Wahyu,
Mohon bantuannya untuk material TM 128/129 yang belum datang mauupun belum di rilis,
M Anwar Septiadi
WAREHOUSE DIVISION
Office 0541 691751 Ext 143
On Thu, Apr 12, 2018 at 7:40 AM, Wahyu PRIYO <wahyu.priyo@mitrakerja.pertamina.com> wrote:
Monggo
http://mail1.kaliraya.co.id:3000/WorldClient.dll?Session=EKHPRNH...
http://mail1.kaliraya.co.id:3000/WorldClient.dll?Session=EKHPRNH...
http://mail1.kaliraya.co.id:3000/WorldClient.dll?Session=EKHPRNH...
http://mail1.kaliraya.co.id:3000/WorldClient.dll?Session=EKHPRNH...
http://mail1.kaliraya.co.id:3000/WorldClient.dll?Session=EKHPRNH...
http://mail1.kaliraya.co.id:3000/WorldClient.dll?Session=EKHPRNH...
To: Rudy ISMAN; Zulkifli ZULKIFLI; Sukman ANWAR; Madyo SATRIYO; Heru SUPRAYOGI; Muhammad LULY
Cc: Definal DEFINAL; Widijani BAHRAH; Sonhaji SONHAJI; I-Made SUARTA; Gulam PRIANGGONO; Warno HANDRE; Warno HANDRE; Suwarto SUWARTO; Chairudin
CHAIRUDIN; Teguh PRIYANTO; Luqman LUQMAN; Suparnno SUPARNNO
Subject: RE: Yani Planning - TM-128/129, Release reservasi .. Urgent !!
Mohon bantuannya untuk bisa diepeed-up material2 kami dari 4 Reservasi di bawah
- Mohon dipostingkan & preparednya Reservasi material Well con,TM-128/129 di bawah ini
- No. 31159279
- No. 31159283
Mohon bisa diplaningkan pengiriman material kami dari Reservasi diatas ke PT. KRS Handil.
Terima Kasih
Warno-6234
Sumonggo,
gp
http://mail1.kaliraya.co.id:3000/WorldClient.dll?Session=EKHPRNH...
Pak Gulam,
- No. 31159279
- No. 31159283
- No. 31159280
- No. 31159303
Terima kasih
Warno-6234
Pak Siswo, maaf pak, reservasi no. 31159174 saya “CANCEL” dan diganti dengan reservasi reservasi dibawah ini.
http://mail1.kaliraya.co.id:3000/WorldClient.dll?Session=EKHPRNH...
- No. 31159279
- No. 31159283
- No. 31159280
- No. 31159303
Ani Bahrah
Terlampir material yang belum di reserve (dikotak merah), mohon bantú reservasi/cari surplus ya.
WBS : 18MHK3C0132003
Terima Kasih
Salam
Rhidiyan WAROKO
ECP/SVC/MAT
3584
Pak Siswo,
http://mail1.kaliraya.co.id:3000/WorldClient.dll?Session=EKHPRNH...
Terima Kasih
Salam
Rhidiyan WAROKO
ECP/SVC/MAT
3584
Pak Cahyo,
Terima kasih
Wr-6234
Mohon di cek material surplus, dan mohon infonya material mana yang perlu di reservasi.
Terima Kasih
Salam
http://mail1.kaliraya.co.id:3000/WorldClient.dll?Session=EKHPRNH...
Rhidiyan WAROKO
ECP/SVC/MAT
3584
Rhidiyan,
Karena Pak Son sdg mission, minta tlg dibuatkan reservasi material piping & structure TM-128/129 ke KRS.
Mas Malucky,
Material instrumentasinya.
Thanks.
Regards,
Bani
Pak Sonhaji,
As informed below, kindly to prepare material reservation for well connection at TM-128/129.
Regards,
Charles Pangaribuan
Bang Charles,
TM-128/129 sudah confirm untuk dilanjutkan pemborannya. Mohon untuk menyiapkan wellconnectionnya.
