SAT PROCEDURE
INTECH
PROCESS AUTOMATION
Project Tle: San Alba Gomprossion Facity- OSS
INTECH Prfect Gode E-160311
Customer Project #
Customer: Exoran
End User Pavobras End User Project ==
‘Superseded By Superseded By
Ret ET-80017 SAT Reve? ‘Date 10-00-2015,
2. HARDWARE SAT PROCEDURE
‘This section oullines the procedures for verification of all the components of the all the panels, The
purpose of this testis to verify the equipment quantity, construction, installation and wiring of cabinets.
Fhe cabinets wil be inspected against the Cabinet IFC drawings and other specification documents,
2.1. DRAWINGS HIGHLIGHTING PROCEDURE
fi reterene documents and drawings use fer epecton veteton will be highlighted / redlined as
low:
+ Forall verified items, the relevant part of the drawing will be highlighted in non-fluorescent ‘Yellow’
color.
It any tern is required to be deleted from the drawing, It will be highlighted in ‘Green’ color
Ifany item is correct in the drawing, but the installation / supply is net correct, the drawing will be
Fighlighted in ‘Red’ color. Any comments will be noted with ‘Blue’ pen. This willbe @ punch list item
tobe fixed in the installation or supplied equipment.
For all items that are correctly installed but the drawing is found to be incorrect, the relevant part of
the drawing will be circled with ‘Red’ pen and correction will be made on the drawing with ‘Red’ pen
(Cedlining). Later, the drawings will be updated to reflect the ‘As-bull version.
2.2. PCS PANEL - SAL UNIT (PCS-001)
2.2.1. MECHANICAL CONDITION OF THE PANEL
SAL-PCS-001 Panel and its associated hardware will be visually inspected for proper installation. The
Cabinet will be inspected against cabinet drawings and the mechanical inspection checklist will be
‘completed for the SAL-PCS-001 Panel.
SAL-PCS-001 Panel will be verified for the folowing checklist:
Sr. | Inspection/Test Item Dotalle/Rosults Verified By/Date
Overall Cabinet Body
Exteriors free from signs of damage
Interior is free from signs of damageSAT PROCEDURE INTECH
PROCESS AUTOMATION
‘rj Tae“ San Norio Compression Facty 1055 INTEGH Project Code ET 180011
| Custer Exeron CunonerPeject#:-
End User Paobras End Une Prleet#:—
Soperedea By: ‘Sopenaded By
Ref ET-As031T SAT Roe? ‘Date 105862578
‘Sr.# | Inspection/Test Item Detalis/Results: ‘Verified By/Date:
2 | Cabinet Doors
‘Quantity OK
Location 0
Hold open y%
3 | Back Pant
‘Quantity «
Mounting location
‘Table 5: SAL-PCS-001 Panel Mechanical inspection Checklist
Suny | Sameer conor thn)
EI Gabpwle treser, Abol aya on ke poste leaal
artic codon
Aaa conchae ADinillo oma {rf be (Uk
[Rokerto Cawvasco Tale ghse As Boil en purde de salurvle
WTEC
Approved {Approved with comments,
Ader sex venitiobo,
Uierot, caus!
ee
Al CN Floves “young, LOS CHERNTAAS DE ESTE
Titaseoms: QOUHENTO SEERY VERIACADDS EN
PUNCH LIST.
rau cmen G. Wt
asic
razrSAT PROCEDURE INTECH
PROCESS AUTONATION
Piejct To Sen Abario Compression Facity CSS INTEGH Project Code ET-16031t
[esmwetare a Searet =
End User Pavobras
‘Superseded 8y
Ref: ET-160511-5AT Date 10-Dec-2015
2.2.2. BOM & LAYOUT VERIFICATION
‘The purpose of this verification is fo ensure that all the items are suppiied and installed as per design
drawings.
‘The panel layout and BOM will be verified against the corresponding external and internal layout
drawings, Drawings shall be marked as per procedure above. All marked drawings shall be signed and
attached to this SAT procedure.
Before inspection, ensure the incoming supply is
disconnected and all devices are powered off.
To avoid equipment Gamage, care must be taken
while handling the control system equipment to
avoid electrostatic discharge,
SAL-PCS-001 Panel will be verified forthe following checklist
‘Sr.# | Inspection/Test Item Detalts/Resutts: - Verified By/Date
+ | External Layout OK
2 | BoM External OK
3 | Internal Layout oK -
4 | BOM dintemal “| Ok :
“Table 6: SAL-PCS-001 Panel OM and Layout Verification| SAT PROCEDURE
ITECH
PROCESS AUTOMATION
[ Project Tite : San Alberto Compression Facilty-ICSS
INTER Projet Gode ET-160511
‘Gusto: Exteran
End Ver: Pecos
‘Siperecea By
Ref: ET160941-9AT Date foDee018
Spodey | umes commana Ar
— Adkualigas cad mares an Planoy
\ PcS-cot-404
Taerto Comasco
\WTECH
C Approved 1H Approved with comments ‘ito be
Vero cram! FE
200SAT PROCEDURE
INTECH’
PROCESS AUTOMATION
re Th Sn Abra Caprowtion Fasty 1685 WWIEGH Popa Cade ET. 160TH -
‘Customer : Exterran ‘Cupiomer Project #:-
Ee Une Feces Eee Ur Pea
Sunernse Oy= [Sines y :- -
fel: ET-S0011SAT Reva? ae: 1.82016
2.2.3. EQUIPMENT & PANEL GROUNDING
Verify thatthe grounding of pane is appropriate and as per required standarcs,
SAL-PCS-001 Panel wil be verified for the folowing checklist:
‘Sr. | Inspection/Test itor Detalle/Reaults: Verified By/Date
fa ‘Verify proper around! wiring Tor field
+ | leeSaely and insirument [etumenta on perpowerandiorwring oc
drawings.
Verify that all cabinet metal parts are
2 | Cabinet bonding properly bonded to the safety ground (panel, |i.
ub panels, door, etc)
Table 7: SAL-PCS-001 Panel Grounding Verification
Chocks: Witnessed
cacy | Mena commana (tan
PES soars ators chasis de
AP tacks,
ert Carrasco
UoTECH
C1 Approved LL Approved with comments:
w
‘Flows
nn 0 Oo
Ab
erSAT PROCEDURE
INTECH
PROCESS AUTOMATION
Project Ta San Alberto Compression Fesly 1055 INTEGH Proje Cove E-160371
Customer Exterian ‘Customer Project #:-
End User Pevobas _ End User Project
‘Swersededby- —=~S*~*~CS~S”S*#d*S 8 -
Ref €T-(9001 SAT Reve? Date 10-D062015
2.2.4. POWER DISTRIBUTION WIRING
“This activity wil include checking and verification of power distribution wiring ofthe cabinet
Before proceeding with this activity
Incoming power is de-energized.
ensure that
sr. | activites Verified ByiDate
Power Source
1 ‘With reference to Power Distribution, ET-150311-SAL-PCS-001-200 check Ole
that correct rated power source ls provided to the cabinet.
Wiring Connections
CCheck that power astibuton wing is connected at the incoming breaker
2 as per Power Distribution ET-150311-SAL-PCS-001-200
Check te continuity of power wires incoming tothe panel wih the help ot | ey
tmult-neter.
3 _| Wiring Color
OK
Check the wiring colors of wires incoming to the panel are acceptable.
4 | Wiring Labets
Check that power wires incoming to the panel are propery labeled. oe
Table & SAL-PCS-00 Panel Power Wiring Check
Checked Witnessed
See eee Conan Ay
7 _ Aapalaat pUNOS PAA as-boale
/ Pinal an PCS co1-200
Reborn Carasto
wre
CO Approved D6 Approved wih comments a To a
Al tess
fac 80 One te loti “GrisSAT PROCEDURE
INTECH
PROCESS AUTOMATION
reject Tide “San Abaro Compression Facity -ICSS_
Customer: Exteran
INTEGH Project Code : ET-150344
{Customer Projet =
[Network functionality willbe checked as
| End User: Pavobres End User Project #:—
Superseded By: _ | Superseded By :- _
Ref: €T-90011 SAT Rez ‘Date: 10-Dee-2015
225, NETWORK INTEGRITY TESTING
per interconnection diagrams ET-150311-SAL-PCS-001-300
Witnessed by
Checked by
Name/Date Name/Dato
‘Comments (If Any)
CColocac tag)
_Ordanar cabnado
_ Aclaligacicu dg plow para
= Tdantificar 24-G2(2)/ENET-F FAC)
~Skiquctads Ag cad tS ETH | FOjC)|
as-lovit Final
Wwrecd - Ubicac emaciores da comvnrcucis.
Hadloos anita d¢ calle canal, coy
mvofla
O Approved! (Approved with comments [To be retested
w" ddve sor tenfeade
_Mlesankes Glows
ra de OTeSAT PROCEDURE
INTECH
PROCESS AUTOMATION
‘Project Tite» San Alberto Compression Faciy -ICSS INTEGH Project Code : ET-160311
‘Customer: Exterran = | Customer Project # - _
End User Patob End User Project =
‘Superseded By = —__| Superseded By = _|
‘Ret #: E1-150811-SAT Rov 2 [[Date:to-Dec2018
2.3. SAL FF LINKING
2.3.1.
‘SAL-PCS-003 Panel and its associated har
Cabinet will be inspected against cabinet
‘completed for the SAL-PCS-003 Panel.
DEVICE PANEL (PCS-003)
MECHANICAL CONDITION OF THE PANEL
rcéware wil be visually inspected for proper installation. The
‘drawings and the mechanical inspection checklist will be
SAL-PCS-003 Panel will be verified for the following checklist:
..# | Inepection/Test item DetaiisiResults Verified ByiDate
4 | Overall Cabinet Body
Exterior is tee fom signe of damage | Ol |
Interiors ree from signs ofdamage | OC
2 | cabinet Doors
‘Quanity OK
Location ae
Hold open of
3 | Back Panet
Quanity OK
Mounting location oO"
‘Table 8 SAL-PCS-008 Panel Mechanical Inspection Checkist
PatSAT PROCEDURE
INTECH
PROCESS AUTOMATION
Project Tite : San Alberto Compression Facity - CSS INTECH Project Code : ET-150311
utr: Baar
ae Porshe
Superseded By :~
Fal EVA6OO SAT DTS
‘iamotoate “Namerbate Semana ete
Falla Wage ad eae canal
TFaller Veapa aw igrsso8e calkes a
Rdeoto Corse pang
WTEC Valle-gise de qpleingte
Approved 8 Approved with comments r
flow
Ae on
myn mestSAT PROCEDURE INTECH
PROCESS AUTOMATION
‘Project Title : San Alberto Comprossion Faciily -ICSS ~~ [INTECH Project Code : ET-150314
Customer: Exieiran anna Customer Project # _
End User : Potrobras [End User Project #:- “|
Sipoeded By: —Fsepornsos8y =
aft ET ASOSIVSAT Reve [Bae boe8
232. BOM & LAYOUT VERIFICATION
“The purpose of this verification is to ensure that all the items are supplied and installed as per design
drawings.
‘The panel layout and BOM will be verified against the corresponding external and internal layout
drawnge, Dravings shall be marked 8s per procedure above. All marked drawings shall be signed and
attached to this SAT procedure.
Before inspection, ensure the incoming supply
disconnected and all devices are powered oft.
9 avoid equipment damage, care must be taken
while handling the control system equipment to
avoid electrostatic discharge,
SAL-PCS.003 Panel will be verted forthe folowing checklist: *
[sr.# | imapectionrTeat item Detalls/Rosuits Verified By/Date
+ | Extemal Layout Ok
2 [BoM externa) OK
3. | intemal Layout OK 1 -
| 4 | BoM cnternat Ok
“Fable 10; SAL-PCS-003 Panel BOM and Layout Verification\ SAT PROCEDURE
INTECH
PROCESS AUTOMATION
Bol?
MRbrorlo Crrac0
Fret Tite San Aborto Compression Fay C38 TWTEGH Proje Cae E0377
Catone Enoran Customer Proc =
End User Poets End ner Propel
Sipoese y= ‘Suparndod BY:=
Fal: €T800TTSAT Revt:2 One: fo-DaSTS
‘Checked by ‘Witnessed by ‘Comments (if Any)
—Aelvalzar glang PCS-003 -001
IWTECH
1 Approved TA. Approved with comments tobe J
all
o
Maelo
Hi
&SAT PROCEDURE INTECH
PROCESS AUTOMATION
reject The : Gan Abero Compression Faciy- GSS TNTEGH Proect Code ET-150811
Cuniomer-Exoran Customer Project #s=
| End User: Povobras End User Projecl@ =
‘Superseded 8y:- Superseded By :~ _
Ret: ET- 160511547 Reve? Date: 10862015, |
2.3.3. EQUIPMENT & PANEL GROUNDING
‘Verity that the grounding of the panel is appropriate and as per required standards,
‘SAL-PCS-003 Panel will be verified for the following checkist:
Sr.# | Inspection/Test tom Detalis/Results: Verified By/Date:
aap azument | VeRiy proper around wiring fr fla
1 [ite Sefer an instument | Tetuments os er powerandrwiing | OK
ravings
Verify tat al cabinet metal pars are
2 | Cabinet bonding properly bonded to the safety ground (panel, | OC
‘sub panels, doors, etc.)
“Table 11: SAL-POS-003 Panel Grounding Verifeation
‘Checked by ‘Witnessed by
Name/Date, ‘NameiDate ‘Comments (W Any)
Reboot Cowras co ‘
(WTECH
Cl Approved Approved with comments Tobe retested
As 6)
A
Jo Gomez Ortiz
Ciera
SkSAT PROCEDURE INTECH
PROCESS AUTOMATION
Project Tle Sen Abaro Compression Faciy-ICSS INTEGH Projed God: ET-150091
‘Customer: Exteran am ~ | Customer Project = -
End User: Povobras End User Project #:~
Superseded By ~~ [Superseded 6y:- |
Ref €T-160317 SAT Reve? [[Date: foDee2018
2.3.4. POWER DISTRIBUTION WIRING
“This activity will include cheoking and verification of power distribution wiring of the cabinet.
Before proceeding with this activity, ensure that
incoming power is de-energized.
Sr, | Activities Verified ByiDate
Power Source
With reference to Power Distribution, ET-150311-SAL-PCS-003-200 check | OX.
that correct rated power source is provided to the cabinet.
Wiring Connections
‘Check that power distribution wiring is connected at the incoming breaker
2 | as per Power Distribution ET-150311-SAL-PCS-003-200
‘Check the continuity of power wires incoming to the panel with the help of | OK
‘multimeter.
3 | Wiring Color
Check the wiring colors of wires incoming to the panel are acceptable. =
| Wiring Labois a
Check that power wires incoming tthe panel ae propel labeled
- “Table 12: SAL-PCS-003 Panel Power Wiring Check
chest, | Wimmer Commnts tan)
fuse VaevAcar qua an glawe PCS-003 -200)
menctone Que existe socket prro
Boratto (rasco no asté instalade
wore Varificar bloguv dv tarmanales TR-
au
CO Approved A Approved with comments [xt0 be rete
= ane i a Pa 9 101
flows
Meare S
8 oOSAT PROCEDURE
INTECH
PROCESS AUTOMATION
Freel Tio Son Aero Canprenen Feit - 1035 INTEGH Poot Gade T2001
‘Customer : Exterran Customer Project # :- _
[End User: Povobas nd User Poet =
‘Superseded By :- ~ | Superseded By :-
Fol ET 16081.SAT ~ Ree. Dale HB D008
2.3.5. NETWORK INTEGRITY TESTING
‘Network functionality will be checked as per interconnection diagrams ET-150311-SAL-PCS-003-300
ciotiy || mart Comment ann
EnColecac lags en cabbla da ved
0 Ethane
o _Colocac idaititicalivo dcheyeda . |
Cavers Carrasco Tos modules Para Mapar Vissa ligidgh
Wren -E€\ Gla Evi ener-FFF(Z4RQ
52(2) to Ss cncucnta an dicho mg
ule. El mismo est CVENETFFG
Cambiar posi@ou
= REBeogiats jastalar Coimas de
[Ridder cen so eadundenca gor cada,
1D Approved! BE Approved with canons
tuscpomaearon
be be
a io)
pagsoar itSAT PROCEDURE INTECH
PROCESS AUTOMATION
Prec Tie San Abra Cargession Fly 15S INTEGH Proj Code ET 182814
Customer Enteran Customer eect: i
End Users Pavobis End User Proje
‘Superseded 69 ‘Supereded By ~
Ret: €T-180917 SAT Rev? [Dae toces2078
2.4. ESD PANEL — SAL UNIT (ESD-001)
2.4.1. MECHANICAL CONDITION OF THE PANEL
‘SAL-ESD-001 Panel and its associated hardware will be visually inspected for proper installation, The
Cabinet will be inspected against cabinet drawings and the mechanical inspection checkist will be
‘completed for the SAL-ESD-001 Panel.
SAL-ESD-001 Panel will be verified forthe following checklist:
r.# | inspection/Test Item Detalls/Results Verified ByiDate
1 | Overall Cabinet Body
Exterior is free from signs of damage | ic
Interior is free from signs of damage |.
2 | Cabinet Doors
Quantity OK
Location ok
Hold open OK
3 | Back Panel
Quantity ok
‘Mounting focation ox
‘Table 13: SAL-ESD-001 Panel Mechanical inspection Checklist) SAT PROCEDURE INTECH
PROCESS AUTOMATION
Project Tie : San Aibeno Compression Facity -ICSS INTECH Project Code : ET-160911
Customer: xara Gusioer Project =
End User Povotras Ed User Project =
| Sureresed By = Superseded By :=
eff: ET-160011 SAT Rev Dots TDeeaOIE
‘Checked by Witnessed by Cemmonts:( Any)
-Recovrar pesiconador da poorta
derecha,
Rdowto Cawasco —Achoaliger plavlo ESD-00f 401
Wwrecd,
CO Approved 2 Approved with comments iro be retested
a
me
gone Pam 8SAT PROCEDURE I NTECH
PROCESS AUTOMATION
Proje! Tie San Abeta Compression Fadi -/O8S INTEGH Project Code" ET-160817
Gustomee Extoran Customer Project =
End User Peto End User Project #
‘Superseded By ~ ‘Supersedes By = 7
Ret €7-160517 SAT —_ Revee ‘ate 10.006.2015, 7
2.4.2. BOM & LAYOUT VERIFICATION
“The purpose of this verification is to ensure that all the items are supplied and installed as per design
drawings.
‘The panel layout and BOM will be veriied against the corresponding external and internal layout
drawings. Drawings shall be marked as per procedure above. All marked drawings shall be signed and
attached to this SAT procedure.
Before Inspection, ensure the Incoming supply is
disconnected and all devices are powered off
To BT UPTO Ga, CTE TTBS EA
[CAUTION | wie rancling the cote! sytem eaubment 0
oval eectrosate escharge
‘SAL-ESD-001 Panel will be verified forthe following checklist
‘Sr.# | Inspection/Test item: Details/Results: Verified By/Date |
+ [external Cayo Ox
2 | Bow cxteman ok
3 _ | intemal Layout [Ok
+ [Bow enema ok
‘Table 14: SAL-ESO-001 Panel BOM and Layout VerificationSAT PROCEDURE
INTECH
PROCESS AUTOMATION
Project TRle : San Alberto Compression Facity -ICSS
INTEGH Project Gode ET-160811
CCosomer Exeran ‘Customer Project
Ed er: Pouches End Uvor Projet
Sparen By = Superseded 8 -
Refs T-180017-AT Revei2 Dai TObse eS
hooked Witnessed by
Nemoroete ‘NamerDate eee
Rdoovto Casrasto
INTECH
TA Approved (C1 Approved with comments U1 To be retested
ger
mee
PueetstrSAT PROCEDURE I NTEC -H
PROCESS AUTOMATION
Projet Tle Sen Aboa Compression Facily- 16S TNTEOH Projet Code ET-150511
Customer: Exaran | eurtomer Project =
User: Pevobras | end User Projet #
Supersedes By [ Superseded By:
ef: €7-150511-SAT Revt 2 Data: To-Dee 2015
2.4.3.
\Verity that the grounding the panel is appropriat
‘SAL-ESD-001 Panel will be verified for the following checkist:
EQUIPMENT & PANEL GROUNDING
1nd as per required standards.
Sr.# | Inspection/Teat Item Dotalle/Rosulte Vorified ByiDate
peiGal inetrum Verily proper ground wiring for fei
1 _ | Field Safety and Instrument | ingtruments as per power andlor wiring ol
‘ground " ke
__| arawings.
Verity that all cabinet metal parts are
2 | cabinet bonding propery bonded tothe safety ground (panel, | Ck.
Sub panels, doors, etc)
Table 18: SAL-ES0-001 Panel Grounding Verication
cheer Mceemaey ‘Comments (if Any)
a —Coloae Sarmocautva( bes an tierras
« |de bavras \afuriorgs
Rdor> Cowrarsco
weed
"Ol Approved 1 Approved wih comments Fito ve tess 7SAT PROCEDURE INTECH
PROCESS AUTOMATION
Projet Tile San Aber ConpresonFoliy -1OSS INTEGH Poel Goda EF 10011
‘Customer Exeran Coster Proje =
End User Pec End User Prope =
Superseded By - Superseded 6y
Ret: ET eG0TT SAT Reva? [Dae Tomes 2016
24.4. POWER DISTRIBUTION WIRING
‘This activity will include checking and verification of power distribution wiring of the cabinet.
Before proceeding with this activity, ensure that
incoming power is de-energized.
Activities Verified ByiDate
Power Source
1 | wun reference to Power Distribution, ET-150311-SAL-ES0-001-200 check | CC
thal corect rated power soures is provided to the cabinet
Wiring Connections
‘Check that power distribution wiring is connected at the incoming breaker
2 | as per Power Distribution £T-180311-SAL-ESD-001-200
lok,
Check the continuity of power wires incoming to the panel withthe help of
ruti-meter
| Wiring Color
loc
Check the wiring colors of wites incoming tothe panel are acceptable,
4 | Wiring Labels le
Check that power wire incoming to the panel are propery labeled.
“Table 16; SAL-ESD-00t Panel Power Wiring Check
Checked by Witnessed by
Name/Dato NameIDate Coreen
ue
Pler'o Canes
yore
Tf Approves Approved with comments Ci Tobe retested
rms ommncron “fit
ec 4 0 OFSAT PROCEDURE INTECH
PROCESS AUTOMATION
it isan Aes Corirntin Fusiy 1688 INTEGH Proje Gado E6377
‘Customer : Exierran ‘Cusiomor Project #:- |
Ed User: Poobas End Une Prost
Supreaed y= Suporeded y=
Fat e301 SAT reve? [Date esas
248, NETWORK INTEGRITY TESTING
Network functionality wil be checked as per interconnection diagrams ET-160311-SAL-ESD-001-300
‘SNametDate WemerDate Commonts (Any)
-Slocat % gutta ag cabia Aged
Lu “lolecat chquates en ets da
” . anveds y Said
Roberto Gauvaseo
WoT
Approves JE Approved with comments J To be rat i
. 4
A
ono
Pa ave otSAT PROCEDURE
INTECH’
PROCESS AUTOMATION
‘Projet Tie “Gan Abarto Compression Facity -1CSS IWTEGH Project Gode ET-16091
‘Gustomer Extoran = Customer Project =
End User: Patobras End User Project =
| Superseded By :- _ ‘Superseded By :-
Ref: ET-S08T1-SAT Rov? Date 10.De6-2015,
2.5.
2.6.1.
ITAU-PCS-002 Panel and its associated hardware wil
‘cabinet will be inepected against cabinet drawings ar
‘completed for the ITAU-PCS-002 Panel,
PCS PANEL — ITAU UNIT (PCS-002)
MECHANICAL CONDITION OF THE PANEL.
be visually inspected for proper installation. The
snd the mechanical Inspection checklist will be
ITAU-PCS-002 Panel will be verified for the following checklist
Sr.# | Inepection/Test tem DetalleReults Verified By/Date
1 | Overalt Cabinet Body
Exterior is free from signs of damage a “|
Interiors free from signs of damage | OIC
2 | Cabinet Doors
Quantity ot
Location ok
Hold open OK
3° | Back Panel 7
Quantity - OK
‘Mounting cation OL
Table 17: ITAU-PCS-002
"anel Mechanical inspection Checklist
Paget 1SAT PROCEDURE
INTECH
PROCESS AUTOMATION
Fre Ts Sn Aor Cones Fatty 108 INTEOH Poe Ga TACO
‘Customer: Extoren Customer Project # :~
Ener: Pabres End Ur Probl
Supneed y= Sipenecta y=
ra 00011387 avez Cais ToDo 2018
‘Checked by Witnessed by Commente'(t'Anyj)
_Linpiaza genara\ da galoiaa les
Rekwlp’ Coneseo Ttelacar panos ac-buills en lad
wreta poutas do Qos qdbinetas Cguncral)
1 Approved A Approved with comments Piro ve
a
PamesatitSAT PROCEDURE INTECH
PROCESS AUTOMATION
Project Tile: San Alberto Compression Facil - GSS [INTECH Projea Code: er-1s0311
Customer Beran _ = | Customor Project iI
End User Pewobras End User Project ==
‘Supersesed By =~ | Supersedes 8y |
Rete ET 18001157 Reve2 [Bate T-Dee 2075
2.5.2 BOM & LAYOUT VERIFICATION
‘The purpose of this verification is to ensure that all the items are supplied and installed as per design
drawings.
‘The panel layout and BOM will be verifies against the corresponding external and internal layout
drawings. Drawings shall be marked as per procedure above. All marked drawings shall be signed and
attached to this SAT procedure.
Before inspection, ensure the incoming supply is
disconnected and all devices are powered off
To avord equipment damage, care must be taken
while handling the control system equipment to
avoid electrostatic discharge.
ITAU-PCS-002 Panel will be verified forthe following checklist:
‘Sr.# | Inspection/Test Item: Details/Results: ¥ Verified By/Date
+ | external Layout ox
2 | BOM (External) 0k
3 Internal Layout of — —
4 | BOM nteray «| OK
Table 18: ITAU:PCS-002 Panel BOM and Layout Verification
ee Pap eoatiet| SAT PROCEDURE
INTECH’
PROCESS AUTOMATION
Project Tila? San Abaio Compression Faciy - ICS
Customer: Extra
End User: PovoDreS
‘Supereeded By:-
efit: €T-160011-SAT Date: 10-000-2016
Checked by
Se uae ‘Commons (if Any)
Boe
TRewalgar plane pare as-builF
Final
Peto Gwrasto Wiige tags da chasis Ly 2 ma
Wwrecd Cordis Visvaligace
OO Approves Ti) Approved with comments Trot
x
Lowe
Peg toonSAT PROCEDURE INTECH
PROCESS AUTOMATION
Project Tie : San Alberto Compression Facility - ICSS ~__[INTECH Project Code = ET-150017
End Pa Ed Ur Project
‘Superseded By = ‘Superseded By
[rata eTis91 SAT ev? “oie obs15
25.3. EQUIPMENT & PANEL GROUNDING
Verify that the grounding of the panel is appropriate and as per required standards.
ITAU-PCS-002 Panel will be verified forthe following checklist:
Sr.# | inapection/Test item Dotalls/Results Verified ByiDato
‘Verify proper ground wiring for field
Fie Stey an nstumert
1 (Fas Teterrorts oper power slr wing
1 | puna connge fe
Weiy ta a cat ral para aa
2 | cebiner bonding vet ede he sey peand (ane, | 1c
patel or ete)
“Table 19; ITAU-PCS-002 Panel Grounding Verification
Nemebets “MamerDete” Comments (Any)
Bae [Nerificar tags dg cardlus de Hem
came Sc sugars coloac Hara de
Roberto Carasco chasis dc les racks
WTEC
1 fepved ~ Eh orc wncormens pote app
B ie
¢ “
hi
FY ae
Moone
mee
specs te v6 ohne
TS (Ata Gite? creSAT PROCEDURE
[ Project Tile : San Alberto Compression Faciity- ISS
Custoree = Exteran
eae
INTECH Proje Code EY-18091"
‘Customer Project #:-
End User Pavobr
‘Supersedea By =~
End User Projet
‘Supereoded By =
Ref: ET-18001-5AT
2.5.4.
Roveiz
[Dae toDeca01s
POWER DISTRIBUTION WIRING
“This activity will include checking and verification of power distribution wiring of the cabinet
Before proceeding with this activity, ensure that
incoming power is de-energized.
Sr. | Activities Verified By/Date
Power Source
1 | with reference to Power Distribution, ET-180311-ITAU-PCS-002-200 check | OK
that correct rated power source (8 provided the cabinet.
‘Wiring Connections
Check that power distribution wiring is connected at the incoming breaker
2 _ | as per Power Distibution ET-150311-ITAU-PCS-002-200, Qe
Ccheck the continuity of power wires incoming to the panel wit the help of
rmultemeter
Wiring Color
2 OK
Check the wiring colors of wites incoming othe panel are acceptable.
| Wiring Labols OK
Check that power wires incoming to the panel are properly labeled |
~ ‘Table 20: [TAU-PCS-002 Panel Power Wiring Check —
reeset) Conon ram)
Sob Corcage tags da UPSD
Cowegie tags da DEPSA
Loot Cawarseo “Coase 48gs an TH- pc) .
wrecd ~ Ayustar boraaras dg alien bauer!
in ETAPS es
SUM
(C1 Approved
~Aclwaliagy Plavio pica aS
a Wier
6 hse vf ai
Protea ot
Y fe
Flows
aeons