Terimakasih
Salam,
http://mail1.kaliraya.co.id:3000/WorldClient.dll?Session=EKHPRNH...
Andy ANARTA
EKD/DP/OPL
Gents,
We can remove the pre-dredge survey as last survey has been done yesterday 4th April
Also we need the Crane barge to be on rig location at latest 7th April AFTERNOON +/- 18H00 as rig at optimistic
case lookahead ops – I will update again tomorrow 6TH Aprilmidday for rig timing move out
There is big possibility anchoring will be at night time, derogation will be issue for this matters tomorrow.
Regards,
Boby W. Hendarno
Dear all,
- Dredging by using 4 hopper barges : 4hrs/hopper with 1 hr interval between hopper barge : 20 hrs
- De-anchoring : 2 hrs
http://mail1.kaliraya.co.id:3000/WorldClient.dll?Session=EKHPRNH...
Some notes :
- CB. ASL 82 will be demobilized from HLB 260 on Saturday 07/04 and arrive at Tambora on Sunday
morning 08/04 (09.00am)
Best Regards,
SP
Dan juga jumlah hopper barge cukup untuk dredging sampai 2.6 - 2.7 meter CD
Regards,
Boby W. Hendarno
Selamat pagi,
- Agar dipastikan sebelumnya bahwa pekerjaan leveling TM-128/129 tdk lebih dari 24 jam
- Apabila confirmed pekerjaan leveling tdk lebih dari 24 jam, EVP setuju dng rekomendasi opsi 1 (move to
TM128/129)
http://mail1.kaliraya.co.id:3000/WorldClient.dll?Session=EKHPRNH...
Usulan ini sedang dibahas dalam weekly steercom dan keputusannya akan saya informasikan segera.
Bang Armenda,
Sambil menunggu keputusan management, mohon untuk mempersiapkan barge untuk leveling di TM-128/129 untuk siap
bekerja di tgl 7/4, Sebelumnya kita sudah menyiapkan ASL-82 yang saat ini sedang dredging di H-LB-260.
Salam,
Andy ANARTA
EKD/DP/OPL
Mas Andy,
If we can have a short and effective leveling job as we had in TN-Q74 case (total 18 hours rig floating to give
space for crane barge operation), we prefer to go with option 1.
This option will also let us clustering the other Ix wells in November 2018 (Ix404 & Ix418).
However, we let you assess the shortfall and other economical parameters to set the final decision.
Looking forward ASAP the decision to allow us set up the rig move plan.
Regards,
Hanifan
Bapak2,
Terkait hasil sounding seabed di samping rig Yani, kami pastikan kami perlu leveling job.
Requirement-nya adalah untuk punya sea bed yang rata dengan maksimum perbedaan tidak lebih dari 20 cm di tempat
rig akan duduk.
Berdasarkan lookahead rig schedule, perkiraan rig selesai deballast adalah tanggal 8 april jam 6 pagi.
Ekpektasi dari kami adalah, seperti case Maera di TN-Q74 kemarin, crane barge untuk leveling sudah ada di
lokasi saat kami selesai deballasting pagi hari tanggal 8 april.
Pak Boby, superintenden Yani, akan mengupdate schedule rig jika memang diperlukan.
Regards,
Hanifan
***** This message may contain confidential and/or privileged information. If you are not the addressee or
authorized to receive this for the addressee, you must not use, copy, disclose or take any action based on this
message or any information herein. If you have received this communication in error, please notify us
immediately by responding to this email and then delete it from your system. PT Pertamina (Persero) is neither
liable for the proper and complete transmission of the information contained in this communication nor for any
delay in its receipt. *****
***** This message may contain confidential and/or privileged information. If you are not the addressee or
authorized to receive this for the addressee, you must not use, copy, disclose or take any action based on this
message or any information herein. If you have received this communication in error, please notify us
immediately by responding to this email and then delete it from your system. PT Pertamina (Persero) is neither
liable for the proper and complete transmission of the information contained in this communication nor for any
delay in its receipt. *****
Attachments: